HomeMy WebLinkAbout1140.97.122nd FLOOR ROUGH FRAMING NOTES
1. USE (2M2(4 CRIPPLES UNDER EACH END OF HEADER
FOR OPENINGS 8' -0' OR GREATER IN WIDTH
2 REFER TO MECHANICAL PLAN FOR BUMEAD AND
DROP CEILING LOCATIONS.
I All BEAMS TO HAVE MINIMUM (2y2(4 STUDS UNDER
EACH END FOR BEARING SUPPORT
4. ALL WALLS TO BE 2x4 STUDS AT 16' O.C. UNLESS
NOTED OTHERWISE
S ALL WINDOWS TO HAVE DRIP CAP MATERIAL AT TOP
6. STANDARD HEADER HEIGHT AT 6' -10 X A.F.F. (UAO.)
7. FINISH FLOOR REFERENCES ARE TO TOP OF DECIN
I
i
dwilo
B-0 25312-
7-112' 7.1011T t
ia•9I/T 6-9'
PERIM
it b
I
'
-�I H4FWALLAT
a
fl00M i4
22.12' AFF.
3'
-1•
tU•1'
3412' 7I 51-0'
9.317
e
�
I
� •1
MSTR BATH � �
ALLwVI>DCAP
� N
?z �
V
7.412' ' 4--aa•
I BATH #2
T-1- °•° 7.7'
ATOCACCF.SS
SffOETAILAI
I
�j7x121EAC6i
-
_
- - -J
__
OOC3SAiBFAPoIG
ry
OF
®
53'
F11 S -0.
17.8'
S•9'
12
L
oumWW1
t
31314'
5. 101/4'
7.4314'
7.71314'
7.412'
5.81/4'
5.101/4'
17.734'
7'•411r
11312'
31'312'
SECOND FLOOR FRAME PLAN
Wdu
SCALE -114" = V-17
�N
�ou
DQi
w wIw
¢ ¢ ¢
cn
¢
C.7
z
a4c www
y
Z
O
a
O
A9
DAT :
11/13 95