HomeMy WebLinkAboutC.503 Erosion Control DetailsU
3
0
0
U
w
0
0
0
U
I
0
L0
0
U
w
U
LO
0
0
0
w
Z
Q
J
J_
V)
U
Z
a
0
rn
cD
L0
0
M
0
i
w
J_
LL_
0
Z
a
0
J
LL
LL
w
F-
U)
r
M
0
Ld
0
w
a
00
N
I
Ld
Q
0
M Ld
W
�7:
LO -
ww
I.- J
aQ
0 U
V)
Z�
Z
0
J
PROVIDE CROSS BRACING
WHEN NECESSARY
WOOD, METAL, OR
SYNTHETIC FRAME
----- - - - - --
�• � � Ilh jlllllljlllllljlll ■11��1 ■ ■ ■ ■ ■ ■ ■� ■! ■111 ■1
�11111111g111� ,,,,11111!11! ■I ■ ■ ■ ■!!!! ■! ■111!1
1j�IOi���l1� 111 ■I���I ■ ■ ■ ■! ■ ■ ■ ■■ ■111 ■1
- �uu: :•uu :)111 ■I■�■■�� ■ ■ ■ ■ ■ ■!■ ■111 ■1
��� � �,�;..;;� IIII ■I��:���� \ ■ ■ ■!! ■111!1
i� ,= ,��;.:.',IIII ■1����5����� ■ ■■ ■111 ■1
,,������ii�'1111lIC������������ \111 ■1
► � l/ 1
BURIED GEOTEXTILE
FABRIC. 4oz. MIN.
INLET
BURIED GEOTEXTILE
FABRIC. 4oz. MIN.
COMPACTED FILL
SECTI ON 1: ► ■ DUAIL
SILT FENCE INLET PROTECTION
NOT • SCALE
Inlet Protection Inspection and Maintenance
1. Inspect BMPs prior to forecast rain, daily during extended rain events, after rain events,
weekly during the rainy season, and at two -week intervals during the non -rainy season.
2. Filter Fabric Fences. If the fabric becomes clogged, torn, or degrades, it should be
replaced.
Make sure the stakes are securely driven in the ground and are in good shape (i.e., not
bent,
cracked, or splintered, and are reasonably perpendicular to the ground). Replace
damaged
stakes.
3. Gravel Filters. If the gravel becomes clogged with sediment, it must be carefully removed
from the inlet and either cleaned or replaced. Since cleaning gravel at a construction
site
may be difficult, consider using the sediment -laden stone as fill material and put fresh
stone
around the inlet. Inspect bags for holes, gashes, and snags, and replace bags as
needed.
Check gravel bags for proper arrangement and displacement.
4. Sediment that accumulates in the BMP must be periodically removed in order to
maintain
BMP effectiveness. Sediment should be removed when the sediment accumulation
reaches
one -third of the barrier height. Sediment removed during maintenance may be
incorporated
into earthwork on the site ore disposed at an appropriate location.
5. Remove storm drain inlet protection once the drainage area is stabilized.
6. Clean and regrade area around the inlet and clean the inside of the storm drain inlet
as it
must be free of sediment and debris at the time of final inspection.
-
MANAGEABLE
2 FOOT
CONTAINMENT
AREA
DANDY SACK'"
i
STRAPS
PS
OVERFLOW STORM
PORTS GRATE
DUMPING REINFC
STRAPS CORN
-STORM
INLET MA
cot
DETAIL OF INLET SEDIMENT CONTROL DEVICE
DANDY CURB SACK'"
URB
LTER
OPTIONAL
OUTFLOW
PORTS
MPING
RAPS
DETAIL OF INLET SEDIMENT CONTROL DEVICE
WITH CURB FILTER
DROP -IN INLET PROTECTION
SANDBAG
10 MIL PLASTIC _O
LINING I II I =1 i
_ I=I1 11=
'7 �1
SECTION A -A
LATH & FLAGGING
ON ALL SIDES
10' ( MIN. ) 1
❑
w
it
Q
❑
SANDBAG
(TYP)
A � A
ID
Io ❑ ❑ ❑ ❑ '111
10 MIL PLASTIC
LINING
CONCRETE TRUCK WASH OUT DETAIL
NOT TO SCALE
1. LOCATE WASH OUT AREA AT LEAST 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR BODIES OF WATER.
DO NOT ALLOW RUNOFF FROM THIS AREA BY CONSTRUCTING A TEMPORARY PIT OR BERMED AREA LARGE
ENOUGH FOR LIQUID AND SOLID WASTE.
2. TEMPORARY WASH OUT FACILITIES SHOULD HAVE A TEMPORARY PIT AREA OF SUFFICIENT VOLUME TO
COMPLETELY CONTAIN ALL LIQUID AND SOLID WASTE CONCRETE MATERIALS GENERATED DURING
WASH OUT PROCEDURES.
