Loading...
HomeMy WebLinkAboutSite Plan106TH STREET S 69'51'51 "E 165.00' S 89 °51'51 "E 252.19' - - - - -- --- - - - - -- PK NAIL (FOUND) _ _____ __________ _____________________ X - _ LOT 2 X - ------ - - - - -- - X WOODED \ t NOTES: ALL WATER AND SANITARY SEWER LINES \ SHALL BE BACKFILLED WITH SAND \ - THE WATER LINES SHALL BE INSTALLED \ AT A MINIMUM DEPTH OF 48" N 0 1 A FIELD REPRESENTATIVE FOR INDIANA GAS X X 1 SHOULD BE ON SITE AT TIME OF WATER LINE CONSTRUCTION TO VERIFY THERE IS NO DAMAGE TO THE EXISTING PIPELINE I ' Indicates point located" in field / Driveway altered to,hit center of circle Proposed 20' Waterline ,'Eassement 1' WATERMETER PIT USE CAPPED REBARS ' (FOUND) \ \. e 1 2 5�1y L 0 � - -- „� 61.9 . �C\'j► B_B `'� , , ' ' PROPOSED \ m ,��dr DRIVE \ ° o Va PK NAIL (FOUND) -- - - - - -- -------- y - - -- - .- - -- - - - - 095 NEW 8 "_LATERAL___ -- _ aw �--Cl - - -- ----------- 1 M� nor / PROPOSED PROPOSED HOUSE g — — — TAP TO EXISTING ALTERAL_ _ 835 — / DRIV$ -- a GARAGE FINISHED FLOOR • 843.0 m BASEMENT FF • 832.4 41 2W all r \4 u7 U3, - - ' — aw - -- ----------- --------------------- lQ - -------------- -- - - - - -- 1 - - -- ----------- - - -__ - 1 11 - WOODED 1 ----------- \ \ _ tat 1 \ \ o '- 0 1 w 825 - °°` - - -i 1 of S' i ' red to and of c MSE CAPPED REBAR ,� ` ✓ ` ' (FOUND) MSE CAPPEI REBAR (FOUND 'e od 1 N 89° 49'27 "E 286.66' 1"' 1 )9--------------- - - - - -- 20'U.& D_E_---------------------- 20' B.S.L. i % 7 PI.SPIA/hp P.