Loading...
HomeMy WebLinkAboutMinutes Sub 11-06-03 City of Carmel CARMEL/CLAY PLAN COMMISSION SUBDIVISION COMMITTEE NOVEMBER 6, 2003 Minutes The Subdivision Committee of the Carmel/Clay Plan Commission met on Thursday, November 6, 2003 in the Caucus Rooms of City Hall, Carmel, Indiana. Members in attendance were: Marilyn Anderson; Dave Cremeans; Wayne Haney; Pam Williams. Department of Community Services Staff in attendance: Jon Dobosiewicz; Mike Hollibaugh, Director. The Subdivision Committee considered the following items: 1. Docket No. 78-03 PP Amend; (#03050038); The Lakes at Hamilton Place (Formerly: Eagle Ridge Subdivision) The applicant is requesting approval of an amended Primary Plat to allow a private street. The site is located on the north side of West 116th Street, 1/4 mile east of US 421. The site is zoned S-1/Residence - Estate. The petitioner also seeks approval of the following Subdivision Waiver: 78-03a SW (03050039) SCO 6.3.20 private streets Filed by David Sexton of Schneider Engineering for Dura Development, Inc. TABLED TO DECEMBER 2. Docket Nos. 126-03 Z (#03080012); 127-03 Z (#03080013) Burlingame Subdivision Rezone The applicant seeks to Rezone 67.295 acres± from S-1/Very Low Intensity Residence to R-2/Residence and also seeks to rezone 9.13 acres± from S-1/Very Low Intensity Residence to R-4/Residence. The site is located at 13619 Shelborne Road. Filed by Steve Pittman on behalf of Shelburn Family Limited Trust. Steve Pittman of Pittman Partners appeared before the Committee on behalf of the applicant. Also in attendance: Neal Smith of Pittman Partners; Brad Little, Executive Director of Carmel Dad’s Club; Paul Rioux, Platinum Properties; Chad Pittman, attorney with Bose McKinney & Evans; Brian Robinson, Stoeppelwerth & Assoc. th Steve Pittman referred to the Committee review at the October 7 meeting in which there were questions regarding the traffic study. Bill Fehribach of A&F Engineering wrote a letter that was to 1 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 be distributed to Commission members regarding the impact of the Dad’s Club practice on the sports fields during peak PM hours. The letter indicates that there is not really an impact. Up-dated, specific commitments have been furnished to the Commission. Steve Pittman high-lighted specific commitments regarding the architectural detail of this project. All townehome residential units will have an all-brick front elevation and all-brick side elevation with a bay window on the ends of a row of townehome buildings. All other townehome buildings not at the end of a row will have brick, 8 feet up on the ends and on the rear—the garage side. All townehome units will have a minimum square footage of 1700 square feet and rear-load garages. All ranch homes will have a minimum of 1200 square feet with white trim. In addition, the ranch homes will have a brick front with brick wrap to the front door from the garage, excluding the gable. th All ranch homes that back up to 136 Street will have complete brick wrap on the first floor. All single family detached homes will have mullions in all windows, all brick front 8 feet up, dusk-to-dawn lights, and coach lights. In addition, there will be street trees every 40 feet minimum. All rear yards that abut exterior roadways will contain at least one conifer of at least six feet, and one deciduous tree of at least two-inch caliper. The parking requirements and commitments are spelled out in “Item U.” The parking requirements were analyzed in three different ways. The Carmel Zoning Ordinance specifically dealing with recreational uses required 93 parking spaces—the original plan provided for 164 parking spaces. A calculation was done with the number of players, number of cheerleaders, number of coaches, referees, spectators, and allowing 30% for fans overlapping between games, and came up with 120 parking spaces. The actual number of participants was counted at the Badger Park facility for a soccer game, and there was no different impact in terms of spectators for football. There is a ratio of participants to cars of 1.31. If three fields were in use, 148.2 spaces would be needed, but since only two fields will be used at any one time, 98.8 parking is required. “Item U” goes on to state: ”The Carmel Dad’s Club will utilize the football fields Monday through Thursday for practice from 5:30 PM to 7:15 PM. The fields will not be used on Friday or Sunday. The Carmel Dad’s Club agrees to field management policy by using only two of the three fields for games on Saturday. The games cannot begin before 8:00 AM or after 5:00 PM. The Carmel Dad’s Club agrees to stagger the start times between the two fields with all start times between the fields being a minimum of 30 minutes apart. The staggered start