Rick Ripma called the meeting to order at approximately 6:00p.m.
The Subdivision Committee will meet to consider the following items:
1.Docket No. 06010001 Z: Monon Townes PUD
The applicant seeks to rezone 6.81 acres from R1/Residential to PUD/Planned Unit
Development for the purpose of creating 65 townhomes.
The site is located at 1001 Rohrer Road.
Filed by Ann M. Walker for Pulte Homes of Indiana, LLC.
Page 1
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
Present for the Petitioner:
Ann Walker-Kloc and Dave Compton with Pulte Homes, Charlie
Frankenberger with Nelson and Frankenberger, James White and Steve Schutz with Primrose
Development, LLC.
Petitioner’s Presentation: Dave Compton
said that the last time they appeared before the
Subdivision Committee was May 2006. He said that they were there at the meeting to ask for some
feedback on a new conceptual plan that reflects the comments of the Subdivision Committee
members and the comments collected at various neighborhood meetings. He said that Pulte Homes
would be stepping away as the developer on this community. He said that Steve Schutz and Jim
Wright and Will Wright would be taking on the project. He said that Pulte began the project in
2005. He introduced the project as it was filed originally. He said that they were not asking for a
vote, but were just asking if the new builders should continue forward and spend their dollars
addressing the Subdivision Committee’s concerns in this new plan. He said that the new plan is 38
units versus the 66 units in the plan presented in May. He said that it was a two-story product versus
the three-story product in the old plan. He said that the price point would start at $310,000. He said
that they are expected to average $350,000. He said that the old plan from Pulte averaged $240,000
house and lot. He said that the existing neighborhood to the South, Autumn Ridge has an average
sales price of $232,000 per the MLS.
Rick Ripma
asked if anyone had seen the new plans in very much detail. He said that he was unsure
what the petitioners wanted direction on and that he was unsure how to proceed.
Jim White
clarified that the effort was to scale back the housing sizes from three-story to two
stories because he said that it was understood that building height was a pretty sensitive issue. He
said that they are bringing a plan that is not as detailed as what Pulte’s last submission was because
they wanted to present a conceptual plan to find out if this plan was, generally, going in the right
direction. He said that there are details of the plan to be presented and that they knew that they
needed to meet with the neighborhood. He said that they didn’t want to waste anyone’s time.
Rick Ripma
said that he wasn’t going to open the floor for public comment because he didn’t think
that anyone truly had anything to comment about. He said that there wasn’t enough information
yet. He said that it sounded like the petitioner was willing to meet with the neighbors before it came
back to the Subdivision Committee. He said that he would hear from the Department.
Department Report: Angie Conn
said that the petitioner was requesting that the Committee look
at the new plan to let them know whether they were heading in the right direction, so they can
prepare more detailed landscaping and engineered drawings for the next meeting.
Dan Dutcher
asked when a proposal ceases and a new proposal emerges. He said that they have
not really seen enough detail to comment on. He said that from what he has heard, he hasn’t heard
anything that makes him think that the proposal may not be going in the right direction. He said that
he thinks that it is possible that it has evolved so significantly from what the Committee has seen in
the past that he thinks that it may need to be treated as a separate, new proposal.
Page 2
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
Angie Conn
said that she would discuss the matter with the Counsel.
John Molitor
said that there was a rule in the Rules and Procedures for the Plan Commission that
says that if a proposal is withdrawn, the petitioner is locked out for six months from submitting the
same proposal and the petitioner is locked out for three months from submitting a similar proposal
for the same property. He said that there is also a rule that says that the Commission at its discretion
may permit amendments or modifications to an existing proposal. He said that in light of that, he
feels that the thing to do is to send the petition back to the full Plan Commission with a
recommendation that the Commission either allow the petitioner to make the amendments proposed
or that the Commission should treat it as a withdraw and that the petitioners should wait to resubmit
a new proposal.
Carol Schleif
asked if there was anything that talked about the change in petitioner.
