CITY OF CARMEL PAVING POLICY
1)GENERAL
A) THE WORK SUBJECT TO THE REQUIREMENTS OF THIS POLICY SHALL INCLUDE THE
PRODUCTION, HAULING /DELIVERY, SPREADING, FINISHING, COMPACTION AND OTHER WORK
NECESSARY TO PREPARE FOUNDATIONS, INSTALL AGGREGATE BASES AND INSTALL ONE OR
MORE COURSES OF BASE, INTERMEDIATE, OR SURFACE HOT MIX ASPHALT MIXTURES WITHIN
EXISTING OR PROPOSED RIGHT -OF -WAY FOR ROADWAYS, AUXILIARY LANES AND ASPHALT
MULTI -USE PATHS.
B) THIS POLICY SHALL BE THE BASIS FOR ACCEPTANCE OF THE WORK BY THE CITY. FAILURE
TO ADHERE TO THE REQUIREMENTS OF THIS POLICY MAY RESULT IN NON- ACCEPTANCE OF
THE WORK OR OTHER REMEDIES OUTLINED IN THIS POLICY.
C) WORKMANSHIP, MATERIALS AND QUALITY OF THE WORK COMPLETED SHALL CONFORM TO
THE 2006 STANDARD SPECIFICATIONS OF THE INDIANA DEPARTMENT OF TRANSPORTATION
(HEREINAFTER REFERRED TO AS STANDARD SPECIFICATIONS), EXCEPT WHERE DEVIATIONS
ARE ALLOWED HEREIN, OR VARIANCES ARE GRANTED.
D) WHERE THE MINIMUM STANDARDS OF ANY OTHER GOVERNMENTAL AGENCY HAVING
CONCURRENT JURISDICTION EXCEED THESE STANDARDS, THE HIGHER STANDARDS SHALL
APPLY.
E) IF ANY PLAN OR OTHER NOTE OR SPECIFICATION ON THE APPROVED CONSTRUCTION
DOCUMENTS EXCEEDS THE MINIMUM STANDARDS OF THIS POLICY, THE HIGHER STANDARDS
SHALL APPLY.
F) NOTHING CONTAINED HEREIN SHALL BE CONSTRUED AS PROHIBITING THE DESIGN AND
CONSTRUCTION OF IMPROVEMENTS MEETING HIGHER STANDARDS, NOR AS DISCOURAGING
PETITIONS TO APPROPRIATE GOVERNING BODIES FOR VARIANCES FOR ALTERNATIVES WHICH
CAN BE SUPPORTED BY ADVANCES IN TECHNOLOGY AND ARE APPROVED BY OTHER
AGENCIES WITH CONCURRENT JURISDICTION.
G) ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 105.03 OF THE STANDARD
SPECIFICATIONS.
H) FOR THE PURPOSES OF THIS POLICY, WHERE THE TERM ENGINEER IS USED IN THIS POLICY
AND THE STANDARD SPECIFICATIONS, IT SHALL MEAN:
b) THE CARMEL CITY ENGINEER, STAFF OF THE DEPARTMENT OF ENGINEERING, OTHER
PERSONNEL EMPLOYED BY THE CITY OF CARMEL, OR AUTHORIZED AGENT(S) THAT MAY BE
RETAINED TO REPRESENT THE CITY OF CARMEL.
ii)THE HAMILTON COUNTY HIGHWAY ENGINEER, STAFF OF THE HAMILTON COUNTY HIGHWAY
DEPARTMENT, OTHER PERSONNEL EMPLOYED BY HAMILTON COUNTY, OR AUTHORIZED
AGENT(S) THAT MAY BE RETAINED TO REPRESENT HAMILTON COUNTY HIGHWAY,
DEPENDING ON THE LOCATION OF THE WORK.
1) AUTHORITY OF THE ENGINEER OVER THE WORK SHALL BE PER SECTION 105.01 OF THE
STANDARD SPECIFICATIONS.
J)PRIOR TO COMMENCING THE WORK, THE CONTRACTOR PERFORMING THE WORK SHALL
CONTACT THE ENGINEER TO SCHEDULE A PRE - CONSTRUCTION MEETING TO REVIEW THE
ENGINEER'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
ENGINEER AS IT RELATES TO THE WORK.
K) UNDER NO CIRCUMSTANCES SHALL WORK SUBJECT TO THE STANDARDS ESTABLISHED BY
THIS POLICY COMMENCE WITHOUT OBTAINING APPROVED CONSTRUCTION DRAWINGS BY THE
CITY OF CARMEL DEPARTMENT OF ENGINEERING.
2) FOUNDATION
A) GENERAL
I) THIS WORK SHALL CONSIST OF THE CONSTRUCTION /PREPARATION OF THE FOUNDATION IN
ACCORDANCE WITH SECTION 105.03 OF THE STANDARD SPECIFICATIONS.
B) EXCAVATION AND EMBANKMENT
i) PRIOR TO BEGINNING EXCAVATION AND EMBANKMENT OPERATIONS, ALL NECESSARY
CLEARING, GRUBBING, SCALPING AND TOPSOIL STRIPPING AND SUBSEQUENT BACKFILLING
FOR REMOVED ITEMS WITHIN THE SLOPE STAKE LIMITS SHALL BE PERFORMED IN
ACCORDANCE WITH SECTION 201.03 AND 201.04 OF THE STANDARD SPECIFICATIONS. ALL
TOPSOIL, VEGETATION, ROOTS, STUMPS, FRIABLE AND DELETERIOUS MATERIAL SHALL BE
COMPLETELY REMOVED WITHIN THE LIMITS OF THE SLOPE STAKES.
ii)EXCAVATI ONS
(1) AFTER EXCAVATION OPERATIONS, ALL SPONGY AND YIELDING MATERIAL THAT DOES
NOT READILY COMPACT SHALL BE REMOVED FROM WITHIN THE SLOPE STAKE LIMITS AND
THE RESULTING VOID SHALL BE REFILLED WITH SUITABLE MATERIAL AND COMPACTED IN
ACCORDANCE WITH SECTION 203 OF THE STANDARD SPECIFICATIONS.
(2) ANY PRONOUNCED DEPRESSIONS WITHIN THE SLOPE STAKE LIMITS RESULTING AFTER
EXCAVATION OPERATIONS SHALL BE REFILLED WITH SUITABLE MATERIAL AND
COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE STANDARD SPECIFICATIONS.
iii) EMBANKMENTS
(1) EMBANKMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 203 OF THE
STANDARD SPECIFICATIONS.
(2) ALL SPONGY AND YIELDING MATERIAL THAT DOES NOT READILY COMPACT SHALL BE
REMOVED FROM WITHIN THE SLOPE STAKE LIMITS PRIOR TO EMBANKMENT OPERATIONS.
(3) ANY PRONOUNCED DEPRESSIONS WITHIN THE SLOPE STAKE LIMITS RESULTING AFTER
CLEARING, GRUBBING, SCALPING AND TOPSOIL REMOVAL SHALL BE REFILLED WITH
SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE
STANDARD SPECIFICATIONS PRIOR TO EMBANKMENT OPERATIONS.
(4) PRIOR TO THE CONSTRUCTION OF ANY EMBANKMENT, THE ORIGINAL GROUND
SURFACE WITHIN THE LIMITS OF THE SLOPE STAKES SHALL BE LEVELED AND THE UPPER
6- INCHES SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE STANDARD
SPECIFICATIONS.