times significantly reduce the number of cars entering the facility at any one time. The Carmel Dad’s Club commits to providing off-duty officers to direct traffic into and out of the football facility during game day.” The only other major changes were as a result of working with the property owner to the north. Pittman Partners has committed to build a wetland facility on their property if requested by the owner; Pittman Partners is also willing to double the buffer yard requirements, one-half on the neighbor’s property, one-half on Burlingame property. However, this item has been deleted 2 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 because the homeowner has indicated no interest. The above are the outstanding issues that were to be addressed. Department Report, Jon Dobosiewicz. The petitioner was to report back to the committee on traffic concerns related to the proposed recreational use. The Department is recommending this item be forwarded to the Commission after comments and concerns have been addressed. Marilyn Anderson was concerned that the traffic study did not take into account the ball fields and the traffic that would be generated. Paul Rioux said he would not hire another traffic study. The consensus of the Committee was that John Myers, traffic engineer with Parsons, Brinckerhoff should be asked to review the traffic study that was submitted by the petitioner. Pam Williams said that the density is still an issue. Docket Nos. 126-03 Z (#03080012) and 127-03 Z (#03080013) TABLED were to the December 2003 Subdivision Committee meeting. 3. Docket No. 131-03 PP (#03080030) Cass Estates- Primary Plat The applicant seeks to plat a 70-lot subdivision. The site is located southwest 116th Street & Shelborne Road. The site is zoned S-1/Residential- Low Density. The petitioner also seeks the approval of the following subdivision waiver: 131-03a SW ( #03090008) §6.3.7 Cul-de-sac length Filed by Dennis Olmstead of Stoeppelwerth & Associates for Graystone Development, LLC. Jim Shinaver appeared before the Committee representing the applicant. Also in attendance were Sheldon Phelps and Dan Shiffauer representing Graystone Development; Brian Robinson, Stoeppelwerth Engineers; Dave Klauba, Landscape Architect. th The site is located at the southwest corner of 116 Street and Shelborne Road. North of the site is Long Branch Estates; to the south is the Weston Ridge Subdivision; to the east and west are various tracts of land individually owned. Jim Shinaver submitted a draft of “Letter of Intent” as well as the proposed commitment document addressing road work requirements/roadway improvements. Jim Shinaver also submitted the revised landscape plan that addresses the buffer yard requirements and additional tree plantings along the interior pathways. In response to comments made from an adjoining property owner, Sheldon Phelps met with the neighbor, Don Pollard, and has also contacted an official of the water utilities to determine if access at the rear of the home was feasible. The utility company reported that such a hook-up from the rear 3 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 of the home is not permitted. Visual screening will be accomplished through landscape plantings. There were comments at public hearing regarding the stubstreet. The petitioner is agreeable to eliminating the stubstreet unless the Department requires them to do so. Through much effort between both parties, an agreement has been reached. The agreement essentially states that Graystone will construct a mound six feet in height and will extend from the southwest corner 330 feet north and terminate at the nature/wildflower area is located at Cass Estates. Graystone has agreed to construct two rows of Norway Spruce, 10 feet tall, spaced 15 feet apart at the top of the six-foot mound. The Spruce Trees will total 67 in number. While the mound will stop 330 feet north near the nature preserve area, the actual tree rows will continue to extend northward the entire 510-foot border. There were comments at public hearing from Greg Zubek, attorney representing Renee and Karen Lewin. Attorney Liz Hobbs appeared at Committee and stated she has authority from Mr. Lewin to express his support of the project. There are other commitments pertaining to tree preservation that relate to Lot 15; these commitments have been worked out between the neighbor and the developer. Members of the public were invited to comment. th Paul Nelson, Yorktown Crossing, said his only issue was the through traffic coming from 116 Street down his street and cutting over. The Committee emphasized connectivity of neighborhoods and the rationale. Kevin Kaiser, property owner to the west, said he had received a copy of the revised landscape plan and the trees have been “beefed up.” Mr. Kaiser is concerned with the sanitary sewer and where it will run, since his home is so close to the road and there are some very mature trees that he would like to preserve. After further discussion regarding the stubstreet to the west and landscaping/tree preservations Docket No. 131-03 PP (#03080030) commitments, the Committee voted unanimously to return Cass Estates,Primary Plat to the full Commission with a 4-0 positive recommendation. 