Loading...
HomeMy WebLinkAboutC.300 Utility Plan0 o: 0 0 n 0 U LaJ U o; co 0 0 0 0 N I- W V) Z Q J / J 5 V) 0 Z 3 Of 0 / o) L0 0 i M O i ry w J LL_ 0 z a X 0 Z 0 X Z M 0 w 0 w o_ iii Lij I 0 F- r) o w LO w J as C) U U) ZF- Z O J 0 n ex, corn n t tr. 860. `� 5): 8 6. !:a 22 I E 21 i, I Q C r- -i 20 U) -W `. curb, Met o ULr� L_ 85 9.56 vi e,: 1854.86 !! 17 rcp 0 �v 0 N 3 M ex. ,urb inlet nv(w 8-'-4.59 inv'n): 85 r.99 inn`s): ex. curb inlet tr: 856.91 inv(n }:851.13 inv(s): 851.13 ASI TBM #81 I J dir. only -� 1 I v I ex. curb tet tr:854.7 --' inv(n):8417.07 STORM STR 24 -- ----- ��- =-+ -- - - - - Amer ------ - - - - -- / (stone drive' STR 22 - - - - ASI TBO - - - - - p- 4„W- 4� i� Elects Esmt nt _ ;� -_ T S884_ T- -.-a r 'ate - - -- - -- - - - -- - - - - -- STORM STIR 52 - - - - - -------- - - - - -- - - - - - - - _ 7. 6 . 1 -- = _ - - - - -- - - - - - - - -_ - __---------------- � - - - -- - -- - io 6' Electric Esmt - - - - - - - - - = - - - - - - - - - - - - - - - 1 -I -- 17 I 18 15LANDSCAPE SETBACK LINE - - - - -- f - - - - - ---------------------- - 14 - - 73E - Tilt ' - --------- - - - - -- 13 \ w W W W W 1 I I I , 711,723 ' STORM STR 25 18 23 G STORM STR 51 \ \ I G IG G G L_r.11 1 I 1 to 14 _ - - - - - - - - - - - - - - - - - - - - -- \ 7 STORM STR 23-,\. 7 I i / I 11 ❑I STORM STR 21 , i I I WI U-I DETENTION POND I ; �I MI Uj STORM STR 28 STORM STR 30 NI ?I JI STORM STR 29 I I I I I I I I \ 1 \ \ \ STORM STR 14 SITE ,.- -- ® STORM STR 3 7.847 ACRES \ � � - - STORM STR 13 g 5 26 w SID ; zI - - -- -- -- - - STORM STR 12 i 0 __ s 01 - T . - / �� / ES STORM STR 11 o I 1 (i INV:849.50 4�y WETLAND' TO REMAIN 1 (REFER TO MEP PLANS / UNDISTURBED I FOR CONNECTION THROUGHOUT I LO / CONSTRUCTION 1 STORM STR 6 / g I LO 3 7t tre;,g) r -------------- 18" RCP // Ro TOP OF PIPE: 848.87 STORM STR 8 , q r / to I \ 8" SAN. 10 BOTTOM OF PIPE: 849.21 TYP 1 `� / � E E , 5 16 �--- E STORM STR 10 / 0 30 60 I S ex. cu -1: 'r. 26 so // �� e / 1 26 I D ►r:84�. 'D , �� y / !%ii6iii 1 v! r i : 8 c; . I / / � �yq / SCALE: 1"=30' 4 (planter w /sign) 1 SD STORM STR 7 STORM STR 9 / / / 10 10 ,��� = � ���- R = 236.62' - - -- = ii' ��$` g� R = 520.30' L = 77.24' I "C or) `� fd�' L = 252.26' CU rb brass) a I 'planter) o (gross) - ex. sanitary mh tr: 8 55. 51 inv(w): 846.06 / inv(s): 845.66 dii . oniy CITY OF CARMEL DEPARTMENT OF ENGINEERING NOTES: 1. ALL WORK IN THE PUBLIC RIGHT -OF -WAY SHALL CONFORM TO CURRENT CITY OF CARMEL STANDARDS. ALL STREETS AND WATER MAINS ARE TO BE CONSTRUCTED TO CARMEL STANDARD SPECIFICATIONS. ALL STORM SEWERS SHALL BE CONSTRUCTED TO CITY OF CARMEL AND HAMILTON COUNTY STANDARDS. CONTACT THE APPROPRIATE AGENCIES FOR ADDITIONAL INFORMATION AND /OR DETAILS. 