HomeMy WebLinkAbout09100098.701 FINISH PLAN
• • • • • • •
SCALE: 1/4 " =1' -0"
FINISH LEGEND
CODE
MATERIAL
MANUFACTURER
PATTERN / STYLE
COLOR
NUMBER
REMARKS
FLOOR MATERIAL
CPT1
CARPET
MASLAND CONTRACT
RHYTHM
TIME
7816 -18608
12' ROLL WODTH, 18" X 13.5" PATTERN REPEAT
CPT2
CARPET
CAMBRIDGE COMMERCIAL
ABERDEEN
WATER HAZARD
26102
12' ROLL WIDTH
VP1
VINYL PLANK FLOOR
MANNINGTON COMMERCIAL
NATURES PATH PLANK
HERITAGE CHERRY
CORDOVAN
12104
4" X 36" PLANK
VCT1
I VINYL TILE
MANNINGTON COMMERCIAL
ESSENTIALS
FLAX
143
12" X 12" TILE
WALL MATERIAL
WC1
WALLCOVERING
DL COUCH - SYMPHONY
CADENCE
CABANA WHITE
AZ50510
CORPORATE PROGRAM
WC2
WALLCOVERING
DESIGN TEX
OVAL STRIPE
THISTLE
6081 -105
CORPORATE PROGRAM
P1
PAINT
PORTER PAINT
SATIN
DUSTY TRAIL
414 -4
-
P2
PAINT
SHERWIN WILLIAMS
SATIN
LATTE
SW6108
-
P3
PAINT
SHERWIN WILLIAMS
SATIN
UNUSUAL GRAY
SW7059
-
P4
PAINT
SHERWIN WILLIAMS
SEMIGLOSS
LATTE
SW6108
-
SURFACE MATERIAL
PL1
PLASTIC LAMINATE
WILSONART
AEON
MAMBO
7948K -07
-
PL2
PLASTIC LAMINATE
FORMICA
-
FLAX GAUSE
7708 -58
-
SS1
QUARTZ SURFACE
ZODIAC
3CM SQUARE EDGE
ASTRAL PEARL
-
-
CEILING MATERIAL
OTHER MATERIALS
VB1
VINYL BASE
JOHNSONITE
4" COVE
BEIGE
49
-
ST1
STAIN
BY CONTRACTOR
BIRCH VENEER
MATCH VP1
-
GLOSS FINISH
ABBREVIATIONS
FINISH TAG
DECK OPEN TO DECK
ETR EXISTING TO REMIAN
LOUNGE
NIC NOT IN CONTRACT
ROOM NAME AND NUMBER
121
ME MATCH TO EXISTING
Sc SEALED CONCRETE
VCT FLOOR MATERIAL 1
TBD TO BE DETERMINED BY DESIGNER
CPT FLOOR MATERIAL 2
LINO UNLESS NOTED OTHERWISE
P WALL TREATMENT
OFOI OWNER FURNISHED, OWNER INSTALLED
VB ACT CEILING TREATMENT
PL SS SURFACE (HORIZONTAL)
OTHER MATERIALS
AND /OR KEYNOTES
SURFACE (VERTICAL)
BASE MATERIAL
GENERAL MILLWORK NOTES
GENERAL FINISH PLAN NOTES
A ALL WOODWORK/MILLWORK SHALL CONFORM TO THE QUALITY STANDARDS OF ARCHITECTURAL
A ALL WALLS TO BE PAINTED P1, UNLESS NOTED OTHER WISE.
WOODWORK INSTITUTE (AWI) PREMIUM GRADE. FABRICATOR SHALL BE FAMILIAR WITH AWI
STANDARDS.
B ALL DOOR FRAMES TO BE PAINTED P4 IN A SEMI -GLOSS FINISH UNLESS NOTED OTHERWISE.
B FABRICATE WOODWORK/MILLWORK ITEMS TO ACTUAL FIELD DIMENSIONS. CONTRACTOR(S) SHALL
C PROCEEDING WITH THE INSTALLATION OF FINISHES WILL BE CONSTRUED THAT THE INSTALLER
SUBMIT, FOR DESIGNER'S APPROVAL, SHOP DRAWINGS, SAMPLES, OR MANUFACTURER'S LITERATURE
AND /OR FINISHER HAS INSPECTED AND ACCEPTED THE SUBSTRATE FOR RECEIVING THE WORK. NO
FOR ALL ITEMS. SHOP DRAWINGS SHALL SHOW SUFFICIENT DETAIL TO DETERMINE COMPLIANCE
CHANGE ORDER WILL BE ISSUED TO RECTIFY CONCEALED, UNKNOWN CONDITIONS OR
WITH QUALITY STANDARDS AND DESIGN INTENT.
UNSATISFACTORY SUBSTRATE ONCE THE FINISH WORK HAS PROCEEDED.
C PROVIDE ALL NECESSARY FURRING AND GROUNDS FOR WOODWORK AND FINISH ITEMS.
D USE MANUFACTURER'S RECOMMENDED INSTALLATION METHODS AND MATERIALS FOR ALL FINISHES.
COORDINATE LOCATION OF BLOCKING WITHIN PARTITIONS FOR ITEMS TO BE SECURED TO SURFACE.