(5) EMBANKMENTS SHALL BE SHAPED TO BE WELL DRAINED AND SHALL BE PROTECTED TO
PREVENT EROSION.
(6) LOOSE DEPTH OF EACH EMBANKMENT LIFT, FINAL COMPACTED DEPTH, COMPACTION
METHOD AND COMPACTION REQUIREMENTS SHALL BE IN ACCORDANCE WITH SECTION
203 OF THE STANDARD SPECIFICATIONS.
C) SOIL SUBGRADES
i) SUBGRADES SHALL BE INSTALLED ON FOUNDATIONS CONSTRUCTED IN ACCORDANCE WITH
SECTION 2(A) AND SECTION 2(B) OF THIS POLICY AND ONLY THE INSTALLATION OF ALL
UTILITIES AND SUBSURFACE DRAINS INDICATED ON THE APPROVED CONSTRUCTION
DOCUMENTS TO BE LOCATED UNDER THE PAVEMENT ARE COMPLETED. TRENCH
BACKFILLING WORK OF THESE INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE CITY
OF CARMEL TRENCH BACKFILLING SPECIFICATIONS.
ii)THE SUBGRADE SHALL BE SHAPED TO THE REQUIRED GRADE AND SECTIONS, FREE FROM
ALL RUTS, CORRUGATIONS, OR OTHER IRREGULARITIES.
iii) THE SUBGRADE SHALL BE UNIFORMLY PREPARED, COMPACTED AND APPROVED IN
ACCORDANCE WITH SECTIONS 207.02, 207.03 AND 207.04 OF THE STANDARD
SPECIFICATIONS.
iv) SUBGRADES SHALL BE INSPECTED AND APPROVED BY THE ENGINEER BEFORE ANY
AGGREGATE BASE OR HOT MIX ASPHALT PAVEMENTS ARE CONSTRUCTED. A PROOFROLL
SHALL BE CONDUCTED IN ACCORDANCE WITH SECTION 203.26 OF THE STANDARD
SPECIFICATIONS. UNACCEPTABLE AREAS SHALL BE CORRECTED TO THE SATISFACTION OF
THE ENGINEER BEFORE ANY AGGREGATE BASE OR HOT MIX ASPHALT PAVING OPERATIONS
COMMENCE.
v)AT THE DISCRETION OF THE ENGINEER, SUBGRADE THAT HAS SATISFACTORILY PASSED A
PROOFROLL, BUT REMAINS UNCOVERED FOR A PERIOD OF 14 CALENDAR DAYS PRIOR TO
PLACING STONE OR IS SUBJECT TO A MEASURABLE RAIN EVENT PRIOR TO PLA C ING STONE,
SHALL BE SUBJECT TO ADDITIONAL PROOF ROLLS PRIOR TO PLACEMENT OF THE
AGGREGATE BASE.
D) EXISTING PAVEMENT
i) MILLING OF EXISTING PAVEMENT SURFACES SHALL BE IN ACCORDANCE WITH SECTION
306.02, 306.03, 306.05, 306.07 AND 306.08 OF THE STANDARD SPECIFICATIONS.
ii)LOCALIZED WEAK AREAS OF THE EXISTING PAVEMENT SECTION UNCOVERED DURING THE
MILLING PROCESS SHALL BE REPAIRED IN ACCORDANCE WITH SECTION 304.02, 304.03,
304.05 OR 305 OF THE STANDARD SPECIFICATIONS.
iii) PRIOR TO OPENING MILLED AREAS TO TRAFFIC, THE MILLED AREAS SHALL BE
CLEANED OF ALL MATERIAL, DEBRIS AND DUST RESULTING FROM THE OPERATION.
iv) MILLED AREAS THAT REMAIN OPEN TO TRAFFIC LONGER THAN THOSE TIMES
STIPULATED IN SECTION 306.05 OF THE STANDARD SPECIFICATIONS SHALL BE SUBJECT
TO LIQUIDATED DAMAGES OUTLINED IN SECTION 306.05 OF THE STANDARD
SPECIFICATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYMENT OF THESE
LIQUIDATED DAMAGES.
3) AGGREGATE BASES
A) GENERAL
i) THIS WORK SHALL CONSIST OF PLACING A COMPACTED AGGREGATE ON A PREPARED SOIL
SUBGRADE IN ACCORDANCE WITH SECTION 105.03 OF THE STANDARD SPECIFICATIONS.
ii)AGGREGATE BASE MATERIALS SHALL BE IN ACCORDANCE WITH SECTION 301.02 OF THE
STANDARD SPECIFICATIONS.
iii) THE MATERIAL SHALL BE OBTAINED FROM A CERTIFIED AGGREGATE PRODUCER IN
ACCORDANCE WITH SECTION 917 OF THE STANDARD SPECIFICATIONS.
iv) THE AGGREGATE BASE MATERIAL SHALL BE HANDLED AND TRANSPORTED TO, AND ON,
THE WORK SITE IN A MANNER THAT MINIMIZES SEGREGATION AND MOISTURE LOSS.
v)AGGREGATE BASES SHALL BE CONSTRUCTED ON PREPARED FOUNDATIONS AND TO
THICKNESSES EQUAL OR GREATER THAN THOSE INDICATED ON THE APPROVED
CONSTRUCTION DOCUMENTS.
B) TEMPERATURE AND SEASONAL LIMITATIONS
►) THE AGGREGATE BASE SHALL BE PLACED IN ACCORDANCE WITH THE TEMPERATURE
LIMITATIONS OF SECTION 301.04 OF THE STANDARD SPECIFICATIONS.
ii)FROZEN MATERIAL SHALL NOT BE PLACED.
iii) AGGREGATE BASES MUST BE PLACED AND PASS PROOF ROLL PRIOR TO NOVEMBER 30
IN ORDER TO ALLOW PAVING IN ACCORDANCE WITH SECTION 4C(IV) OF THIS POLICY.
C) PREPARATION
i) THE PREPARED FOUNDATION SHALL BE FREE FROM OBJECTIONABLE OR FOREIGN
MATERIALS AT THE TIME OF PLACEMENT.
ii)THE SUBGRADE SHALL BE SUBJECT TO ADDITIONAL PROOF ROLLS IN ACCORDANCE WITH
SECTION 203.26 OF THE STANDARD SPECIFICATIONS JUST PRIOR TO PLACING THE
AGGREGATE BASE ON THE SUBGRADE IN ACCORDANCE WITH SECTION 2C(V) OF THIS
POLICY. UNACCEPTABLE AREAS SHALL BE CORRECTED TO THE SATISFACTION OF THE
ENGINEER BEFORE ANY AGGREGATE BASE IS PLACED.
D) SPREADING AND FINISHING
i) THE AGGREGATE BASE SHALL BE SPREAD IN ACCORDANCE WITH SECTION 301.05 OF THE
STANDARD SPECIFICATIONS.
ii)THE AGGREGATE BASE SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 301.06 OF
THE STANDARD SPECIFICATIONS.
iii) SUBSEQUENT PAVING COURSES SHALL BE PLACED OVER THE AGGREGATE BASE
WITHIN 14 CALENDAR DAYS. AGGREGATE BASES THAT LAY EXPOSED FOR A PERIOD OF
TIME GREATER THAN 14 CALENDAR DAYS OR EXPERIENCE A MEASURABLE RAIN EVENT
PRIOR TO THE PLACEMENT OF SUBSEQUENT PAVING COURSES SHALL BE SUBJECT TO
INSPECTION AND ACCEPTANCE BY THE ENGINEER. AT THE DISCRETION OF THE ENGINEER,
ADDITIONAL PROOF ROLLS MAY BE REQUIRED.
