I. Sewer and water lines, septic system, (tanks & filed systeml and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc.)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geotherm.al heat pump discharge locations
*NOTE: Zf land is not within a platted subdivision~ a legal description is required,
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29,04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) workil~g days of the receipt 0f the written application form and accompanying
materials. The improvement Location Permit shall be issued when the proposed structure, ~mprovement, or use and
its location conform in all respects to this ordinance.'
iN ADDITION TO THE ABOVE-LiSTED SUBMZITAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
W]TH ANY INFORMATION RELATIVE TO COMM~I'MENTS MADE iN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THiS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
ADDFI'[ONAL INFORMATION MAY BE REQUESTED BY, AND W~LL BE PROVIDED TC] THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUF~C,~ENT CLAR_TfY OR DET/~L, TO INDiCATE THE NATURE AND EXTENT
OFTHE WORK PROPOSED AND TO DETERMINE COMPUANCE W~TH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADD~I~ONALLY REQUESTED/REQUIRED INFORMATION, AFTERTHE [N~,L SUBM]-fiI'AL, WiLL
EXTEND THE 'I'~ME ~1' TAKES COMPLETE THE PERMIT REVIEW.
THE OF~CE OFBUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE: N. PIABLE FINISH i SPACE. IF AN AREA SO
LABELED IS TO BE A ~NISHED SPACE, CONSTRUCT]ON PLANS MUST BE LABELED ACCORDINGLY. IF iT IS
DETERMINED THAT AN UNF~NISHED~ "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA ~
ISS ~ : FTHEP R QT, THE PLANS AND PERM]TRECORDS NUST BE UPDATED AT THE OFF[CE OF BUILDING &
CODE ENFORCEMENT.
i~ ALL CONSTRUCTION IS SUB3ECT TO FZELD INSPECTION, AND SHOULD NOT BEGIN PP~OR TO THE
ISSUANCE OF THE BUILDZNG PERMIT. ONCE THE PERM~-F IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PR]OR TO THE APPROPRIATE INSPECT[ON. Beginning prior to obtaimng
a building permit and/or proceeding with construction beyond the stage of a required inspec[ion without approva
constitutes Late Fee Penalties, per ~-289 of the Carmel/Clay Zoning O~'dinance; 29.06.07, and 29.06.08.
BUILDING ~ CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sq.; Carmel, IN 460]52. Ph, f317) 57%244-4.
' and accurately on the
submitted with the
J fluxes. Failure to comply
penalties of Perjury (Indiana
provided in the table below is
not knowingly or intentionally
'slead the Dept. of
Unfinished)
Sunroom
Total Sc
Ft. of
Garages
NAME ~NTE D
S:Permits/FORMS/RESIDENT~L PROCEDURES 2 of 2