Loading...
HomeMy WebLinkAbout05080275-Sq. Ft. k. All s dewa ks and dr veways 1. seWer and water lines, septic syStem, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc, o. Sump pump -- Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge iocatons *NOTE: If land is not within a platted subdivision, a legal description is required, FURTHER NOTES / NOTICES: CARMEk ZONING ORDINANCE Z-289, SECTZON 29.04.02 (3): "The Director shal~ approve or deny the Improvement Location Permit within five (5) working days of the receipt Of the written applicat on {'orm and ac~0mpeny ng materials. The Improvement Locatior~ Per'nit sba t be ssued when the proposed structure, improver~ent, or use and its location conform in all respects to this ordinance," IN ADDFrZON TO THE ABOVE-LISTED SUBMITrAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROWDED WITH ANY INFORMATION RELATZVE TO COMMi-TMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY iNVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION~ BOARD OF ZONING APPEALS, AND/OR DEPT, OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDI-rZONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICZENT CLARITY OR DETAZL, TOINDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED ANDTO DETERMINE COMPLIANCE wI'rH ALL APPLICABLE CODES AND ORDINANCES, SUBMZTTAL OF ADDZTIONALLY REQUESTED/REQUIRED INFORMATION, AFTERTHE INITIAL SUBMI~AL, WILL EXTEND THE TIME iT TAKES COMPLETE THE PERN1T REVIEW. THE OFFZCE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCT[ON PLANS AS A "BONUS ROOM" TO BE - - ~PIAB:. ~NFINISHED_ SPACE. IF AN AREA SO LABELED IS TO BE A FIN~'SHED SPACE, CONSTRUCT[ON PLANS MUST BE LABELED ACCORDINGLY. IF i3' iS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE IS ANCEOFTH PERMIT. THEPLANSANDPERMiTRECORDSMUSTI]EUPDATEDATTHEOFFICEOFBU~'LDING& CODE ENFORCEMENT. ~ ALL CONSTRUCTION IS SUB3ECT TO F/ELD ZNSPECT~ON, AND SHOULD NOT BEGZN PR/OR TO THE ~ ISSUANCE OF THE BUILDING PERHI"T, ONCE THE PERMIT ~*S ISSUED, WORK SHOULD NOT BE POURED, I~k..ll.~J~'J iNSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE ~NSPECTION. Beginning prior to obtaining ~ a building permit and/~r proceeding with construction beyond the stage of a r,e. quired inspection without approval constitutes Late Fee penalties, per~-289 oftheCarmel/Clay Zoning Oi-dinance;129.06.07, and 29.06.08. BUILDING &CODE ENFORCEMENT: CITY OF C~ARMEL. One Civic Sq.; Carmel, IN 46032. Pt~. [317) 571-2444, attached plot or site building permi' nd accurately on the , submitted with the I further re to comply ~der the penalties of Perjury (Indiana below is mislead the Dept. of rein. Total Sql- ~ Ft. of DATE S:Perm~tsIFORt4S/RESIDENTZAL PROCEDURES 2 of 2