Loading...
HomeMy WebLinkAbout0241.98.3DOOR SGHEDUL� - I�ORT+� V�li NC� DETAILS }�J�y�R NO. DIMENSIONS YPE M�TEizIP� �IN15H H�AD JAMB SILL SET REMAi�KS OI � • � • " A S.G. WDOD STAIN�D 2" H.M. FRAME 3-O x� -O xl 3/4 PAINTED, PT-2 � 02 3'-O'x�'-O'xl 3/4" A I 03 (P� �'-O"x�l'-O"xl 3/4" B � 04 3'-O'x7'-O"xl 3/4" A 2 OS 3'-O'x�'-O'x I 3/4" A I O6 3'-O'x�'-O'xl 3/4" A � O�f 3'-O'x�f'-O'x I 3/4" A I OS OMIT7ED OCI OMI7TED 10 3'-O'x�'-O'xl 3/4" A S.G. WOOD 57AITtED 2�� H.M. FRAME � PAINTED, PT-2 I I 3'-O'x�f'-O'x I 3/4" A I 12 3'-O'x�'-O'xl 3/4" A I 13 3'-O'x�'-O'xl 3/4" A 2 14 (PR) 2'-O"x�l'-O"xl 3/4" B 2 15 2'-O'x�'-O"xl 3/4" A 2 I6 3'-O'x7'-O'xl 3/4" A 2 � � (P� 2'-O"x �'-O"x I 3/4" B � 18 3'-O'x7'-O'xl 3/4" A 2 ia 3�-o�x�►�-o�xi 3i4p a. 2 20 3�-O�x��-O�x� 3�4' A 2 21 3'-O'x�'-O'xl 3/4" A � �� OMITTED 2" H.M. FRAME � 23 3'-O'x�'-O'xl 3/ " S.G. WOOD STAIN�D PAINTED, PT-2 24 3'-O'x7'-O"xl 3/4" A S.G. WOOD STAIN�D 2�� +�-M• FRAME I PAINTED, PT-2 25 OMI7TED 26 3'-O'x�'-O'xl 3/4" p, S.G. WOOD STAINED 2" H.M. FRAME 2 PAINT�D, PT-2 2� 3'-O'x�'-O'xl 3/4" q I 28 3'-O'xl'-O'xl 3/4" A � 2q 3'-O'x�l'-D'xl 3/4" A I 3O 3'-O'xl'-O'x I 3/4" A I 31 3'-O'x�i'-O'xl 3/4" A � 32 3'-O'x7'-O'xl 3/4" A I 33 3'-O'x�l'-O'xl 3/4" A � DOOR SGH�DUL� - SOUTH I�IIN� DET�ILS HDWR. NO. DIMENSIONS YPE MATERIP. FIN15H }��AD JAMB 51LL 5ET REMARKS 34 3'-O"x�l'-O"xl 3/4" A S.G. WOOD STAINED 2� H.M. fRAME � PAINTED, PT-2 35 3'-O"x7'-O"xl 3/4" A � 3b 3'-O"x�l'-O"xl3/4" A 2 3� 3'-O"x7'-O"xl 3/4" A 2 38 3'-O"x�'-O"xl 3/4" A � 3q 3'-O"xl'-O"xl 3/4" A � 40 3'-O"x�i'-O"xl3/4" A � 41 2'-b'x�'-O"xl 3/4" A 2 42 3'-O"x�i'-O"xl 3/4" A 2 43 3'-O"x�'-O"xl 3/4" A � 44 3'-O"x�1'-O"x1 3/4" A 2 45 3'-O"x7'-O"xl 3/4" A � `� 3'-O"x�i'-O"xl 3/4" q � 4� 3'-O"x�'-O"xl 3/4" A 2 48 2'-6'x�'-O"xl 3/4" q � 4q 3'-O"xl'-O"xl 3/4" A � 5O 3'-O"x7'-O"xl 3/4" A � 51 3'-O"x7'-O"xl 3/4" A I 52 3'-O"x�'-O"xl 3/4" A I 53 3'-O"x�'-O"xl 3/4" A 2 54 3'-O"x�'-O"xl 3/4" A � � 3'-O"xl'-O"xl 3/4" A I 56 3'-O"x�1'-O"xI3/4" q I 5�1 3'-O"xl'-O"xl 3/4" A � 58 3'-O"x�l'-O"xl 3/4" A I �I�RDY��R� 5�T5: I. LOGK5E7, WALL STOP, LEVER STYLE HARDWARE �. PASSAGE SET, WALL STOP, LEVER STYLE HARDWARE 2" H.M. FRAN PAINTED, PT S.G. WOOD 57AINED LEVER STYI HARDWARE 2' H.M. FR PAINTED, S.G. WOO SrAir�ED LEV�R 5 HARDWA DOOR TYPE " � " DOOR TYPE " B " ROOM �11�15H � GOLOR SGH�DUL� - 1�ORTI� V�III�C� WALLS NO_ ROOM NAME �LOOR BASE NORTH EAST SOUTH WEST REMARKS 101 OFFIGE � GP7-I / �_� �yy�_I VWG-I VWG-I �/{NG-� � 12" BORDER GPT-3 GPT-3 10� OFFIGE GPT-I PT-I PT-I P7-I PT-I 103 GLOSET GPT-I 104 VESTIBl1LE GPT-4 105 GORRIDOR GPT-I 106 OFFIG� ��� OFFIG� 108 OFFIG� 10�1 OPEN AREA I10 10' RAISED GOMPUTER ROOM F��� ��� OPEN ARE�4 G PT- I 112 GORRIDOR GPT-I 113 OFFIGE � GPT-I / VWG-I YWG-I VWG-I �/VyG-� 12" BORDER GPT-3 � GP7-3 114 OFFIGE � GP7-I / VWG-I VWG-I VWG-I VW�G-I � 12" BORDER GPT-3 GPT-3 115 LOBBY GPT-I PT-I PT-I PT-I PT-I II6 OPEN AREA � �� TRAINING 118 GL05ET ��q GL05ET I�O GLOSET 121 GORRIDOR �22 KITGHNE77E VGT-I ��3 GOATS GPT-I 124 STORAGE 125 GORRIDOR I �6 MA I L/GOPY I�� OFFIGE 128 OFFIGE �2a OPEN AREA 131 GORRIDOR 12" BORDER 132 GONFERENGE � GPT-2/ �-I VWG-I VWG-I VWG-I � GPT-� 133 GPT-I / VWG-I VWG-I VWG-I VWG-I � 12" BORDER OFFIGE � GPT-3 GPT-3 134 pfFIGE GPT-I p-�-I PT-I P7-I PT-I 135 O�FIGE �� o����� 13� ARGHIVE ROOM 138 TESTING ROOM 138 BREAK VGT-I �� OPEN AREA GP7-I 140 GORRIDOR GPT-I �� IV�S�L✓: GARPET: GPT-I J3 J INDl15TRIE5, ..�JBILEE #626 R.S.V.P. GPT-2 J� J INDU57RIES, GOLOUR SUPREME, 38 OZ. #036 GRANBERRY (12' BORDER - GONFERENGE ROOMS) GPT-3 Jd J INDU57RIES, GOLOUR SUPREME, 38 OZ. �0�4 MOHAIR (I�" BORDER - OFFIGES) GPT-4 INTERFAGE, HEUGA �LOR, NEEDLEPUNGH, HAIR TILE (GOL.OR 70 B� SELEGTED) VINYL BASE: VB-1 JOHN�.�ONI7E, 4' VINYL GOVE bo-rauPE VINYL WALLGOVERING: VYVG-I JM LYNNE, STONEBROOK STB-IISq SAVANNA STONE P IhIT: PT-1 DURON 8302W-MIN�RAL MAINE P7-� DURON (DOOR FRAMES) (TO BE SELEGT�D) PLASTIG LAMINATE: PL-I TIEVAMAR MR-2-5T TAUPE MA7RIX (BREAK GOUNTERTOPS) VINYL GOMP051TION 71LE: VGT- I ARMSTRONG (TO BE S�LEGTED) VG7-2 ARMSTRONG (TO BE SELEGTED) ROOM � INISH � GOLOR SGH�DUL� - SOUTH l�llNC� WALLS NO. ROOM NAME FLOOR BASE NORTH EAST SOUTH y��ST R�MARKS GPT-I / 12' BORDER 141 OFFIGE � G�-3 VB-I VWG-I VWG-I VYVG-I VWG-I � GPT-3 142 WORK ROOM GpT-I PT-I PT-I PT-I PT-I 143 KITGHNETTE �/GT-I 144 GOA7S G�' � 145 GOATS G�'T- � 146 GONFERENGE G�-� � 12' BORDER � GPT-2 VWG-I VWG-I VYVG-I VWG-I � GPT-2 147 OPEN AREA G�-I PT-I PT-I PT-I PT-I 148 O�FIGE 14q GOATS GPT-I / . 