HomeMy WebLinkAbout09100098.2DOOR TYPES
SEE SCHED SEE SCHED
0 0
_ _
U) �
w w
U) U)
TYPE #1 TYPE #2
SOLID WOOD SOLID WOOD
DOOR DOOR, GLASS
KIT
FRAME TYPES
I�
DOOR
SIE -E SCH_E'D
V -8" WIDTH
I\
0
w
1
U
U
>I \`S
U
cn
w
Uj cn
CN
I
I
>1
TYPE #2
HOLLOW METAL
SIDELITE
I N1 3" VENT TO MAIN
N.- U
BE 1/4" CLEAR
I BLDG. VENT
TEMP.
O
1"x 5 3/8" WOOD CAP FINISH AND SPECIES
I
AS SPECIFIED, EASE ALL EDGES
I
0 Z `
SEAL JOINT BETWEEN WOOD CAP
I
AND DRYWALL
I
I
N0.
WOOD NAILER BOARD FOR TOP CAP
STAT
LAV
I
3 5/8" METAL STUDS, 16" O.C. WITH 5/8"
2" WASTE
o z
m U 1 w F
°Q �
GYPSUM BOARD BOTH SIDES
w w�
of O � J Z
C.O. i W.C.
°o a n° W
w w v w
Q<t z 2-:: H i >�
UQ(7w-
w
(n (n W
°ZQmJW W
- a-
: w
20: (f Q.
a ° � U) L
,o
°w. wmw W
Z�wa H
Q =Ow�X Q
n�>mww
z 0, _w 1
°w C)LL (n d'
z
zw� o
Qwwwow O
jw��za O
<ww M
4�.
tilq��gSTF
ezOC T0
DWG SCALE:
BASE SEE SCHEDULE
CHECKED BY:
MD PROJECT #:
- FOR SPECIFICATIONS
G//qs
FLOOR LINE
NOT
PLUMBING RAISER TYPICAL
PARTIAL HEIGHT
WALL (TYP.)
•• • • • • •
SCALE: NOT TO SCALE
SCALE: 314 " =1' -0"
•• • • • • •
\
N. "\
UNDERSIDE OF SLAB OR STRUCTURE ABOVE
INSULATION ABOVE CEILING GRID Z -0"
ON EACH SIDE OF WALL
UQ-)
2" VENT TO
CEILING AS SCHEDULED, REFER TO
MAIN BLDG. VENT
REFLECTED CEILING PLAN
j SINK
x
o
z
g
3 5/8" METAL STUDS, 16" O.C. WITH 5/8"
a
c�
GYPSUM BOARD BOTH SIDES.
c.o�,
w
INSULATION IN WALL CAVITY
0
w
U
�I
w
J
w
A4
" y/
Uj
w
w
v�
w
4% 0
BASE - SEE SCHEDULE FOR SPECIFICATIONS
v
�
CONTINUOUS ACOUSTICAL SEALANT
F
FLOOR LINE
PLUMBING RAISER TYPICAL
2
PARTITION THRU
CEILING (INSULATED)
SCALE: NOT TO SCALE
SCALE: 314 " =1' -0"
— UNDERSIDE OF SLAB OR STRUCTURE ABOVE
UNDERSIDE OF SLAB OR STRUCTURE ABOVE
CEILING AS SCHEDULED, REFER TO
CEILING AS SCHEDULED, REFER TO
REFLECTED CEILING PLAN
REFLECTED CEILING PLAN
T_
O
_
U
W
2
W
=
O
U_
z
g — 3 5/8" METAL STUDS, 16" O.C. WITH 5/8"
a GYPSUM BOARD BOTH SIDES.
O
w
z
g
a
3 5/8" METAL STUDS, 16" O.C. WITH 5/8"
z
z
GYPSUM BOARD BOTH SIDES
Mu — INSULATION IN WALL CAVITY
Uj
0
0
w
~
U
0
W
U
W
J
LL_
w
�
w
J
U_
w �
w
w
w
w
�
w
_w
> BASE -SEE SCHEDULE FOR SPECIFICATIONS
d�
w
BASE - SEE SCHEDULE FOR SPECIFICATIONS
— CONTINUOUS ACOUSTICAL SEALANT
i
CONTINIOUS ACCOUSTICAL SEALANT
— FLOOR LINE
FLOOR LINE
PARTITION TO DECK (INSULATED)
PARTITION THRU
CEILING (UN- INSULATED)
.....