John Molitor
said that generally land use goes with the land, therefore, the identity of the petitioner
could change prior to it being built, etc. He said that when the nature of the proposal and use of the
land change is when this comes up.
Rick Ripma
said that based upon the little bit of the design that he has seen; it is certainly a huge
improvement and addresses a lot of the concerns that were heard originally. He said that he thinks
sending it back to the full Plan Commission makes sense to him. He said that he thinks that is fair.
He said that they certainly couldn’t vote on it tonight.
Charlie Frankenberger,
on behalf of the applicant, said that the existing petition was to change the
property to a PUD zoning classification. He said that they heard clearly from the neighbors that they
needed to reduce building height and density. He said that the petitioners had tried the best that they
could to accommodate those concerns. He said that they would ask that, considering that they are
responding to the suggestions of the Committee and the Public and adjusting their plans per those
suggestions, that they not be treated as a new petition and suffer a three-month penalty or a
six-month penalty. He said that they have already done the public notice. He said that this plan is
the result of the process doing what it is supposed to be doing. He said that he would ask that the
Commission and the Committee just consider this a continuation of the process that was started a
while back.
Patrick Rondeau
, who resides at 13708 Autumn Lake Overlook, said that they are not against
development if it involves high-quality builders. He said that they had worked extensively with
Pulte in the past and that they felt like they had made progress in the development plan. He said that
in this particular case, he feels that this amendment should be treated as a new filing for a few
reasons. He said that they are starting over from scratch from their point of view. He said that he
felt that it was Pulte’s responsibility to make their business partner aware of whatever discussions
and agreements were made beforehand, if this is a continuing petition. He said that if you look at
what has been provided with regards to the amendments, the new plan ignores a lot of the things that
the neighbors had worked out with Pulte. He gave examples of the items that they felt had been
worked out with Pulte that they felt the new plan ignored. He said that they would expect that the
new builder would review and honor many of the prior agreements that were made. He said that is
Page 3
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
what they would see as being justification for a continuance. He said that they don’t even have raw
documents to look at beyond two small sheets of paper. He asked how they could tell that it was
the same project. He said that, while they argue that they should not be penalized, he would argue
the other way. He said that it was the petitioner’s responsibility to make sure that the plan was set
up correctly when they came here for the fourth time around. He said that in business if you don’t
do what you are supposed to do, then there should be a penalty. He said that they would like to see
a fresh process started with a new petitioner that the neighborhood can work with and who can
work with them. He said that way they could come up to the Commission as a unified front in
support of the project. He said that those were his comments for now.
Rick Ripma
said that he personally didn’t see what was to be gained by making the petitioner wait
ninety days. He said that it is the same process whether they start over or continue the process.
Dan Dutcher
said that he thinks that his conclusions are probably the same, but that the
expectations of the Committee are that when it comes back on October 3, 2006, the petitioners will
have sat down with the neighbors, fully-developed the plan, and that the Committee members will
have received the documents with plenty of time to fully review the plans. So, that the next meeting
can be one with the opportunity for full dialogue. He said that with that expectation, he agrees with
Rick Ripma.
Carol Schleif
added that she would suggest that the starting point be no less than what has already
been negotiated. She said that it still wasn’t enough and that the petitioners should keep that in
mind.
Dan Dutcher 06010001 Z: Monon Townes PUD
made formal motion to send docket number
recommendation that the full Plan Commission pass
back to the full Plan Commission with the
a motion allowing the petitioner to make amendments to the proposal and send it back to the
Committee for further deliberation at the October 3, 2006 meeting of the Plan Commission
Subdivision Committee.
Carol Schleif
seconded the motion.
APPROVED (4-0)
The motion was unanimously .
…END…
2.Docket No. 06040017 PUD: Townhomes at Central Park
The applicant seeks to create 110 townhomes on 8.8 acres.
The site is located at 11400 Westfield Blvd. and is zoned R1 Residential
Filed by Mary Solada of Bingham McHale for Mann Properties.
Present for the Petitioner:
Brian Sullivan, Greg Ewing, and Tim Stevens with Mann properties,
and Mary Solada with Bingham McHale representing Mann Properties.
