HomeMy WebLinkAboutEngrg Dept Review Lettera ® A EMI A • A NM, aMI ®� 0 ®t 0 9 September 16, 2013 JAMES BxAlNaRn, MAYO Mr. David K. Sexton, P.E. Terra Site Development, Inc. 1307 West 161" Street Westfield, IN 46074 RE: Village Center Townhomes, Phase 2- Project Review #1 Dear Mr. Sexton: The City received your construction plans on August 6, 2013. The project was scheduled for review at the August 21, 2013 Technical Advisory Committee meeting. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Please provide a legal description of the site. 2. Provide all current easements for entire tract to pertinent sheets with correct calls for each. 3. Are any offsite easements necessary? 4. Please ensure all locations of electrical power vaults, transformers, power Iines, gas lines, television cable, and telephone lines are shown on the plans. 5. Please clearly indicate the construction limits on all plan sheets. 6. The plan indicates 18 -feet of alley pavement. This should be 16 -feet since there is a 2 -foot curb shown. 7. Please indicate the dimensions of the sidewalks within the right -of -way. 8. All storm sewers shall be located within a 30 -foot drainage easement. The drainage easement for the storm sewer along Rhettsbury Street does not meet this requirement. 9. Please provide the MFPG and MLAG for the buildings. These elevations shall be based on: a. 1 -foot above the maximum water surface elevation onsite, during a 100 -year rain event, assuming all storm inlets plugged. b. A minimum of 2 -feet above the 100 -year elevation of the offsite detention facility and 2- feet above the emergency spillway.. 10. Please indicate the subsurface drain under the curb at the entrance off of Apsley Lane. 11. Please indicate the onsite flood routing through the site. 12. Please provide a Maintenance of Traffic Plan on Apsley Lane for the construction of the entrance to the alley. GENERAL INFORMATION • These comments represent the Department of Engineering's first review of the site construction plans for this project. • We request that all responses to our comments be provided in writing and be accompanied by a drawing reflecting the requested revisions. Failure to provide written responses may result in the delay of the review process. • It is critical that this office be made aware of all modifications made on the plans being re- submitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission,l3ZA or other committee meetings. • We have engaged Crossroad Engineers, PC to review drainage plans and drainage calculations submitted to this office for review. If you have not already done so, please of ERG IN FEW \(, ONE CIVIC SQUARE, CARMFL, IN 46032 OFI`icF 317.571.2441 FAx 317.571.2439 E,,NIAIL enginrrrin,pc6c.trnirl.in.go5 Mr. David K. Sexton, P.E. September 16, 2013 RE: Village Center Townhomes, Phase 2- Project Review #1 Page 2 of 4 provide a set of drainage plans and calculations to their office for review. We will share Crossroad's continents as they are received. • Final drawings will not be approved for construction until: a. All Engineering Department and Utility Department and Hamilton County Surveyor issues have been resolved.. b. All bonds and performance guarantees are posted. c. All Board of Public Works and Safety approvals and any other governing agency approvals (if required) are obtained. d. All off -site easements necessary to install utilities to serve the development are secured. e. SWPPP is approved. f. All fees are paid. • The Department reserves the right to provide additional comments based upon subsequent reviews. • An approved Storm Water Management Permit is required prior to commencing any earth disturbing activity. Please contact Mr. John Thomas regarding storm water quality requirements. • An approved right -of -way permit is required prior to commencing any work in the public right-of-way and for construction equipment access from the City's right -of -way. • If it will be necessary to relocate existing utilities, the costs for such relocation shall be borne solely by the developer. Any utility poles requiring relocation shall be relocated to within one foot of the outside edge of the proposed right -of -way. • The Department requires that the construction drawings be developed in accordance with the City of Carmel digital submission standards and that all required submittals for primary plat, secondary plat, and construction drawings be made. The digital files must be submitted to the Department of Engineering prior to the approval of the construction plans. Please contact the City GIS Department for the requirements. • Jurisdictions: g. The project site is located within current City of Carmel Corporate Limits. h. Perimeter Street and Right -of -Way — City of Carmel (Apsley Lane, Rhettsbury Street) i. Water — City of Carmel Utilities j. Sanitary Sewers — Clay Township Regional Waste k. Storm Sewers /Drainage — City of Carmel. 1. Legal Drains — Hamilton County Surveyor's Office. • Drawings submitted for approval: m. The design engineer must certify all drawings submitted for final approval. n. This office will require 9 sets of drawings for approval after all issues have been resolved. The drawings will be stamped as approved and signed by the City Engineer and by Carmel Utilities. The Owner will receive 3 sets, one of which must be maintained on the construction site at all times. If this project is subject to review and approval by the Hamilton County Surveyor's Office, a total of 11 sets will be required for final approval. • Carmel Utilities will provide separate reviews of this project for water issues. Please assure that copies of all drawings are sent to: i. Paul Pace Joe Faucett ii. Carmel Utilities Distribution Carmel Utilities Collection iii. 3450 West 131" Street 9609 Hazel Dell Parkway