SCALE: 314 " =1' -0"
SCALE: 314 " =1' -0"
DOOR TYPES
SEE SCHED SEE SCHED
0 0
_ _
U) �
w w
U) U)
TYPE #1 TYPE #2
SOLID WOOD SOLID WOOD
DOOR DOOR, GLASS
KIT
FRAME TYPES
HARDWARE LEGEND
#1 PASSAGE LATCH
1 LEVER HANDLE
PASSAGE LATCH SET
1 DOORSTOP
3 SILENCERS
#5 STORAGE SET
1 LEVER HANDLE
STORAGE SET
1 DOOR STOP
3 SILENCERS
DOOR NOTES
#2 ENTRY /EXIT OR
OFFICE LOCKSET
1 LEVER HANDLE
OFFICE LOCK SET
1 DOORSTOP
3 SILENCERS
#6 BI -FOLD HARDWARE
1 BI -FOLD HARDWARE SET
1 HANDLE SET
SEE SCHED
0
w
_
U
U)
w
w
TYPE #3
SOLID WOOD
BI -FOLD DOOR
0
w
U
U
w
w
U)
TYPE #3
HOLLOW METAL
DOUBLE DOOR
#3 PUSH / PULL
1 PUSH PULL SET
1 CLOSER
1 KICK PLATE
1 DOOR STOP
3 SILENCERS
A DOORS TO BE MARSHFIELD, ROTARY WHITE BIRCH, ESPRESSO FINISH.
B DOOR HARDWARE TO BE LEVER STYLE SATIN NICKEL.
C DOOR FRAMES TO BE HOLLOW METAL PAINTED P4.
ELECTRICAL RAISER TYPICAL
#4 PRIVACY LOCKSET
1 LEVER HANDLE
PRIVACY LOCKSET
1 CLOSER
1 DOORSTOP
3 SILENCERS
186,
DOOR
SIE -E SCH_E'D
V -8" WIDTH
w
w
0
w
1
U
U
ph 317.573.
U
cn
w
Uj cn
w
U)
I
I
TYPE #1
TYPE #2
HOLLOW METAL
SIDELITE
GLASS TO
N.- U
BE 1/4" CLEAR
U/ L
TEMP.
HARDWARE LEGEND
#1 PASSAGE LATCH
1 LEVER HANDLE
PASSAGE LATCH SET
1 DOORSTOP
3 SILENCERS
#5 STORAGE SET
1 LEVER HANDLE
STORAGE SET
1 DOOR STOP
3 SILENCERS
DOOR NOTES
#2 ENTRY /EXIT OR
OFFICE LOCKSET
1 LEVER HANDLE
OFFICE LOCK SET
1 DOORSTOP
3 SILENCERS
#6 BI -FOLD HARDWARE
1 BI -FOLD HARDWARE SET
1 HANDLE SET
SEE SCHED
0
w
_
U
U)
w
w
TYPE #3
SOLID WOOD
BI -FOLD DOOR
0
w
U
U
w
w
U)
TYPE #3
HOLLOW METAL
DOUBLE DOOR
#3 PUSH / PULL
1 PUSH PULL SET
1 CLOSER
1 KICK PLATE
1 DOOR STOP
3 SILENCERS
A DOORS TO BE MARSHFIELD, ROTARY WHITE BIRCH, ESPRESSO FINISH.
B DOOR HARDWARE TO BE LEVER STYLE SATIN NICKEL.
C DOOR FRAMES TO BE HOLLOW METAL PAINTED P4.
ELECTRICAL RAISER TYPICAL
#4 PRIVACY LOCKSET
1 LEVER HANDLE
PRIVACY LOCKSET
1 CLOSER
1 DOORSTOP
3 SILENCERS
"TP" 100 A 3 4W OLO
1 2P 60 CB
1 2P 30 CB
101P 20 CB
161 P SPACES
TYPICAL OF 16 TENANT PANELS
NOTE: NEW WORK TO EXISTING TENANT PANEL
DEMOLITION NOTES
A THE GENERAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND TEMPORARY DOORS
AS INDICATED ON THIS DEMOLITION PLAN, OR AS DEEMED NECESSARY BY THE ARCHITECT AND
OWNER. THEY SHALL BE MAINTAINED AND REPAIRED IMMEDIATELY IF ANY DAMAGE OCCURS. THESE
DOOR ARE TO AVOID MIGRATION OF DUST INTO THE ADJOINING AREAS.
