HomeMy WebLinkAbout1186.97.9DECK Ff3AMING NOTES:
1. ONE ROW OF JOIST BRIDGING IN CENTER OF
JOIST SPANS 9 AND GREATER. (U.N.O.)
2. JOIST LAYOUT TO BE 2X10 MATERIAL
AT 15 O.C. UNLESS NOTED OTHERWISE
3. ALL FLOOR SYSTEM MEMBERS IN CONTACT WITH
CONCRETE SHALL BE OF TREATED MATERIAL
4. ALL BAND BOARD MATERIAL AT FRONT PORCH AND
REAR PATIOS SHALL BE TREATED WHEN IN CONTACT
WITH CONCRETE.
i WALLS BELOW ARE SHOWN AS DASHED UtES
& FIXTURES (ON THIS FLOOR LEVEL) ARE SHOWN DASHED
7. DIMENSIONS GIVEN TO JOISTS BELOW WALLS (SEE
LEGEND BELOW) ARE TO CENTER -LINE OF JOIST
ASSEMBLY (CENTER OF 1,2, or 3 200s) U.N.O.
ds"I
LEGEND - FLOOR DECK PLAN
X SINGLE JOIST HANGER
0 DOUBLE JOIST HANGER
T TRIPLE JOIST HANGER
01 ADD SINGLE JOIST UNDER WALL ABOVE
02 - ADD DOUBLE JOIST UNDER WALLABOVE
Q • ADD TRIPLE JOIST UNDER WALL ABOVE
2 DOUBLE JOISTS AT THIS LOCATION
3 TRIPLE JOISTS AT THIS LOCATION
v • QUADRUPLE JOISTS AT THIS LOCATION
SECOND FLOOR DECK FRAMING PLAN
B Elevation
scale: 1/4' =1' -0"
SCALE -1/4' =1' -0"
Of
a
INS
Z
0
GJ
cz
0
A8
08%0197