Loading...
HomeMy WebLinkAbout09120027.16FIBERGLASS / ASPHALT SHINGLES: - w/ 15# ROOF FELT 7/16" O.S.B. ROOF SHEATHING: - - w/ PLY -CLIPS 10° O.H 1x8 GUTTER BOARD: - w/ ALUMINUM GUTTER 3/8" SOFFIT: - W/ ALUMINUM VENT @ 48" O.0 15 /" BARGE MOULD 1/z" x 12" HARDBOARD FRIEZE: - - TRIM TO MATCH WINDOW HEADER HEIGHTS "J" CHANNEL w/ FINISH TRIM, TYP. HORIZONTAL SIDING 2x4 FRAME WALL: - W/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) R -19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS 2x4 FRAME WALL: , - w/ R -13 KRAFT FACED I BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) 2" x 3" METAL DRIP FLASHING, TYP. - w/ 1" HEM - NAIL TO SHEATHING - USE 1" ROOFING NAILS @ EA. STUD 2%4" x 5" LIMESTONE SILL, TYP. - PULL BTM. 1 "f - SLOPE %4" MIN. APPROXIMATE 1" AIR SPACE T ALLOW FOR STANDARD CONSTRUCTION TOLERANCES, SUCH AS MORTAR PROTRUSION, SQUARENESS OF FOUNDATION, ETC. THE INTENT OF THE AIR SPACE BEHIND THE BRICK VENEER IS TO ALLOW MOISTURE THAT ENTERS THE CAVITY TO MIGRATE DOWN AND OUT THROUGH THE +i BRICK WEEPHOLES. N 4' -0 "h. BRICK VENEER: - W/ METAL WALL TIES @ 24" O.C. VERT. (9 BRICK COURSES) 16" O.C. HORIZONTAL R -19 BATT INSULATION - CONTINUOUS ALONG BAND BOARDS FLASHING 2x4 PRESSURE - TREATED SILL PLATE: - STRAPPED TO FOUNDATION v PER MANUFACTURER'S RECOMMENDATION - APPLY CONTINUOUS POLY SILL SEALER TO SILL R, TYP. - BRICK WEEPHOLES @ 24" O.C. HORIZONTAL - w/ WEEP CARDS FINISH GRADE - VARIES - SEE EXTERIORS, SHEET # A1.0 z - HOLD DOWN MIN. 8 1/2" %" FROM TOP OF WALL O.H. (2) #4 RE -BARS: - CONTINUOUS AROUND PERIMETER OF FDN. - MINIMUM 2" COVERING NOTE: 8" THICK WALLS ONLY!! VERTICAL #4 RE -BARS @ 18" O.C., VERTICAL SPACING - MAINTAIN MINIMUM 2" COVER - EXTEND 18" BELOW BTM/ CURB 8" THICK CAST -IN -PLACE CONCRETE FOUNDATION WALL: - UNLESS NOTED OTHERWISE ON FOUNDATION PLAN BITUMINOUS ASPHALT ALL WALL TIES, CONTROL JOINTS, & COLD JOINTS. SPRAY APPLY (2) COATS BITUMINOUS DAMPROOFING BELOW GRADE,TYPICAL. - REFER TO FOUND. PLAN FOR WATERPROOFING INFO. IF REQUIRED. NOTE: POUR BASEMENT SLAB BEFORE BACKFILLING - OTHERWISE PROVIDE CONTINUOUS 2x4 KEY -WAY IN FOOTING 8 "x18" CONCRETE FOOTING: (UNLESS NOTED OTHERWISE) 1Ij I1►_ M� M� G I I 4 rl c 4 c c I F a u 2 `J' PRE - ENGINEERED WOOD ROOF TRUSSES: @ 24" O.C. INSULATION BAFFLE LJ - IN EA. TRUSS SPACE R -38 BLOWN -IN INSULATION UNLESS NOTED OTHERWISE ON PLAN T/ 2nd FLR. DBL. TOP R DRYWALL DBL. 2x4 TOP PLATE 2x2 NAILER %" DRYWALL 2x No. 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS T &G O.S.B. SUBFLOOR: GLUED, NAILED, AND SCREWED 2nd FLR. SUBFLR. o` a+ T/ 1st FLR. DBL. TOP R 1/" DRYWALL DBL. 2x4 TOP PLATE %z" DRYWALL co z z a it 0 0 u- W OJ W 2x No. 1 KD SOUTHERN 1x8 RAKE BOARD PER PLAN 7/16" O.S.B. ROOF @ 16" OR 19.2" O.C. @ 24" O.C. - SEE FRAMING PLANS SHEATHING FOR SIZE OF JOISTS GABLE EXTENSION: 4V2' GABLE w/ STUDS @ 16" O.C. - GLUED, NAILED, AND SCREWED - 2x6 BLOCKS @ 24" O.C. 1st FLR. SUBFLR. - w/ R -13 KRAFT FACED T/ 2nd FLR. DBL. TOP R ON ix6's BATT INSULATION PRE- ENGINEERED WD, BACKFILLING 3/8" SOFFIT 03 T/ FDN. WALL ROOF TRUSSES: 03 T/ FDN. WALL S -B /„ @ 24" O.C. U) w = 15 /" BARGE MOULD BASEMENT INSULATION NOT