HomeMy WebLinkAboutSite Plan106TH STREET S 69'51'51 "E 165.00'
S 89 °51'51 "E 252.19' - - - - -- --- - - - - --
PK NAIL
(FOUND)
_ _____ __________ _____________________
X - _
LOT 2 X - ------ - - - - -- -
X WOODED
\ t
NOTES: ALL WATER AND SANITARY SEWER LINES \
SHALL BE BACKFILLED WITH SAND \ -
THE WATER LINES SHALL BE INSTALLED \
AT A MINIMUM DEPTH OF 48" N
0 1
A FIELD REPRESENTATIVE FOR INDIANA GAS X X 1
SHOULD BE ON SITE AT TIME OF WATER LINE
CONSTRUCTION TO VERIFY THERE IS NO DAMAGE
TO THE EXISTING PIPELINE
I '
Indicates point located" in field /
Driveway altered to,hit center
of circle
Proposed 20' Waterline
,'Eassement 1'
WATERMETER PIT
USE CAPPED REBARS '
(FOUND)
\ \. e 1 2
5�1y L 0
�
- -- „� 61.9
. �C\'j► B_B `'� , , ' ' PROPOSED \
m ,��dr DRIVE \ ° o
Va
PK NAIL
(FOUND)
-- - - - - -- -------- y -
- -- - .- - -- - - - - 095
NEW 8 "_LATERAL___ -- _
aw
�--Cl - - -- ----------- 1 M� nor
/ PROPOSED PROPOSED HOUSE g
— — — TAP TO EXISTING ALTERAL_ _ 835 — / DRIV$ -- a GARAGE FINISHED FLOOR • 843.0 m
BASEMENT FF • 832.4 41
2W all r \4 u7
U3, - -
' — aw - --
-----------
---------------------
lQ
- -------------- -- - - - - --
1 - - -- -----------
- - -__ -
1
11 - WOODED
1 ----------- \ \ _ tat
1 \ \
o '-
0
1 w 825 -
°°` - - -i
1
of S' i '
red to
and of c MSE CAPPED REBAR ,� ` ✓ `
' (FOUND)
MSE CAPPEI REBAR
(FOUND
'e od 1 N 89° 49'27 "E 286.66'
1"' 1
)9--------------- - - - - -- 20'U.& D_E_----------------------
20' B.S.L.
i
% 7 PI.SPIA/hp P.