150 GONFERENGE �IE GPT-2 VWG-I �/WG-I YYVG-I VWG-I � GPT-BORD�R 151 �,pRRIDOR GPT-I PT-I PT-I PT-I P7-I 152 LOBBY PT-I PT-I PT-I PT-I 153 LIBRARY VWG-I VWG-I VYVG-I VWG-I 154 OPEN AREA PT-I PT-I P7-I PT-I 155 OPEN AREA 15(� OFFIGE 15�1 pFFIGE �� OPEN AREA �� OPEN AREA �bp GORRIDOR I61 GONFERENGE �GPT-I / �/�„�-I �/WG-I VYVG-I VWG-I �2' BORDER GPT-2 � GPT-2 162 OFFIGE GPT-I PT-I PT-I PT-I PT-I 163 �,pATS 164 OFFIGE 165 pFFIGE I66 OFFIGE Ib�l �/ESTIBULE GPT-4 168 OFFIGE GPT-i �� OFF IGE ��� OFFIGE I�I WpRK ROOM 1�2 OFFIGE 2 3 C�E1��R�L 1�OTES ALL PLAN DIMENSIONS At?E TAKEN FROM GENTER OF NEW WALL TO GEN7ER OF NEW WAI_L AND fAGE OF EXISTING TO GENTER OF NEW WALL. D�L DOOR ROUCyH OPENIN�>5 SHALL BE FRAMED 4' FROM AD.IAGEN7 1NALL CARNER IRJLE55 OTHERWISE NOTED. PROYIDE BI_OGKING IN WALLS FOR ALL MILLWORK, WALL 5TOP5, HARDWARE AND GABIPIETRY Y�-IERE SPEGIFIED. ALL WOOD BLOGKING SHALL BE �IRE TREATED. 4. GEILING: EXISTING 24" X 48" SU�.�-'ENDED GRID AND EXISTING 24" X 48" GEILIN6 TILES TO REMIAN. 5. LI6HT5: 24" X 48" FLUORESGENT FIXTt1RE5 WITH PARABpLIG LENS. 6. TENANT 15 RESPONSIBLE FOR PROVIDING AND INSTALLING ALL TELEPHONE d GOMPUTER WIRINC�. ALL GABLE MJr.�T BE TELFON GOATED OR IN GONDUIT. �I. WHERE STRUGTURAL BEAMS, DUGTWORK ETG. PENE7RATE RA7ED PAR71710N5, GYPSIJM YVALL BOARD SHALL BF SGRIBED TO FIT TIGH7 AND GAIJ(_KED. 8. GENERAL GONTRAGTOR 5HA!_L BE RESPONSIBLE FOR FIELD GHEGKING ALL DIMENSIONS AND MEASUREMENTS. IF JOB GONDITIONS PREVENT OBTAINING DIMEN510N5 OR RE5ULT5 AS SFiOVV�1 OR SPEGIFIED, GONTRAGTOR SHALL BE RE5PON51Bl_E FOR INFORMING LAM50N d GONDON, tNG. BEFORE ANY GONSTRUGTION IS GOMPLETED. q. EAGH GONTRAGTOR SHAI_L VERIFY EXISTINC� GONDITIONS AS INDIGATED ON TH� DRAWINGS AND REPORT ANY DISGREPANGY THAT MAY OGGUR TO THE GENERAL GONTRAGT4R. ANY IRREGULARITIES SHALL BE REPORTED TO LAM50N d GONDON, ING., FROM THE GEWERAL GONTRAGTOR. 10. ALL DETAILS, MATERIALS, AND INSTALLATIONS O� SAME ARE Sl1BJEGT TO i=1NAL APPROVAL BY LAM50N d GONDON, ING. II. � DRAWINGS OR GA7ALOf� GUTS M115T BE SIJBMiTTED 70 LAMSON a GONDON, ING., ON ALL MATERIALS OR 17FM5 IF THE GONTRAGTOR GHOO�.�fS 70 DEVIATE �ROM 7HA7 SHOY�BV ON THE DRAWINGS OR IF 7HE DRAWING DOES NOT INDIGATE A SPEGIFIG MANUFAGTURER OR MODEL NJMBER. 12. GENERAL GONTRAGTOR SHALL EXPEDI7E PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS 70 ALLOW SUFFIGIENT TINtE FOR GHEGKING FABRIGA710N AND/OR ORDERING AND DELIVERY OF MATERIALS AND EQUIPMEN7. 