HomeMy WebLinkAbout2012 Sewer Bond pay request 20 annotimairtarmel Utilities`-"
City of Carmel Utilities
760 Third Avenue S.W..Ste.110•Carmel,IN 46032
Phone:(317)571-294•Ent(3171 5714265
wvw+carmelm soy
EXHIBIT B
Disbursement Direction#20
E-Mail or FAX the signed Disbursement Direction to:
The Huntington National Bank Corporate Trust Department (INHP22) Attn: Kim Wilson Tel: (317) 229-
4094 Fax: (31 7) 229-4094 E-Mail: Kint.Wilson(w_huntington.com
Re: Depositary Agreement between the City of Cannel and The Huntington National Bank,
dated May 16, 2012-Trust#4057000067
Dear Kim:
On September 20, 2013 , you are hereby authorized and directed, as the Depositary under the above-
referenced Agreement, to pay the amounts set forth on the attached Register of Claims from the above-
referenced Trust account and overnight checks to:
Carmel Utilities
Attn: Lisa Kempa
760 Third Avenue SW
Carmel, IN 46032
City of Cannel, Indiana
Name: Diana L.Cordray Title: C.-Treasurer
(*) Your Alternate contact at Huntington National Bank will be:
Ellen Campbell-Tel # (616)235-5941 EIIen.Campbelliuhuntington.com
CARMEL UTILITIES
Register of Claims
912 012 01 3
PAYMENT REQUISITION NO 20
AMOUNT OF Wire
VENDOR ADDRESS FUND CLAIM MEMORANDUM Instructions
760 Third Avenue SW
Carmel Utilities Carmel.IN 46032 Cons $ 245.009,09 Reimb
2207 Collections
Center Dr Chicago,IL
Hach Co 60693 Cons $ 2,910-00 testing
PO Box 2533
M K. Betts Engineering Anderson. IN 46018 Cons S 271,952.32 construction
PO Box 2533
M.K.Betts Engineering Anderson, IN 46018 Cons $ 1,700.00 construction
PO Box 2533
M.K.Betts Engineering Anderson,IN 46018 Cons $ 56,301.50 construction
1625 North Post Road
United Consulting Indianapolis,IN 46219 Cons $ 2,495.00 engrg services
1625 North Post Road
United Consulting Indianapolis, IN 46219 Cons $ 125.00 engrg services
6219 South East SI
Wessler Engineering Indianapolis, IN 46227 Cons $ 4.309.49 engrg services
TOTAL $ 585,802.6a
ALLOWANCE OF CLAIMS
We have examined the claims listed on the foregoing Register of Claims,consisting of 1 page,and except for claims not allowed as
shown on the register such el s are hereby allowed in the total amount at $505,80 40
r %0 94 John/141/, LIM ec r Date
PLEASE OVERNIGHT CHECKS T0'
Carmel Utilities
Attn: Lisa Kempa
763 3rd Avenue SW
Carmel,IN 46032
City of Carmel - Sewer Utility
Utility personnel have committed substantial time to projects.