B GENERAL CONTRACTOR TO VERIFY DUCTWORK OR PIPING PENETRATIONS THROUGH WALLS ABOVE
CEILING. IF PENETRATIONS OCCUR AND DUCTWORK OR PIPING IS TO BE REMOVED OR RELOCATED,
FILL IN OPENINGS TO BE FLUSH WITH AND OF THE SAME MATERIAL AS THE SURROUNDING WALL.
C MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER SUITABLE TO ACCEPT NEW SPECIFIED
FINISHES AND OR SURFACES. REFER TO ARCHITECTURAL PLANS, SPECIFICATIONS, AND DETAILS FOR
SPECIFIC INFORMATION REGARDING APPLICATION OF NEW MATERIAL.
ARCHITECTURAL NOTES
A ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
ORDINANCES, RULES, REGULATIONS AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA
BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS VVITH DISABILITIES
ACT (ADA), INTERNATIONAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE
RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS.
B THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR
TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT /DESIGNER IMMEDIATELY.
C THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS REQUIRED FOR
COMPLETION OF THIS PROJECT.
D ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH,
SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF
THE OWNERS F.F.E.
E ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. ANY DIMENSIONS NOT SHOWN OR DEEMED
QUESTIONABLE ARE TO BE VERIFIED WITH THE ARCHITECT /DESIGNER. DO NOT SCALE DIMENSIONS
ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, MASONRY /CONCRETE
WALLS. OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE.
F CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND
THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED.
G DURING THE ENTIRE PERIOD OF CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE
PROTECTIVE DEVICES, AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED.
H FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 4" FROM ADJACENT PERPENDICULAR
PARTITIONS, UNLESS OTHERWISE NOTED.
I ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS,
PREMIUM GRADE.
J ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED VVITH THE CONTRACTOR,
DESIGNER AND THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION.
K CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE
WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK
ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS
NECESSARY TO PREVENT OR MINIMIZE DAMAGE. WHERE EXISTING WORK IS TO BE REMOVED OR
ALTERED, RESTORE ADJACENT FINISH TO ORIGINAL CONDITION. EXTEND /REFINISH ALL FRAMES,
BASE, AND TRIM WHERE CUTTING HAS EXPOSED ANY UNFINISHED SURFACES. REPAIR ANY DAMAGE
TO EXISTING WORK AND RESTORE TO ORIGINAL CONDITION.
L CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE
OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE STORED IN A LOCATION APPROVED BY THE LANDLORD.
M ALL PLUMBING ITEMS AND /OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED VVITH
INTERIOR ELEVATIONS PRIOR TO ROUGH -IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH THE
DESIGNER.
N COORDINATED WITH OWNER AND FACILITY STAFF PROJECT PHASING TO MINIMIZE DISRUPTION OF
EXISTING FACILITY SERVICES. PHASING TO INCLUDE ASSURANCE FOR CLEAN AIRFLOW, WRITTEN
NOTIFICATION OF INTERRUPTIONS, AND COMMUNICATION AUTHORITY. CONTRACTOR, OWNER, AND
FACILITY STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN
HEALTH AND SAFETY. THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS
DURING ALL PHASES OF CONSTRUCTION USING AIRTIGHT BARRIERS, AND EXHAUST AIR FLOW SHALL
BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE.
0 SUBMIT THE REQUIRED NUMBER OF SUBMITTALS FOR DESIGNER REVIEW AND APPROVAL PLUS ONE
EXTRA COPY FOR DESIGNERS RECORDS.
REFLECTED CEILING NOTES
A PROVIDE FIRE DAMPERS AT FIRE -RATED PARTITIONS AS REQUIRED PER APPLICABLE BUILDING
CODES.
B CEILING IN ALL AREAS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS, AND ALL APPLICABLE BUILDING CODES.
C MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUCTWORK, SUPPLY AND RETURN AIR
AND THERMOSTATS. COORDINATE ALL ELEMENTS OF THE HVAC SYSTEM TO PROVIDE A COMPLETELY
BALANCED AND EFFICIENT HEATING AND COOLING SYSTEM.
D HVAC THERMOSTAT CONTROL FOR ALL ROOMS SHALL BE LOCATED WITHIN DEMISED SUITE. VERIFY
AND REWORK EXISTING DUCTWORK AND THERMOSTATS AS REQUIRED.