2. ALL PAVING WITHIN THE EXISTING AND PROPOSED RIGHT -OF -WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE - CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK, AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN ANY EXISTING OR PROPOSED CITY RIGHT -OF -WAY. 3. ALL PAVING IS TO BE COMPLETED WITHIN THE SAME PAVING SEASON. UTILITY CONTACTS Beehive Inlet UTILITY COMPANY CONTACT PHONE NO. GAS VECTREN RANDY CRUTCHFIELD 317 - 776 -5560 ELECTRIC DUKE ENERGY SHIRLEY HUNTER 317 - 896 -6711 TELEPHONE AT &T STEVE KREBS 317- 544 -8683 WATER CARMEL UTILITIES PAUL PACE 317 - 733 -2855 SANITARY CLAY TOWNSHIP REGIONAL WASTE I RYAN HARTMAN 317- 844 -9200 STORM ICITY OF CARMEL ENGINEERING DEPT. I GARY DUNCAN 1 317 - 571 -2441 =mac =p °mac `mss--- - - - = == R = 328.19' o = E pRIVA� ORIVE.�'' -' _� L = 109.83' oo (6 1• O 1. (n -' - -- _ R = 374.20' _ - _17 ` - - - - - -- _- - _~ - - -- L = 150.71' BENCH INFORMATION ('88 datum) B@O ZE R DISK SET IN THE TOP OF THE NE CORNER OF A CONC. SWITCH BASE; 8 INCHES BELOW THE LEVEL OF THE RAILROAD TRACKS; 2 YARDS EAST OF THE EAST RAIL; 7 RAILS SOUTH OF 111TH STREET, 10 RAILS NORTH OF THE CROSSING OF THE INDIANA RAILROAD; 11.5 RAILS NORTH OF MILE POST B 170; 2 MILES SOUTH OF THE STATION ALONG THE RAILROAD. STAMPED "Y 42 1934 ". ELEV = 838.62 ACE TBM 50 CHISELED SQUARE E. SIDE LIGHT POLE CONC BASE 250'± S. OF N.E. CORNER SITE AND 30'± E. OF EAST R. ELEV = 845.34 ASI TBM 80 CHISELED SQUARE ON NORTH SIDE LIGHT POLE BASE; ±300' EAST OF PENNSYLVANIA STREET ON SOUTH SIDE JOHN KIRK FURNITURE BUILDING. ELEV = 857.65 ASI TBM 81 CHISELED "X" ON EAST BOLT FIRE HYDRANT ON WEST SIDE PENNSYLVANIA STREET IN FRONT OF ADDRESS: 12065; EAST MOST OF TWO FIRE HYDRANTS. ELEV = 860.20 NOTES: 1. CONTRACTOR SHALL PROTECT AND NOT DESTROY THE PROPERTY CORNER MONUMENTS AND BENCHMARKS DURING CONSTRUCTION. RELOCATE IF NEEDED TO FACILITATE CONSTRUCTION. 2. CONTRACTOR TO VERIFY LOCATION, SIZE AND DEPTH OF EXISTING UTILITIES PRIOR TO COMMENCING ANY CONSTRUCTION. CONTACT ENGINEER IF VARIATION EXISTS. CAUTION II THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. 1- 800 - 382 -5544 CALL TOLL FREE INDIANA UNDERGROUND - GENERAL UTILITY NOTES 1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATIONS. 2. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS (VERTICAL AND HORIZONTAL) IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 4. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND /OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 5. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size and depth ) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 6. TRENCHES FOR ALL STORM DRAIN LINES AND ALL UTILITY LINES SHALL BE BACKFILLED COMPLETELY WITH GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 7. AFTER STRIPPING TOPSOIL MATERIAL, PROOFROLL WITH A MEDIUM WEIGHT ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE NECESSITY FOR SUBDRAINS AND /OR REMOVAL OF ANY UNSUITABLE MATERIAL WITHIN THE PROPOSED PARKING AREAS WILL BE DETERMINED AT THE TIME OF CONSTRUCTION. 8. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, STANDING WATER CONDITIONS. 9. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 10. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 11. ALL STORM SEWER MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL STANDARDS. 12. INVERTS AT PIPE OUTLETS ARE GIVEN AT END OF PIPE END SECTION. 