Petitioner’s Presentation: Mary Solada
said that they had last presented the case at the
Page 4
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
Subdivision Committee meeting on June 29, 2006. She said that they had made substantial changes
to the plan since then. She said that Greg Ewing would review the changes to the plan. She said that
the petitioner had received extremely favorable staff comments in the Department report. She said
that the road to the new Central Park had now been paved.
Greg Ewing
recapped the prior developments in the project. He said that in June, they came before
the petitioners with a proposed density of 10.45 units per acre, or 92 townhomes. He discussed the
issues brought up at the June 29, 2006 meeting. He said that the current proposal is 9.9 units per
acre. He said that they have increased the setback along Westfield Blvd. significantly. He said that
they are now proposing buildings no closer to the Westfield Blvd. right of way line than 20 ft. He
said that was over fifty feet of pavement. He said that they had reduced the number of buildings
along Westfield Blvd. and that they are now only proposing two buildings along the frontage. He
said that they had increased the Westfield Blvd. open space significantly in the Northwest corner of
the site. He said that as a result, the new plan saves a lot more trees along the Westfield Blvd. site.
He said that all of the trees along the Northern property line are existing. He said that they have
increased the number of guest parking spaces. He said that the plan still provides for four and five
unit buildings mostly instead of the seven unit buildings that were originally proposed. He said that
there were forty to fifty feet apart from one another. He said that there were a few instances of thirty
th
feet between buildings, but that the Aramore project at 99 and Westfield Blvd. had a minimum of
fifteen feet of separation between buildings. He said that the townhome component of that project
provided almost fifteen feet of separation throughout. He said that there were only a couple of
instances of thirty feet of separation between the buildings, which is the minimum in the Townhomes
at Central Park project. He said that the building orientation has been structured to prevent garage
views from Westfield Blvd. He said that when you look into the site from Westfield Blvd. he
believes it would be very difficult to see a garage view. He said that they have resolved all of the
preliminary issues and concerns there. He said that they are providing an 80 ft. esplanade through
the whole site as well as a fifty-foot esplanade and green space through this portion of the site. He
said that since the original filing, the density has been reduced by 26%. He said that ¼ of the density
has been reduced and that they feel that is significant. He said that he thinks that they have
continued to move in the right direction. He said that they would like to request the Committee’s
approval today. He said that he would like to request that project be sent to the full Plan
Commission and, of course, preferentially with a recommendation for approval.
Rick Ripma
called for Public Comments.
Jack Engledow,
who resides at 1819 Wood Valley Drive, said that he generally represented the
views of the residents of Creekside, Wood Valley, Pine Valley, Jordan Woods and many of the
residents along Westfield Blvd. He said that they are not categorically against development. He
said that they live in a dynamic community and that they expect change and that they are proud to
be a part of Carmel. He said that he thinks that the development needs to follow the Comprehensive
Plan to protect their property rights within reason. He said that a development plan has to have
some common sense. He said that they contend that the current proposal fails on all those tests.
He said that it is too dense. He said that there are 87 units in the current proposal. He said that it
is too tall because he assumes they are still planning to have three-story tall units. He said that it kills
too many trees and that it brings too much traffic. He said that it has some potential water problems
Page 5
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
that have not been discussed with the proximity to Carmel Creek. He said that he feels that the
developers have only taken token steps to come to compliance with the Comprehensive Plan. He
said that the Comprehensive Plan identifies this parcel as changing zoning from R-1 to attached
residential, formerly multi-family residential. He said that they are curious as to why this parcel is
th
the only area in the township South of 116 Street that is so designated as attached residential that
isn’t already devoted to multi-family or attached residential. He said that if attached residential is
going to be the hand that they are dealt, then he hoped that the developers would play by the rules.