4) ASPHALT PAVEMENT
A) GENERAL
►) THIS WORK SHALL CONSIST OF PLACING ONE OR MORE COURSES OF BASE, INTERMEDIATE,
OR SURFACE HOT MIX ASPHALT (HMA) MIXTURES ON A PREPARED FOUNDATION IN
ACCORDANCE WITH SECTION 105.03 OF THE STANDARD SPECIFICATIONS.
ii)HMA BASE, INTERMEDIATE, OR SURFACE MIXTURES SHALL BE CONSTRUCTED ON PREPARED
FOUNDATIONS AND TO THICKNESSES EQUAL OR GREATER THAN THOSE INDICATED ON THE
APPROVED CONSTRUCTION DOCUMENTS.
iii) MATERIALS USED IN THE PRODUCTION OF THE HMA MIXTURES SHALL BE IN
ACCORDANCE WITH SECTION 401.03 OF THE STANDARD SPECIFICATIONS.
iv) EQUIPMENT FOR HMA OPERATIONS, INCLUDING BUT NOT LIMITED TO PRODUCTION,
HAULING /TRANSPORTATION, LAYDOWN, COMPACTION AND MISCELLANEOUS /ANCILLARY
ACTIVITY SHALL BE IN ACCORDANCE WITH SECTION 409 OF THE STANDARD
SPECIFICATIONS.
v)INSTALLATION OF THE FULL PAVEMENT SECTION INDICATED ON THE APPROVED
CONSTRUCTION DOCUMENTS FOR THE ENTIRE AREA TO BE PAVED MUST BE COMPLETED IN
THE SAME PAVING SEASON.
vi) WIDENING OPERATIONS SHALL COMPLY WITH THE FOLLOWING:
(1) THE OUTSIDE FACE OF THE EXCAVATED AREA SHALL BE LEFT AS NEARLY VERTICAL
AS THE NATURE OF THE MATERIAL WILL PERMIT AND NOT WIDER THAN THE OUTSIDE
LIMITS OF THE WIDENING SECTION.
(2) THE EXISTING PAVEMENT ADJACENT TO THE WIDENING AREA SHALL BE SAWCUT TO A
CLEAN EDGE.
(3) THE SUBGRADE IN THE WIDENED AREA SHALL BE COMPACTED IN ACCORDANCE WITH
THIS POLICY.
(4) WIDENING MIXTURES SHALL COMPLY WITH THE PAVEMENT SECTION INDICATED ON THE
APPROVED CONSTRUCTION DOCUMENTS.
(5) COMPACTION OF THE WIDENING SHALL BE IN ACCORDANCE WITH SECTION 304.05 OF
THE STANDARD SPECIFICATIONS.
B) PREPARATION
SHALL BE SUBJECT T
i) THE AGGREGATE BASE 0 ADDITIONAL PROOF ROLLS IN ACCORDANCE
WITH SECTION 203.26 OF THE STANDARD SPECIFICATIONS JUST PRIOR TO PLACING THE
HMA COURSES IN ACCORDANCE WITH SECTION 3D(III) OF THIS POLICY. UNACCEPTABLE
AREAS SHALL BE CORRECTED TO THE SATISFACTION OF THE ENGINEER BEFORE ANY
PAVING OPERATIONS COMMENCE.
ii)ALL DISPLACEMENT OR RUTTING OF THE AGGREGATE BASE SHALL BE REPAIRED PRIOR TO
PLACING HMA MIXTURES.
iii) MILLED ASPHALT SURFACES SHALL BE TACKED IN ACCORDANCE WITH SECTION 406
OF THE STANDARD SPECIFICATIONS.
iv) ASPHALT SURFACES BETWEEN COURSES SHALL BE TACKED IN ACCORDANCE WITH
SECTION 406 OF THE STANDARD SPECIFICATIONS.
v)CONTACT SURFACES OF CURBING, GUTTERS, MANHOLES, AND OTHER STRUCTURES SHALL
BE TACKED IN ACCORDANCE WITH SECTION 406 OF THE STANDARD SPECIFICATIONS.
vi) SURFACES ON WHICH A MIXTURE IS PLACED SHALL BE FREE FROM OBJECTIONABLE OR
FOREIGN MATERIALS AT THE TIME OF PLACEMENT.
vii) TACK COAT MATERIAL SHALL BE DISTRIBUTED WITH EQUIPMENT MEETING THE
REQUIREMENTS OF SECTION 409.03(A) OF THE STANDARD SPECIFICATIONS.
C) WEATHER AND SEASONAL LIMITATIONS
i) HMA COURSES SHALL BE PLACED WHEN THE AMBIENT TEMPERATURE AND THE
TEMPERATURE OF THE SURFACE ON WHICH IT IS TO BE PLACED IS 45 °F (7 °C) OR ABOVE.
THE ENGINEER SHALL DETERMINE THE AMBIENT TEMPERATURE. THERE SHALL BE NO
PROVISION FOR LOW TEMPERATURE COMPACTION ALLOWED BY SECTION 402.16 OF THE
STANDARD SPECIFICATIONS.
ii)NO MIXTURE SHALL BE PLACED ON A FROZEN SUBGRADE.
iii) UNDER NO CIRCUMSTANCES SHALL HMA MIXTURES BE PLACED BETWEEN DECEMBER 15
AND MARCH 30.
iv) IF A FOUNDATION THAT IS TO RECEIVE ONE OR MORE COURSES OF BASE,
INTERMEDIATE, OR SURFACE HMA MIXTURES IS PLACED AND DETERMINED TO BE AN
APPROVED FOUNDATION BY THE CITY PRIOR TO NOVEMBER 30, PLACEMENT OF HMA
COURSES WILL BE ALLOWED UP TO DECEMBER 15, PROVIDED THAT THE AMBIENT AND
FOUNDATION SURFACE TEMPERATURE COMPLIES WITH THE REQUIREMENTS OF SECTION
4C(I) OF THIS POLICY AND THE PAVING CONTRACTOR PAY FOR THE SERVICES OF A FULL
TIME CONSTRUCTION INSPECTOR AND WHO SHALL ACT AS AN AUTHORIZED AGENT OF THE
ENGINEER. THE ENGINEER SHALL SELECT THE CONSTRUCTION INSPECTOR.
v)IF THE AMBIENT AND FOUNDATION SURFACE TEMPERATURE COMPLIES WITH THE
REQUIREMENTS OF SECTION 4C(I) OF THIS POLICY BETWEEN APRIL 1 AND APRIL 15, HMA
COURSE SHALL BE ALLOWED TO BE PLACED ON AN APPROVED FOUNDATION PROVIDED
THAT THE PAVING CONTRACTOR PAY FOR THE SERVICES OF A FULL TIME CONSTRUCTION
INSPECTOR AND WHO SHALL ACT AS AN AUTHORIZED AGENT OF THE ENGINEER. THE
ENGINEER SHALL SELEC T THE CONSTRUCTION INSPECTOR.
vi) THE ENGINEER RESERVES THE RIGHT TO SUSPEND ALL PAVING OPERATIONS IF, IN THE
OPINION OF THE ENGINEER, THAT PREVAILING WEATHER CONDITIONS AND /OR THE
CONDITION OF THE SU BGRADE AND/OR / THE AGGREGATE BASE MAY RESULT IN
SUBSTANDARD HMA PLACEMENT, SPREADING AND FINISHING.