13. CONTRACTOR SHALL ENSURE NEW LIGHT POLES INSTALLED DO NOT CONFLICT WITH STORM SEWER OR OTHER UTILITIES PRIOR TO INSTALLATION. 14. CONTRACTOR SHALL PROVIDE ALL CONDUITS FOR NEW UTILITY SERVICES AS REQUIRED BY THE UTILITY COMPANY 15. BACKFLOW PREVENTERS SHALL BE PROVIDED INSIDE THE BUILDING. (REFER TO MEP PLANS) 16. ALL NEW FIRE HYDRANTS MUST BE AVAILABLE, ACCESSIBLE, AND IN SERVICE PRIOR TO COMBUSTIBLE MATERIALS DELIVERED ONSITE. EXISTING TOPOGRAPHY LEGEND PROPOSED UTILITY LEGEND -SAN- Beehive Inlet -SD- Fire Hydrant ® Curb Inlet j` Sprinkler Valve Q Lid o Stand Pipe • Guard Post a Buried Electric Line QS Sanitary Manhole t Buried Telephone Line v Sign w Buried Water Line Coniferous Tree tr Top Of Rim Elevation t Tree Stump inv Invert Elevation "T Deciduous Tree rcp Reinforced Concrete Pipe jE( Electric Box vcp Clay Pipe Ground Light cpp Corrugated Plastic Pipe Light Pole pvc Plastic Pipe ® Transformer ® Telephone Handhole Q Telephone Manhole --Cr- Telephone Marker -a Telephone Pedestal PROPOSED UTILITY LEGEND -SAN- SANITARY SEWER LINE -SD- STORM DRAIN PIPE G GAS LINE E ELECTRIC LINE T TELECOMMUNICATIONS LINT W WATER LINE 0 GAS METER HELECTRICAL TRANSFORMER 04 VALVE C( HYDRANT 0 MANHOLE °= LIGHT POLE (REFER TO LIGHTING PLAN) FIRE DEPT. CONNECTION t POST INDICATOR VALVE PROPOSED UTILITY KEYNOTES O 8" PVC SDR -35 SANITARY LATERAL ® 0.45% MIN. O2 WYE CONNECTION ® MAIN �3 TYPE I SANITARY CLEANOUT C° 8" PVC SDR -35 SANITARY MAIN (REFER TO PLAN & PROFILE - SHEET C.302) �5 GREASE INTERCEPTOR O6 GAS METER (COORDINATE WITH MEP PLANS) a7 GAS LINE (SIZE PER MEP PLANS) O 6" C900 FIRE DEPT. CONNECTION LINE O9 FIRE DEPT. CONNECTION (5" STORZ WITH 30" TURNDOWN AND 5" KNOX LOCKING CAP PER CARMEL FIRE DEPT. REQUIREMENTS) 10 GATE VALVE 11 POST INDICATOR VALVE 12 4" C900 DOMESTIC WATER LINE 13 6" C900 FIRE SERVICE LINE 14 8" x 6" TEE 15 8" x 4" REDUCER 16 20 L.F. OF 4" PERFORATED UNDERDRAIN 17 8" C900 WATER LINE 18 FIRE HYDRANT ASSEMBLY (PAINTED RED) 19 45' BEND & CONCRETE THRUST BLOCK 20 TAP EXISTING 20" MAIN PER CITY OF CARMEL STANDARDS 21 DIRECTIONAL DRILL WATER LINE BENEATH PENNSYLVANIA STREET 22 REMOVE AND REPLACE EXISTING CURB & SIDEWALK AS REQUIRED FOR WATER CONNECTION. REPLACE PER CITY OF CARMEL STANDARDS. 23 CONTRACTOR TO ENSURE VERTICAL CONFLICTS DO NOT OCCUR. 18" MIN. VERTICAL SEPARATION REQUIRED BETWEEN WATER /STORM /SANITARY CROSSINGS 24 ELECTRIC TRANSFORMER WITH CONCRETE PAD (COORDINATE WITH UTILITY PROVIDER) 25 GENERATOR (REFER TO MEP PLANS) 26 ELECTRIC SERVICE (COORDINATE WITH MEP PLANS AND UTILITY PROVIDER) 27 CONNECT TO EXISTING ELECTRIC SERVICE AS DIRECTED BY UTILITY COMPANY 28 TELECOMMUNICATIONS SERVICE (COORDINATE WITH MEP PLANS AND UTILITY PROVIDER) r Z r- O B OMN o �c)O to HV)It.0 (q N LO a oW� m ZZM W Cn QOw N 0 U) < U° ) 0ZLO co Q Ih � Z L0 J W H H,3 Z CL LU LUH z� U L ¢ NEON ■NOMEN �10 �Q` JP�, �pG� ADO p'� L Q` A� CERTIFIED BY J W a V LL V O� JN N LU H y 10 0az .m �ZO >� N�Z oC°�z wr 0a LLINW O� JZ��� Jaa LU = v aoc oO Z Z a a � J a LU DATE: 05/17/2013 DRAWN BY. JCS CHK'D BY. RLN JOB NO. 2013.00569 I REVISIONS UTILITY PLAN SHEET NO. C.300