Loading...
HomeMy WebLinkAboutPlot Plan pg 2STABILIZATION PRACTICE JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC. PERMANENT A SEEDING DORMANT B B -� SEEDING SEEDING Y C� SODDING F ** * / / / / /I / / / //* MULCHING G A - KENTUCKY BLUEGRASS 40 LBS /ACRE; CREEPING RED FESCUE 40 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 20 LBS /ACRE. 8 = KENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE; PLUS 2 TONS STRAW MULCH /ACRE. OR ADD ANNUAL RYEGRASS 30 LBS /ACRE. C = SPRING OATS 3 BUSHEL /ACRE. D = WHEAT OR RYE 2 BUSHEL /ACRE. E - ANNUAL RYEGRASS 40 LBS /ACRE. F = SOD G = STRAW MULCH 2 TONS /ACRE. */I /* IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER ** IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD SEASONAL SOIL PROTECTION CHART (NO SCALE) EROSION CONTROL: A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING OR FILL HAVE BEEN GRADED SHALL BE SEEDED FOR SILT EROSION PROTECTION. AFTER GRADING, ALL CONSTRUCTION AREAS ARE TO BE SEEDED AS FOLLOWS: A. SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRUCTION LIMITS WITH 5# /ACRE "REDTOP GRASS ", 20# /ACRE "RYE GRASS ", 20# ACRE "BLUEGRASS ", 25# /ACRE "FESCUE" AND 600# /ACRE 12 -12 -12 FERTILIZER. B. CUT /FILL SEEDING (ALONG PAVED AREAS): SEED AND FERTILIZE WITH 25# /ACRE "FESCUE", 20# /ACRE "RYE GRASS ", 15# /ACRE "BLUEGRASS" AND 600# /ACRE 12 -12 -12 FERTILIZER. C. SEEDED AREAS SHALL HAVE A SUITABLE MULCH APPLIED FOR EROSION AND SILT CONTROL. MULCH MAY BE STRAW, SHREDDED HARDWOOD OR EROSION CONTROL MAT. D. DEVELOPERS OPTION: CONSTRUCTION AREAS REQUIRING EROSION CONTROL MAY BE HYDROSEEDED IN ACCORDANCE WITH ABOVE SEED AND FERTILIZER SPECIFICATIONS. AREA OF iA TAP TO B R T D TO ORIG ION.