Loading...
HomeMy WebLinkAboutA100a Overall First Floor PlanM N N co r O N LC) r N N OVERALL FIRST FLOOR PLAN i ainstr ee invc -Ii rg mc, -c than cc.cital I Nis ■ STRUCTUREPOINT 7260 5hadeland Station I Indianapolis, Indiana 46256 I TEL 317,547.5560 FAX 317.543.0270 www.strucWfepoint.com I I FIRST FLOOR - 47,872 SQ. FT. SECOND FLOOR - 20,810 SQ. FT. TOTAL AREA - 68,682 SO. FT. SHORT STAY REHABILITATION & ASSISTED LIVING FACILITY NORTH PENNSYLVANIA ST. CARMEL, INDIANA CERTIFIED BY SCHEMATIC DESIGN I ISSUANCE INDEX I DATE: 5/17/2013 PROJECT PHASE: SCHEMATIC DESIGN REVISION SCHEDULE NO. I DESCRIPTION I DATE Project Number 2013.00569 OVERALL FIRST FLOOR PLAN Al 00a o � N N OVERALL FIRST FLOOR PLAN i ainstr ee invc -Ii rg mc, -c than cc.cital I Nis ■ STRUCTUREPOINT 7260 5hadeland Station I Indianapolis, Indiana 46256 I TEL 317,547.5560 FAX 317.543.0270 www.strucWfepoint.com I I FIRST FLOOR - 47,872 SQ. FT. SECOND FLOOR - 20,810 SQ. FT. TOTAL AREA - 68,682 SO. FT. SHORT STAY REHABILITATION & ASSISTED LIVING FACILITY NORTH PENNSYLVANIA ST. CARMEL, INDIANA CERTIFIED BY SCHEMATIC DESIGN I ISSUANCE INDEX I DATE: 5/17/2013 PROJECT PHASE: SCHEMATIC DESIGN REVISION SCHEDULE NO. I DESCRIPTION I DATE Project Number 2013.00569 OVERALL FIRST FLOOR PLAN Al 00a