HomeMy WebLinkAbout1396.98.13SUPERVISQR WQRKSHEE_T �ZYLAND
FOUNDATION CHECKLIST FRAME PUNCH-OUT CHECK LlST
BASEMENT SLAB i. QARA�E
GARLKsE DOOR OPENING FR4MED TO GORRECT BIZE: i' Ht., 8' OR I6' WIDE.
PROJECT INFORMATIQN PROJECT INF4RMATION ��LERS� d3TALL CCOlBJER3 OF GARAGE ,�p CEILIt.ICs.� ��GATION.
GARAGE STEP PRAMED AND KiCfC PLATE UNDER DOOR
BOIU STUD3
HOUS�E NAME / ELEY. HOUSE NAME 1 ELEV. STRAP ArICNOR NAILEp GORREC7LY
EGtUAL RIS�R I-iEICsHT AT GARACsE 87EPS C8 I/4" MAX,7
SET INUMBER SET NUMBER ��7 F�UNG ON NAIL IN CsARACxE
GHEGK FOR LOAD-BEARINCs POINTS AND PROPER LOAD TRANSFER
PLAN / JOB NUMBER 2. BASEMENT AND HOUSE
PLAN / JOB NUMBER CN£CiC SASEMENT STAIR AND 2nd PLOOR STAIR INSTALLATION
HALP-WALL 42" FROM FLOOR ANp SAME P17GI-1 AS STAIR3 1 1/2" PAS7 STRIh1GER
RIGH'� HAND OR LEFT HAND RIGHT HAND OR LEFT HAND G EGG FOR LO D-BEAR �POIN�TS AND PROPER LpAD TRANSFER
StRAP fSNGi-(ORS SECUI2ED IN NOUSE
ANY NON-STD. CHANGES? � ANY NON-STD. CHANGES? STAIR1llAY SNIMF7ED IMAX. 1/2�� CsAP EACN SIPE)
F7ANpRAIL SLOGKS INSTALLEp 32" FROM STAIR NOSING ANP LOFT T.iEWELL P06T$
9AFETY a00TS ANp R41L5 INSTALLED 3 1/2" FROI"t STRINrEt2
FRONT OR SIDE LOAD GARAGE FRONT OR SIDE LOAD GARAGE BARRICADE BAGG DOOR I� STEP IS CsREATER 7HAN 18��
SC,�UA3H BLOGiCS INSTALLED PER PLAN ANp T.J.I. DE7AIL SF-tEET
CRAllA_ SPACE AND BASEMENT GLEAN£D OUT
STD.� ENLI�RGED� OR FULL BSMT. ALL SIDING QR BRICK FRONT �ILL GAPS W/ PLYWD. WNERE T.J.I'e MEE7 IN GORNEi2S AND FIREPLACE CANT.'e
a. HousE
lIN 3ET •) (OPt_ 293) CppT. 295J (fN 5ET �') COPT. 490) GNECK FOR BOW STUDS
CNECK FOR NAILERS
ALL :31DING OR BRICK FRONT MARK pOOR 3WINCs pIf2EGtION AND SIZE
lIN :rET •) (OPt. 490) MASONRY GHEGK �OR GA3iNCs ROOM (MIN. 2" ON EACN SIDEJ
FIREPLACE OPT. PRE-FAB CNEGK CENtERLINE OF KITGHEN WINDOW
BSMI'. WINDOW OPT. QTY.
NOTE: INStALL BRIGK LHpGE ON MASONRY F�REPLAGES GHEGIC BULK1�fEAD DIMENSIONS C2" LONGEi2 AND 2" WIAER TI-IAN CABINE7S)
IMA��IG LOGATiONCS) pµ pR��yT .
GHEGK WALL SIZES IN RELATION TO GABINET SPACE
FRONIT PORCH WJ9►LL HT. TO BE BUILDING PERMIT NUMBER GNEGK VANItY SIZES IN f2ELATION TO IUALL SPACE
CkEGK VANiT7 QEPTN TO DOOR OPENING (MIN. 24 I/2"J
A O�'E TOP OF FTN. WALL LOT ADDRESS CHECK I>OOR OPER4TION AND IN3TALLATION
2" ABOVE ili! ii VS" 1at FLR T�J.I:e 6" ACiOYE WI 16" 1e! FLR TJ.I.'e CHECK W1NpOtU Of'ER4TION ANA MS7ALLATION
MASONRY PITCN l2AIL WALL INSTALLED 1/2" 6ELOW STRIHGsEt2 ANp 1 I/2" 9NORT
FIREI�LACE OPT. TOWNSHIP iUB PLATFOIZ9 Bl11LT GORFEC7LY I6 V2" HT., 38" X 5'1" INSIDE
PRE-FAB NAILERS FOR PIBERGLASS TU85 AND GAS1hIG AROUND 7UB5 INST��LLED.