He said that the Comprehensive Plan says for this attached residential that it should be two-story
or three-story if the context reflects that scale. He said that the only thing in the area that might
possibly reflect a three-story is the trees and he said that a lot of those would be leaving if the
development were passed. He said that it also talks about a density of seven units per acre. He said
that this proposed development is around ten units per acre. He said that he feels that anything
going in that area should hit the very low end of the seven units per acre. He said that the proposed
development would have to fit into an area where the density was around one unit per acre, if not
a little less than that. He said that he thinks that the recent approval of the Gramercy proposal along
th
Keystone and 126 Street have added to a rising concern that anything goes in zoning. He said that
a three-story development would open speculation of developers with regards to where they could
build townhomes next. He said that, in general, they think that because of the way that it fits into
the Comprehensive Plan, it should be rejected out of hand because it is a bad development. He said
that, perhaps, the zoning designation permitting attached residential is not an appropriate
classification. He said that he thinks that Mann Development is a highly respected firm and that they
have done a good job in other locations. He said that he would urge the Committee to not pass this
plan as proposed.
Carol Ludwig,
who resides at 10725 Westfield Blvd., which she noted is downstream from the said
development, said that this was her first time looking at the development and that her comments
would be a little raw because she wasn’t prepared to comment on it. She said that she sees this
parcel as a developers delight. She said that the City Parks and Recreation Department is paying for
the development of green space for them. She said that time and time again, she has seen the City
of Carmel letting developers piggyback on all the funding that is used by the City itself. She said that
the developers use Carmel and feed off of it. She said that she sees this project as presenting a huge
traffic problem that the City will have to address. She said that it is a developers dream. She said
that she wanted to know which unit the people who are developing it were going to live in. She said
that most of the time, living South of the said property, she can’t get out of her driveway and that
the developers were proposing to add eighty-seven more families to the area. She said that she
didn’t know how she would get out of her driveway without getting rear-ended as she has been in
the past. She said that the site presented an environmental challenge. She said that the development
was going to impact her. She said that she doesn’t see a lot of green space, other than Central Park.
She said that she didn’t see where guests would park and that she felt that the project needed to go
back to the drawing board.
Rick Ripma
closed the public hearing andcalled for the petitioner’s rebuttal.
Mary Solada
said that this project is completely consistent with the Comprehensive Plan. She said
that the Comprehensive Plan suggests this because, as the Department Report points out, there is
Page 6
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
a correlation between density and City Services. She said that there was a major regional City Park
that was going to be generating a lot of traffic. She said that within walking distance there was a
neighborhood commercial development. She said that the notion is that the City Services are there
and that the density should be reserved for the core and that the area in question is closer to the core
than a lot of other areas towards the East and the West. She said that 16,000 vehicles travel by the
site per day. She said that the proposed development would be about 200 cars. She said that they
believe that they are literally a drop in the bucket compared to the traffic Central Park will generate.
She said that the bottom line about the height is that you pick your poison. She said that if they
were to do some type of single-family detached development, site coverage would be increased and
the petitioners would not be able to save as many trees and may not be able to do the grand
promenade and the other things that make the proposed development unique. She said that they are
talking about average pricing of $250,000-$300,000. She said that she would guess that is within
25% of the price of many of the homes in the area. She said that the other thing that is worth noting
is that when the petitioners were approached by neighbors after the other two meetings, she said
that it was clear that they don’t want townhomes. She said that the petitioners feel that townhomes
is what the Comprehensive Plan is calling for. She said that discussion about single-family homes,
etc. wasn’t going to be a meaningful dialogue for either party. She noted that the Department
Report calls the development one of the best-designed townhome developments on record in
Carmel. She said that they would ask the Committee for their indulgence and that after all of the
discussion over the last few months, she believes that the petitioners are ready for a vote.
Department Report: Angie Conn
said that she would like to read some excerpts from the
Department Report. She said that with Carmel’s Urban Design Initiative, the increased density
within the city has been directed to the City’s core. She said that it is the Department and the City’s
goal to accommodate growth in the most responsible manner. She said that they see this as doing
so. She said that the City Engineer feels that this development will not be of concern with regards
to increased traffic, when it is considered in the whole scheme of things. She said that the developer
has made it a priority to preserve many of the mature trees on the site. She said that in terms of site
design and architecture, the Department feels that it is one of the better townhome projects in
Carmel. She said that all of the Urban Forestry issues have been resolved and the Department
recommends that the Committee vote on this tonight and send it to the full Plan Commission.