3. ONLY CONCRETE FROM MIXER TRUCK CHUTES SHOULD BE WASHED INTO WASH OUT PIT.
4. PLASTIC LINING MATERIAL SHOULD BE A MINIMUM OF 10 MIL POLYETHYLENE SHEETING AND SHOULD
BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL.
5. THE CONCRETE WASHOUT AREA SHALL BE INSPECTED DAILY FOR PUNCTURES OR TEARS IN THE PLASTIC
LINER. THE LINER SHALL BE REPLACED UPON REMOVAL OF HARDENED CONCRETE.
6. TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE MAINTAINED TO PROVIDE ADEQUATE HOLDING CAPACITY
WITH A MINIMUM FREEBOARD OF 12 INCHES FOR BELOW GRADE FACILITIES. MAINTAINING TEMPORARY CONCRETE
WASH OUT FACILITIES SHOULD INCLUDE REMOVING AND DISPOSING OF HARDENED CONCRETE AND RETURNING THE
FACILITY TO A FUNCTIONAL CONDITION. HARDENED CONCRETE MATERIALS SHOULD BE REMOVED AND DISPOSED OF.
IN ACCORDANCE WITH LOCAL STANDARDS.
7. CONCRETE WASHOUT AREAS SHALL BE CLEARLY MARKED WITH LATH & FLAGGING AND A SIGN POSTED
AND LABELED "CONCRETE WASHOUT". LATH AND FLAGGING SHOULD BE COMMERCIAL TYPE.
8. THE CONCRETE WASH OUT AREA SHALL BE REPAIRED AND /OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY
FOR WASTED CONCRETE.
9. WASHOUT FACILTIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE
ONCE THE WASHOUT IS 759 FULL.
10. AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF AT
AN APPROVED SITE
STEEL FRAME OVERFLOW
FEATURE
HANDLES Im. FOR EAS Y REMOVAL �r�'� STAINLESS STEEL BAND
r,f?' (HEMMED INTO BAG)
POLYESTER MESH' ' ;' "' POLYPROPYLENE
REINFORCEMENT GEOTTXFILTER FABRIC
(OUTER LAYER) (INNER LAYER)
q 000O0OD00O0UDDO00°
0000
0 0 0 0
0 0 0 0
0 0 0 0
** CONTRACTOR TO USE CATCH -ALL STORMWATER INLET PROTECTOR,
DANDY BAG OR APPROVED ALTERNATE.
FWOOD POST
EDSILT FENCE
SILT FENCE POST- WRAPPING DETAIL
NOT TO SCALE
i
STABILIZATION
PRACTICE
WIRE
FEB.
1
U
MAY
JUNE
FILTER FABRIC
UWOOD
POST
OCT.
FLOW 1
��1
PERMANENT
SEEDING
NOTE:
POSTS SHALL HAVE A MINIMUM LENGTH OF
36 INCHES PLUS BURIAL DEPTH. POST MATERIAL
-
I`
-
-
SHALL BE WOOD, STEEL, OR SYNTHETIC, AND SHALL
_ _ :• ' '
-1
BE OF SUFFICIENT STRENGTH TO RESIST DAMAGE
I I -III
�� I
I
DURING INSTALLATION AND TO SUPPORT APPLIED
:711
B
-III
-
LOADS.
I 1 III
N
-I
B
FABRIC SHALL BE A WOVEN GEOTEXTILE FABRIC
-I
III-
CONSISTING OF STRONG, ROT RESISTANT,
MATERIALS RESISTANT TO DETERIORATION FROM
EXTEND
D FABRIC & -III-
C
ULTRAVIOLET AND HEAT EXPOSURE.
4 BELOW =�
I I-
I
-
(-
/// D
SURFACE
-I
SILT
FENCE CONSTRUCTION
NOT TO SCALE
SILT FENCE INSTALLATION REQUIREMENTS
SITE PREPARATION
1. PLAN FOR THE FENCE TO BE AT LEAST 10 ft. FROM THE TOE OF THE SLOPE TO PROVIDE A SEDIMENT STORAGE
AREA.
2. PROVIDE ACCESS TO THE AREA IF SEDIMENT CLEANOUT WILL BE NEEDED.
FENCE CONSTRUCTION
1. ALONG THE ENTIRE INTENDED FENCE UNE, DIG AN 8 in. DEEP FLAT - BOTTOMED OR V- SHAPED TRENCH.
2. ON THE DOWNSIDE SLOPE OF THE TRENCH, DRIVE THE WOOD OR STEEL SUPPORT POSTS AT LEAST 1 ft. INTO THE
GROUND, SPACING THEM NO MORE THAN 8 ft. APART IF THE FENCE IS SUPPORTED BY
WIRE OR 6 ft. IF EXTRA - STRENGTH FABRIC IS USED WITHOUT SUPPORT WIRE. ADJUST SPACING, IF NECESSARY, TO
ENSURE THAT POSTS ARE SET AT THE LOW POINTS ALONF THE FENCE UNE. (NOTE: IF THE FENCE HAS PRE - ATTACHED
POSTS OR STAKES, DRIVE THEM DEEP ENOUGH SO THE FABRIC IS SATISFACTORILY IN THE TRENCH AS DESCRIBED
IN STEP 6).
