HomeMy WebLinkAbout1476.98.7CFM'S INDICATE A!R FLOW MEASURED BY
ENGINEER AT THE TIME OF SURVEY
%LL VERIFY EXISTING CONDITIONS
ALL MODIFY EXISTING CONDITIONS AS NECESSARY TO
iE REQUIREMENTS OF' THE MECHANICAL & ELECTRICAL
;S.
ARCHITECTS PLAN FOR EXTENT OF DEMOLITION
(13) 145 CFM
EACH
FIFTH FLOOR PLAN - EXISTING HVAC
\
CFM'S INDICATE A!R FLOW MEASURED BY
ENGINEER AT THE TIME OF SURVEY
%LL VERIFY EXISTING CONDITIONS
ALL MODIFY EXISTING CONDITIONS AS NECESSARY TO
iE REQUIREMENTS OF' THE MECHANICAL & ELECTRICAL
;S.
ARCHITECTS PLAN FOR EXTENT OF DEMOLITION
(13) 145 CFM
EACH
FIFTH FLOOR PLAN - EXISTING HVAC