Sewer Rehab-09.1050.86
Employee C. Cooper Eidson Faucett Hoover Massingill Wolfe
% to Proj 75% 50% 50% 75% 50% 25%
# pay periods 18 18 18 18 18 18
Biweekly Salary 2,419.54 2,354.31 2,884.62 2,430.30 2,128.58 3,400.27
Biweekly PERF 302.44 294.29 360.58 303.79 266.07 425.03
Biweekly Medical Insurance 957.00 957.00 957.00 957.00 957.00 639.25
Monthly Life Insurance 7.50 7.50 7.50 7.50 7,50 7.50
Monthly Short Term Disability 18.71 18.21 22.31 18.80 16.46 26.30
F.I.C.A. 185.09 180.10 220.67 185.92 162.84 260.12
Annualized:
Salary 62,908.04 61,212.06 75,000.12 63,187.80 55,343.08 88,407.02
PERF 7,863.44 7,651.54 9,375.08 7,898.54 6,917.82 11,050.78
Medical 24,882.00 24,882.00 24,882.00 24,882.00 24,882.00 16,620.50
Life 90.00 90.00 90.00 90.00 90.00 90.00
Short Term Disability 224.52 218.52 267.72 225.60 197.52 315.60
F.I.C.A. 4,812.34 4,682.60 5,737.42 4,833.92 4,233.84 6,763.12
Annual Salary& Benefit Cost 100,780.34 98,736.72 115,352.34 101,117.86 91,664.26 123,247.02
Hourly Salary & Benefit Cost 51.6822 50.8342 59.1550 51.8553 47.0073 63.2036
Hours on project thru 9/13 1,012.50 675.00 675.00 1,012.50 675.00 337,50
Charge to project 52,328.23 34,178.09 39,929.63 52,503.49 31,729.93 21,331.22
106th St. LS to 30MGD - 09.1050.55
Employee Manifold
to Proj 100%
#pay periods 5 (7/6 to 9/13)
Biweekly Salary 1,791.58
Biweekly PERF 223.95
Biweekly Medical Insurance 639.25
Monthly Life Insurance 7.50
Monthly Short Term Disability 13.86
F.I.C.A. 137.06
Annualized:
Salary 46,581.08
PERF 5,822.70
Medical 16,620.50
Lite 90.00
Short Term Disability 166.32
3,563.56
Annual Salary& Benefit Cost 72,844.16
Hourly Salary& Benefit Cost 37.3560
Hours on project thru 9/13 375.00
Charge to project 14,008.50
2013 Journal Envies,Errployee Project Labor 9E1912013,3:18 PM
Journal Entry Debit Credit
09.1050.55 14,008.50
09.1050.86 232,000.59
01.1420.00 246,009.09
01.7010.01 32,736.42
01.7010.02 73,082.43
01.7012.05 15,301.22
01.7012.06 34,919.48 156,039.55
01.7040.01 17,175.10
01.7040.02 39,650.66
01.7042.05 4,859.45
01.7042.06 16,347.30 78,032.51
01.4080.12 11,937.03
09.2331.00 246,009.09
492,018.18 492,018.18
2013 Journal Entries.Employee Project Labor 9119/2013,3:18 PM
HAGH Ea7 INVOICE NUMBER 8451667
DATE: 08/26/2013
Page: 1
Be Right'
t DETACH lOP!PORIIO\ 4\DR4 1IIR\y''ITH P4\MEN't IOe .T' TOTAL: $2,910.00
k
Hach Company
2207 Collections Center Drive _
Chicago, IL 60693 Huge you ordered ant/to ? —
Phone: (800) 227-4224 Order at W'ti'N'.11ACILC(j f —
84516673 008330458 00000291000 082613
Sort Seg: 360 Tray: 7 DETACH HERE Original
INVOICE NO 8451667 I DATE: 1 08/26/2013
s I'I'II'111IIII'IIIIIII'I'11'IIIIIPIIII'IIIIIII°IIIIIIIIIIILIuii PURCHASE DDS102611-01
CITY OF CARMEL ORDER
L NUMBER
O Wastewater Treatment Plant Net 45 Days From Invoice Date
760 3rd Ave SW TERMS
T Carmel,IN 46032-2072 ,
O United Stales FREIGHT
S CARRIER
H CITY OF CARMEL ACCOUNT 833045
I 750 3RD AVE SW Remit to:
P WASTEWATER TREATMENT PLANT REF. NO. HACH248387
Hach Company
CARMEL, IN 46032-2072
T United States Chicago,go,IL 60693
Center Dr
O Chicago,IL 60693
Phone:(800) 227-4224
These commodities are sold.packaged.maiked,and labeled for uestinalions In the Listed States. Exportation of these cammodilles may require special licensing,packaging.marking or lanelnp.
LN# PRODUCT DESCRIPTION ITEM NO. QUANTITY UNIT PRIC EXT. PRICE
1 DOS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge'36:DDS
C O N TRAC T:02/04/2 013:02/03/2014
2 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::02/04/2013'0210 312 0 1 4
3 DOS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
C harg e:1::04/26/2 013:10/25/2 013
ORDER CONTACT: SUBTOTAL 2,910.00
TAX 0.00
Notes: INVOICE TOTAL 2,910.00
PURCHASE AND ACCEPTANCE OF PRODUCT(S)SUBJECT TO HACH COMPANY'S TERMS AND CONDITIONS OF SALE,
PUBLISHED ON HACH COMPANY'S WEBSITE AT WWW.HACH-COMITERMS
For order discrepancies or product exchanges please call 800-227-4224 or 970-669-3050 to obtain Return Authorization.