SHOWN -B 1x8 GABLE FRIEZE: TYPE AND DEPTH VARIES R -38 BLOWN -IN INSUL. O N - ON 2X WIDE 5/4 NAILERS C r ��C 7r, �� vn J 7 OTHERWISE ON PLAN - SEE NOTES ON FOUNDATION F W BASEMENT INSULATION NOT PLAN FOR SPECIFIC INFO W x THERMO -PLY SHEATHING: (STRUCTURAL ��� U0 6 MIL POLY VAPOR & WATER REPELLENT) JCS 1/" DRYWALL - 8 "thk. WALLS -GABLE SHT'G TO OVERLAP WALL SHT'G w c� - PROVIDE #4 REBARS SPACED o 2" MINIMUM. VERTICALLY @ 22" o.c. & (3) T/ 1st FLR. DBL. TOP R R -19 BATT INSULATION: N BRICK VENEER: = z 9' -0 "h. FOUNDATION WALLS - REFER TO NOTES ON SECTIONS BAND BOARDS °' DBL. 2x4 TOP PLATE = SECTION - BRICK GABLE w/ EXTENDED RAKE 0 VERTICALLY @ 19" o.c. & (4) 0 � ° o #4 REBARS HORIZONTALLY 07 SCALE: Z 3/4" = V -0" 0 u 1x8 RAKE BOARD ONE HORIZ. BAR SHALL BE 7/16" O.S.B. ROOF O WITHIN THE TOP 24 ", ONE IN 07 Q Q� SHEATHING THE BOTTOM 24" w/ THE 1x6 BACK -UP 41/" REMAINING BARS EQUALLY x VERTICALLY @ 22" o.c. & (3) e SPACED, MIN. 2" CONCRETE GABLE w/ STUDS G THERMO -PLY SHEATHING CANT. @ 16" O.C. WALL & FACE OF HORIZ. BARS (STRUCTURAL & WATER REPELLENT) z 9' -0 "h. FOUNDATION WALLS PRE - ENGINEERED WD. HORIZONTAL SIDING - EA. SIDE OF FOOTING ROOF TRUSSES: @ 24" O.C. _ METAL FLASHING R -38 BLOWN -IN INSUL. - PIPE TO DAYLIGHT lx BAND BOARD: PLAN FOR SPECIFIC INFO - UNLESS NOTED - SPECIFIC TO EXTERIOR �� O� OTHERWISE ON PLAN ELEVATIONS, SHEET # A1.0 #4 REBARS HORIZONTALLY 2x10 BLOCKING z D BRICK VENEER: I DRYWALL U 0 - REFER TO NOTES ON SECTIONS IJ Z ONE HORIZ. BAR SHALL BE THERMO -PLY SHEATHING 0 THERMO -PLY SHT'G (STRUCTURAL & WATER REPELLENT) - 8 "thk. WALLS CONT. @ UNDERSIDE 06SECTION - SIDED GABLE OVER BRICK OFBLK'G,TYP. W SCALE: 3/4" = V -0" 1x8 RAKE BOARD 7/16" O.S.B. ROOF z SPACED, MIN. 2" CONCRETE SHEATHING o COVER BTWN INSIDE FACE OF o GABLE w/ STUDS = Lu WALL & FACE OF HORIZ. BARS @ 16" O.C. z 9' -0 "h. FOUNDATION WALLS PRE - ENGINEERED WD. w 2x4 CONTINUOUS c ROOF TRUSSES: LL 4" 0 DRAIN TILE: - 10 "thk. WALLS co @ 24" O.C. a z 0 - EA. SIDE OF FOOTING C� (J�) a - PROVIDE #4 REBARS SPACED THERMO -PLY SHEATHING: (STRUCTURAL �� 0 & WATER REPELLENT) J J ��r r O� C� J v R -38 BLOWN -IN INSUL. - UNLESS NOT ED ED 0 -GABLE SHT'G TO OVERLAP WALL SHT'G OTHERWISE PLAN ON 31/" THICK CONCRETE 2" MINIMUM. ° 0 Q SLAB m %" DRYWALL °o BRICK VENEER: - ON MIN. 4" GRAVEL BASE 00 - REFER TO NOTES ON SECTIONS ^ DBL. 2x4 TOP PLATE o SECTION - BRICK GABLE / END WALL 0 05SCALE: O r1i 0"" *-.. 3/4" = V-0" ci 000 02 �-- U_ S -B o REMAINING BARS EQUALLY '-' T/ FDN. WALL FLASHING DBL. 2x TOP PLATE z Ln L F- 4" 0 DRAIN TILE: 2x PRESSURE - TREATED SILL - w/ GRAVEL FILL z g g a o ~ PLATE: - STRAPPED TO FOUNDATION - PIPE TO DAYLIGHT z 00 a q 0 ii PER MANUFACTURER'S - TYPICAL 0 z o RECOMMENDATION 3%" THICK CONCRETE 0 o - APPLY CONTINUOUS POLY SLAB ° u- SILL SEALER TO SILL 2, TYP. - ON MIN. 4" GRAVEL BASE � CO o W CC U- BRICK WEEPHOLES ` 6 MIL POLY VAPOR W @ 24" O.C. HORIZONTAL BARRIER - w/ WEEP CARDS :7�7 T/ SLAB FINISH GRADE - VARIES z T/ FOOTING M - SEE EXTERIORS, SHEET # A1.0 H a o - HOLD DOWN MIN. 7" FROM TOP OF WALL ° �.. - co FOUNDATION SUBWALL - - THICKNESS VARIES ° a 09 - REFER TO PLAN S -B FOOTING WIDTH PE