ALL FASTENERS SHALL BE CONCEALED.
E ALL EXISTING WALLCOVERING TO REMAIN SHALL BE THOROUGHLY CLEANED AND ALL LOOSE SEAMS
REPAIRED.
D ALL MILLWORK HARDWARETO BE TOP KNOBS, M527, PULL IN BRUSHED SATIN NICKEL, UNLESS NOTED
OTHERWISE.
F REMOVE ALL EXISTING ANCHORING DEVICES FROM WALLS. TAPE AND SPACKLE WALLS IN
PREPARATION FOR NEW FINISHES.
G FLOORING CONTRACTOR TO PROVIDE SEAMING DIAGRAM FOR CARPET LAYOUT FOR DESIGNER'S
APPROVAL PRIOR TO INSTALLATION.
H CONTRACTOR TO IMMEDIATELY NOTIFY DESIGNER IF A SPECIFIED FINISH ITEM BECOMES
UNAVAILABLE.
FINISH KEYNOTES
I CONTRACTOR TO SUBMIT SHOP DRAWINGS SHOWING TRANSITION LOCATIONS FOR DESIGNER'S
APPROVAL.
01 END FLOOR TRANSITION AT CORNER OF PARTITION.
J PAINT ALL GRILLES, FIRE EXTINGUISHER CABINETS, ETC., TO MATCH SURFACE ON WHICH THEY
OCCUR.
02 PAINTED CROWN MOULDING AT CEILING, P4.
K FLOORING CONTRACTOR TO LEVEL EXISTING FLOOR AS REQUIRED TO ACCEPT NEW FLOORING
03 PROVIDE 2' -0" X 3' -0" PLATE GLASS MIRROR ABOVE SINK WITH POLISHED EDGES.
MATERIAL. USE SUB -FLOR REDUCER STRIPS TO LEVEL CARPET OF UNEQUAL HEIGHTS.
F 04 MIRROR IN THIS LOCATION PROVIDED BY TENANT.
L USE RUBBER TRANSITIONS STRIPS WHERE VCT MEETS CARPET. (CONTRACTOR TO SUBMIT COLOR
SAMPLES TO DESIGNER FOR APPROVAL.) CENTER TRANSITION STRIP UNDER CENTERLINE OF DOOR
OR CENTERLINE OF OPENING, WHICHEVER APPLIES. TRANSITIONS TO MATCH VB1.
Fo-51 CONTRACTOR TO PROVIDE PLUMBING FIXTURES IN THIS LOCATION.
M ALL LIMESTONE /MARBLE TILE AND SLAB TO BE CLEANED AND /OR SEALED PER STONE SUPPLIER'S
06 LENGTH OF VINYL PLANK TO RUN IN DIRECTION AS INDICATED.
m
RECOMMMEDATIONS.
07 NOTE ALL WALLS TO BE PAINTED SHERWIN WILLIAMS SW6507 RESOLUTE BLUE IN A SATIN FINISH.
N STONE FLOORING CONTRACTOR TO PROVIDE LAYOUT DIAGRAM FOR DESIGNER'S APPROVAL PRIOR
WALL BASE TO BE JOHNSONITE 4" WHITE COVE, ALL TRIM INSIDE OF ROOM TO BE PAINTED WHITE
TO INSTALLATION.
WITH A SEMI -GLOSS FINISH.
0 CENTER ALL APPLICABLE CARPET LINES UNDER CENTERLINE OF DOOR (WHILE IN CLOSED POSITION).
P REMOVE, CLEAN, AND REINSTALL AT END OF PROJECT ALL EXISTING WINDOW TREATMENTS. MODIFY
AS REQUIRED.
ri'dah,
3cn
I G N
vania pkwy
indiana 46280
2222
2230
asign.com
• • • • • •
• • • • • •
D
nco
] O
� O
z
�o
.� z
nU
TE
-184
OF
P P��
III
• • • • •
1/8"= 1 1-011
KDAR
SS
09162
• • • • •
"30H
►N
r
mll
DES
501 pennsyl
suite 160
indianapolis,
ph 317.573.
fx 317.573.
www.mitschd
1
I
J �
Q
W
Z W
�0
L I
C!� U.
�0
0. w
c
0 Z c
����111111
PRA
C,v s
No.
STATI
I I
co
0` o�
0 z
m U > F
¢ W
W W
O 3: ZO J z
00 ¢moo W
w W l< U r W
in
O¢U' LLC7-
°Z z z 0 x m tau
W i
zUz¢
W ¢wao ~'0 Fa
pw�Wmw W
znLL�0
¢wow�w Q
=
m W
(zD m�aZ�
0 O LL a ca
Z o oM )
Q W w W 0 O
W "),>
o w � n O
ae _1 z w w
�zLL�
a¢ � v
Q(Y QU) Q W O
DWG SCALE:
DRAWN BY:
CHECKED BY:
MD PROJECT #:
FINI
P LA
14(
3cn
I G N
vania pkwy
indiana 46280
2222
2230
asign.com
• • • • • •
• • • • • •
D
nco
] O
� O
z
�o
.� z
nU
TE
-184
OF
P P��
III
• • • • •
1/8"= 1 1-011
KDAR
SS
09162
• • • • •
"30H
►N
r