Carol Schleif
said that they asked for a lot of things last time. She said that the best that she could
tell, one four-plex has been removed and two trees were saved. She said that at the last meeting
there were issues about density and it is still way off in her opinion. She said that the Committee
asked for some two-story. She said that she personally thinks that some one- and two-story would
be more in fitting with the neighborhood. She said that five townhomes in a row makes a huge
building and she said that was really out of place for that neighborhood. She said that they have to
address transition issues. She said that there is already an existing transition from commercial back
to single-family residential at the house to the North of the property and she said that putting this
development in would take it back to high-density, multi-family housing. She said that if the
petitioners had the property to the North, it would be a different issue. She said that she thinks that
it needs to be in keeping with what is already there. She said that when she is laying out
developments, she uses the height of the two buildings to determine the building separation. She
said that based on that assessment, the building separation is not enough. She said that she can see
Page 7
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
how this project can work, she said that she was just hoping to see a little more of what the
Committee asked for at the last meeting.
Kevin Heber
said that, with all due respect to the one single-family home there, he doesn’t see one
home as being significant enough to be a transition. He said that the proposed development is pretty
close to the core. He said that in his mind it isn’t “the core.” He said that the challenges of what is
going to work in the area and preserving the character of the area should warrant the petitioners
showing a view from Rangeline. He said that having that picture would help him tremendously to
be able to visualize. He said that at the very least he would also like to see tree preservation and,
even better, would be a tree ID and preservation plan overlayed, so that they could see exactly
which trees would be coming down. He said that he thinks that the important issue with this project
is the character and he said that he believes that is largely determined by what can be seen from
Rangeline. He said that if it can be determined that the feel of driving down Rangeline will not
change, then at least they can say that has been addressed. He said that he doesn’t really have a
major issue with the proposal other than that he wants to make sure that the character remains in
tact. He said that he doesn’t really have a vision for what else could possibly work here. He said
that Dan Dutcher would probably mention something that he might think would work better than
what has been proposed. Kevin Heber said that he doesn’t really see that idea working better than
what has been proposed.
Dan Dutcher
said that he thinks that height, density, and scale all remain an issue to him. He said
that he thinks that this is a significant improvement over what they saw before. He said that he
thinks that three stories may not be appropriate for this area. He said that the project is still dense.
He said that he doesn’t accept the idea that somehow, because there is a park entrance off of
Rangeline Road, that becomes the line of demarcation of where they will apply the New Urban
approach. He said that there would be three entrances to Central Park. He said that the anticipated
th
“main entrances” would be along 111 street and College Avenue. He said that this is one area
where he probably differs from the Department in terms of the designation of this property for
high-intense urban use. He said that he thinks that we can fall into a habit of thinking that
townhomes are the only vehicle by which we can achieve desired urban, higher-intensity kind of
uses. He said that if you look at the Comprehensive Plan draft, there is a heading called “Urban
Residential”. He said that it permits density up to 6.9 units per acre. He said that it has a much more
residential feel to it and he thinks that would be a better fit for this location. He said that the
petitioners would have increased density, but the character and residential flavor would be retained.
He said that he thinks that his major issue is that using townhomes on the property as proposed
doesn’t accomplish what he feels should be accomplished from a transition standpoint.
Kevin Heber
said that he personally would rather see the green space preserved that the townhome
proposal would allow. He said that he could see both sides, but that it would feel more open despite
the increased height because the townhomes allowed the petitioner to retain so much open space.
Dan Dutcher
said that he assumes that reducing the density would generate more open space. He
said that the “Urban Residential” would generate around 6 units per acre as opposed to the 10 units
per acre proposed in the townhome development.
