Loading...
HomeMy WebLinkAbout1476.98.7CFM'S INDICATE A!R FLOW MEASURED BY ENGINEER AT THE TIME OF SURVEY %LL VERIFY EXISTING CONDITIONS ALL MODIFY EXISTING CONDITIONS AS NECESSARY TO iE REQUIREMENTS OF' THE MECHANICAL & ELECTRICAL ;S. ARCHITECTS PLAN FOR EXTENT OF DEMOLITION (13) 145 CFM EACH FIFTH FLOOR PLAN - EXISTING HVAC \ CFM'S INDICATE A!R FLOW MEASURED BY ENGINEER AT THE TIME OF SURVEY %LL VERIFY EXISTING CONDITIONS ALL MODIFY EXISTING CONDITIONS AS NECESSARY TO iE REQUIREMENTS OF' THE MECHANICAL & ELECTRICAL ;S. ARCHITECTS PLAN FOR EXTENT OF DEMOLITION (13) 145 CFM EACH FIFTH FLOOR PLAN - EXISTING HVAC