HomeMy WebLinkAbout05080285-Misc. Info
----
'AIA:
OS-08oz 8s-
Document G704™ - 2000
Certificate of Substantial Completion
PROJECT:
(Name and address):
Kipp Brothers Addition
9760 Mayflower Park Drive
Carmel, IN 46032
TO OWNER:
(Name and address):
Kipp Brothers
9760 Mayflower Park Drive
Carmel, IN 46032
PROJECT NUMBER: 05-0118/
CONTRACT FOR: General Construction
CONTRACT DATE: February 08, 2006
OWNER: 121
ARCHITECT: 121
CONTRACTOR: 121
FIELD: 0 .
PUNCH LIST: 121
TO CONTRACTOR:
(Name and address):
Smith Development and Construction
5220 East 64tb Street
Indianapolis, IN 46220
PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE:
26,000 square feet additon to existing building.
The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief,
to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated
portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for
its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established
by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except
as stated below:
Warranty
02/08/2006
Date of Commencement
~-,
.--.
BY
01-- O~
DATE OF ISSUANCE
()'-i
Peterson Architecture
ARCHITECT
A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the
responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in
writing, the date Of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate
of Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective: $ 0.00
The Contractor will complete or correct the Work on the list of items attached hereto within Zero ( 0 ) days from the above date
of Substantial Completion.
Smith Development and
Construction
CONTRACTOR
~'t~ /J ~
ZIIO/Ob
DATE I I
The Owner accepts the Work or designated po
(date).
Kipp Brothers
OWNER
2/ ( () /0 G
DATE! f
.ally complete and will assume full possession at
(time) on
The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance
shall be as follows:
(Note: Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and
coverage.)
AlA Oocumel\t G704'N. -2000. Copyright @1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This'
AlAe Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution 01 this AlAe Document; or 1
any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maxImum extent possible under the law. This
document was produced by AlA software at 14:03:50 on 02108/2006 under Order No.l000197605_1 which expires on 9/1212006, and is not for resale.
User Notes: (4212025087)
! R; Hoyt, G
@co hami ton n us'
DUTSTANDIN~
I' ON
~ING
lNG
Pag~
Lillard, Sarah N
From: jsouth [john-south@iaswCd,org]
Sent: Tuesday, August 23, 2005 2:44 PM
To: Lillard, Sarah N
Subject: Kipp Brothers Building
Sarah,
The revised plans have been reviewed anC approved [or the Kipp Brothers Building Expansion, No further issues,
John South
Hamilton County Soil and Water Conservation District
1108 South 9th Street
pNhO. blesville IN 46060
317-773-1406
08/23/2005
Brothers Bldg. Addition
11:21 AM
Matt L
, Jim E;
'n.us; 'Candy
Conservation District
! A; 81anchard, Jim E;
irt-
Matt L
Enforcement
.eeting
IF YOU HAVE OUTSTANDING ISSUES. After
iittaL
ITION
Meeting Date:
Time:
PENDING
docket numbers:
05
Lillard, Sarah N
Office has resolved the issues with this project. If you have any
05. 2005 >>>
~ received a request to
TO
that time, we may proceed
· ADDITION
PENDING
concerns that might affect the issuance of this permit, please REPLY TO ALL on this
Bldg. Addition
3can, Gary R; Hoyt, Gary A; Blanchard, Jim
; 'mbm@co.hamilton,in.us';
O~C(~.
o[our
One Civic Square, Carmel, IN, 46032.
mental Planner
(3) copies of the architectural elevation drawings for the structure to Matt Gr ff n DOCS One C v c
~032. You will be notified when your copies ire ready for pickup.
IF YOU HAVE
a building
and submittal.
ADDITION
Bldg. Addition
Lillard, Sarah N
To:
Cc:
Matt L
Jim E;
'n.us; john-
ot have additional sewer connections.
(317) 844-920~
(317) 844-9203 fax
From: Lillard, Sarah N [madto.
Sent: Friday, August 19, 2005 4 14 PH
TO: Lillard, ~ral~.N; Cor~n, Angelina V; Hill, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard, Jim E; Kendall,
A; Bre.w. er, Scott I, Do an, Veronica A; Akers, William P; grh@co.hamiltonJn.us; john-south@ aswcd.org; candy
Feigner; mbm@co.hamiltonJn.us; Foley, Amanda .1; Griffin, Platt L
Cc.' jdsser@sdcco.com
Subject: Pre-Submittal for Kipp Brothers Bldg, Addition
PENDING
05070009 TAC ONLY
P grh@co.ham ton n.us; 'john-
us' Foley, Amanda J; Griffin, Matt
Addition
re department has n
at this time.
Kendall, ,]eft A;
'Candy Feltner';
has received a
building
DUTSTANDIN~
TION
NG
H II Dick B
Friday August 19 2005 4:37 PM
Lillar~, Sarah N Corm Angelina V Duncan, Ga~y R; Hoyt ?,aryA Blanchard ,Jim E,. ,Kenda
Jeff A Brewer, SC.o,.t! I; Dolan, Vero,n.i,C_a A Akers Williar~ P gr'@co ham ton in us; ~john-
.s0uth@iaswcd.org Candy Feltner robin@co.hamilton.in.us' Foley Amanda J Griffin Matt
jrisser@sdcco. C°m'
RE: Pre~-Submittal for Kipp Brothers Bldg. Addition
This project ts (
Jrisdiction.
Amanda .1;
· 3eft A; Brewer· Scott
'; 'Candy Feltner';
le
J HAVE
a building
PENDING
Time: PENDING
& Zoning docket numbers:
(317) 726-0340
might affect the issuance of this permit,