Loading...
HomeMy WebLinkAbout1396.98.13SUPERVISQR WQRKSHEE_T �ZYLAND FOUNDATION CHECKLIST FRAME PUNCH-OUT CHECK LlST BASEMENT SLAB i. QARA�E GARLKsE DOOR OPENING FR4MED TO GORRECT BIZE: i' Ht., 8' OR I6' WIDE. PROJECT INFORMATIQN PROJECT INF4RMATION ��LERS� d3TALL CCOlBJER3 OF GARAGE ,�p CEILIt.ICs.� ��GATION. GARAGE STEP PRAMED AND KiCfC PLATE UNDER DOOR BOIU STUD3 HOUS�E NAME / ELEY. HOUSE NAME 1 ELEV. STRAP ArICNOR NAILEp GORREC7LY EGtUAL RIS�R I-iEICsHT AT GARACsE 87EPS C8 I/4" MAX,7 SET INUMBER SET NUMBER ��7 F�UNG ON NAIL IN CsARACxE GHEGK FOR LOAD-BEARINCs POINTS AND PROPER LOAD TRANSFER PLAN / JOB NUMBER 2. BASEMENT AND HOUSE PLAN / JOB NUMBER CN£CiC SASEMENT STAIR AND 2nd PLOOR STAIR INSTALLATION HALP-WALL 42" FROM FLOOR ANp SAME P17GI-1 AS STAIR3 1 1/2" PAS7 STRIh1GER RIGH'� HAND OR LEFT HAND RIGHT HAND OR LEFT HAND G EGG FOR LO D-BEAR �POIN�TS AND PROPER LpAD TRANSFER StRAP fSNGi-(ORS SECUI2ED IN NOUSE ANY NON-STD. CHANGES? � ANY NON-STD. CHANGES? STAIR1llAY SNIMF7ED IMAX. 1/2�� CsAP EACN SIPE) F7ANpRAIL SLOGKS INSTALLEp 32" FROM STAIR NOSING ANP LOFT T.iEWELL P06T$ 9AFETY a00TS ANp R41L5 INSTALLED 3 1/2" FROI"t STRINrEt2 FRONT OR SIDE LOAD GARAGE FRONT OR SIDE LOAD GARAGE BARRICADE BAGG DOOR I� STEP IS CsREATER 7HAN 18�� SC,�UA3H BLOGiCS INSTALLED PER PLAN ANp T.J.I. DE7AIL SF-tEET CRAllA_ SPACE AND BASEMENT GLEAN£D OUT STD.� ENLI�RGED� OR FULL BSMT. ALL SIDING QR BRICK FRONT �ILL GAPS W/ PLYWD. WNERE T.J.I'e MEE7 IN GORNEi2S AND FIREPLACE CANT.'e a. HousE lIN 3ET •) (OPt_ 293) CppT. 295J (fN 5ET �') COPT. 490) GNECK FOR BOW STUDS CNECK FOR NAILERS ALL :31DING OR BRICK FRONT MARK pOOR 3WINCs pIf2EGtION AND SIZE lIN :rET •) (OPt. 490) MASONRY GHEGK �OR GA3iNCs ROOM (MIN. 2" ON EACN SIDEJ FIREPLACE OPT. PRE-FAB CNEGK CENtERLINE OF KITGHEN WINDOW BSMI'. WINDOW OPT. QTY. NOTE: INStALL BRIGK LHpGE ON MASONRY F�REPLAGES GHEGIC BULK1�fEAD DIMENSIONS C2" LONGEi2 AND 2" WIAER TI-IAN CABINE7S) IMA��IG LOGATiONCS) pµ pR��yT . GHEGK WALL SIZES IN RELATION TO GABINET SPACE FRONIT PORCH WJ9►LL HT. TO BE BUILDING PERMIT NUMBER GNEGK VANItY SIZES IN f2ELATION TO IUALL SPACE CkEGK VANiT7 QEPTN TO DOOR OPENING (MIN. 24 I/2"J A O�'E TOP OF FTN. WALL LOT ADDRESS CHECK I>OOR OPER4TION AND IN3TALLATION 2" ABOVE ili! ii VS" 1at FLR T�J.I:e 6" ACiOYE WI 16" 1e! FLR TJ.I.'e CHECK W1NpOtU Of'ER4TION ANA MS7ALLATION MASONRY PITCN l2AIL WALL INSTALLED 1/2" 6ELOW STRIHGsEt2 ANp 1 I/2" 9NORT FIREI�LACE OPT. TOWNSHIP iUB PLATFOIZ9 Bl11LT GORFEC7LY I6 V2" HT., 38" X 5'1" INSIDE PRE-FAB NAILERS FOR PIBERGLASS TU85 AND GAS1hIG AROUND 7UB5 INST��LLED. NOTE: IN°TALL BRIGG LEDGE ON MASONt2Y PIIZEPLAGES MEASURE VINYL AREAS FOR SQiJAR£ BUILCiING PERMIT NUMBER �et AND 2nd FLOORS LINE UP W StAIR UIELL NO CsAPS ABOV� STAfRIUAY pR4FIS70P LOT ,ADDRESS � sTAIRWAY pROP CEILINCs DONE GORRECTLY CCHECK PRINTS) CHECKUST �LOOR SHEAtNINCx NAILED PER SPEG.