FEDERAL TAX ID#42-0704420
-a Environmental r� x- rC
'' ` Test Systems Np H IH '� Other brands
® _ ��r �I r r c,esenates =1Z _IMEI from Hach
APPLICATION AND CERTIFICATE FOR PAYMENT AlA DOCUMENT 0707 (Instructions on reverse side) PACE ONE OF PACES
TO (OWNER): City of Cannel PROJECT: Final Clarifier & Misc. APPLICATION NO: Six(6) Distribution to:
Once Civic Square Improvements - Contract 79 D OWNER
Carmel, IN 46032 PERIOD TO: 08/31/13 ❑ ARCHITECT
S CONTRACTOR
FROM ICONTRACTORI: VIA (?Rer'TI•'FcnTit: ARCHITECT'S '
M. K. Betts Engineering Engineer: Jones & Henry Engineers PROJECT NO: 0
& Contracting, Inc.
CONTRACT FOR: Invoice 13-124.06 CONTRACT DATE:
is made CONTRACTOR'S APPLICATION FOR PAYMENT Continuation nuation Sheet,fAlA Document G703, is altt chedconnection with the Contract.
I CHANGE ORDER SUMMARY I 1. ORIGINAL CONTRACT SUM 5 3,423,000.00
Change Orders approved in ADDITIONS DEDUCTIONS 2. Net change by Change Orders 5 O
previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 -2) s 3,423,000.00
TOTAL 4. TOTAL COMPLETED & STORED TO DATE $ 775,175.75
Approved this Month (Column G on G703)
•
Number I Date Approved 5. RETAINAGE:
a. 10 % of Completed Work s 56,552.65
(Column D+E on G703)
b. 10 % of Stored Material $ 20,964.93
(Column F on G703)
Total Retainage (Line 5a+5b or
I TOTALS Total in Column I of G703) s _ 77,517.58
I Net change by Change Orders 6. TOTAL EARNED LESS RETAINAGE $ 697,658. 17
The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) 5 425,705.85
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE 5 271 ,952.32
issued and payments received from the Owner, and that current payment shown 9, BALANCE TO FINISH, PLUS RETAINAGE $ 2,725,341 .83
herein is now due. (Line 3 less Line 6)
CONTRACTOR: M. K. Betts Engineering & Contracting, Inc.. State of: Indiana County of: Madison
Subscribed and sworn to before me this 31st day of Aug. , 2013
� Notary Public: �3
By: fff...���"'!lllllY9 hiv? Date: August 31 , 2013 My Commission expires: October 28 , 2015 .
AMOUNT
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach s
ttach explanatiIFIED on rr amount certified differs from the amount applied iocr
In accordance with the Contract Documents, based on on-site observations and the ARCHITE
data oft erisrchteeabove knowledge, information and belief Owner _ ' 9— �-(
best of the Architect's knowledge,information and belief the Work has progressed as By: Date: .
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AlA DOCUMENT C702•.APPUCAFIr1N AND CERTIFICATE. FOR PAYMENT•MAY 140.1 EDITION•AlA • c IGNI
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT C702 (Instructions on reverse side) PACE ONE or PACES
TO (OWNER): City of Carmel PROJECT: 106th Street Pump Station APPLICATION NO: Eleven(ilpistribution to:
One Civic Square Electrical Upgrade G OWNER
Carmel, IN 46032 PERIOD TO: 08/31/13 0 ARCHITECT
0 CONTRACTOR
FROM (CONTRACTOR): VIA (ARCHITECT): ARCHITECT'S
M. K. Betts Engineering PROJECT NO: —
& Contracting, Inc.
CONTRACT FOR: Invoice No. 12-238. 11 CONTRACT DATE:
Application is made for Payment,as shown below, in connection with the Contract.
CONTRACTOR'S APPLICATION FOR PAYMENT Continuation Sheet, AIA Document G703, is attached.
