Loading...
HomeMy WebLinkAbout1476.98.4DOOR SCHEDULE NO. DIMENSIONS )"FE MATERIAL FIN 15H DETAILS SET HSET REMARK5 HEAD JAMB SILL OI EXISTING — S.G. WOOD STAINED BLDG STD. TIMELY FRAME PREFIN15H O O 02 3'- O "x8' -6 "xl 3/4" A 103 OFFICE 03 3'-O "x8' -6 "xl 3/4" A 104 OFFICE 105 OFFICE 04 3'- O "x8' -6 "xl 3/4" A 106 COATS 101 OPEN AREA 05 3'- O "x8' -6 "xl 3/4" A 108 CONFERENCE IOq 06 3'- O "x8' -6 "xi 3/4" A 110 OFFICE 0_1 3'- O "x8' -6 "xl 3/4" B 112 OFFICE 08 3'- O "x8' -6 "xl 3/4" B 114 BREAK Oq 3'- O "x8' -6 "xl 3/4" B STORAGE 116 CLOSET 10 3'- O "x8' -6 "xl 3/4" B 11-7 HALLWAY 118 HALLWAY II 3'- O "x8' -6 "xl 3/4" B Ilq COPY /SUPPLY 120 CLOSET 12 3'- O "x8' -6 "xl 3/4" A 13 EXISTING 3'- O "x8' -6 "x 13/4" A 14 EXISTING 3'- O "x8' -6 "xl 3/4" A 15 EXISTING 3'- O "x8' -6 "x 13/4" B 1 6 BIFOLD (PR) 3'- O "x7' -O "xl 3/4" C I'7 3'- O "x8' -6 "xl 3/4" A HARDWARE SETS: I. PASSAGE 5ET, WALL STOP, LEVER STYLE HARDWARE 2. LOCK SET, WALL STOP, LEVER STYLE HARDWARE >" TIMELY .EFINI51­1 (E G. WOOD, �) MATCH I LEVER 5 HARDWA DOOR TYPE " A " 2" TIMELY FRAME PREFIN15H (BLDG 5" S.G. WOOD, STAINE TO MATCH EXI5TIN F" 51DELITE E" TEMP. GLA55 DOOR TYPE " B " 10" PL -2 TRANSACTION TOP WITH EASED EDGE RECEPTION DESK BIFOLD HARDWI FLOOR LINE NO. ROOM NAME FLOOR BA5E HALLS D PAINT Q SOUTH WEST N 17 RECEPTION DESK BIFOLD HARDWI FLOOR LINE DOOR TYPE " G " GENERAL NOTES I. ALL PLAN DIMENSIONS ARE TAKEN FROM CENTER OF WALL TO CENTER OF WALL UNLESS NOTED OTHERWISE. 2. ALL DOOR ROUGH OPENINGS SHALL BE FRAMED 4" FROM ADJACENT WALL CORNER UNLE55 OTHERWISE NOTED. 3, PROVIDE BLOCKING IN WALL5 FOR ALL MILLWORK, WALL STOPS, HARDWARE AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING SHALL BE FIRE TREATED. 4. CEILING= EXISTING 20" X 20" SUSPENDED GRID. PROVIDE NEW 20" X 20" CEILING TILE5 WITH REVEALED EDGE. 5. LI6HT5: 20" X 60" FLUORESCENT FIXTURES WITH PRISMATIC LEN5E. 6. TENANT 15 RESPONSIBLE FOR PROVIDING AND INSTALLING ALL TELEPHONE d COMPUTER WIRING. ALL GABLE MUST BE TELFON COATED OR IN CONDUIT. 7. WHERE STRUCTURAL BEAM5, DUCTWORK ETC. PENETRATE RATED PARTITIONS, GYPSUM WALL BOARD SHALL BE SCRIBED TO FIT TIGHT AND CAULKED. 8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD CHECKING ALL DIMENSIONS AND MEASUREMENTS. IF JOB CONDITIONS PREVENT OBTAINING DIMENSIONS OR RESULTS AS SHOWN OR SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING LAN50N d LONDON, INC. BEFORE ANY CONSTRUCTION 15 COMPLETED. q. EACH CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AS INDICATED ON THE DRAYVIN65 AND REPORT ANY DISCREPANCY THAT MAY OCCUR TO THE GENERAL CONTRACTOR. ANY IRRE6ULARITIE5 SHALL BE REPORTED TO LAM50N d LONDON, INC., FROM THE GENERAL CONTRACTOR. 10. ALL DETAILS, MATERIALS, AND INSTALLATIONS OF SAME ARE SUBJECT TO FINAL APPROVAL BY LAM50N d LONDON, INC. 11. SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO LAM50N d LONDON, INC., ON ALL MATERIALS OR ITEMS IF THE CONTRACTOR CHOOSES TO DEVIATE FROM THAT SHOWN ON THE DRAWINGS OR IF THE DRAWING DOES NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. 12. GENERAL CONTRACTOR SHALL EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENT TIME FOR CHECKING FABRICATION AND /OR ORDERING AND DELIVERY OF MATERIALS AND EQUIPMENT, 13. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL MATERIAL AND LABOR, SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE RESPECTED TRADE. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL WORK SHALL BE IN ACCORDANCE WITH THE STATE UNIFORM BUILDING CODES AND STANDARDS FOR ALL GENERAL CONSTRUCTION, MECHANICAL, AND ELECTRICAL WORK AND LOCAL AND FEDERAL CODES AND STANDARDS. 14. ALL TRADE CONTRACTORS SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM DATE OF CONSTRUCTION COMPLETION. 15. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURING HOLIDAYS. 16. THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD GLEAN -UP PROCEDURES AND 6UIDELINE5 TO BE FOLLOWED ON A DAILY BA515 IN ORDER TO CONDUCT BU51NE55 IN A SAFE AND GLEAN ENVIRONMENT. THE GENERAL CONTRACTOR SHALL COORDINATE ELEVATOR USE AND PROTECT THE ELEVATOR GABS AS THE LANDLORD REQUIRES. I-7. THE GENERAL CONTRACTOR SHALL MAINTAIN A CLEAR AND UNOBSTRUCTED PATHWAY TO ALL EXITS DURING DEMOLITION AND NEW CONSTRUCTION. 18. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMP5TER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING RE5TROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. Iq. IN CONSTRUCTION OF A MULTI - TENANT FLOOR, OR A REMODEL OF EXISTING TENANT, THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2 X 4 WOOD STUDS AT 24" ON CENTER, INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. DUST PARTITIONS SHALL EXTEND FROM FLOOR TO CEILING. THE USE AND LOCATION OF DUST PARTITIONS SHALL BE COORDINATED WITH THE LANDLORD. 20. CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. PLASTID LAMINATE — GENTER DRAWER (PL -I PLASTIC LAMINATE COUNTERTOP (PL -1) BUILT -IN BOX/ BOX/FILE DRAWERS, MELAMINE ° INTERIOR WITH PLASTIC LAMINATE 1p FINISH (PL -I) G ry DRAWERS TO HAVE LOCK. 4" TOE KICK IS" (TYP I GAL) 7�7� PL -2 10" DEEP TRANSACTION TOP WITH EASED EDGE PROVIDE GROMMETS FOR ELECTRICAL AG VERIFY LOCATION KITH TENANT 5' -3" PT -2 PT -2 SUPPORT LEG -J AS REQUIRED (PL-1) ROOM FINISH GOLOR SGHEDULE NO. ROOM NAME FLOOR BA5E HALLS D EAST SOUTH WEST 101 17 O O .RE DOOR TYPE " G " GENERAL NOTES I. ALL PLAN DIMENSIONS ARE TAKEN FROM CENTER OF WALL TO CENTER OF WALL UNLESS NOTED OTHERWISE. 2. ALL DOOR ROUGH OPENINGS SHALL BE FRAMED 4" FROM ADJACENT WALL CORNER UNLE55 OTHERWISE NOTED. 3, PROVIDE BLOCKING IN WALL5 FOR ALL MILLWORK, WALL STOPS, HARDWARE AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING SHALL BE FIRE TREATED. 4. CEILING= EXISTING 20" X 20" SUSPENDED GRID. PROVIDE NEW 20" X 20" CEILING TILE5 WITH REVEALED EDGE. 5. LI6HT5: 20" X 60" FLUORESCENT FIXTURES WITH PRISMATIC LEN5E. 6. TENANT 15 RESPONSIBLE FOR PROVIDING AND INSTALLING ALL TELEPHONE d COMPUTER WIRING. ALL GABLE MUST BE TELFON COATED OR IN CONDUIT. 7. WHERE STRUCTURAL BEAM5, DUCTWORK ETC. PENETRATE RATED PARTITIONS, GYPSUM WALL BOARD SHALL BE SCRIBED TO FIT TIGHT AND CAULKED. 8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD CHECKING ALL DIMENSIONS AND MEASUREMENTS. IF JOB CONDITIONS PREVENT OBTAINING DIMENSIONS OR RESULTS AS SHOWN OR SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMING LAN50N d LONDON, INC. BEFORE ANY CONSTRUCTION 15 COMPLETED. q. EACH CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AS INDICATED ON THE DRAYVIN65 AND REPORT ANY DISCREPANCY THAT MAY OCCUR TO THE GENERAL CONTRACTOR. ANY IRRE6ULARITIE5 SHALL BE REPORTED TO LAM50N d LONDON, INC., FROM THE GENERAL CONTRACTOR. 10. ALL DETAILS, MATERIALS, AND INSTALLATIONS OF SAME ARE SUBJECT TO FINAL APPROVAL BY LAM50N d LONDON, INC. 11. SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO LAM50N d LONDON, INC., ON ALL MATERIALS OR ITEMS IF THE CONTRACTOR CHOOSES TO DEVIATE FROM THAT SHOWN ON THE DRAWINGS OR IF THE DRAWING DOES NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. 