Page 8
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
Carol Schleif
pointed out that the green space in the middle was a utility easement, so there would
not be any building on that easement.
Rick Ripma
asked the petitioners if they were willing to change the plan enough to make it worth
the Committee’s time to come back and look at it again or if the Committee should just vote on it.
Tim Stephens
responded that the petitioners would like the Committee to vote on it tonight.
Dan Dutcher 06040017 PUD: Townhomes at
made formal motion to send docket number
Central Park a negative recommendation.
back to the full Plan Commission with
Carol Schleif
seconded the motion.
PASSED(4-0)
Motion unanimously .
…END…
3.Docket No. 06030025 DP Amend/ADLS Amend: Pearson Ford
The applicant seeks approval for a proposed building alteration.
The site is located at 10650 North Michigan Road and is zoned B3/Business. The site is
located partially within the US 421/Michigan Road Overlay District.
Filed by John Pearson of Pearson Realty, LLC, for Pearson Ford.
Present for the Petitioner:
Dave Coots with Coots, Henke, & Wheeler.
Petitioner’s Presentation: Dave Coots
said that at the last Committee meeting, the petitioners
had asked for the approval of the signs, as well as the Committee’s approval to substitute the
Deco-Brick material or a clay-brick veneer for the Collision center that has been approved. He
noted that they had presented several examples of buildings in which the building material had been
used. He discussed the different finishes that could be applied to the product and how it would be
applied. He said that the Deco-Brick is a concrete-based product and the dye is mixed in the mortar
and permeates the entire unit. He said that they would ask that the Committee approve their request
to modify the building material.
Carol Schleif
clarified that the Deco-Brick material was a full-mortared material.
Department Report: Angie Conn
said that the Department recommended that the item be
approved once all concerns were addressed. She said that the item would only require Committee
approval.
Rick Ripma
said that he appreciated the petitioners’ information because he really didn’t know
what the material was or whether it would be acceptable. He said that he now understands what it
is and he is fine with it.
Carol Schleif
clarified that the petitioner would save a considerable amount of money by using this
Page 9
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
building material. She asked if the petitioners could consider putting some skylights in the addition
to the truck service center.
Dave Coots
said that this material would be going on the new structure that was going to be the
collision center and that it wouldn’t be going on the addition to the truck service center.
Carol Schleif
clarified that she was requesting them on the new building because it had office areas
and mechanics areas deep in the building that could use the natural sunlight.
Dave Coots
said that he would certainly present the idea to Mr. Pearson and to the Architect
involved on the project. He said that addition wouldn’t change the exterior.
Dan Dutcher APPROVE 06030025 DP Amend/ADLS
made formal motion to docket number
Amend: Pearson Ford.
The motion was seconded.
approved (4-0).
Motion was
…END…
4.Docket No. 06060016 Z: Cherry Tree Grove Rezone
The applicant seeks to rezone 20.44 acres from S1 to S2 to allow for low-density residential
development. Commitments will be filed in conjunction with this request.
th
The site is located on the east side of Cherry Tree Road, south of 146 Street.
Filed by Matthew Skelton of Baker & Daniels, LLP.
Present for the Petitioner:
Matt Skelton with Baker & Daniels, LLP and Chris White with RDJ
Development, LLC.
Petitioner’s Presentation: Matt Skelton
said that the Staff was asked to provide an explanation
of conservancy lot and he said that he thought that was included with the Department Report. He
said that another item that was raised was the shape of the proposed retention pond. He said that
they have actually incorporated those comments into the design. He said that they have tried to give
the proposed retention pond a more organic form. He said that they were asked to provide a
probable layout for lot 34, which is the conservancy lot. He said that was included with the
Committee packet materials. He said that they were asked to provide an aerial exhibit, which was
also included in the packet of materials. He said that the Staff was asked to do an analysis of the
City’s draft Architectural guidelines versus what was being proposed. He said that they did a quick
analysis and included that in the packet of materials. He said that he thinks they have provided
everything that the Plan Commission asked for.
Rick Ripma
called for Public Comments.
