Loading...
HomeMy WebLinkAbout05080285-Misc. Info ---- 'AIA: OS-08oz 8s- Document G704™ - 2000 Certificate of Substantial Completion PROJECT: (Name and address): Kipp Brothers Addition 9760 Mayflower Park Drive Carmel, IN 46032 TO OWNER: (Name and address): Kipp Brothers 9760 Mayflower Park Drive Carmel, IN 46032 PROJECT NUMBER: 05-0118/ CONTRACT FOR: General Construction CONTRACT DATE: February 08, 2006 OWNER: 121 ARCHITECT: 121 CONTRACTOR: 121 FIELD: 0 . PUNCH LIST: 121 TO CONTRACTOR: (Name and address): Smith Development and Construction 5220 East 64tb Street Indianapolis, IN 46220 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: 26,000 square feet additon to existing building. The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty 02/08/2006 Date of Commencement ~-, .--. BY 01-- O~ DATE OF ISSUANCE ()'-i Peterson Architecture ARCHITECT A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date Of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $ 0.00 The Contractor will complete or correct the Work on the list of items attached hereto within Zero ( 0 ) days from the above date of Substantial Completion. Smith Development and Construction CONTRACTOR ~'t~ /J ~ ZIIO/Ob DATE I I The Owner accepts the Work or designated po (date). Kipp Brothers OWNER 2/ ( () /0 G DATE! f .ally complete and will assume full possession at (time) on The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows: (Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) AlA Oocumel\t G704'N. -2000. Copyright @1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This' AlAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution 01 this AlAe Document; or 1 any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maxImum extent possible under the law. This document was produced by AlA software at 14:03:50 on 02108/2006 under Order No.l000197605_1 which expires on 9/1212006, and is not for resale. User Notes: (4212025087) ! R; Hoyt, G @co hami ton n us' DUTSTANDIN~ I' ON ~ING lNG Pag~ Lillard, Sarah N From: jsouth [john-south@iaswCd,org] Sent: Tuesday, August 23, 2005 2:44 PM To: Lillard, Sarah N Subject: Kipp Brothers Building Sarah, The revised plans have been reviewed anC approved [or the Kipp Brothers Building Expansion, No further issues, John South Hamilton County Soil and Water Conservation District 1108 South 9th Street pNhO. blesville IN 46060 317-773-1406 08/23/2005 Brothers Bldg. Addition 11:21 AM Matt L , Jim E; 'n.us; 'Candy Conservation District ! A; 81anchard, Jim E; irt- Matt L Enforcement .eeting IF YOU HAVE OUTSTANDING ISSUES. After iittaL ITION Meeting Date: Time: PENDING docket numbers: 05 Lillard, Sarah N Office has resolved the issues with this project. If you have any 05. 2005 >>> ~ received a request to TO that time, we may proceed · ADDITION PENDING concerns that might affect the issuance of this permit, please REPLY TO ALL on this Bldg. Addition 3can, Gary R; Hoyt, Gary A; Blanchard, Jim ; 'mbm@co.hamilton,in.us'; O~C(~. o[our One Civic Square, Carmel, IN, 46032. mental Planner (3) copies of the architectural elevation drawings for the structure to Matt Gr ff n DOCS One C v c ~032. You will be notified when your copies ire ready for pickup. IF YOU HAVE a building and submittal. ADDITION Bldg. Addition Lillard, Sarah N To: Cc: Matt L Jim E; 'n.us; john- ot have additional sewer connections. (317) 844-920~ (317) 844-9203 fax From: Lillard, Sarah N [madto. Sent: Friday, August 19, 2005 4 14 PH TO: Lillard, ~ral~.N; Cor~n, Angelina V; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard, Jim E; Kendall, A; Bre.w. er, Scott I, Do an, Veronica A; Akers, William P; grh@co.hamiltonJn.us; john-south@ aswcd.org; candy Feigner; mbm@co.hamiltonJn.us; Foley, Amanda .1; Griffin, Platt L Cc.' jdsser@sdcco.com Subject: Pre-Submittal for Kipp Brothers Bldg, Addition PENDING 05070009 TAC ONLY P grh@co.ham ton n.us; 'john- us' Foley, Amanda J; Griffin, Matt Addition re department has n at this time. Kendall, ,]eft A; 'Candy Feltner'; has received a building DUTSTANDIN~ TION NG H II Dick B Friday August 19 2005 4:37 PM Lillar~, Sarah N Corm Angelina V Duncan, Ga~y R; Hoyt ?,aryA Blanchard ,Jim E,. ,Kenda Jeff A Brewer, SC.o,.t! I; Dolan, Vero,n.i,C_a A Akers Williar~ P gr'@co ham ton in us; ~john- .s0uth@iaswcd.org Candy Feltner robin@co.hamilton.in.us' Foley Amanda J Griffin Matt jrisser@sdcco. C°m' RE: Pre~-Submittal for Kipp Brothers Bldg. Addition This project ts ( Jrisdiction. Amanda .1; · 3eft A; Brewer· Scott '; 'Candy Feltner'; le J HAVE a building PENDING Time: PENDING & Zoning docket numbers: (317) 726-0340 might affect the issuance of this permit,