D) SPREADING AND FINISHING
i) HMA COURSES SHALL BE PLACED UPON AN APPROVED FOUNDATION OR OTHER HMA
COURSE BY MEANS OF LAYDOWN EQUIPMENT IN ACCORDANCE WITH SECTION 409.03(C) OF
THE STANDARD SPECIFICATIONS.
ii)SEGREGATION OR FLUSHING OR BLEEDING OF HMA MIXTURES WILL NOT BE PERMITTED.
CORRECTIVE ACTION SHALL BE TAKEN TO PREVENT CONTINUATION OF THESE CONDITIONS.
SEGREGATED OR FLUSHED OR BLEEDING HMA MIXTURES SHALL BE REMOVED IF DIRECTED.
iii) ALL AREAS SHOWING AN EXCESS OR DEFICIENCY OF BINDER SHALL BE REMOVED AND
REPLACED.
iv) ALL HMA MIXTURES THAT BECOME LOOSE AND BROKEN, MIXED WITH DIRT, OR IS IN
ANY WAY DEFECTIVE SHALL BE REMOVED AND REPLACED.
E) JOINTS
i) JOINTS SHALL CONFORM TO THE REQUIREMENTS OF SECTION 401.15 OF THE STANDARD
SPECIFICATIONS.
F ) COMPACTION
I) THE HMA MIXTURE SHALL BE COMPACTED WITH EQUIPMENT IN ACCORDANCE WITH SECTION
409.03(D) OF THE STANDARD SPECIFICATIONS IMMEDIATELY AFTER THE MIXTURE HAS
BEEN SPREAD AND FINISHED.
ii)ROLLERS SHALL NOT CAUSE UNDUE DISPLACEMENT, CRACKING, OR SHOVING.
5) INSPECTIONS
FURNISHED AND EACH PART
MATERIALS FU OR DETAIL OF THE WORK WILL BE
A) ALL SUBJECT TO
INSPECTION PER SECTION 105.10 OF THE STANDARD SPECIFICATIONS FOR THE PURPOSE OF
ASCERTAINING THAT THE WORK IS IN SUBSTANTIAL CONFORMANCE WITH THIS POLICY AND
THE APPROVED CONSTRUCTION DOCUMENTS.
B) THE CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 48 -HOURS IN ADVANCE OF
COMMENCING ANY WORK SUBJECT TO THE STANDARDS ESTABLISHED BY THIS POLICY.
C) THE CONTRACTOR SHALL SCHEDULE PROOFROLLS WITH THE ENGINEER A MINIMUM OF
- ADVANCE OF SUCH PROOFROLL
48 HOURS IN AD C S.
D) SAMPLING AND TESTI N G OF MATERIALS EQUIPMENT OR CONSTRUCTION WORK MAY BE
REQUIRED AT THE EXPENSE OF THE CONTRACTOR AT THE DISCRETION OF THE ENGINEER FOR
THE PURPOSE OF ASCERTAINING THAT THE WORK IS IN SUBSTANTIAL CONFORMANCE WITH
THIS POLICY AND THE APPROVED CONSTRUCTION DOCUMENTS. SAMPLING AND TESTING
SHALL CONFORM TO THE REQUIREMENTS OF THE SECTIONS OF THE STANDARD
SPECIFICATIONS APPLICABLE TO THE PORTION OF THE WORK SUSPECTED TO BE
NON- COMPLIANT OR AS DIRECTED BY THE ENGINEER.
E) WHERE THE ENGINEER DETERMINES THAT IS NECESSARY TO CONFIRM COMPLIANCE WITH
STANDARDS OF QUALITY OR THICKNESS, PAVEMENTS SHALL BE CORED AND TESTED AT THE
EXPENSE OF THE CONTRACTOR. THE AVERAGE THICKNESSES OF ALL COURSES MUST EQUAL
OR EXCEED THE MINIMUM PRESCRIBED BY THE APPROVED CONSTRUCTION DOCUMENTS, AND
NO SINGLE CORE SHALL SHOW A DEFICIENCY GREATER THAN ONE HALF INCH (1/2 ") IN ANY
COURSE OR TOTAL THICKNESS FROM THE PAVEMENT SECTION INDICATED ON THE APPROVED
CONSTRUCTION DOCUMENTS.
F) SUCH INSPECTIONS SHALL NOT BE CONSTRUED TO RELIEVE THE DEVELOPERS' ENGINEERS
OR CONTRACTORS IN ANY WAY FROM THEIR OBLIGATIONS AND RESPONSIBILITIES UNDER
THEIR CONTRACTS. SPECIFICALLY, INSPECTION BY THE ENGINEER, OR BY RETAINED
ENGINEERS OR TESTING AGENCIES, SHALL NOT REQUIRE THEM TO ASSUME RESPONSIBILITIES
FOR THE APPROVED CONSTRUCTION DOCUMENTS, FOR ANY MISINTERPRETATION OF THE
APPROVED CONSTRUCTION DOCUMENTS BY THE CONTRACTORS DURING CONSTRUCTION, OR
FOR THE MEANS AND METHODS OF CONSTRUCTION, NOR FOR SAFETY ON THE JOB SITE.
G) WORK IDENTIFIED TO NOT MEET THE REQUIREMENTS OF THIS POLICY OR THE APPROVED
CONSTRUCTION DOCUMENTS, UNACCEPTABLE WORK, WHETHER THE RESULT OF POOR
WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH CARELESSNESS, OR ANY
OTHER CAUSE FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL BE
REMOVED IMMEDIATELY AND REPLACED IN AN ACCEPTABLE MANNER AT THE CONTRACTOR'S
EXPENSE.
H) IF THE CONTRACTOR FAILS TO COMPLY FORTHWITH WITH ANY ORDER MADE UNDER THE
PROVISIONS OF THIS SUBSECTION, THE ENGINEER WILL HAVE AUTHORITY TO CAUSE
UNACCEPTABLE WORK TO BE REMEDIED OR REMOVED AND REPLACED; TO CAUSE
UNAUTHORIZED WORK TO BE REMOVED; AND TO DEDUCT THE COSTS FROM ANY MONIES DUE
OR TO BECOME DUE.
1) WORK DONE CONTRARY TO INSTRUCTIONS PROVIDED BY THE ENGINEER SHALL BE
CONSIDERED UNACCEPTABLE AND SUBJECT TO IMMEDIATE REMOVAL AND REPLACEMENT IN
ACCORDANCE WITH THE INSTRUCTIONS PROVIDED BY THE ENGINEER.
