Loading...
HomeMy WebLinkAboutApproved Elevations: Outback side & rear 5-28-13 11242MHTBST28 NOV 1221 DEC 20122 MAY 2013 Outback Steakhouse Store # 1513 Carmel, IN SITE PLAN MODIFICATIONS Project Number Elevations A4.1 Checked By MHT Exterior LJD Stone Tower Drawn By Date 12 CONTRACTOR TO SUPPLY REQUIRED POWER AND CONFECTION TO VERIFY SQUARE FOOTAGE REQUIREMENTS PER LOCAL ZONING SIGNAGE SHOWN FOR GENERAL LOCATION ONLY. REFER TO REFER TO FINISH SCHEDULE FOR EXTERIOR FINISHES AND DOWNSPOUT TO UNDERGROUND SEWER SYSTEM. PAINT MODULAR RED BRICK, RUNNING BOND, RECESS IN FROM EIFS EF-1, 4" HORIZONTAL BAND. COLOR TO MATCH P-1. MODULAR RED BRICK, SOLDIER COURSE, BR-1. CORBEL STANDING SEAM METAL ROOF. MR-1. COLOR TO MATCH DUMPSTER ENCLOSURE, WALLS TO MATCH BUILDING, APPROVED SIGN DRAWINGS BY SIGNAGE COMPANY. BRICK COLUMN WITH 6" PRECAST CONCRETE CAP TO ROOF LINE AND MECHANICAL EQUIPMENT BEYOND. PRE-MANUFACTURED CANVAS CANOPY. COLOR TO DOWNSPOUT CONNECT TO UNDERGROUND STORM SPLIT FACE BLOCK, CMU-1, WITH PRECAST WATER PRE-FINISHED METAL COPING. COLOR TO MATCH SEPARATE PERMIT REQUIRED FOR ALL SIGNS. SIGN. COORDINATE WITH SIGN CONTRACTOR. , BR-1. SIGN SUPPLIED AND INSTALLED BY OTHERS. EIFS EF-1, CORNICE. COLOR TO MATCH P-1. A4 SERIES GENERAL NOTES MODULAR RED BRICK, RUNNING BOND TO OVERHANG FIELD BRICK BY 1/2". EIFS EF-1. COLOR TO MATCH P-1. P-1. REFER TO CIVIL DRAWINGS. A4 SERIES KEY NOTES ALUMINUM STOREFRONT SF-1. TOP WITH 6" PRECAST CAP. WATER SYSTEM. PAINT P-1. ORDINANCES AND CODES. EXTERIOR LIGHT FIXTURE. METAL DOOR. PAINT P-1. OVERFLOW SCUPPER. ADJACENT MATERIAL. STONE VENEER. ST-1. FIELD BRICK 1/2". MATCH CMU-1. TABLE CAP. MATCH P-2. COLORS. P-2. 20.21. 10.11.12.13.14.15.16.17.18.19. A.C. D. B.E. 2.3.4.5.6.7.8.9. 1. 1 METAL COPING ABOVE TO BE ATLAS INTERNATIONAL INC "CONCORD OR APPROVED ALTERNATE SANDPEBBLE FINE FINISH NOTES NO SUBSTITUTIONS 2 COATS CREME" 2 8 A1.4 3 5-28-13 15 2615 PLACIDA RD. ENGLEWOOD, FL 3 CONTACT TAZ TILE & MARBLE INC. 3250 WATERVILLE ROAD PHONE: 1.800.99.CEMEX PHONE: 1.800.277.2745 PHONE: 941-473-3730PHONE: 727-804-6122 7 DICK GOSKE MACON, GA 6 1 3 MANUFACTURER 8 ARCHITECTURAL MASONRY SOUTHWEST SHEET METALCHEROKEE BRICK AND TILE 16 CAROLINA CERAMICS SHERWIN WILLIAMS CEMEX SPLIT-FACE BENJAMIN MOOREBENJAMIN MOORE ERTH COVERINGS DECKSCAPES BOOZER BEAM 12 DRYVIT 1510 SEMI TRANSPARENT STAIN; YANKEE BARN, ITEM / MANUFACTURER # 1 STONE STRIPS COLOR: CEDAR STONE PAINT - SQUIRE HILL BUFF - BM1068 6 STANDING SEAM METAL ROOF COLOR: M/S VELOUR MAROON OUTSULATION PLUS SYSTEM 1 PAINT -OAK GROVE - BM489 117 1510 6COLOR: MOUNTAIN FOG 9 17 9 DARK BRONZE 11 SW3505 1510 ITEM NO. 3 2018 EXTERIOR FINISH SCHEDULE CMU-1 MR-1 BR-1 GL-1 ST-1EF-1SF-1 P-1P-2S-1 14 6 STAIN/CLEAR SEALER 21 INTEGRAL COLORINTEGRAL COLOR SPLIT-FACE CMU METAL ROOFING ITEM BRICK VENEER STOREFRONT 17 GLU-LAM 2 STONE 11 EIFS 1 6 94 1 12 3 10 3 20 18 3 1 10 14 4 21 2 17 16 6 1 21 2 9 20 12 20 18 1 3 11 14 21 20 17 21 17 1 6 11 7 8 1 3 2 16 A1.4 2 6 1 6 17 REAR ELEVATION SIDE ELEVATION 1/4" = 1'-0" 1/4" = 1'-0" 1 2