E MECHANICAL CONTRACTOR SHALL VERIFY WORKING CONDITION OF ALL EXITING THERMOSTATS, VAV
BOXES, EXHAUST FANS, AND ANY OTHER DEVICE DIRECTLY RELATED TO THE HVAC SYSTEM.
CONTRACTOR TO NOTIFY ENGINEER /DESIGNER IMMEDIATELY UPON DISCOVERY OF DEFECTIVE
DEVICE.
ELECTRICAL NOTES
A THE ELECTRICAL CONTRACTOR IS TO PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, AND
CONTRACTORS SERVICES NECESSARY TO COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN FULL
CONFORMITY WITH APPLICABLE CODES AND ORDINANCES. THE FINISHED JOB SHALL BE FUNCTIONAL
AND COMPLETE IN EVERY DETAIL INCLUDING ANY AND ALL SUCH ITEMS FOR A COMPLETE SYSTEM.
B ALL MATERIALS AND WORKMANSHIP SHALL MEET ALL APPLICABLE STATE AND LOCAL CODES,
ORDINANCES, UTILITY COMPANY REGULATIONS AND NATIONALLY ACCEPTED CODES AND STANDARDS.
THE ELECTRICAL CONTRACTOR WILL BEAR ALL COSTS ARISING IN CORRECTING ANY NON
COMPLIANCE WITH THE REQUIREMENTS OF APPLICABLE CODES.
C CONTRACTOR TO SUPPLY AND INSTALL ALL ELECTRICAL VVIRING, INCLUDING RUNS FROM JUNCTION
BOX TO INDIVIDUAL WORKSTATION UNITS. CONTRACTOR TO SUPPLY PLENUM RATED BOXES AND
PULLS AS REQUIRED TO ACCOMMODATE TENANT'S TELEPHONE, DATA AND SECURITY DEVICES.
lfrdah.
186,
10
DES
116
suite 160
1
indianapolis,
ph 317.573.
fx 317.573.
www. mitschd
I
I
I
W :
"TP" 100 A 3 4W OLO
1 2P 60 CB
1 2P 30 CB
101P 20 CB
161 P SPACES
TYPICAL OF 16 TENANT PANELS
NOTE: NEW WORK TO EXISTING TENANT PANEL
DEMOLITION NOTES
A THE GENERAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND TEMPORARY DOORS
AS INDICATED ON THIS DEMOLITION PLAN, OR AS DEEMED NECESSARY BY THE ARCHITECT AND
OWNER. THEY SHALL BE MAINTAINED AND REPAIRED IMMEDIATELY IF ANY DAMAGE OCCURS. THESE
DOOR ARE TO AVOID MIGRATION OF DUST INTO THE ADJOINING AREAS.
B GENERAL CONTRACTOR TO VERIFY DUCTWORK OR PIPING PENETRATIONS THROUGH WALLS ABOVE
CEILING. IF PENETRATIONS OCCUR AND DUCTWORK OR PIPING IS TO BE REMOVED OR RELOCATED,
FILL IN OPENINGS TO BE FLUSH WITH AND OF THE SAME MATERIAL AS THE SURROUNDING WALL.
C MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER SUITABLE TO ACCEPT NEW SPECIFIED
FINISHES AND OR SURFACES. REFER TO ARCHITECTURAL PLANS, SPECIFICATIONS, AND DETAILS FOR
SPECIFIC INFORMATION REGARDING APPLICATION OF NEW MATERIAL.
ARCHITECTURAL NOTES
A ALL WORK IS TO BE COMPLETED IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
ORDINANCES, RULES, REGULATIONS AND STANDARDS, INCLUDING, BUT NOT LIMITED TO: THE INDIANA
BUILDING CODE, THE INDIANA CODES, THE INDIANA FIRE CODES, THE AMERICANS VVITH DISABILITIES
ACT (ADA), INTERNATIONAL BUILDING CODE, AND APPLICABLE TRADE STANDARDS. ALL APPLICABLE
RULES AND REGULATIONS ARE TO BE THE MOST CURRENT ADOPTED EDITIONS.
B THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL CONDITIONS AND DIMENSIONS PRIOR
TO THE START OF WORK. REPORT ANY DISCREPANCIES TO THE ARCHITECT /DESIGNER IMMEDIATELY.
C THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL STATE AND LOCAL PERMITS REQUIRED FOR
COMPLETION OF THIS PROJECT.
D ALL WORK IS TO BE COORDINATED BY THE GENERAL CONTRACTOR TO ASSURE ADEQUATE FIT, FINISH,
SYSTEM OPERATION, AND FULL COMPLETION OF THE WORK, INCLUDING SERVICE REQUIREMENTS OF
THE OWNERS F.F.E.
E ALL DIMENSIONS ARE SHOWN ON THE DRAWINGS. ANY DIMENSIONS NOT SHOWN OR DEEMED
QUESTIONABLE ARE TO BE VERIFIED WITH THE ARCHITECT /DESIGNER. DO NOT SCALE DIMENSIONS
ON THE DRAWINGS. ALL DIMENSIONS ARE TO THE FACE OF GYPSUM BOARD, MASONRY /CONCRETE
WALLS. OR CENTERLINE OF COLUMNS UNLESS NOTED OTHERWISE.
F CONTRACTOR IS TO SIGN EACH SHOP DRAWING SUBMITTAL HAS BEEN REVIEWED, APPROVED, AND
THAT THE CONTRACTOR COORDINATION HAS BEEN PERFORMED.
G DURING THE ENTIRE PERIOD OF CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE
PROTECTIVE DEVICES, AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED.
H FINISHED DOOR OPENINGS IN NEW PARTITIONS SHALL BE SET 4" FROM ADJACENT PERPENDICULAR
PARTITIONS, UNLESS OTHERWISE NOTED.
I ALL FINISH CARPENTRY IS TO BE COMPLETED IN STRICT ACCORDANCE WITH A.W.I. STANDARDS,
PREMIUM GRADE.
J ALL FIRE EXTINGUISHER CABINET LOCATIONS ARE TO BE COORDINATED VVITH THE CONTRACTOR,
DESIGNER AND THE LOCAL FIRE OFFICIALS PRIOR TO INSTALLATION.
K CONTRACTOR(S) SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, AND EQUIPMENT FOR THE
WORK IN THESE DOCUMENTS, UNLESS CLEARLY NOTED "NOT IN CONTRACT" (N.I.C.). EXISTING WORK
ADJACENT TO OR IN THE AREA OF NEW WORK SHALL BE PROTECTED BY ALL SUITABLE MEANS
NECESSARY TO PREVENT OR MINIMIZE DAMAGE. WHERE EXISTING WORK IS TO BE REMOVED OR
ALTERED, RESTORE ADJACENT FINISH TO ORIGINAL CONDITION. EXTEND /REFINISH ALL FRAMES,
BASE, AND TRIM WHERE CUTTING HAS EXPOSED ANY UNFINISHED SURFACES. REPAIR ANY DAMAGE
TO EXISTING WORK AND RESTORE TO ORIGINAL CONDITION.
L CONTRACTORS SHALL KEEP WORK AREAS AND ADJACENT PUBLIC CORRIDORS AND FACILITIES FREE
OF DEBRIS. MATERIALS STORED ON SITE ARE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE STORED IN A LOCATION APPROVED BY THE LANDLORD.
M ALL PLUMBING ITEMS AND /OR EQUIPMENT ITEMS ARE TO BE COORDINATED AND VERIFIED VVITH
INTERIOR ELEVATIONS PRIOR TO ROUGH -IN. ANY DISCREPANCIES SHALL BE COORDINATED WITH THE
DESIGNER.
N COORDINATED WITH OWNER AND FACILITY STAFF PROJECT PHASING TO MINIMIZE DISRUPTION OF
EXISTING FACILITY SERVICES. PHASING TO INCLUDE ASSURANCE FOR CLEAN AIRFLOW, WRITTEN
NOTIFICATION OF INTERRUPTIONS, AND COMMUNICATION AUTHORITY. CONTRACTOR, OWNER, AND
FACILITY STAFF TO PLAN FOR PROCEDURES ON THE EFFECTS OF NOISE AND VIBRATION ON HUMAN
HEALTH AND SAFETY. THE RENOVATED AREAS SHALL BE ISOLATED FROM THE OCCUPIED AREAS
DURING ALL PHASES OF CONSTRUCTION USING AIRTIGHT BARRIERS, AND EXHAUST AIR FLOW SHALL
BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE.
