Loading...
HomeMy WebLinkAboutEngrg Dept Review#24 a g o own on I N 111 = ®a 2 1 r September lb, 2013 JP.ws BRAINARD, MAYOR Mr. Dave Sexton, P.E. Terra Site Development, Inc. 1307 West 161" Street Westfield, IN 46074 RE: Danny Boy Beer Works - Project Review #2 Dear Mr. Sexton: The City received your construction plans on August 1, 2013, in response to the Engineering Department's comment letter dated June 25, 2013. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS I . Previous Comment 2 of a letter dated June 25, 2013. The alley entrance off Rhettsbury Street shall conform to City standards for a commercial driveway and shall be constructed of concrete. Please include the City Standard Commercial Driveway detail. Is this curb cut master planned? The proposed driveway/alley connection shall be located within an ingress /egress easement. 2. Previous Comment 7 of a letter dated June 25, 2013. Please label the MFPG and MLAG for the building. The MFPG and MLAG shall be the same elevation. These elevations shall be based on: a. 1 -foot above the maximum water surface elevation onsite, during a 100 -year rain event, assuming all storm inlets plugged. b. 2 -Feet above the 100 -year elevation of the detention facility and 2 -feet above the emergency spillway. The Department repeats this comment. 3. Previous Comment 10 of a letter dated June 25, 2013. All subsurface drain pipe shall conform to requirements of the Storm Water Technical Standards Manual and be double wall, Hancor HI -Q pipe. Where was this included in the plans? 4. The emergency flood route shall be located within a 30 -foot drainage easement. If you have questions, please contact me at 571 -2441. Sincerely, Gary R. D can Assistant City Engineer Department of Engineering cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Joe Faucett, Carmel Utilities Dei>Air MENT OF ENGINEFRInG Ore Civic: SQUARE, CAxaiLL, IN 46032 OFFICF 317.571.2441 FAx 317.571.2439 ENLML engineeringlacarrncl.in.goy, Mr. Dave Sexton, P.E. September 16, 2013 RE: Danny Boy Beer Works- Project Review #2 Page 2 of 2 Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrappsluser datalz;lshared\Development Reviewsl PROJREV 131DANNYBOYBEERWORKSREV 92