HICK RIGID INSULATION VARIES R PLAN a ° - 24" DEPTH a I- @ ALL AREAS WHERE GRADE COVERS 30" OR LESS °a OF THE FDN. WALL ABOVE ° aa THE T/ SLAB QY 1" BEVELED INSULATION ° O ° O 3" 0 DRAIN TILE: z WALL SECTION - -THRU SUBWALL @ 6' -0" O.C. - PLACE @ BOTTOM OF SUBWALL w BASEMENT WALKOUT w/ BRICK TO GRADE 04SCALE: 3/4" = V -0" FIBERGLASS / ASPHALT SHINGLES: - w/ 15# ROOF FELT 7/16" O.S.B. ROOF SHEATHING: - - w/ PLY -CLIPS 10° O.H 1x8 GUTTER BOARD: - w/ ALUMINUM GUTTER 3/8" SOFFIT: - W/ ALUMINUM VENT @ 48" O.0 15 /" BARGE MOULD 1/z" x 12" HARDBOARD FRIEZE: - - TRIM TO MATCH WINDOW HEADER HEIGHTS "J" CHANNEL w/ FINISH TRIM, TYP. HORIZONTAL SIDING 2x4 FRAME WALL: - W/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) R -19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS 2x4 FRAME WALL: , - w/ R -13 KRAFT FACED I BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) 2" x 3" METAL DRIP FLASHING, TYP. - w/ 1" HEM - NAIL TO SHEATHING - USE 1" ROOFING NAILS @ EA. STUD 2%4" x 5" LIMESTONE SILL, TYP. - PULL BTM. 1 "f - SLOPE %4" MIN. APPROXIMATE 1" AIR SPACE T ALLOW FOR STANDARD CONSTRUCTION TOLERANCES, SUCH AS MORTAR PROTRUSION, SQUARENESS OF FOUNDATION, ETC. THE INTENT OF THE AIR SPACE BEHIND THE BRICK VENEER IS TO ALLOW MOISTURE THAT ENTERS THE CAVITY TO MIGRATE DOWN AND OUT THROUGH THE +i BRICK WEEPHOLES. N 4' -0 "h. BRICK VENEER: - W/ METAL WALL TIES @ 24" O.C. VERT. (9 BRICK COURSES) 16" O.C. HORIZONTAL R -19 BATT INSULATION - CONTINUOUS ALONG BAND BOARDS FLASHING 2x4 PRESSURE - TREATED SILL PLATE: - STRAPPED TO FOUNDATION v PER MANUFACTURER'S RECOMMENDATION - APPLY CONTINUOUS POLY SILL SEALER TO SILL R, TYP. - BRICK WEEPHOLES @ 24" O.C. HORIZONTAL - w/ WEEP CARDS FINISH GRADE - VARIES - SEE EXTERIORS, SHEET # A1.0 z - HOLD DOWN MIN. 8 1/2" %" FROM TOP OF WALL O.H. (2) #4 RE -BARS: - CONTINUOUS AROUND PERIMETER OF FDN. - MINIMUM 2" COVERING NOTE: 8" THICK WALLS ONLY!! VERTICAL #4 RE -BARS @ 18" O.C., VERTICAL SPACING - MAINTAIN MINIMUM 2" COVER - EXTEND 18" BELOW BTM/ CURB 8" THICK CAST -IN -PLACE CONCRETE FOUNDATION WALL: - UNLESS NOTED OTHERWISE ON FOUNDATION PLAN BITUMINOUS ASPHALT ALL WALL TIES, CONTROL JOINTS, & COLD JOINTS. SPRAY APPLY (2) COATS BITUMINOUS DAMPROOFING BELOW GRADE,TYPICAL. - REFER TO FOUND. PLAN FOR WATERPROOFING INFO. IF REQUIRED. NOTE: POUR BASEMENT SLAB BEFORE BACKFILLING - OTHERWISE PROVIDE CONTINUOUS 2x4 KEY -WAY IN FOOTING 8 "x18" CONCRETE FOOTING: (UNLESS NOTED OTHERWISE) 1Ij I1►_ M� M� G I I 4 rl c 4 c c I F a u 2 `J' PRE - ENGINEERED WOOD ROOF TRUSSES: @ 24" O.C. INSULATION BAFFLE LJ - IN EA. TRUSS SPACE R -38 BLOWN -IN INSULATION UNLESS NOTED OTHERWISE ON PLAN T/ 2nd FLR. DBL. TOP R DRYWALL DBL. 2x4 TOP PLATE 2x2 NAILER %" DRYWALL 2x No. 