�a FALL PROTECTION INStALLED A7 StAIR WALL OPENINGS TOWINSHIP MARK OUT .4LL NAUNCNES IVOT U°.�p El"EBOL7 AND ANCHOR POINT IN PLAGE MARK IN FRONT PORCFI tUALL5 IF N07 GN PRMTS �4LL PRAFT STOP INSTALLED ON CHASE AND $ANp JOISTS � CHECKLIST lUA7EF2 bLEEVE LoGATION MARKEp PERIMETER AND PANELS CsLUED INTEF210R WALLS CsLUED D011AJ 51A1P PUMP LOGATION MalRKED SEIUER AND UTATEf2 SLEEVE W��L�GHT ,4�L TF{IGKENEp SLAB FOOtINCaS INTERIOR AND EXTERIOR WALLS NAILED INTO I-JpISTS BELOW EJf:GTOR P71 LOGAtIOty 1-(qhCEp �-�ATION9 MARKED C3' W/ 4" SEIUEIi HIGHLIGHT ALL PAD FOOTING LOCATIONS SET T1168 IN70 ROOM AND WIQE-OUT COUPLER, 5� wi i in�� s���ve� MARK OUT ALL NAUNGµES NOT USED NIGNLICsHt ALL BEAM POCKETS BEAM T,4KE-OF� SHEET GOMPLTE ANp TURNED IN AT'TIG AGGESS WSTALLED IN NOUSE PER PRINt, 12" 81DE8 TO FOUNi7A710N SUPERYISOF2 J015T HANGERS NAILEp FRONT AND 91D£8 MARK M FRONT ?ORGN �J,4� � tt0 BE GOMpLTED EVEN IF NO 6EAM5 REQUIia'�D) IF ?l0T ON PRINTS NICsHLICsHT ALL PAp PTCs. LOCATIONS MARK ONE OR 7W0 faAR/�a£ pOORS ALL GIRDER tRUS8E8 NAILED PER ENCsINEERINCs PRE-START GNECKLiBT TUis�p �N Mq{� pry� OR TWO Cs,4RAr3E D0012S �i. EXTERIOR 4T'AGN SELECTION S+��t Tp lU,4L.L ATT�4G+� PLOT PLAN AND STAKE SF�IEET CON?RAGTOR PRINTS BSMT. BATN ROtJCsH-IN LOGATIONS i0 ExGAYATOR PRINT. MAKE SURE tHEY MATGH ALL 7YVECK 87APLED IN-PLACS EXTERIOR ATIAGH PLOT PL,oN DO N07 INTE1�Ei� WITH FUR�IACE OR EACF{ OTNER AN1? SELECTION SHEET ALL NOLES PA7CH8p IN INSt1LA710N SOARD �ND BTAKE SHEET STANtION POST LOGAtIONS t.e. STANDAI� OR �VERSED q1,1 TRIM IN9TALLED PER PRINT TO EXGAVATOR PRM�. MAKE 311RE 7HEY MA*C►� EACN OtuER ANp ^�LEGTION CHEGK LOT LI671NG ,4CsAINST A7TACH SELECTfoN SHEEt TO BLOCK SHE?ET, t.e. STANpAh'D pR �yE(�$�p SELEG7fON SNEET, is. 8TANDARD GONTRAGTOR PRINTS 3 1/2" RIPS 1/2 9HEATF{ING INSTALLEp ON GOI�IERS MA4lC-UP ALL NON-STD. CHANGES, NOUSE �� ���` D l°��LD MATCI-4) ALL WINpOWS TAPEp ON TOP lsND CsLUED ON FOUR SIDES EXI'EN310N5, ANp GARq� �X7ENSIONB MARK-UP ALL NON-STANDARD CNANGEB, i-IOUSE L�LL DOORS tAPEA ASOVE BE4M T,eKE-OF� SNFET GpMPLEtE AND TURNED IN EXTENSIONb, AND CsAR4CsE EXTENSIONS ALL WINpOWS INSTALLED PER PRINT, ELEVA710N ANp STACK TO FCtNDATION SUPE1Qy�gpR RU BE COHPLTED EY� IF NO BEAMS REQUN'�ED) PRE-START CNEGKLIST tU1�lEp IN S�TE PIGKED Up ANp PUT IN pILE �AGN DAY 2X4 AROUND TOP OF GHIMNEY, 1 li2" PAST GHIMNEY FLAT D' TO BSMT. 5'E@L BEAMS Ot•! UJALK-OUT CHECK LOT LIS71NCs ACsAINBT BELEGTION 3NEE7 BASEMENTS IF 61DE LLtqLLS STHP DOtLN i.e. STANpARD OR REvERSEp lSHOULp MATGH) ALL CsIRDER TRUSSE5 NAILED PER ENCsINEERiNCs SASEMENT WtNDCW LOCATIONS DO NOT INtERFE}2E IX4 EXTEN510N5 INSTALLED AT FRONT DOOR AND WINDOW SURROl1NPS WIT� FIREPLAGE9, DEC1�^, pR BAY WINDOUIS REVISED 5/29/98 FLASFlINrs INSTALLED UNDER F'RONT DOOR ANp CsARAGH RE7URd WALL C�PROJECTS�DE?A:I.S�SUP\4RK .,5/29/S8 090