12. GENERAL CONTRACTOR SHALL EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENT TIME FOR CHECKING FABRICATION AND /OR ORDERING AND DELIVERY OF MATERIALS AND EQUIPMENT, 13. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL MATERIAL AND LABOR, SHALL BE IN ACCORDANCE WITH THE BEST QUALITY STANDARDS OF THE RESPECTED TRADE. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OVERSEEING THAT ALL WORK SHALL BE IN ACCORDANCE WITH THE STATE UNIFORM BUILDING CODES AND STANDARDS FOR ALL GENERAL CONSTRUCTION, MECHANICAL, AND ELECTRICAL WORK AND LOCAL AND FEDERAL CODES AND STANDARDS. 14. ALL TRADE CONTRACTORS SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR ONE YEAR FROM DATE OF CONSTRUCTION COMPLETION. 15. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURING HOLIDAYS. 16. THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD GLEAN -UP PROCEDURES AND 6UIDELINE5 TO BE FOLLOWED ON A DAILY BA515 IN ORDER TO CONDUCT BU51NE55 IN A SAFE AND GLEAN ENVIRONMENT. THE GENERAL CONTRACTOR SHALL COORDINATE ELEVATOR USE AND PROTECT THE ELEVATOR GABS AS THE LANDLORD REQUIRES. I-7. THE GENERAL CONTRACTOR SHALL MAINTAIN A CLEAR AND UNOBSTRUCTED PATHWAY TO ALL EXITS DURING DEMOLITION AND NEW CONSTRUCTION. 18. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMP5TER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING RE5TROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. Iq. IN CONSTRUCTION OF A MULTI - TENANT FLOOR, OR A REMODEL OF EXISTING TENANT, THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2 X 4 WOOD STUDS AT 24" ON CENTER, INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. DUST PARTITIONS SHALL EXTEND FROM FLOOR TO CEILING. THE USE AND LOCATION OF DUST PARTITIONS SHALL BE COORDINATED WITH THE LANDLORD. 20. CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. PLASTID LAMINATE — GENTER DRAWER (PL -I PLASTIC LAMINATE COUNTERTOP (PL -1) BUILT -IN BOX/ BOX/FILE DRAWERS, MELAMINE ° INTERIOR WITH PLASTIC LAMINATE 1p FINISH (PL -I) G ry DRAWERS TO HAVE LOCK. 4" TOE KICK IS" (TYP I GAL) 7�7� PL -2 10" DEEP TRANSACTION TOP WITH EASED EDGE PROVIDE GROMMETS FOR ELECTRICAL AG VERIFY LOCATION KITH TENANT 5' -3" PT -2 PT -2 SUPPORT LEG -J AS REQUIRED (PL-1) ROOM FINISH GOLOR SGHEDULE NO. ROOM NAME FLOOR BA5E HALLS NORTH EAST SOUTH WEST 101 RECEPTION 102 OPEN AREA 103 OFFICE 104 OFFICE 105 OFFICE 106 COATS 101 OPEN AREA 108 CONFERENCE IOq OFFICE 110 OFFICE III OFFICE 112 OFFICE 113 OFFICE 114 BREAK 115 STORAGE 116 CLOSET 11-7 HALLWAY 118 HALLWAY Ilq COPY /SUPPLY 120 CLOSET FINISHES: FIN15HE5 TO BE DETERMINED AT LATER DATE BY TENANT 10 116 /q8. CARPET: VINYL COMPO51TION TILE. CPT -I J3 J INDUSTRIES, VGT -I TO MATCH EXISTING F_ AL it PT -I CPT -2 J3J INDUSTRIES, WALL BA5E: VB -1 JOHN50NITE 4" VINYL COVE BA5E GB -1 4" CARPET BASE RECEPTION DESK A5 REQUIRED (PL -1) TWO (2) BUILT -IN FILE/FILE DRAWERS, MELAMINE INTERIOR WITH PLASTIC LAMINATE FINISH (PL-1) DRAWERS TO HAVE LOCK. I x 2 NAILER U- Q in VINYL WALLCOVERING: VNC- I PT -: EL DTI PL -1 3/4" PLYIND SHELF 16" 12" 41/4" x 3/4" WOOD E061,16 �- I x 2 SK I RT �— METAL I x 2 SUPPORT � TR OD E L �GLOSE ADJ. PAINTED CLOSET ROD BRACKET I x 2 BRACKET SUPPOf�T GOAT ROD d SHELF NO 5GALE: 15" (5) PLYWOOD SHELVE S, ON ADJUSTABLE HEt__ J7 K.V. BRAGKET5. CONTRACTOR TO I W r� WOOD BLOCKING IN .'IA AS REQUIRED TO PR ?P HANG THE SHELVES. ?ADJUSTABLE SHELVES DETr SCALE: 1/2" = 1' -0" 'Qf;y 5GALE: 1/2" = 1' -0" �-�� SCALE: 1/2" = 1' -0"