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS T &G O.S.B. SUBFLOOR: GLUED, NAILED, AND SCREWED 2nd FLR. SUBFLR. o` a+ T/ 1st FLR. DBL. TOP R 1/" DRYWALL DBL. 2x4 TOP PLATE %z" DRYWALL co z z a it 0 0 u- W OJ W 2x No. 1 KD SOUTHERN PRE - ENGINEERED WOOD PINE FLOOR JOISTS: - w/ METAL WALL TIES @ @ 16" OR 19.2" O.C. @ 24" O.C. - SEE FRAMING PLANS INSULATION BAFFLE FOR SIZE OF JOISTS 16" O.C. HORIZONTAL 5/" T &G O.S.B. SUBFLOOR: R -38 BLOWN -IN INSULATION - GLUED, NAILED, AND SCREWED - UNLESS NOTED OTHERWISE ON PLAN 1st FLR. SUBFLR. - w/ R -13 KRAFT FACED T/ 2nd FLR. DBL. TOP R _ 1/" DRYWALL BATT INSULATION - SEE FRAMING PLANS BACKFILLING - UNLESS NOTED OTHERWISE 03 T/ FDN. WALL - PIPE TO DAYLIGHT 03 T/ FDN. WALL S -B /„ NOTE: U) w = $" T &G O.S.B. SUBFLOOR: BASEMENT INSULATION NOT SHOWN -B - GLUED, NAILED, AND SCREWED TYPE AND DEPTH VARIES O O N PER PLAN a x x .N...N.i - SEE NOTES ON FOUNDATION F W BASEMENT INSULATION NOT PLAN FOR SPECIFIC INFO W x v � NOTE: U0 6 MIL POLY VAPOR 8' -0 "h. FOUNDATION WALLS (n ° ° o O O o - 8 "thk. WALLS O M w c� - PROVIDE #4 REBARS SPACED o 00 VERTICALLY @ 22" o.c. & (3) T/ 1st FLR. DBL. TOP R R -19 BATT INSULATION: N #4 REBARS HORIZONTALLY = z 9' -0 "h. FOUNDATION WALLS w BAND BOARDS °' - 10 "thk. WALLS co = z - PROVIDE #4 REBARS SPACED w 0 0 VERTICALLY @ 19" o.c. & (4) 0 � ° o #4 REBARS HORIZONTALLY 0 0 Z FOR ALL WALL HEIGHTS: -1 0 u 0 ONE HORIZ. BAR SHALL BE m O WITHIN THE TOP 24 ", ONE IN 07 Q Q� o - PROVIDE #4 REBARS SPACED THE BOTTOM 24" w/ THE Q U- REMAINING BARS EQUALLY x VERTICALLY @ 22" o.c. & (3) e SPACED, MIN. 2" CONCRETE — G COVER BTWN INSIDE FACE OF = g WALL & FACE OF HORIZ. BARS PER PLAN z 9' -0 "h. FOUNDATION WALLS 4" 0 DRAIN TILE: - EA. SIDE OF FOOTING u - 10 "thk. WALLS co _ - w/ GRAVEL FILL - PIPE TO DAYLIGHT J J 9 PLAN FOR SPECIFIC INFO 31 /z" THICK CONCRETE VERTICALLY @ 19" o.c. & (4) 0 � SLAB o - ON MIN. 4" GRAVEL BASE #4 REBARS HORIZONTALLY o o • 6 MIL POLY VAPOR ° BARRIER 00 o T/ SLAB T/ FOOTING �� GRAVEL FILL a �/ oo /° ° 1 Boat° 3" 0 DRAIN TILE: oD Go - THRU FOOTING @ 6' -0" O.C. - PLACE @ BOTTOM OF FT'G. ;l WALL SECTION - LOW BRICK / SIDING 03SCALE: 3/4" = V -0" FIBERGLASS / ASPHALT SHINGLES: - w/ 15# ROOF FELT 7/16" O.S.B. ROOF SHEATHING:- - w/ PLY -CLIPS 10" O.H. U � ' Lu 1x8 GUTTER BOARD: - w/ ALUMINUM GUTTER 3/" SOFFIT: - w/ ALUMINUM VENT @ 48" O.0 15 /8" BARGE MOULD 1/" x 12" HARDBOARD FRIEZE: - - TRIM TO MATCH WINDOW HEADER HEIGHTS "J" CHANNEL w/ FINISH TRIM, TYP. HORIZONTAL SIDING 2x4 FRAME WALL: - w/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) - R-19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS 2" x 3" METAL DRIP FLASHING, TYP.- - w/ 1" HEM - NAIL TO SHEATHING - USE 1" ROOFING NAILS @ EA. STUD 21/4" x 5" LIMESTONE SILL, TYP. - PULL BTM. 1 "t - SLOPE %4" MIN. APPROXIMATE 1" AIR SPACE TO ALLOW FOR STANDARD CONSTRUCTION TOLERANCES, SUCH AS MORTAR PROTRUSION, SQUARENESS OF FOUNDATION, ETC. THE INTENT OF THE AIR SPACE BEHIND THE BRICK VENEER IS TO ALLOW MOISTURE THAT ENTERS THE CAVITY TO MIGRATE DOWN AND OUT THROUGH THE BRICK WEEPHOLES. T/ WINDOW M N BRICK VENEER: PRE - ENGINEERED WOOD 2 - w/ METAL WALL TIES @ 2x No 1 KD SOUTHERN @ 24" O.C. 24" O.C. VERT. (9 BRICK COURSES) INSULATION BAFFLE LJ 16" O.C. HORIZONTAL Wlz R -38 BLOWN -IN INSULATION 2x4 FRAME WALL: - UNLESS NOTED OTHERWISE ON PLAN @ 16" OR 19.2" O.C. - w/ R -13 KRAFT FACED T/ 2nd FLR. DBL. TOP R _ 1/" DRYWALL BATT INSULATION - SEE FRAMING PLANS BACKFILLING - UNLESS NOTED OTHERWISE 03 T/ FDN. WALL - PIPE TO DAYLIGHT ON PLAN /„ THERMO -PLY SHEATHING U) w = $" T &G O.S.B. SUBFLOOR: (STRUCTURAL & WATER REPELLENT) Z -B - GLUED, NAILED, AND SCREWED - GLUED, NAILED, AND SCREWED O O N O N a x x .N...N.i v F W BASEMENT INSULATION NOT - 4" GRAVEL BASE W x v � 2 U0 6 MIL POLY VAPOR M (n ° ° o O O o - TYPE AND DEPTH VARIES O M w c� m rn o 00 w T/ 1st FLR. DBL. TOP R R -19 BATT INSULATION: N 00 + < - a SEE NOTES ON FOUNDATION - CONTINUOUS ALONG v u? = , w BAND BOARDS °' .1 M W Z co co W FLASHING 2x4 PRESSURE - TREATED SILL PLATE: - STRAPPED TO FOUNDATION PER MANUFACTURER'S RECOMMENDATION APPLY CONTINUOUS POLY SILL SEALER TO SILL R, TYP. BRICK WEEPHOLES @ 24" O.C. HORIZONTAL - w/ WEEP CARDS 0 FINISH GRADE - VARIES - SEE EXTERIORS, SHEET # A1.0 - HOLD DOWN MIN. 7" FROM TOP OF WALL (2) #4 RE -BARS: - CONTINUOUS AROUND PERIMETER OF FDN. - MINIMUM 2" COVERING NOTE: 8" THICK WALLS ONLYH VERTICAL #4 RE -BARS @ 18" O.C., VERTICAL SPACING - MAINTAIN MINIMUM 2" COVER - EXTEND 18" BELOW BTM/ CURB 8" THICK CAST -IN -PLACE CONCRETE FOUNDATION WALL: - UNLESS NOTED OTHERWISE ON FOUNDATION PLAN BITUMINOUS ASPHALT ALL WALL TIES, CONTROL JOINTS, & COLD JOINTS. - SPRAY APPLY (2) COATS BITUMINOUS DAMPROOFING BELOW GRADE,TYPICAL. - REFER TO FOUND. PLAN FOR WATERPROOFING INFO. IF REQUIRED. NOTE: POUR BASEMENT SLAB BEFORE BACKFILLING - OTHERWISE PROVIDE CONTINUOUS 2x4 KEY -WAY IN FOOTING 8 "x18" CONCRETE FOOTING: —� (UNLESS NOTED OTHERWISE) 3r �' PRE - ENGINEERED WOOD 2 ROOF TRUSSES: 2x No 1 KD SOUTHERN @ 24" O.C. z O INSULATION BAFFLE LJ - IN EA. TRUSS SPACE Wlz R -38 BLOWN -IN INSULATION C - UNLESS NOTED OTHERWISE ON PLAN @ 16" OR 19.2" O.C. EE FRAMING PLANS T/ 2nd FLR. DBL. TOP R _ 1/" DRYWALL - w/ GRAVEL FILL - SEE FRAMING PLANS DBL. 2x4 TOP PLATE 2x2 NAILER 1/" DRYWALL :-a w %" DRYWALL z g a m 0 00 J U_ W co W O O It M 01 Ln 00 ui J a 2x No. 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS 5 /8" T &G O.S.B. SUBFLOOR: - GLUED, NAILED, AND SCREWED 1st FLR. SUBFLR. 2x No 1 KD SOUTHERN NOTE: z O 0 ^ o =� PINE FLOOR JOISTS: Wlz w o - EA. SIDE OF FOOTING @ 16" OR 19.2" O.C. EE FRAMING PLANS ' - w/ GRAVEL FILL - SEE FRAMING PLANS BACKFILLING FOR SIZE OF JOISTS 03 T/ FDN. WALL - PIPE TO DAYLIGHT FOR SIZE OF JOISTS /„ o S U) w = $" T &G O.S.B. SUBFLOOR: 2x4 KEY -WAY IN FOOTING Z -B - GLUED, NAILED, AND SCREWED - GLUED, NAILED, AND SCREWED 8 "x18" �z3M NOTE: 1st FLR. SUBFLR. 2nd FLR. SUBFLR, CONCRETE FOOTING: BASEMENT INSULATION NOT - 4" GRAVEL BASE CW = U� (UNLESS NOTED OTHERWISE) 2 SHOWN 6 MIL POLY VAPOR (� 0 ° ° o O O o - TYPE AND DEPTH VARIES O M J 0 00 N PER PLAN T/ T/ 1st FLR. DBL. TOP R GRAVEL FILL O o o < - a SEE NOTES ON FOUNDATION %" DRYWALL O cl ` DBL. 2x4 TOP PLATE -' %" DRYWALL z g a m 0 00 J U_ W co W • 117 6 MIL POLY VAPOR ° BARRIER 0 O O o T/ SLAB 000 ° Q _ cra & ° ��aw� °O T/ FOOTING M 0 0 0 r. GRAVEL FILL o \ - J / o o �- o o 3" 0 DRAIN TILE: co co - THRU FOOTING @ 6' -0" O.C. 02- PLACE @ BWALL SECTION'- HIGH BRICK / SIDING SCALE: 3/4" = 1' -0" FIBERGLASS / ASPHALT SHINGLES: - w/ 15# ROOF FELT 7/16" O.S.B. ROOF SHEATHING: - - w/ PLY -CLIPS 10" O.H. ULn , LU J CL Lu> = r 1x8 GUTTER BOARD: - w/ ALUMINUM GUTTER SOFFIT: - w/ ALUMINUM VENT @ 48" O.C. 15 /8" BARGE MOULD %" x 12" HARDBOARD FRIEZE: - TRIM TO MATCH WINDOW HEADER HEIGHTS - EXTENDED 4%" 2x4 FRAME WALL: - W/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) R -19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS I APPROXIMATE 1" AIR SPACE TO ALLOW FOR STANDARD CONSTRUCTION TOLERANCES, SUCH AS MORTAR PROTRUSION, SQUARENESS OF FOUNDATION, ETC. THE INTENT OF THE AIR SPACE BEHIND THE BRICK VENEER IS TO ALLOW MOISTURE THAT ENTERS THE CAVITY TO MIGRATE DOWN AND OUT THROUGH THE BRICK WEEPHOLES. BRICK VENEER: - w/ METAL WALL TIES @ 24" O.C. VERT. (9 BRICK COURSES) 16" O.C. HORIZONTAL 2x4 FRAME WALL: - w/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) - R-19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS FLASHING 2x4 PRESSURE - TREATED SILL PLATE: - STRAPPED TO FOUNDATION PER MANUFACTURER'S RECOMMENDATION - APPLY CONTINUOUS POLY SILL SEALER TO SILL R, TYP. BRICK WEEPHOLES @ 24" O.C. HORIZONTAL - W/ WEEP CARDS FINISH GRADE - VARIES ' - SEE EXTERIORS, SHEET # A1.0 z - HOLD DOWN MIN. 8 1/2" oo I %4" FROM TOP OF WALL ILI O.H. (2) #4 RE -BARS: - CONTINUOUS AROUND PERIMETER OF FDN. - MINIMUM 2" COVERING NOTE: 8" THICK WALLS ONLYII VERTICAL #4 RE -BARS @ 18" O.C., VERTICAL SPACING - MAINTAIN MINIMUM 2" COVER - EXTEND 18" BELOW BTM/ CURB 8" THICK CAST -IN -PLACE CONCRETE FOUNDATION WALL: - UNLESS NOTED OTHERWISE ON FOUNDATION PLAN BITUMINOUS ASPHALT ALL WALL TIES, CONTROL JOINTS, & COLD JOINTS. - SPRAY APPLY (2) COATS BITUMINOUS DAMPROOFING BELOW GRADE,TYPICAL. - REFER TO FOUND. PLAN FOR WATERPROOFING INFO. IF RE PRE- ENGINEERED WOOD ROOF TRUSSES: @ 24" O.C. INSULATION BAFFLE J - IN EA. TRUSS SPACE C C (� J r. R -38 BLOWN -IN INSULATION C UNLESS NOTED OTHERWISE ON PLAN J r M L T/ 2nd FLR. DBL. TOP R %" DRYWALL DBL. 2x4 TOP PLATE 2x2 NAILER 5/4 NAILERS: - 2" WIDE RIPPERS 2x4 BLOCKS @ 24" O.C. 1x2 NAILERS %" DRYWALL co 2x No 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS 5/" T &G O.S.B. SUBFLOOR: - GLUED, NAILED, AND SCREWED 2nd FLR. SUBFLR. I o` r 0, T/ 1st FLR. DBL. TOP R DRYWALL DBL. 2x4 TOP PLATE %" DRYWALL 2x No. 1 KD SOUTHERN U) z 1g a �0 0 0 UL W co W O O It M 01 Ln 00 ui J a 2x No. 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS 5 /8" T &G O.S.B. SUBFLOOR: - GLUED, NAILED, AND SCREWED 1st FLR. SUBFLR. Z O NOTE: z O 0 ^ o =� 16" OR 19.2" O.C. !S Wlz w o - EA. SIDE OF FOOTING K EE FRAMING PLANS ' - w/ GRAVEL FILL BACKFILLING FOR SIZE OF JOISTS 03 T/ FDN. WALL - PIPE TO DAYLIGHT U) /„ o S U) w = U 2x4 KEY -WAY IN FOOTING Z -B - GLUED, NAILED, AND SCREWED 8 "x18" �z3M NOTE: 1st FLR. SUBFLR. CONCRETE FOOTING: BASEMENT INSULATION NOT - 4" GRAVEL BASE CW = U� (UNLESS NOTED OTHERWISE) 2 SHOWN 6 MIL POLY VAPOR (� 0 ° ° o O O o - TYPE AND DEPTH VARIES O M J 00 N PER PLAN T/ Z GRAVEL FILL O o o < - a SEE NOTES ON FOUNDATION FOOTING M O cl a cc PLAN FOR SPECIFIC INFO Lu � a°Bo Z �• J NOTE: NOTE : - PLACE @ BOTTOM OF FT'G. (n z H4 8' -0 "h. FOUNDATION WALLS I Q BASEMENT INSULATION NOT STORY ° - 8 "thk. WALLS a 01 0— S Z V= Z4 o LU 07 Q Q� o - PROVIDE #4 REBARS SPACED z Q w Q� OEz Oar x VERTICALLY @ 22" o.c. & (3) GC o? - TYPE AND DEPTH VARIES — G 0 #4 REBARS HORIZONTALLY = g Ln