Barry Smalstig,
who resides at 14320 Cherry Tree Road, said that his property forms the South
Page 10
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
and a portion of the West boundary of the proposed subdivision. He said that he did send the Plan
Commission a letter. He said that they generally support the project, but that their major concern
is traffic. He said that Cherry Tree Road is a small, twisty road with about twenty-0three homes on
it. He said that they are not thrilled with the thought that a property that currently has two homes
on it will have thirty-something homes on it. He said that they think that they can live with that.
He said that the one thing that they really object to is the connection to the proposed
Legacy/Earlham property. He said that he understands that the Plan Commission likes to have
interconnectivity, but he said that opening several thousand home sites to the East side of the
property to access Cherry Tree Road makes no sense. He said that if it were a path that allowed bike
traffic or pedestrian traffic, then it would make sense to have connectivity there. He said that
opening it up to the large Legacy project makes no sense. He said that other than that, they support
the project.
Dottie Brisley,
who resides at 14558 Cherry Tree Road, said that she wanted to show the
Committee some pictures of the property that will be developed. She said that he property is the
largest one that abuts the proposed development. She said that they were in favor of the project.
She said that they were hoping that they could move forward with the project, so the earthwork
could be done in the winter to cut down on a lot of the dust. She said that she was showing the
pictures because the petitioners have said that a lot of the trees along the Northern part will remain
and she wanted the Committee to see how pretty it was. She said that they were really pleased with
the development as they proposed it. She said that he only concern is that they move it through, so
the petitioners can start on it as quickly as possible, so it doesn’t get into next summer.
Department Report: Angie Conn
said that the Staff has no outstanding concerns with the rezone
given the proposed commitments. She said that the proposed primary plat does not need any
additional waivers as proposed. She said that the Department recommends that the Committee
forward this to the full Plan Commission with a positive recommendation.
Dan Dutcher
clarified that the Committee would only be moving on the rezone request at this point
and that the stub request was not at issue at this point. He clarified that the Department was
comfortable with the Architectural Standards proposed, even though they do not fully live up to the
Draft Architectural guidelines.
Angie Conn
said that seemed to be the case.
Carol Schleif
said that she would have to stand firm on the Draft Architectural guidelines because
having windows on the sides of the homes is really important for light and air in the home. She said
that she would really like to see that happen at this point and have that stated in the commitments.
She said that the garages wouldn’t have to be front loading. She said that courtyard garages could
be utilized. She asked the petitioners for further explanation on the four-foot front porches.
Matt Skelton
said that they have tried to hold to as many of the Draft Architectural guidelines as
make sense with the petitioners existing custom product. He said that because of the design of some
of their models, not every one of them would necessarily work. He said that some of the
commitments that they are making are above what the Draft Architectural standards call for to
Page 11
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
mitigate for the ones that the petitioner was not meeting, such as roof pitch and building materials.
Carol Schleif
said that she thinks that the homes the petitioner builds should meet all of the Draft
Architectural standards. She said that part of what she thinks Carmel is looking for Carmel is to
raise the bar of the design. She said that it isn’t a poor investment, but that it is helping them find
the criteria that they are looking for.
Rick Ripma
clarified what Chimney panels are.
Christine Barton-Holmes
explained that the panels are usually an EIFS drivet or hearty plank
material. She said that the intent of the inclusion of that in the Draft Architectural standards is to
prohibit the use of Vinyl Siding materials on the chimneys.
Rick Ripma
clarified that the panel would look like masonry or stucco material.
Carol Schleif
said that the petitioners should strike the language that says “as architecturally
appropriate” from the window section and the roofline section. She said that the petitioners could
say EIFS instead of panels.
Kevin Heber
said that he thought that no one would even use a four-foot porch.
Rick Ripma
said that since the homes are courtyard, he assumes the houses are pushed forward.
Matt Skelton
said that they could do the six-foot porch. He said that the architectural language is
right out of the standards.
Dan Dutcher
asked if the window standard could be changed as well.