6) ACCEPTANCE
A) BEFORE ACCEPTANCE OF ANY PHASE OF CONSTRUCTION, THE ENGINEER SHALL DETERMINE
IF THE IMPROVEMENTS ARE IN SUBSTANTIAL COMPLIANCE WITH THIS POLICY (EXCEPT FOR
ANY VARIANCES GRANTED) AND THE APPROVED CONSTRUCTION DOCUMENTS
B) THE ENGINEER MAY, AT HIS SOLE DISCRETION, ACCEPT WORK THAT IS NOT IN
CONFORMANCE WITH THIS POLICY PROVIDED THAT THE WORK IS BONDED FOR A PERIOD
GREATER THAN THREE YEARS. THE ENGINEER SHALL ESTABLISH THE EXTENDED BONDING
REQUIREMENT.
CITY OF CARMEL CURBING POLICY
1)GENERAL
A) THE WORK SUBJECT TO THE REQUIREMENTS OF THIS POLICY SHALL INCLUDE THE
PRODUCTION, HAULING /DELIVERY, EXCAVATION FOR, PLACING, INSTALLATION, JOINTING,
CURING, FINISHING, AND OTHER WORK NECESSARY TO PREPARE FOUNDATIONS AND SOIL
SUBGRADES, INSTALL AGGREGATE BASES AND INSTALL CONCRETE CURBING WITHIN
PROPERTY WITHIN THE CORPORATE LIMITS OF THE CITY OF CARMEL AND EXISTING OR
PROPOSED RIGHT -OF -WAY.
B) THIS POLICY SHALL BE THE BASIS FOR ACCEPTANCE OF THE WORK BY THE CITY.
FAILURE TO ADHERE TO THE REQUIREMENTS OF THIS POLICY MAY RESULT IN
NON- ACCEPTANCE OF THE WORK OR OTHER REMEDIES OUTLINED IN THIS POLICY.
C) WORKMANSHIP, MATERIALS AND QUALITY OF THE WORK COMPLETED SHALL CONFORM
TO THE 2006 STANDARD SPECIFICATIONS OF THE INDIANA DEPARTMENT OF
TRANSPORTATION (HEREINAFTER REFERRED TO AS STANDARD SPECIFICATIONS), EXCEPT
WHERE DEVIATIONS ARE ALLOWED OR SPECIFIED HEREIN, OR VARIANCES ARE GRANTED.
D) WHERE THE MINIMUM STANDARDS OF ANY OTHER GOVERNMENTAL AGENCY HAVING
CONCURRENT JURISDICTION EXCEED THESE STANDARDS, THE HIGHER STANDARDS SHALL
APPLY.
E) IF ANY PLAN OR OTHER NOTE OR SPECIFICATION ON THE APPROVED CONSTRUCTION
DOCUMENTS EXCEEDS THE MINIMUM STANDARDS OF THIS POLICY, THE HIGHER
STANDARDS SHALL APPLY.
F) NOTHING CONTAINED HEREIN SHALL BE CONSTRUED AS PROHIBITING THE DESIGN AND
CONSTRUCTION OF IMPROVEMENTS MEETING HIGHER STANDARDS, NOR AS DISCOURAGING
PETITIONS TO APPROPRIATE GOVERNING BODIES FOR VARIANCES FOR ALTERNATIVES
WHICH CAN BE SUPPORTED BY ADVANCES IN TECHNOLOGY AND ARE APPROVED BY
OTHER AGENCIES WITH CONCURRENT JURISDICTION.
G) ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 105.03 OF THE
STANDARD SPECIFICATIONS.
H) FOR THE PURPOSES OF THIS POLICY, WHERE THE TERM ENGINEER IS USED IN THIS
POLICY AND THE STANDARD SPECIFICATIONS, IT SHALL MEAN:
a) THE CARMEL CITY ENGINEER, STAFF OF THE DEPARTMENT OF ENGINEERING, OTHER
PERSONNEL EMPLOYED BY THE CITY OF CARMEL, OR AUTHORIZED AGENT(S) THAT MAY
BE RETAINED TO REPRESENT THE CITY OF CARMEL.
ii)THE HAMILTON COUNTY HIGHWAY ENGINEER, STAFF OF THE HAMILTON COUNTY
HIGHWAY DEPARTMENT, OTHER PERSONNEL EMPLOYED BY HAMILTON COUNTY, OR
AUTHORIZED AGENT(S) THAT MAY BE RETAINED TO REPRESENT HAMILTON COUNTY
HIGHWAY, DEPENDING ON THE LOCATION OF THE WORK.
I) AUTHORITY OF THE ENGINEER OVER THE WORK SHALL BE PER SECTION 105.01 OF THE
STANDARD SPECIFICATIONS.
J)PRIOR TO COMMENCING THE WORK, THE CONTRACTOR PERFORMING THE WORK SHALL
CONTACT THE ENGINEER TO SCHEDULE A PRE - CONSTRUCTION MEETING TO REVIEW THE
ENGINEER'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS,
REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE
AUTHORITY OF THE ENGINEER AS IT RELATES TO THE WORK.
K) UNDER NO CIRCUMSTANCES SHALL WORK SUBJECT TO THE STANDARDS ESTABLISHED
BY THIS POLICY COMMENCE WITHOUT OBTAINING APPROVED CONSTRUCTION DRAWINGS
BY THE CITY OF CARMEL DEPARTMENT OF ENGINEERING.
L)AT THE SOLE DISCRETION OF THE ENGINEER, THE PORTIONS OF THIS POLICY RELATED
TO INSPECTIONS AND TESTING OF WORK SUBJECT TO THE REQUIREMENTS OF THIS
POLICY OUTSIDE OF THE RIGHT -OF -WAY SHALL BE DETERMINED AT THE
PRE - CONSTRUCTION MEETING.
M) DIMENSIONAL AND OTHER STANDARDS FOR CONCRETE CURB SHALL BE IN ACCORDANCE
WITH THE CITY OF CARMEL STANDARD DETAILS.
N) UNDER NO CIRCUMSTANCES SHALL MATERIAL OTHER THAN PORTLAND CEMENT
CONCRETE MEETING THE STANDARDS ESTABLISHED BY THIS POLICY BE UTILIZED TO
CONSTRUCT CONCRETE CURBS WITHIN THE CORPORATE LIMITS OF THE CITY OF CARMEL.
0) UNDER NO CIRCUMSTANCES SHALL EXTRUDED TYPE CURB BE INSTALLED WITHIN THE
CORPORATE LIMITS OF THE CITY OF CARMEL.
2) FOUNDATION
A) GENERAL
►) THIS WORK SHALL CONSIST OF THE CONSTRUCTION /PREPARATION OF THE FOUNDATION
IN ACCORDANCE WITH SECTION 105.03 OF THE STANDARD SPECIFICATIONS.
ii)THE FOUNDATION SHALL BE PREPARED IN ACCORDANCE WITH SECTION 605.03(A) OF
THE STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF THIS POLICY.