0 SUBMIT THE REQUIRED NUMBER OF SUBMITTALS FOR DESIGNER REVIEW AND APPROVAL PLUS ONE
EXTRA COPY FOR DESIGNERS RECORDS.
REFLECTED CEILING NOTES
A PROVIDE FIRE DAMPERS AT FIRE -RATED PARTITIONS AS REQUIRED PER APPLICABLE BUILDING
CODES.
B CEILING IN ALL AREAS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S
SPECIFICATIONS, AND ALL APPLICABLE BUILDING CODES.
C MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUCTWORK, SUPPLY AND RETURN AIR
AND THERMOSTATS. COORDINATE ALL ELEMENTS OF THE HVAC SYSTEM TO PROVIDE A COMPLETELY
BALANCED AND EFFICIENT HEATING AND COOLING SYSTEM.
D HVAC THERMOSTAT CONTROL FOR ALL ROOMS SHALL BE LOCATED WITHIN DEMISED SUITE. VERIFY
AND REWORK EXISTING DUCTWORK AND THERMOSTATS AS REQUIRED.
E MECHANICAL CONTRACTOR SHALL VERIFY WORKING CONDITION OF ALL EXITING THERMOSTATS, VAV
BOXES, EXHAUST FANS, AND ANY OTHER DEVICE DIRECTLY RELATED TO THE HVAC SYSTEM.
CONTRACTOR TO NOTIFY ENGINEER /DESIGNER IMMEDIATELY UPON DISCOVERY OF DEFECTIVE
DEVICE.
ELECTRICAL NOTES
A THE ELECTRICAL CONTRACTOR IS TO PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, AND
CONTRACTORS SERVICES NECESSARY TO COMPLETE INSTALLATION OF SYSTEMS REQUIRED IN FULL
CONFORMITY WITH APPLICABLE CODES AND ORDINANCES. THE FINISHED JOB SHALL BE FUNCTIONAL
AND COMPLETE IN EVERY DETAIL INCLUDING ANY AND ALL SUCH ITEMS FOR A COMPLETE SYSTEM.
B ALL MATERIALS AND WORKMANSHIP SHALL MEET ALL APPLICABLE STATE AND LOCAL CODES,
ORDINANCES, UTILITY COMPANY REGULATIONS AND NATIONALLY ACCEPTED CODES AND STANDARDS.
THE ELECTRICAL CONTRACTOR WILL BEAR ALL COSTS ARISING IN CORRECTING ANY NON
COMPLIANCE WITH THE REQUIREMENTS OF APPLICABLE CODES.
C CONTRACTOR TO SUPPLY AND INSTALL ALL ELECTRICAL VVIRING, INCLUDING RUNS FROM JUNCTION
BOX TO INDIVIDUAL WORKSTATION UNITS. CONTRACTOR TO SUPPLY PLENUM RATED BOXES AND
PULLS AS REQUIRED TO ACCOMMODATE TENANT'S TELEPHONE, DATA AND SECURITY DEVICES.
lfrdah.
1
)ch
I G N
ania pkwy
indiana 46280
?222
?230
ssign.com
•• • • • •
IF,
nN
-CO
] O
�Q
Z
n�
.J Z
) J
e
50
184
OF
P/
III 1
AS NOTE
MAR
SS
09162
RAL
ES
G001
mll.
DES
501 pennsyl�
suite 160
indianapolis,
ph 317.573.
fx 317.573.
www. mitschd
I
I
I
W :
Z W
N.- U
L
U/ L
O
W
0 Z `
C, s
N0.
STAT
II
o z
m U 1 w F
°Q �
w w�
of O � J Z
°o a n° W
w w v w
Q<t z 2-:: H i >�
UQ(7w-
(n (n W
°ZQmJW W
- a-
: w
20: (f Q.
a ° � U) L
,o
°w. wmw W
Z�wa H
Q =Ow�X Q
n�>mww
z 0, _w 1
°w C)LL (n d'
z
zw� o
Qwwwow O
jw��za O
<ww M
W °z = � 0 Qi
¢�¢u� °w O
DWG SCALE:
DRAWN BY:
CHECKED BY:
MD PROJECT #:
GENE
NOT
1
)ch
I G N
ania pkwy
indiana 46280
?222
?230
ssign.com
•• • • • •
IF,
nN
-CO
] O
�Q
Z
n�
.J Z
) J
e
50
184
OF
P/
III 1
AS NOTE
MAR
SS
09162
RAL
ES
G001