3. FASTEN SUPPORT WIRE FENCE (IF THE MANUFACTUER RECOMMENDS ITS USE) TO THE UPSLOPE SIDE OF THE POSTS,
EXTENDING IT 8 in. INTO THE TRENCH.
4. RUN A CONTINUOUS LENGTH OF GEOTEXTILE FABRIC IN FRONT ( UPSLOPE) OF THE SUPPORT WIRE AND POSTS,
AVOIDING JOINTS, PARTICULARLY AT LOW POINTS IN THE FENCE UNE.
5. IF A JOINT IS NECESSARY, NAIL THE OVERLAP TO THE NEAREST POST WITH LATH.
6. PLACE THE BOTTOM 1 ft. OF FABRIC IN THE 8 in. DEEP TRENCH, EXTENDING THE REMAING 4 in. TOWARD THE
UPSLOPE SIDE.
7. BACKFILL THE TRENCH WITH COMPACTED EARTH OR GRAVEL.
NOTE: IF USING A PRE - PACKED COMMERCIAL SILT FENCE RATHER THAN CONSTRUCTING ONE, FOLLOW MANUFACTURER'S
INSTALLATION INSTRUCTIONS.
SILT FENCE MAINTENANCE REQUIREMENTS
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED
PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT
OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED REMOVE THE FENCE AND SEDIMENT
DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
OUTLET CONSTRUCTION (OPTIONAL)
1. DETERMINE THE APPROPRIATE LOCATION FOR A REINFORCED, STABILIZED BYPASS FLOW OUTLET (UNLESS
THE FENCE IS DESIGNED TO RETAIN ALL RUNOFF FROM A 2 YEAR FREQUENCY, 24 HR DURATION STORM EVENT)
2. SET THE OUTLET ELEVATION SO THAT WATER DEPTH CANNOT EXCEED 1 ft. AT THE LOWEST POINT
ALONG THE FENCE UNE.
3. LOCATE THE OUTLET WEIR SUPPORT POSTS NO MORE THAN 4 ft. APART, AND INSTALL A HORIZONTAL BRACE
BETWEEN THEM. (WEIR HEIGHT SHOULD BE NO MORE THAN 1 ft. DEEP, 5 ft. WIDE, AND 10 ft. LONG ON LEVEL GRADE.
4. EXCAVATE THE FOUNDATION FOR THE OUTLET SPLASH PAD TO MINIMUMS OF 1 ft. AND WATER DEPTH NO MORE
THAN 16 ft. ANYWHERE ELSE ALONG THE FENCE.)
5. FILL THE EXCAVATED FOUNDATION WITH INDOT N0, 1 STONE, BEING CAREFUL THAT THE FINISHED SURFACE
BLENDS WITH THE SURROUNDING AREA, ALLOWING NO OVERFILL
6. STABILIZE THE AREA AROUND THE PAD.
SEASONAL SOIL PROTECTION CHART
STABILIZATION
PRACTICE
JAN.
FEB.
MAR.
APR.
MAY
JUNE
JULY
AUG.
SEPT.
OCT.
NOV.
DEC.
PERMANENT
SEEDING
DORMANT
SEEDING
B
B
TEMPORARY
SEEDING
C
*/
/ / / /I/
/// D
E
A = KENTUCKY BLUEGRASS 100 LBS. /ACRE; CREEPING RED FESCUE 100 LBS. /ACRE; HYDROSEEDED
B = KENTUCKY BLUEGRASS 120 LBS. /ACRE; CREEPING RED FESCUE 120 LBS. /ACRE; HYDROSEEDED
C = SPRING OATS 3 BUSHELS /ACRE
D = WHEAT OR RYE 2 BUSHELS /ACRE
E = ANNUAL RYEGRASS 40 LBS. /ACRE ( 1 LB /1000 SQ. FT. )
* /I /* = IRRIGATION NEEDED DURING JUNE, JULY, AUGUST AND /OR SEPTEMBER
O N N U
M O
�IO�.0
fn N Lq Q
to N
Z Z M v
Ji
QOLL N
0
U) Q n
Nco Fn
CD Z LO
�Z`n
co
J
W
H
U
Z
W
F-
z�
Q
LdU
L
a i
NONE
■NOMEN
14
o
Gp�
I CERTIFIED BY
J
W
2
Q
V
LL v
O� JN
N � '~ LLI
�y C*
M Z .m
N Z a > >�
N>Z WE Z
a
N
JI >- j
ZZ2
JZ=
LU Wav 4C 44
X
OZ C*
Z a
Q
X
F
J
a
LV
Z
DATE:
05/17/2013
DRAWN BY:
JCS
CHWD BY:
RLN
JOB NO.
2013.00569
REVISIONS
EROSION
CONTROL
DETAILS
SHEET NO.
C ■503
OF