HomeMy WebLinkAbout0423.97.91St 0 G i
1. USE 0.2%4 CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS i' -0' 08 GREATER W WIDTH
2 FE-ER TO MECHANICAL PLAN FOR BUU(HEAD AND
DROP CEILING LOCATIONS.
3. ALLBEAMS To RAVE MINIMUM (Z-a4 STUDS UNDER
EACH END FOR BEARING SUPPORT
4. PROVIDE (. 2).2xto HEADER AT FIREPLACE OPENING
5. ALL WALLS TO BE 24 STUDS AT 15 O.C. UNLESS
NOTED OTHERWISE
6
ALL WMOWSTO HAVE DRIP CAPMATERNLATTOP
7. STANDARD HEADER HEIGHT TO BEAT 540 7WAFF. (Uxa)
I. FINISH FLOOR REFERENCES ARE TO FRO aKFETERM
FOR SLAB PLANS AND TO 70P CF DECKf4FOR O W
PARTX BASEMENT, AND FULL BASEL ® RA
50',70'
SCALE • 1/4' =1'•0'
U P1
0
0
7 A7
9 295