CHANGE ORDER SUMMARY
1. ORIGINAL CONTRACT SUM • • 5 1,077,000.00 2. Net change by Change Orders 5 50,150.00
months Change Orders approved in I ADDITIONS DEDUCTIONS 3. CONTRACT SUM TO DATE (Line 1 =2) 5 1 ,127 ,150.00
previous months by Owner 4. TOTAL COMPLETED & STORED TO DATE $ 1 ,127,150.00
TOTAL
(Column G on G703)
I Approved this Month S. RETAINAGE:
Number I Date Approved I a. — % of Completed Work 5
C011l I + $51 ,280.00 – $ 2,250.00 (Column D4-Eon C703)
C0;12 + $ 5,170.00 – $ 4,050.00 b. — % of Stored Material S
(Column F on G703)
L— Total Retainage (Line 5a+5b or 56,301 .50
1 TOTALS! + $56,450.00 – $6,300.00 I Total in Column I of G7031 5 –
6. TOTAL EARNED LESS RETAINAGE $ 1,070,848.50
Net change by Change Orders + $50,150.00 I (Line 4 less Line 5 Total)
The undersigned Contractor certifies that to the best of the Contractor's knowledge, 7. LESS PREVIOUS CERTIFICATES FOR
information and belief the Work covered by this Application for Payment has been PAYMENT PREVIOUS CERTIFICATES
6 from prior Certificate) 5 1,069,148.50
completed in accordance with the Contract Documents, that all amounts have been p 1 ,700.00
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE 5 56,301 .50
issued arid payments received from the Owner, and that current payment shown g. BALANCE TO FINISH, PLUS RETAINAGE S
herein is now due. (Line 3 less Line 6)
State of: Indiana County of: Madison
CONTRACTOR: M. K. Betts Engineering & Contracting, Inc. Subscribed and sworn to before me this 31st day of Aug. , 2013
•
Notary Public: �7 �'�-�
a //' 7ida Date: August 31 , 2013 i My Commission expires: October 28 , 2015
AMOUNT CERTIFIED S
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach explanation if amount certified differs from the amount applied foe)
In accordance with the Contract Documents, based on on-site observations and the ARCHITECT: ' /�
data comprising the above application,the Architect certifies to the Owner that to the q-5-/
best of the Architect's knowledge,information and belief the Work has progressed as By: Date:
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED- Contractor named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
au DOCUMENT 0702•APPUGATIc.N AND eaRrilICAn FOR PN■IENT•.MA• wn I EDITION•AlA' • c 193.1 G707-1982
•
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G707 (Instructions on reverse sidet PAGE ONE OE PAGES
TO (OWNER): City of Carmel PROJECT: 106th Street Pump Station APPLICATION NO: Twelve (12L)istribution to:
One Civic Square Electrical Upgrade . Retainage G OWNER
Carmel IN 46032 PERIOD TO: 08/31/13 ❑ ARCHITECT
0 CONTRACTOR
FROM (CONTRACTOR): VIA (ARCHITECT): ARCHITECT'S C •
M. K. Betts Engineering PROJECT NO:
& Contracting, Inc.
CONTRACT FOR: Invoice No. 12-238.12 Ret. CONTRACT DATE:
Application is made for Payment.as shown below, in connection with the Contract..
CONTRACTOR'S APPLICATION FOR PAYMENT Continuation Sheet, AIA Document G703, is attached.
CHANGE ORDER SUMMARY 50, 150.00
1. ORIGINAL CONTRACT SUM 5 1 ,077,000.00
2. Net change by Change Orders •
• ,
Change Orders approved in ADDITIONS 3. CONTRACT SUM TO DATE (Line 1 =2) 00
5
1 127 150.