PER PLAN z 9' -0 "h. FOUNDATION WALLS w u - 10 "thk. WALLS co _ a z a -PROVIDE #4 REBARS SPACED LO J J 9 PLAN FOR SPECIFIC INFO VERTICALLY @ 19" o.c. & (4) 0 � o #4 REBARS HORIZONTALLY o o z D I m FOR ALL WALL HEIGHTS: C? U 0 0 IJ Z ONE HORIZ. BAR SHALL BE m 0 WITHIN THE TOP 24 ", ONE IN - 8 "thk. WALLS 0 THE BOTTOM 24" w/ THE W - PROVIDE #4 REBARS SPACED o REMAINING BARS EQUALLY • 4 z SPACED, MIN. 2" CONCRETE o COVER BTWN INSIDE FACE OF o #4 REBARS HORIZONTALLY = Lu WALL & FACE OF HORIZ. BARS z 9' -0 "h. FOUNDATION WALLS w LL 4" 0 DRAIN TILE: - 10 "thk. WALLS co z a z 0 - EA. SIDE OF FOOTING a - PROVIDE #4 REBARS SPACED oo af - w/ GRAVEL FILL 0 p W U_ - PIPE TO DAYLIGHT 0 . 31/" THICK CONCRETE #4 REBARS HORIZONTALLY ° 0 SLAB m FOR ALL WALL HEIGHTS: °o U 0 - ON MIN. 4" GRAVEL BASE • 117 6 MIL POLY VAPOR ° BARRIER 0 O O o T/ SLAB 000 ° Q _ cra & ° ��aw� °O T/ FOOTING M 0 0 0 r. GRAVEL FILL o \ - J / o o �- o o 3" 0 DRAIN TILE: co co - THRU FOOTING @ 6' -0" O.C. 02- PLACE @ BWALL SECTION'- HIGH BRICK / SIDING SCALE: 3/4" = 1' -0" FIBERGLASS / ASPHALT SHINGLES: - w/ 15# ROOF FELT 7/16" O.S.B. ROOF SHEATHING: - - w/ PLY -CLIPS 10" O.H. ULn , LU J CL Lu> = r 1x8 GUTTER BOARD: - w/ ALUMINUM GUTTER SOFFIT: - w/ ALUMINUM VENT @ 48" O.C. 15 /8" BARGE MOULD %" x 12" HARDBOARD FRIEZE: - TRIM TO MATCH WINDOW HEADER HEIGHTS - EXTENDED 4%" 2x4 FRAME WALL: - W/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) R -19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS I APPROXIMATE 1" AIR SPACE TO ALLOW FOR STANDARD CONSTRUCTION TOLERANCES, SUCH AS MORTAR PROTRUSION, SQUARENESS OF FOUNDATION, ETC. THE INTENT OF THE AIR SPACE BEHIND THE BRICK VENEER IS TO ALLOW MOISTURE THAT ENTERS THE CAVITY TO MIGRATE DOWN AND OUT THROUGH THE BRICK WEEPHOLES. BRICK VENEER: - w/ METAL WALL TIES @ 24" O.C. VERT. (9 BRICK COURSES) 16" O.C. HORIZONTAL 2x4 FRAME WALL: - w/ R -13 KRAFT FACED BATT INSULATION - UNLESS NOTED OTHERWISE ON PLAN THERMO -PLY SHEATHING (STRUCTURAL & WATER REPELLENT) - R-19 BATT INSULATION: - CONTINUOUS ALONG BAND BOARDS FLASHING 2x4 PRESSURE - TREATED SILL PLATE: - STRAPPED TO FOUNDATION PER MANUFACTURER'S RECOMMENDATION - APPLY CONTINUOUS POLY SILL SEALER TO SILL R, TYP. BRICK WEEPHOLES @ 24" O.C. HORIZONTAL - W/ WEEP CARDS FINISH GRADE - VARIES ' - SEE EXTERIORS, SHEET # A1.0 z - HOLD DOWN MIN. 8 1/2" oo I %4" FROM TOP OF WALL ILI O.H. (2) #4 RE -BARS: - CONTINUOUS AROUND PERIMETER OF FDN. - MINIMUM 2" COVERING NOTE: 8" THICK WALLS ONLYII VERTICAL #4 RE -BARS @ 18" O.C., VERTICAL SPACING - MAINTAIN MINIMUM 2" COVER - EXTEND 18" BELOW BTM/ CURB 8" THICK CAST -IN -PLACE CONCRETE FOUNDATION WALL: - UNLESS NOTED OTHERWISE ON FOUNDATION PLAN BITUMINOUS ASPHALT ALL WALL TIES, CONTROL JOINTS, & COLD JOINTS. - SPRAY APPLY (2) COATS BITUMINOUS DAMPROOFING BELOW GRADE,TYPICAL. - REFER TO FOUND. PLAN FOR WATERPROOFING INFO. IF RE PRE- ENGINEERED WOOD ROOF TRUSSES: @ 24" O.C. INSULATION BAFFLE J - IN EA. TRUSS SPACE C C (� J r. R -38 BLOWN -IN INSULATION C UNLESS NOTED OTHERWISE ON PLAN J r M L T/ 2nd FLR. DBL. TOP R %" DRYWALL DBL. 2x4 TOP PLATE 2x2 NAILER 5/4 NAILERS: - 2" WIDE RIPPERS 2x4 BLOCKS @ 24" O.C. 