NOTE: IN°TALL BRIGG LEDGE ON MASONt2Y PIIZEPLAGES MEASURE VINYL AREAS FOR SQiJAR£
BUILCiING PERMIT NUMBER �et AND 2nd FLOORS LINE UP W StAIR UIELL
NO CsAPS ABOV� STAfRIUAY pR4FIS70P
LOT ,ADDRESS � sTAIRWAY pROP CEILINCs DONE GORRECTLY CCHECK PRINTS)
CHECKUST �LOOR SHEAtNINCx NAILED PER SPEG.�a
FALL PROTECTION INStALLED A7 StAIR WALL OPENINGS
TOWINSHIP MARK OUT .4LL NAUNCNES IVOT U°.�p El"EBOL7 AND ANCHOR POINT IN PLAGE
MARK IN FRONT PORCFI tUALL5 IF N07 GN PRMTS �4LL PRAFT STOP INSTALLED ON CHASE AND $ANp JOISTS
� CHECKLIST lUA7EF2 bLEEVE LoGATION MARKEp PERIMETER AND PANELS CsLUED
INTEF210R WALLS CsLUED D011AJ
51A1P PUMP LOGATION MalRKED SEIUER AND UTATEf2 SLEEVE W��L�GHT ,4�L TF{IGKENEp SLAB FOOtINCaS INTERIOR AND EXTERIOR WALLS NAILED INTO I-JpISTS BELOW
EJf:GTOR P71 LOGAtIOty 1-(qhCEp �-�ATION9 MARKED C3' W/ 4" SEIUEIi HIGHLIGHT ALL PAD FOOTING LOCATIONS SET T1168 IN70 ROOM AND WIQE-OUT
COUPLER, 5� wi i in�� s���ve�
MARK OUT ALL NAUNGµES NOT USED NIGNLICsHt ALL BEAM POCKETS BEAM T,4KE-OF� SHEET GOMPLTE ANp TURNED IN AT'TIG AGGESS WSTALLED IN NOUSE PER PRINt, 12" 81DE8
TO FOUNi7A710N SUPERYISOF2 J015T HANGERS NAILEp FRONT AND 91D£8
MARK M FRONT ?ORGN �J,4� � tt0 BE GOMpLTED EVEN IF NO 6EAM5 REQUIia'�D)
IF ?l0T ON PRINTS NICsHLICsHT ALL PAp PTCs. LOCATIONS
MARK ONE OR 7W0 faAR/�a£ pOORS ALL GIRDER tRUS8E8 NAILED PER ENCsINEERINCs
PRE-START GNECKLiBT TUis�p �N Mq{� pry� OR TWO Cs,4RAr3E D0012S �i. EXTERIOR
4T'AGN SELECTION S+��t Tp lU,4L.L ATT�4G+� PLOT PLAN AND STAKE SF�IEET
CON?RAGTOR PRINTS BSMT. BATN ROtJCsH-IN LOGATIONS i0 ExGAYATOR PRINT. MAKE SURE tHEY MATGH ALL 7YVECK 87APLED IN-PLACS EXTERIOR
ATIAGH PLOT PL,oN DO N07 INTE1�Ei� WITH FUR�IACE OR EACF{ OTNER AN1? SELECTION SHEET ALL NOLES PA7CH8p IN INSt1LA710N SOARD
�ND BTAKE SHEET STANtION POST LOGAtIONS t.e. STANDAI� OR �VERSED q1,1 TRIM IN9TALLED PER PRINT
TO EXGAVATOR PRM�. MAKE 311RE 7HEY
MA*C►� EACN OtuER ANp ^�LEGTION CHEGK LOT LI671NG ,4CsAINST A7TACH SELECTfoN SHEEt TO BLOCK
SHE?ET, t.e. STANpAh'D pR �yE(�$�p SELEG7fON SNEET, is. 8TANDARD GONTRAGTOR PRINTS 3 1/2" RIPS 1/2 9HEATF{ING INSTALLEp ON GOI�IERS
MA4lC-UP ALL NON-STD. CHANGES, NOUSE �� ���` D l°��LD MATCI-4) ALL WINpOWS TAPEp ON TOP lsND CsLUED ON FOUR SIDES
EXI'EN310N5, ANp GARq� �X7ENSIONB MARK-UP ALL NON-STANDARD CNANGEB, i-IOUSE L�LL DOORS tAPEA ASOVE
BE4M T,eKE-OF� SNFET GpMPLEtE AND TURNED IN EXTENSIONb, AND CsAR4CsE EXTENSIONS ALL WINpOWS INSTALLED PER PRINT, ELEVA710N ANp STACK
TO FCtNDATION SUPE1Qy�gpR
RU BE COHPLTED EY� IF NO BEAMS REQUN'�ED) PRE-START CNEGKLIST tU1�lEp IN S�TE PIGKED Up ANp PUT IN pILE �AGN DAY
2X4 AROUND TOP OF GHIMNEY, 1 li2" PAST GHIMNEY FLAT
D' TO BSMT. 5'E@L BEAMS Ot•! UJALK-OUT CHECK LOT LIS71NCs ACsAINBT BELEGTION 3NEE7
BASEMENTS IF 61DE LLtqLLS STHP DOtLN i.e. STANpARD OR REvERSEp lSHOULp MATGH) ALL CsIRDER TRUSSE5 NAILED PER ENCsINEERiNCs
SASEMENT WtNDCW LOCATIONS DO NOT INtERFE}2E IX4 EXTEN510N5 INSTALLED AT FRONT DOOR AND WINDOW SURROl1NPS
WIT� FIREPLAGE9, DEC1�^, pR BAY WINDOUIS REVISED 5/29/98 FLASFlINrs INSTALLED UNDER F'RONT DOOR ANp CsARAGH RE7URd WALL
C�PROJECTS�DE?A:I.S�SUP\4RK .,5/29/S8 090