Loading...
HomeMy WebLinkAbout05090152-Sq. Ft. k, All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pit(s) and discharge line locations p. Geotherm.al heat pump discharge locations '~NOTE: If land is not within a platted subdivision~ a legal description is required, FURTHERNOTES / NOTICES: CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying mater als. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and Ets location conform in all respects to this ordinance.'" [N ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULDINCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/ORDEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAYBE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMII-rED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATUREAND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMII-I'AL OF ADDITIONALLY REQUESTED/RE(~UIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. > THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE ~FINISHED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE I ' ~-N' ' TI E PERMIT THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ~* ALL CONSTRUCTION IS SUB3ECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ~ Z~UANCE OF THE BUILDING PERHI'I'. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED I~J INSULATED/COVERED AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining ~ a building permit and/or prOCeeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06,08. BUILDING ~ CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sq.; Carmel, IN 46052, Ph. (317) 571-2444, Community Services fluxes. Failure to comply Under the penalties of Pedury (Indiana IS otherwise mislead the Dept, of Floor Porch Ft. of unroom Garages ,,2q7 DATE NAME PRINTED S:Permits/FORHS/RESIDENT~L PROCEDURES 2 of 2