B) EXCAVATION AND EMBANKMENT
►) PRIOR TO BEGINNING EXCAVATION AND EMBANKMENT OPERATIONS, ALL NECESSARY
CLEARING, GRUBBING, SCALPING AND TOPSOIL STRIPPING AND SUBSEQUENT
BACKFILLING FOR REMOVED ITEMS WITHIN THE SLOPE STAKE LIMITS SHALL BE
PERFORMED IN ACCORDANCE WITH SECTION 201.03 AND 201.04 OF THE STANDARD
SPECIFICATIONS. ALL TOPSOIL, VEGETATION, ROOTS, STUMPS, FRIABLE AND
DELETERIOUS MATERIAL SHALL BE COMPLETELY REMOVED WITHIN THE LIMITS OF THE
SLOPE STAKES.
ii)EXCAVATIONS
(1) AFTER EXCAVATION OPERATIONS, ALL SPONGY AND YIELDING MATERIAL THAT
DOES NOT READILY COMPACT SHALL BE REMOVED FROM WITHIN THE SLOPE STAKE
LIMITS AND THE RESULTING VOID SHALL BE REFILLED WITH SUITABLE MATERIAL AND
COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE STANDARD SPECIFICATIONS.
(2) ANY PRONOUNCED DEPRESSIONS WITHIN THE SLOPE STAKE LIMITS RESULTING
AFTER EXCAVATION OPERATIONS SHALL BE REFILLED WITH SUITABLE MATERIAL AND
COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE STANDARD SPECIFICATIONS.
iii) EMBANKMENTS
(1) EMBANKMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 203 OF
THE STANDARD SPECIFICATIONS.
(2) ALL SPONGY AND YIELDING MATERIAL THAT DOES NOT READILY COMPACT SHALL
BE REMOVED FROM WITHIN THE SLOPE STAKE LIMITS PRIOR TO EMBANKMENT
OPERATIONS.
(3) ANY PRONOUNCED DEPRESSIONS WITHIN THE SLOPE STAKE LIMITS RESULTING
AFTER CLEARING, GRUBBING, SCALPING AND TOPSOIL REMOVAL SHALL BE REFILLED
WITH SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH SECTION 203 OF
THE STANDARD SPECIFICATIONS PRIOR TO EMBANKMENT OPERATIONS.
(4) PRIOR TO THE CONSTRUCTION OF ANY EMBANKMENT, THE ORIGINAL GROUND
SURFACE WITHIN THE LIMITS OF THE SLOPE STAKES SHALL BE LEVELED AND THE
UPPER 6-INCHES S H ALL BE COMPACTED IN ACCORDANCE WITH SECTION 203 OF THE
STANDARD SPECIFICATIONS.
(5) EMBANKMENTS SHALL BE SHAPED TO BE WELL DRAINED AND SHALL BE
PROTECTED TO PREVENT EROSION.
(6) LOOSE DEPTH OF EACH EMBANKMENT LIFT, FINAL COMPACTED DEPTH,
COMPACTION METHOD AND COMPACTION REQUIREMENTS SHALL BE IN ACCORDANCE
WITH SECTION 203 OF THE STANDARD SPECIFICATIONS.
C) SOIL SUBGRADES
i) SUBGRADES SHALL BE INSTALLED ON FOUNDATIONS CONSTRUCTED IN ACCORDANCE
WITH SECTION 2(A) AND SECTION 2(B) OF THIS POLICY AND ONLY AFTER THE
INSTALLATION OF ALL UTILITIES AND SUBSURFACE DRAINS INDICATED ON THE
APPROVED CONSTRUCTION DOCUMENTS TO BE LOCATED UNDER THE PAVEMENT ARE
COMPLETED. TRENCH BACKFILLING WORK OF THESE INSTALLATIONS SHALL BE IN
ACCORDANCE WITH THE CITY OF CARMEL TRENCH BACKFILLING SPECIFICATIONS.
ii)THE SUBGRADE SHALL BE SHAPED TO THE REQUIRED GRADE AND SECTIONS, FREE
FROM ALL RUTS, CORRUGATIONS, OR OTHER IRREGULARITIES.
iii) THE SUBGRADE SHALL BE UNIFORMLY PREPARED, COMPACTED AND APPROVED IN
ACCORDANCE WITH SECTIONS 207.02, 207.03 AND 207.04 OF THE STANDARD
SPECIFICATIONS.
iv SUBGRADES SHALL BE INSPECTED AND APPROVED BY THE ENGINEER BEFORE ANY
AGGREGATE BASE OR CONCRETE CURBS ARE CONSTRUCTED. A PROOFROLL SHALL BE
CONDUCTED IN ACCORDANCE WITH SECTION 203.26 OF THE STANDARD
SPECIFICATIONS. UNACCEPTABLE AREAS SHALL BE CORRECTED TO THE SATISFACTION
OF THE ENGINEER BEFORE THE PLACEMENT OF ANY AGGREGATE BASE OR CONCRETE
CURBING.
v)AT THE DISCRETION OF THE ENGINEER, SUBGRADE THAT HAS SATISFACTORILY PASSED
A PROOFROLL, BUT REMAINS UNCOVERED FOR A PERIOD OF 14 CALENDAR DAYS
PRIOR TO PLACING AGGREGATE BASE OR CONCRETE CURBING OR IS SUBJECT TO A
MEASURABLE RAIN EVENT PRIOR TO PLACING AGGREGATE BASE OR CONCRETE
CURBING, SHALL BE SUBJECT TO ADDITIONAL PROOF ROLLS PRIOR TO PLACEMENT OF
THE AGGREGATE BASE OR CONCRETE CURBING.
3) AGGREGATE BASES
A) GENERAL
i) THIS WORK SHALL CONSIST OF PLACING A COMPACTED AGGREGATE BASE ON A
PREPARED SOIL SUBGRADE IN ACCORDANCE WITH SECTION 105.03 OF THE STANDARD
SPECIFICATIONS.
ii)AGGREGATE BASE MATERIALS SHALL BE IN ACCORDANCE WITH SECTION 301.02 OF THE
STANDARD SPECIFICATIONS.
iii) THE AGGREGATE BASE MATERIAL SHALL BE OBTAINED FROM A CERTIFIED
AGGREGATE PRODUCER IN ACCORDANCE WITH SECTION 917 OF THE STANDARD
SPECIFICATIONS.
iv) THE AGGREGATE BASE MATERIAL SHALL BE HANDLED AND TRANSPORTED TO, AND
ON, THE WORK SITE IN A MANNER THAT MINIMIZES SEGREGATION AND MOISTURE LOSS.
v)AGGREGATE BASES SHALL BE CONSTRUCTED ON APPROVED SOIL SUBGRADES AND TO
THICKNESSES EQUAL OR GREATER THAN THOSE INDICATED ON THE APPROVED
CONSTRUCTION DOCUMENTS.
B) TEMPERATURE AND SEASONAL LIMITATIONS
i)THE AGGREGATE BASE SHALL BE PLACED IN ACCORDANCE WITH THE TEMPERATURE
LIMITATIONS OF SECTION 301.04 OF THE STANDARD SPECIFICATIONS.
ii)FROZEN MATERIAL SHALL NOT BE PLACED.
iii) AGGREGATE BASES MUST BE PLACED AND PASS PROOF ROLL PRIOR TO
NOVEMBER 30 IN ORDER TO ALLOW PAVING IN ACCORDANCE WITH SECTION 4C(IV) OF
THIS POLICY.