iv. Westfield, IN 46074 Indianapolis, IN 46280 • Carmel Utilities subscribes to "Holey Moley" who should be contacted directly for all water main locations. • The following items will be sent electronically upon request regarding this correspondence and project: o. Project Approval Checklist Mr. David K. Sexton, P.E. September 16, 2013 RE: Village Center Townhomes, Phase 2- Project Review #I Page 3 of 4 p. Performance/Maintenance Guarantees q. Utility Jurisdictions /Right of Way Permits r. Availability (acreage) Fees BOARD OF PUBLIC WORKS AND SAFETY • A schedule for Board of Public Works and Safety meeting dates and agenda deadlines will be sent electronically for your use upon request. Please use the Engineering Department deadlines for submissions to the Board. • Any submission to the Board requires prior approval by the Carmel Clay Plan Commission and /or the Board of Zoning Appeals (if applicable) and completion of review by the Technical Advisory Committee. All written requests to be placed on the Board's agenda must include the appropriate Docket Number and the date (or dates) of approval by the Plan Commission and /or the Board of Zoning Appeals (if applicable). • Water Availability and Sanitary Sewer approval from the Board will be required. This is an EDU approval based upon the proposed use of the site. Reference Items #33 to #35 below for additional details /explanations. Please note that if an entryway or other irrigation system is planned for this development, additional Water Availability Approval from the Board will be required and additional Water Connection Fees will be assessed based upon the size and usage of the system as determined by the Director of Carmel Utilities. • Commercial Curb Cut Approval. Please provide 8' /z x 1 I exhibits with the request for approval. Provide all pertinent information including lane widths, overall width, radii, lane markings, location of opposing drives or streets, relationship to the location of previous curb cut, etc. • Temporary Construction Entrance Approval. It appears the construction entrance is at the location of a permanent curb cut; therefore, Board approval will not be required. • The installation of any permanent, privately owned and/or maintained improvement (signs, decorative street signs, walls, streetlights, etc.) within dedicated right of way or dedicated easements requires the execution of a Consent to Encroach Agreement between the Owner and the City of Carmel. Such agreements are executed by the Board of Public Works and Safety, The City Engineer may approve irrigation system agreements. • Secondary Plat approval if applicable. All performance guarantees must be posted prior to submission of secondary plats for Board of Public Works and Safety approval. • Dedication of right -of -way if not platted. This is based upon the City of Carmel 20 -Year Thoroughfare Plan requirements. Dedication documents are available upon request. Please be advised that all Right -of -Way Dedications must be accompanied by a Sales Disclosure Agreement completed by the owner for the property being dedicated to the City. The dedication document cannot be recorded without a completed Sales Disclosure. The form is available upon request. • Any open pavement cuts of City right -of -way will require Carmel Board of Public Works and Safety approval. BONDING REQUIREMENTS • Please contact Mr. Dave Barnes to review performance guarantee requirements. PIease contact Mr. John Duffy to review water and sanitary sewer bonding requirements. • The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100% of the cost of labor and materials to construct the individual improvements, to be provided by the design engineer. Please provide detailed Engineer's Estimates for each improvement including quantities, unit costs, pipe sizes, and materials, etc. • Upon completion and release of individual Performance Guarantees, a three -year Maintenance Guarantee will be required (see Street Sign comments above). The Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and Curbs and 10% of the Performance amount for all other improvements. Mr. David K. Sexton, P.E. September 16, 2013 RE: Village Center Townhomes, Phase 2- Project Review #1 Page 4 of 4 Performance Guarantees may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the available enclosures for more detailed explanation of our procedures. RIGHT OF WAY PERMIT AND BONDING • Any work in the dedicated right - of-way will require an approved Right -of -Way Permit and a License & Permit Bond, • The bond amount is determined by our Right -of -Way Manager. However, if the work is included in the scope of work of a required and posted Performance Guarantee, the Performance Guarantee may be used to satisfy the bond requirements of the Right -of -Way Permit. Please contact our Right -of -Way Manager, Fred Glaser, to arrange right -of -way permitting and bonding. AVAILABILITY AND CONNECTION FEES • We defer to Carmel Utilities regarding this issue. • If an entryway or overall site irrigation system is planned for this development, additional Water Connection Fees will be assessed based upon the size and usage of the system and upon the recommendations of the Director of Carmel Utilities. • These fees are required to be paid prior to final approval of construction plans by Engineering and prior to issuance of building permits by Building Codes Services. Please confirm these fees and calculations with Carmel Utilities. If you have questions, please contact me at 571 -2441. Sincerely, M4Gary R. unc ,r., P.E. Assistan City Engineer Department of Engineering cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Joe Faucett, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrappsluserdata lz:Lshared%Development ReviewsTRO]REV131 VILLA GECENTERTOWNHOMESPHASE2REV #1