13. THE GENERAL GONTRAGTOR SHALL BE RESPONSIBLE FOR OVERSEEINC� THAT ALL MATERIAL AND LA80R, SHALL BE IN AGGORDANGE WITH THE BEST QUALITY STANDARDS O� 7HE RESPEGTED TRADE. THE GENERAL GONTRAGTOR SHALL BE RESPONSIBLE FOR OVERSE�ING THA7 ALL WORK SHALL B� IN AGC,ORDANGE WITH 7HE STATE UNIFORM Bl11LDINC� GODES AND STANDARDS FOR ALL GENERAL GONSTRUGYION, MEGHANIGAL, AND ELEGTRIGAL WORK AND LOGAL AND FEDERAL GOD�S AND 57ANDARDS. 14. ALL TRADE GONTRAG70R5 SHALL WARRAN7Y ALL MA7�RIALS AND WORKMANSHIP �OR ONE YEAR FROM DA7E OF GONSTRUGTION GOMPLE710N. 15. THE GENERAL GONTRAGTOR SHALL GOORDINATE WITH THE LANDLORD, DAILY YVORKING HOURS, lNEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURIhIG HOLIDAYS. Ib. THE GENERAL GONTRAGTOR SHA!_L ESTrABL15H WITH THE LANDLORD GLEAN-UP PROGEDURES ANp GUIDELIIVES TO BE �OLLOY�D ON A DAILY BA515 IN ORpER TO GONDUGT BU51NE55 IN A SAFE AND GLEAN ENVIRONMENT. TFiE GENERAL GONTRAGTOR SHA�L GOORDINATE ELEYATOR USE AND PROTEGT THE EL�VATOR GABS AS THE LANDLORD REQUIRES. Il. THE GENERAL GONTRAGTOR SHALL MAINTAIN A GLEAR AND UNOBSTRUGTED PATHWAY TO ALL EXITS DURING DEMOL1710N AND NEW GONSTRUGTION. 18. THE GENERAL GONTRAG70R SHALL GOORDINA7E WITH 7HE LANDLORD, AN AREA fOR 57AGING OF GONSTRUG710N MATERIALS, EQUIPP�NT, DIJMP'STER ANp PARKING GONS7RUG710N ANp DELIVERY VEHIGLES. THE t1� OF EXISTING RESTRDOM FAGILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THO� DESIGNA7ED AREAS SHALL BE USED BY �,pNSTRIJGTION GREWS. 19. IN GONSTRUGTION OF A h�71-7ENANT FLOOR, OR A REMppEL pF EX15TING TENANT, THE GENERAL GONTRAGTOR SHALL U5E D1J57 PAR7ITIONS 70 MINIMIZE DISTURBANGES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND GONSTRUGTION WpRK. DUST PARTITIONS SHALL BE GON57RUG7ED OF 2 X 4 Yy00D 57UD5 AT 24" ON GENTER, INSULATION AND b MIL VAPOR BARRIER ON EAGH SIDE. DInT PARTITIONS SHALL EXTEND FROM F�QpR 70 GEILING. THE USE AND 40GA710N OF DU�",�T PARTITIONS SHA4L BE GOORDINATED WITH THE LANDLORD. 20. GONTRAG70R 70 ALLOW FOR UNLEVEL FL.00R GONDITIONS. A4L EXI571NG FLOOR AND WALL SlJB6TRATES SHAI_L BE 4E1/ELED AND PATGHED AS REQUIf2ED TO REGEI�/E NEW GONSTRt1GTION AND FINI5HE5. AD.JUS7 DOORS AND FRAM�S AS REQUIRED. I:\q8101\�'REL1M DI/22/q8 12:13:30 pm � J �� �