C) PREPARATION
i) THE PREPARED SOIL SUBGRADE SHALL BE FREE FROM OBJECTIONABLE OR FOREIGN
MATERIALS AT THE TIME OF PLACEMENT.
ii)THE SUBGRADE SHALL BE SUBJECT TO ADDITIONAL PROOF ROLLS IN ACCORDANCE
WITH SECTION 203.26 OF THE STANDARD SPECIFICATIONS JUST PRIOR TO PLACING
THE AGGREGATE BASE ON THE SUBGRADE IN ACCORDANCE WITH SECTION 2C(V) OF
THIS POLICY. UNACCEPTABLE AREAS SHALL BE CORRECTED TO THE SATISFACTION OF
THE ENGINEER BEFORE ANY AGGREGATE BASE IS PLACED.
D) SPREADING AND FINISHING
i) THE AGGREGATE BASE SHALL BE SPREAD IN ACCORDANCE WITH SECTION 301.05 OF
THE STANDARD SPECIFICATIONS.
ii)THE AGGREGATE BASE SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 301.06
OF THE STANDARD SPECIFICATIONS.
iii) CONCRETE CURB SHALL BE PLACED OVER THE AGGREGATE BASE WITHIN 14
CALENDAR DAYS. AGGREGATE BASES THAT LAY EXPOSED FOR A PERIOD OF TIME
GREATER THAN 14 CALENDAR DAYS OR EXPERIENCE A MEASURABLE RAIN EVENT
PRIOR TO THE PLACEMENT OF CONCRETE CURB SHALL BE SUBJECT TO INSPECTION
AND ACCEPTANCE BY THE ENGINEER. AT THE DISCRETION OF THE ENGINEER,
ADDITIONAL PROOF ROLLS MAY BE REQUIRED.
4) CONCRETE CURB
A) GENERAL
i) THIS WORK SHALL CONSIST OF PLACING CONCRETE CURBING ON PREPARED SOIL
SUBGRADES OR AGGREGATE BASES IN ACCORDANCE WITH SECTION 105.03 OF THE
STANDARD SPECIFICATIONS.
ii)CONCRETE CURB SHALL BE CONSTRUCTED ON PREPARED SOIL SUBGRADES OR
AGGREGATE BASES TO THE DIMENSIONAL STANDARDS OF THE APPLICABLE CITY OF
CARMEL STANDARD DETAILS OR IN ACCORDANCE WITH THE CURBING DETAILS OF THE
APPROVED CONSTRUCTION DOCUMENTS.
iii) MATERIALS USED IN THE PRODUCTION OF THE CONCRETE FOR THE CURBING
SHALL BE IN ACCORDANCE WITH SECTION 605.02 OF THE STANDARD SPECIFICATIONS.
HIGH EARLY STRENGTH ADMIXTURES MAY BE UTILIZED BUT SHALL NOT BE CONSIDERED
IN WAIVING ANY REQUIREMENTS OF THIS POLICY. FREEZE PROTECTION ADMIXTURES
SHALL NOT BE UTILIZED UNDER ANY CIRCUMSTANCES.
iv) EQUIPMENT UTILIZED FOR CONCRETE CURBING INSTALLATION WORK, INCLUDING BUT
NOT LIMITED TO PRODUCTION, HAULING /DELIVERY, PLACING, INSTALLATION, JOINTING,
CURING, FINISHING AND MISCELLANEOUS /ANCILLARY ACTIVITY SHALL BE IN
ACCORDANCE WITH SECTION 508 OF THE STANDARD SPECIFICATIONS.
v)CONCRETE PRODUCTION, MIXING AND HAULING /DELIVERY SHALL BE IN ACCORDANCE
WITH SECTION 502.10 OF THE STANDARD SPECIFICATIONS.
vi) INSTALLATION OF THE CONCRETE CURBING INDICATED ON THE APPROVED
CONSTRUCTION DOCUMENTS SHALL BE COMPLETED IN THE SAME PAVING SEASON.
B) PREPARATION
i) THE SOIL SUBGRADE OR AGGREGATE BASE SHALL BE SUBJECT TO ADDITIONAL PROOF
ROLLS IN ACCORDANCE WITH SECTION 203.26 OF THE STANDARD SPECIFICATIONS JUST
PRIOR TO PLACING THE HMA COURSES IN ACCORDANCE WITH SECTION 2C(V) AND
3D(III) OF THIS POLICY. UNACCEPTABLE AREAS SHALL BE CORRECTED TO THE
SATISFACTION OF THE ENGINEER BEFORE PLACEMENT OF ANY CONCRETE CURBING.
ii)ALL DISPLACEMENT OR RUTTING OF THE SOIL SUBGRADE OR AGGREGATE BASE SHALL
BE REPAIRED PRIOR TO PLACING CONCRETE CURBING.
C) WEATHER AND SEASONAL LIMITATIONS
i) CONCRETE CURBING SHALL ONLY BE PLACED IN ACCORDANCE WITH SECTION 502.11
OF THE STANDARD SPECIFICATIONS WITH THE EXCEPTION THAT PLACEMENT
OPERATIONS SHALL NOT BEGIN UNTIL THE AMBIENT TEMPERATURE IS 50 °F AND RISING.
PLACEMENT OPERATIONS SHALL BE DISCONTINUED WHEN THE AMBIENT TEMPERATURE
IS DESCENDING AND IS 50 °F OR BELOW. AT THE DISCRETION OF THE ENGINEER,
CONCRETE MAY BE PLACED AT AMBIENT TEMPERATURES LESS THAN NOTED ABOVE
PROVIDED THAT PLACEMENT, JOINTING, FINISHING AND CURING OPERATIONS CONFORM
TO SECTIONS 502.11 AND 702.11 OF THE STANDARD SPECIFICATIONS.
ii)NO MIXTURE SHALL BE PLACED ON A FROZEN SUBGRADE OR AGGREGATE BASE.
iii) UNDER NO CIRCUMSTANCES SHALL CONCRETE CURB BE PLACED BETWEEN
DECEMBER 15 AND MARCH 30.
iv) IF A SOIL SUBGRADE OR AGGREGATE BASE OVER WHICH CONCRETE CURB IS TO
PLACED, IS PLACED AND APPROVED BY THE CITY PRIOR TO NOVEMBER 30,
PLACEMENT OF THE CONCRETE CURB WILL BE ALLOWED UP TO DECEMBER 15,
PROVIDED THAT THE AMBIENT AND SOIL SUBGRADE OR AGGREGATE BASE SURFACE
TEMPERATURE COMPLIES WITH THE REQUIREMENTS OF SECTION 4C(I) OF THIS POLICY
AND THE PAVING CONTRACTOR PAY FOR THE SERVICES OF A FULL TIME
SHALL ACT AS AN AUTHORIZED AGENT CONSTRUCTION INSPECTOR AND WHO T OF THE
ENGINEER. THE ENGINEER SHALL SELECT THE CONSTRUCTION INSPECTOR.
v)IF THE AMBIENT AND SOIL SUBGRADE OR AGGREGATE BASE SURFACE TEMPERATURE
COMPLIES WITH THE REQUIREMENTS OF SECTION 4C(I) OF THIS POLICY BETWEEN APRIL
1 AND APRIL 15, CONCRETE CURB SHALL BE ALLOWED TO BE PLACED ON AN
APPROVED SOIL SUBGRADE OR AGGREGATE BASE PROVIDED THAT THE PAVING
CONTRACTOR PAY FOR THE SERVICES OF A FULL TIME CONSTRUCTION INSPECTOR AND
WHO SHALL ACT AS AN AUTHORIZED AGENT OF THE ENGINEER. THE ENGINEER SHALL
SELECT THE CONSTRUCTION INSPECTOR.
vi) THE ENGINEER RESERVES THE RIGHT TO SUSPEND ALL CONCRETE CURB
PLACEMENT OPERATIONS IF, IN THE OPINION OF THE ENGINEER, THAT PREVAILING
WEATHER CONDITIONS AND /OR THE CONDITION OF THE SUBGRADE AND /OR THE
AGGREGATE BASE MAY RESULT IN SUBSTANDARD CONCRETE CURB PLACEMENT,
CURING AND FINISHING.