1x2 NAILERS %" DRYWALL co 2x No 1 KD SOUTHERN PINE FLOOR JOISTS: @ 16" OR 19.2" O.C. - SEE FRAMING PLANS FOR SIZE OF JOISTS 5/" T &G O.S.B. SUBFLOOR: - GLUED, NAILED, AND SCREWED 2nd FLR. SUBFLR. I o` r 0, T/ 1st FLR. DBL. TOP R DRYWALL DBL. 2x4 TOP PLATE %" DRYWALL 2x No. 1 KD SOUTHERN U) z 1g a �0 0 0 UL W co W QUIRE D. O O It M 01 Ln 00 ui J a PINE FLOOR JOISTS: Z O NOTE: z O u Ga 4" 0 DRAIN TILE: 16" OR 19.2" O.C. !S Wlz w o - EA. SIDE OF FOOTING K EE FRAMING PLANS ' - w/ GRAVEL FILL BACKFILLING FOR SIZE OF JOISTS U_ LU - PIPE TO DAYLIGHT U) - OTHERWISE PROVIDE CONTINUOUS 58" T &G O.S.B. SUBFLOOR: U) w = U 2x4 KEY -WAY IN FOOTING Z 0ax - GLUED, NAILED, AND SCREWED 8 "x18" �z3M a 1st FLR. SUBFLR. CONCRETE FOOTING: 4 - 4" GRAVEL BASE CW = U� (UNLESS NOTED OTHERWISE) 2 6 MIL POLY VAPOR (� 0 ° ° o O O o o` \ O M J 00 r / T/ Z GRAVEL FILL O o o O J U Q FOOTING M O cl 03 T/ FDN. WALL S -B O v � a°Bo Z �• W NOTE : - PLACE @ BOTTOM OF FT'G. (n I Q BASEMENT INSULATION NOT STORY BRICK a 01 0— S Z V= Z4 o LU 07 Q Q� SHOWN z Q w Q� OEz Oar OZ GC o? - TYPE AND DEPTH VARIES — 3/4" = V -0" Ln PER PLAN a - SEE NOTES ON FOUNDATION cc Lu PLAN FOR SPECIFIC INFO ' NOTE: IJ Z 8' -0 "h. FOUNDATION WALLS 0 - 8 "thk. WALLS - PROVIDE #4 REBARS SPACED 0= VERTICALLY @ 22" o.c. & (3) o #4 REBARS HORIZONTALLY = g z 9' -0 "h. FOUNDATION WALLS w u - 10 "thk. WALLS co z a z a - PROVIDE #4 REBARS SPACED oo 0 0 VERTICALLY @ 19" o.c. & (4) 0 . w #4 REBARS HORIZONTALLY ° 0 I m FOR ALL WALL HEIGHTS: °o U 0 0 ONE HORIZ. BAR SHALL BE ^ m w o G WITHIN THE TOP 24 ", ONE IN 0 THE BOTTOM 24" w/ THE U_ o REMAINING BARS EQUALLY LU • z SPACED, MIN. 2" CONCRETE p COVER BTWN INSIDE FACE OF WALL & FACE OF HORIZ. BARS QUIRE D. O O It M 01 Ln 00 ui J a U W J O W Z O NOTE: z O u Ga 4" 0 DRAIN TILE: Wlz w o - EA. SIDE OF FOOTING K POUR BASEMENT SLAB BEFORE ' - w/ GRAVEL FILL BACKFILLING O U_ LU - PIPE TO DAYLIGHT U) - OTHERWISE PROVIDE CONTINUOUS U) w = U 2x4 KEY -WAY IN FOOTING Z 0ax 31/" THICK CONCRETE 8 "x18" �z3M a SLAB ON MIN. CONCRETE FOOTING: 4 - 4" GRAVEL BASE CW = U� (UNLESS NOTED OTHERWISE) 2 6 MIL POLY VAPOR (� 0 ° ° o O O o U C, U) r. W BARRIER T/ SLAB J 00 r / T/ Z GRAVEL FILL O o o O J U Q FOOTING M O 3" 0 DRAIN TILE: o-V'r y O v � a°Bo Z - THRU FOOTING @ 6' -0" O.C. W O - PLACE @ BOTTOM OF FT'G. (n I Q WALL SECTION - 2 STORY BRICK a 01 0— S Z V= Z4 o LU 07 Q Q� ; wa z Q w Q� OEz Oar OZ GC o? SCALE: — 3/4" = V -0" U J w � C) = % CD U_ > 'T O O It M 01 Ln 00 ui J u c '" � w = � p U W J O W Z O Z O z O Z O W Q �= = U► Wlz w JpY H K Q 0 rn z0�r O w W W o a � �00 W U) w = U Oa Z 0ax �z3M a =H Co CW = U� o 2 I.LI j U C, U) r. W J W_ >- a-J 0 r / Z Z N a- L. L U U L O J U Q O W d o-V'r y O v Z 62 W O W (n I Qz °c � I. `. QE O o GC w t�/ O+ Z � 0— S Z V= Z4 o LU 07 Q Q� ; wa m w �� zco Q w Q� OEz Oar OZ GC o? R) 0 av a=a`�o %%J11111111111/1 ��''i 7. ```````O W F— N m O J Q Y W Ln Q W o vJ � Q W Q �= = U► Wlz w � Ln > CV � _0 Q Sheet No. /S-B 1 Job No. LRE- 14 I W F— N m O J Q Q W Z z w � Ln > CV � _0 Q 0 a � �00 W ui 0ax =aw O I.LI \_.Z r / Z O �. Ui U Z W W (n 0 0 w Z w Q z � w Z o z 0 0 2 — Sheet No. /S-B 1 Job No. LRE- 14 I