HomeMy WebLinkAbout05090077-Sq.Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...) '
o. Sump pump -- Show sump pump pit(s) and discharge line locations
· p, ,Geothermal heat pump discharge locations
NOTE: If land is not within a platted subdivision, a legal description is required.
CARMEL ZONING ORDINANCE Z-289, SECTION 29 04.02 (3): "The D rector shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall br,e issued when the proposed structure, improvement, or use and
its location conform in all respecrm to this ordinance.'
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED, THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
> ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND VVILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMII-FED PLANS ARE NOT OF SUFFICIENT CLARITY OR DE-FAIL, TO INDICATE THE NATURE AND EXTENT
OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, VVILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
> THE OFFICE OFBUILDING & CODE ENFORCEMENT RECOGNIZES ANYROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UN - BL UNFINISHED SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE,~ CONSTRUCTI,O, N PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED,; BONUS ROOM AREA IS TO BECOME A FINISHED AREA ~
ISSU .N E PERMIT THE PLANS AND PERMIT RECORDS MUST BE dPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
> ALL CONSTRUCTZON IS SUB3ECT TO FTELD INSPECTZON,, AND SHOULD NOT BEGTN PRZOR TO THE
~ TSSUANCE OF THE BUILDZNG PERHZT, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
[~l]~lJ INSULATED/COVERED, AND/OR OCcuPIED PR[OR TO THE APPROPR[ATE INSPECT[ON. Beginning pdor to obtaining
~ a building permit and/or proceeding with construction beyond the ~age of a required inspeddon without approval
const~utes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29,06.08.
BUILDING & CODE ENFORCEMENT; CITY OF CARMEL, One Civic sq,; Carmel, IN 4~O52. PJ~. C517) 571-24.44,
I further
~ply
CommL
~tentionally
obscure, or otherwise mislead the Dept. of
'essed therein.
Front
Floor Porch
Unfinished) Sunroom Garages
95?
TOTAL
DATE
S:Permits/FORMS/RESZDENTt-AL PROCEDURES 2 of 2