HomeMy WebLinkAbout0396.97.81st FLOOR ROUGH FRAMING NOTES!
0411 s +,m
d
r•T Lr
1.
USE M-W CRPHPLES UNDER EACH END OF HErDER
■ '^r '�
31.0 itr
FOR OPENINGS Z %T OR GREATS NWDTH
• xmWaaa�a
• ■ptT311O10
1
� �
2
REFER TOMECHANM RAN FOR BU(HEADAM
r -a,rr rr
lralrr
H
DROP CEILING LOCATIONS.
_,
3.
ALL BEWTO HAVE YINNUMla- ZFA STUDS UNDER
- ----�
—
-------------- _
----- - - - - - --
EACH ETD FOR BEARING SUPPORT
4.
PROVIDE (2fWC HEADER ATF>'AEPLAC:OPENING
r-r ra•
S.
ALLWALLS TO SE 2[4STUDS AT 1C O.C. UHLESS
b
NOTED OTHERWISE
B.
ALLWNDOWS TD HAVE CHP CAP MATT: MAT TOP
a
1.
STANDARD HEADER HEW TO BEAT C- 101/✓t' A.F.F. (UXO.)
iSRWI
L
FIGH FLOOR R SARETOFf719HCQiOTCFLOOR
FORSIA KANS40TO TOP OFDEC(NG FOR CF1K
mwewoi
PDX BASEMENT, AND FULL BASBENTPLANS
e od-10
ua3r
0411 s +,m
10'4,10
r•T Lr
9.331r
7-3 TV
31.0 itr
2lFN1RF(3GH11
• ^I WALL•i0P�T0
1
� �
b
sa•
r -a,rr rr
lralrr
H
b
_,
--
- ----�
—
-------------- _
----- - - - - - --
sa12 sa
r-r ra•
ea rr
b
iv
a
iSRWI
LLi
All
S•11 3M' 1 r -113K'
7• wr rd Sr I S•S tr t 8 =512•
11'•111?
rM 1)r
I 12.11•
a••r
SECOND FLOOR FRAME PLAN
A Elevation scale: 1/4" =1' -0"
•
>a>a
' -�
; maa �
i
C�4
A9
SCALE •,1/4' =1'•0' 04/05/96