4. Docket No. 132-03 PP (#03080031): Heather Knoll - Primary Plat The applicant seeks primary plat approval of a 57-lot subdivision. The petitioner also seeks the approval of the following subdivision waivers: 132-03a SW (#03090009) §6.3.4Provision of North-south collector road 132-03b SW (#03090010) §6.1.1 Conformance with the master plan 132-03c SW (#03090011) §5.1.7Extension of facilities in the master plan The site is located northeast of 141st Street & Shelborne Road. The site is zoned S-1/Residence-Very Low Density. Filed by Dennis Olmstead of Stoeppelwerth & Associates for Pittman Partners. 4 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 Neal Smith and Steve Pittman, Pittman Partners appeared before the Committee representing the applicant. Also in attendance: Brian Robinson, Engineer with Stoeppelwerth & Associates; Paul Rioux, Platinum Properties; Dave Klauba, landscape designer, LandFocus. Neal Smith reported that changes in the landscape plan have been made and submitted to Scott Brewer, Urban Forester. The site plan has also been revised to provide for the connectivity street that will run to the north/south collector, east/west through the property at the west side and th provides for future connection to 146 Street. The Department had requested a commitment regarding additional road-work requirements and the petitioner will work closely with the Department to address those commitment requirements. Jon Dobosiewicz referred to the site layout. The petitioner has been encouraged to acquire an additional 7 acres to the northwest of the property to guarantee the development of the future street. The Department would like to continue the probability that the extra segment of road can be installed. The petitioner would need to be granted relief from the Ordinance, similar to other situations to accommodate the flexibility of the road and a waiver filed. Docket No. 132-03 PP, (#03080031) Heather Knoll Marilyn Anderson moved to forward Primary Plat , together with related Subdivision Waivers, to the full Commission with a positive recommendation, seconded by Wayne Haney and Approved 4-0. 5. Docket No. 137-03 PP (#03090005) Weston Pointe - Primary Plat The applicant seeks to plat a 130-unit subdivision. The site is located northeast 106th Street & Michigan Road. The site is zoned part R-4/Residence and B-2/Business, and is within the US 421 Overlay Zone. Filed by Dennis Olmstead of Stoeppelwerth & Associates for Pittman Partners. Steve Pittman, Pittman Partners appeared before the Committee representing the applicant. Neal Smith, Pittman Partners and Brian Robinson, Stoeppelwerth & Associates were also in attendance. Steve Pittman reported that Pittman Partners has worked closely with the surrounding neighbors regarding the development of this property. The waiver regarding tree planting was opposed by the neighbors as being contrary to commitments made at the time of rezone of this property. The plan has been altered and the detention relocated—the waiver for the trees is no longer needed and the neighbors have submitted letters of support; those letters have been submitted to the Department. Steve Pittman commented that at public hearing, Steve Sanders, Weston Pointe Subdivision objected to the connector/stub street into the Weston neighborhood. Steve Sanders was in attendance at the Committee. Mr. Sanders said the traffic situation is of prime concern. Speed bumps have been discussed as well as walkways, etc. The County Sheriff does nothing to enforce the traffic speed. 5 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 Jon Dobosiewicz reported that the Subdivision Control Ordinance requires the connectivity of subdivisions and the stub street is required in this instance. Also, at the time the rezone petition went through the process, a traffic study was done; the traffic study stated minimal impact. forward Docket No. 137-03 PP (#03090005) Weston Pointe Primary Pam Williams moved for Plat,to the full Commission with a positive recommendation, seconded by Marilyn Anderson and Approved 4-0. ______________________________ Dave Cremeans, Chairperson __________________________________ Ramona Hancock, Secretary 6 S:\\PlanCommission\\Minutes\\SubdivisionCommitteeMinutes\\Subdiv2003nov06 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417