previous months b Owner ONS DEDUCTIONS
1
y
4. TOTAL COMPLETED & STORED TO DATE '127'
150.00
TOTAL (Column G on G703)
i Approved this Month I 5. RETAINAGE:
Number Date Approved a. — % of Completed Work $
C01/1 + $51 ,280.00 – $ 2,250.00 (Column D+E on G703)
COu 2 + $ 5,170.00 – $ 4,050.00 h. — % of Stored ,Material 5
(Column F on G703)
Total Retainage (Line 5a+Sb or
TOTALS + $56,450.00 I – $ 6,300.00 Total in Column I of G703) S
Net change by Change Orders + $50,150.00
6. TOTAL EARNED LESS RETAINAGE s _ 1 ,127 ,150.00
(Line 4 less Line S Total)
The undersigned Contractor certifies that to the best of the Contractor's knowledge, 7. LESS PREVIOUS CERTIFICATES FOR
information and belief the Work covered by this Application for Payment has been PAYMENT (Line 6 from prior Certificate) c 1,070,848.50
completed in accordance with the Contract Documents, that all amounts have been p 5 56,301 .50
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE 30– —
issued and payments received from the Owner, and that current payment shown 9. BALANCE TO FINISH, PLUS RETAINAGE 5
herein is now due. (Line 3 less Line 6)
CONTRACT R: M. K. Betts Engineering & Contracting, Inc., State of: Indiana County of: Madison
• Subscribed and sworn to before me this 31st day of Aug. , - 20.13
/ Notary Public l4
Rv: % wry. Date: _ Aug. 31 , 2013 • My Commission expires: October 28 , 2015 .
AMOUNT CERTIFIED 5
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attach explanation if amount certified differs from the amount applied foci
In accordance with the Contract Documents. based on on-site observations and the ARCHITECT:
data comprising the above application,the Architect certifies to the Owner that to the
best of the Architect's knowledge,information and belief the Work has progressed as By: Date: `l3 –
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
AIA OOCV.MENT 0702'APPLICATIC'N AND CERrirICATt FOR PAV.MENT•MAN' 14a1 EDITION•AIA' • c 1951
UNITE 1625 North Post Road
T" !' r)a [R' l.' Bus. (317)i8,895-2585
58519
1��j �j ,j(„rjjJ/ Bus. (317)895-2585
—Consulting= Fax (317)895-2596
Carmel Utilities Invoice number 1390101-07
John Duffy Date 08/07/2013
Director
760 Third Avenue S.W. Project 13-901-01 Carmel -Cool Creek Bank
Carmel, IN 46032 Stabilization Project
For Professional Services Rendered Through: July 26, 2013
Project No.: 13-901-01 Carmel Utilities-Task Order No. 2013-1
Project Description: Cool Creek Bank Stabilization Project
Professional Engineering Services in connection with the above referenced project. This period we continued
erosion control design, plan preparation and other engineering tasks.We also continued the permit application
process. This invoice includes a $200 direct expense for the permit application to the Indiana Department of
Natural Resources.
We appreciate having the opportunity to work with Carmel Utilities.
Please feel free to contact our office if you have questions about this invoice or project.
Invoice Summary
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Billed
13-901-01 Survey & Right of Way/Property Line 6,300.00 100.00 6,300.00 6,300.00 0.00
Services
13-901-01 Design & Permitting Services 58,100.00 41.14 21,404.80 23,899.80 2,495.00
13-901-01 Bid Phase Services 10,500.00 0.00 0.00 0.00 0.00
13-901-01 Construction Phase Services 34,300.00 0.00 0.00 0.00 0.00
Total 109,200.00 27.66 27,704.80 30,199.80 2,495.00
Design & Permitting Services
Professional Fees
Billed
Hours Rate Amount
Department Manager
Keith Bryant
Project Time 0.50 190.00 95.00
Senior Project Manager
Paul D. Glotzbach
Project Time 1.00 165.00 165.00
Project Engineer
Scott M. Siple
Project Time 12.00 125.00 1,500.00
CADD Designer
Darcy A. Robinette
Project Time 2.50 118.00 295.00
Carmel Utilities Invoice number 1390101-07
Page 1 of 2
Carmel Utilities Invoice number 1390101-07
Project 13-901-01 Carmel-Cool Creek Bank Stabilization Project Dale 08/07/2013
Design 8 Permitting Services
Professional Fees
Billed
Hours Rate Amount
Receptionist
Ashley N. Pierson
Project Time 3.00 50.00 150.00
Valli L. Shattuck
Project Time 1.50 60.00 90.00
Reimbursables
Billed
Units Rate Amount
Permits 200.00
Invoice total 2,495.00
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
1390101-05 06/11/2013 125.00 125.00
1390101-07 08/07/2013 2,495.00 2,495.00
Total 2,620.00 2,495.00 125.00 0.00 0.00 0.00
Approved by:
4:f J
J rat,
Keith Bryant
Vice President
Carmel Utilities Invoice number 1390101-07
Page 2 of 2
SEP/20/201 _/PR I 03: 91--. AM FAX No. P. 00'2
1625 North Post Road
UNITED p , 46219
Bus.Indiana1
crie
(37) 895-2olisIN 585
Consulting= Fax (317) 995-2598
Carmel Utilities Invoice number 1390101-05
John Duffy Date 06/11/2013
Director
760 Third Avenue S.W. Project 13-901-01 Carmel -Cool Creek Bank
Carmel, IN 46032 Stabilization Project
For Professional Services Rendered Through: May 31, 2013
Project No.: 13-901-01 Carmel Utilities-Task Order No. 2013.1
Project Description:Cool Creek Bank Stabilization Project
Professional Engineering Services in connection with the above referenced project. This period we continued
erosion control option evaluation, sewer crossing evaluation and option preparation, plan preparation and other
engineering tasks.