Matt Skelton
said that poses a problem depending on how the interiors are laid out. He said that
certain furniture doesn’t work in the rooms depending on window placement.
Carol Schleif
said that she couldn’t disagree with that more. She said that she knew the petitioners
could do it.
Matt Skelton
said that wasn’t an issue that they could answer this evening without checking with
RDJ’s architect.
Dan Dutcher
suggested that the Committee move on the rezone tonight and discuss the
architectural standards later
Matt Skelton
said that they could be redesigned to be effective upon plat instead of rezone. He said
that the issue is that the petitioners wanted to pin down as many things as they possibly could, so the
platting process is expedited. He said that they could include it in the commitments that they would
review the architectural standards at the plat process.
Page 12
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
Discussion ensued whether they were actually going to be custom homes or not.
Carol Schleif
said that the day lighting issue is becoming a public health issue. She said that saving
a few dollars now could turn into costing the health care system a whole lot of money. She said that
we have the science and numbers now to back that up. She said that she would just like to see the
petitioners go with the guidelines.
Matt Skelton
said that it had little to do with saving money, but rather, it was about floor plans.
Carol Schleif
said that skylights could be an effective alternative.
Rick Ripma
asked if the windows requirement was for the exterior look of the home.
Christine Barton-Holmes
said that it was for the look, but that it was also a public health and
safety issue. She said that when there are windows on all four sides of the home, there could be
good cross ventilation that would alleviate a lot of the problems that newer houses tend to have with
mold and stagnant air, etc. She said that it allows for more daylight in the rooms, which uses less
electricity.
Matt Skelton
said that after discussing it with his client, they would just agree to the standards as
proposed, if that were acceptable to the Committee. He said that the petitioners would retract what
has already been submitted and that they would go with the City of Carmel’s draft Architectural
standards.
Dan Dutcher 06060016 Z: Cherry Tree Grove
made formal motion to send docket number
Rezone favorable recommendation with the inclusion
back to the full Plan Commission with a
of the modification by the petitioner to use the City’s Draft Architectural Standards.
The motion was seconded.
approved. (4-0)
Motion was unanimously
…END…
5.Docket No. 06010005 Z: Shelborne Property PUD – CONT TO OCT. 3
The applicant seeks to rezone 20 acres from S1/Residential to PUD/Planned Unit Development
for the purpose of developing single-family residences.
st
The site is located on the west side of Shelborne Road, north of 121 Street.
Filed by Charles Frankenberger of Nelson and Frankenberger for Indiana Land Development Co.
6.Docket No. 06010009 Z: Crook PUD – CONT. TO OCT. 3
The applicant seeks to rezone 20 acres from S1/Residential to PUD for the purpose of platting
40 single family homes on 20 acres.
th
The site is located at 2238 W. 136 Street and is zoned S1/Residential.
Filed by Charlie Frankenberger of Nelson and Frankenberger for Indiana Land Development.
th
7.Docket No. 06020017 CPA: 96 & Westfield Neighborhood Plan
Page 13
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
September 5, 2006
Carmel Plan Commission Subdivision Committee Minutes
CONT. TO OCT. 3
The applicant seeks to amend the Carmel/Clay Comprehensive Plan in order to incorporate
th
the 96 & Westfield Neighborhood Plan.
Filed by the Carmel Department of Community Services.
8.Docket No. 06050020 PP: Clay Creek– CONT TO. OCT. 3
The applicant seeks to plat 30 lots on 29.971 acres.
th
The site is located on Hoover Road north of 116 Street and is zoned S1.
The applicant seeks the following waivers for the proposed plat:
06050022 SW:
SCO Chapter 6.05.07 Orientation of Home – request to allow dwellings to
face internal street
06050023 SW:
SCO Chapter 7.05.07 Clearing of greater than 15% of mature woodlands.
Filed by Charlie Frankenberger for MHE Development Co. LLC.
__________________________________ __________________________________
Subdivision Committee Chair – Rick Ripma Respectfully Submitted By: Laura Rouse-DeVore
Page 14
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417