We appreciate having the opportunity to work with Carmel Utilities.
Please feel free to contact our office if you have questions about this invoice or project.
Invoice Summary
Contract Percent Prior Total Current
Description Amount Complete billed Billed . Billed
13-901-01 Survey & Right of Way/Property Line 6,300.00 100.00 6,300.00 6,300.00 0.00
Services
13-901-01 Design& Permitting Services 58,100.00 29.39 16,951.00 17,076.00 125.00
13-901-01 Bid Phase Services 10,500.00 0.00 0.00 0.00 0.00
13-901-01 Construction Phase Services 34,300.00 0,00 . 0.00 0.00 0.00
Total 109,200.00 21.41 23,251.00 23,376.00 125.00
Design &Permitting Services
Professional Fees
Billed
Hours Rate Amount
Project Engineer
Scott M. Siple
Project Time 1.00 125.00 125.00
Invoice total 125.00
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
1390101-04 05/15/2013 8,127.60 8,127.60
1390101-05 06/11/2013 125.00 125.00
Les Total 8,252.60 8.252.60 0.00 0.00 0.00 0.00
.mn_I Utilities Invoice number 1390101.05
SEP/20/2013/FR1 09: 26 AM FAX Ito, P, 003
Carmel Utilities Invoice number 1390101-05
Project 13-901-01 Carmel-Cool Creek Bank Stabilization Project pate 0G/1112013
Approved
Keith Bryant
Vice President
Carmel Utilities Invoice number 1390101-05
1111 More than a Project"
WESSLER
ENGINEERING
INVOICE
To: CITY OF CARMEL Invoice Number: 25160 •
MR. JOHN DUFFY, UTILITIES DIRECTOR January 15, 2013
760 THIRD AVENUE, S.W.
SUITE 110
CARMEL, INDIANA 46032
Project: 91104.00 CARMEL ON CALL ENGINEERING SERVICES
Manager: BRENT A. SIEBENTHAL
Professional Services for the Period: 12/1/1210 12/30/12
PHASE: .03 ON CALL ENGINEERING SERVICES
TASK: .05 2012 MANHOLE INSPECTION
Professional Services
Bill Boors Bill Rate Charge
Project Engineer I 5.25 $ 105.00 $ 551.25
Engineer I 40.75 $ 90.00 3,667.50
Survey Crew Chief 1.00 $ 70.00 70.00
Total Labor 47.00 $ 4,288.75
Reimbursables
Printing S .20
Travel 20.54
Total Reimbursables $ 20.74
Total Project Invoice Amount $ 4,309.49
Aged Receivables:
CURRENT 30-60 6�90 90-120 OVER 120
Zz: $4,309.49 S11,771.99 50.00 $0.00 $0.00
Wessler Eng//ing, Inc.
BRENT A. SIEBENTHAL
Project Manager
All invoices are due upon receipt. A late charge of 1.5% Ivi//he added to
any unpaid balance after 30 days.
PLEASE REMIT TO: 6219 SOUTH EAST STREET // INDIANAPOLIS,INDIANA 46227 // WESSLERENGINEERING.COM
Phone(317)788-4551 // Fax(317)788-4803