D) PLACEMENT
►) CONCRETE CURB SHALL BE PLACED IN ACCORDANCE WITH SECTION 502.09, 502.12
AND 605.04(C) AND 605.04(D) OF THE STANDARD SPECIFICATIONS.
ii)CURB MACHINES MAY BE UTILIZED IN ACCORDANCE WITH SECTION 605.04(C) AND
605.04(H) OF THE STANDARD SPECIFICATIONS PROVIDED THAT THE EQUIPMENT
CONFORMS TO THE REQUIREMENTS OF SECTION 508 OF THE STANDARD
SPECIFICATIONS.
iii) FORMWORK SHALL COMPLY WITH THE REQUIREMENTS OF SECTION 605.04(8) OF
THE STANDARD SPECIFICATIONS.
iv) FORMS SHALL BE REMOVED IN ACCORDANCE WITH SECTION 502.16 AND 605.04(B)
OF THE STANDARD SPECIFICATIONS.
E) JOINTS
i) JOINTS SHALL CONFORM TO THE REQUIREMENTS OF SECTION 503 AND 605.04(E) OF
THE STANDARD SPECIFICATIONS.
ii)JOINTS SHALL BE INSTALLED AT INTERVALS OF 10 -FEET OR LESS; 5 -FOOT OR LESS
ALONG RADII. JOINTS IN INTEGRAL CURB AND SIDEWALKS SHALL BE LOCATED AT THE
SAME LOCATION AS THE JOINTS IN THE ADJOINING SIDEWALK. JOINTS MAY BE SAWED
OR TOOLED TO A MINIMUM DEPTH OF i/2 -INCH.
iii) PREFORMED EXPANSION JOINTS SHALL BE PLACED AT INTERVALS OF 50 -FEET OR
LESS, AT ALL CASTINGS, THE BEGINNING AND END OF ALL CURB RETURNS, THE END
OF EACH DAYS WORK AND WHERE ABUTTING EXISTING CONSTRUCTION. IN ADDITION TO
THESE REQUIREMENTS, EXPANSION JOINTS IN INTEGRAL CURB AND SIDEWALKS SHALL
BE LOCATED AT THE SAME LOCATION AS THE EXPANSION JOINTS IN THE ADJOINING
SIDEWALK.
F) FINISHING AND CURING
►) THE CONCRETE CURB SHALL BE FINISHED AND CURED IN ACCORDANCE WITH SECTION
502.14, 502.15, 504 AND 605.04(F) OF THE STANDARD SPECIFICATIONS.
ii)CURING COMPOUND SHALL BE APPLIED TO ALL EXPOSED SURFACES ON SLIP - FORMED
CONCRETE CURB. FOR FORMED CONCRETE CURB, CURING COMPOUND SHALL BE
APPLIED TO ALL EXPOSED SURFACES INCLUDING SIDES AFTER ANY FORMS ARE
REMOVED.
iii) THE CONCRETE CURB SHALL BE ALLOWED TO CURE FOR A MINIMUM OF 5 -DAYS
PRIOR TO COMMENCING BACKFILLING OPERATIONS ADJACENT TO THE CONCRETE
CURBING.
G) BACKFILLING
i) THE SPACES ADJACENT TO THE CONCRETE CURB SHALL BE BACKFILLED IN
ACCORDANCE WITH SECTION 605.04(G) OF THE STANDARD SPECIFICATIONS ONLY
AFTER THE CONCRETE CURBING IS INSPECTED AND ACCEPTED BY THE ENGINEER IN
ACCORDANCE WITH SECTION 5 OF THIS POLICY.
ii)BACKFILLING OPERATIONS SHALL BE COMPLETED PRIOR TO OPENING THE AREA TO
REGULAR CONSTRUCTION TRAFFIC.
5) INSPECTIONS
A) ALL MATERIALS FURNISHED AND EACH PART OR DETAIL OF THE WORK WILL BE
SUBJECT TO INSPECTION PER SECTION 105.10 OF THE STANDARD SPECIFICATIONS FOR
THE PURPOSE OF ASCERTAINING THAT THE WORK IS IN SUBSTANTIAL CONFORMANCE
WITH THIS POLICY AND THE APPROVED CONSTRUCTION DOCUMENTS.
B) THE CONTRACTOR SHALL NOTIFY THE ENGINEER A MINIMUM OF 48 -HOURS IN
ADVANCE OF COMMENCING ANY WORK SUBJEC T TO THE STANDARDS ESTABLISHED BY
THIS POLICY.
C) THE CONTRACTOR SHALL SCHEDULE PROOFROLLS WITH THE ENGINEER A MINIMUM
OF 48 -HOURS IN ADVANCE OF SUCH PROOFROLLS.
D) THE CONTRACTOR AND ENGINEER WILL CONDUCT AN INSPECTION OF THE NEW
CONCRETE CURBING FOR ANY DAMAGE, INCLUDING FREEZING OR RANDOM CRACKS. THE
INSPECTION AND ALL NECESSARY REPAIRS SHALL BE COMPLETED PRIOR TO
BACKFILLING OPERATIONS.
E) SAMPLING AND TESTING OF MATERIALS, EQUIPMENT OR CONSTRUCTION WORK MAY
BE REQUIRED AT THE EXPENSE OF THE CONTRACTOR AT THE DISCRETION OF THE
ENGINEER FOR THE PURPOSE OF ASCERTAINING THAT THE WORK IS IN SUBSTANTIAL
CONFORMANCE WITH THIS POLICY AND THE APPROVED CONSTRUCTION DOCUMENTS.
SAMPLING AND TESTING SHALL CONFORM TO THE REQUIREMENTS OF THE SECTIONS OF
THE STANDARD SPECIFICATIONS APPLICABLE TO THE PORTION OF THE WORK
SUSPECTED TO BE NON- COMPLIANT OR AS DIRECTED BY THE ENGINEER.
F) WHERE THE ENGINEER DETERMINES THAT IS NECESSARY TO CONFIRM COMPLIANCE
WITH STANDARDS OF QUALITY OR THICKNESS, CONCRETE CURB SHALL BE CORED AND
TESTED AT THE EXPENSE OF THE CONTRACTOR. THE AVERAGE THICKNESSES OF THE
CURB MUST EQUAL OR EXCEED THE MINIMUM PRESCRIBED BY THE APPROVED
CONSTRUCTION DOCUMENTS.
G) SUCH INSPECTIONS SHALL NOT BE CONSTRUED TO RELIEVE THE DEVELOPERS'
ENGINEERS OR CONTRACTORS IN ANY WAY FROM THEIR OBLIGATIONS AND
RESPONSIBILITIES UNDER THEIR CONTRACTS. SPECIFICALLY, INSPECTION BY THE
ENGINEER, OR BY RETAINED ENGINEERS OR TESTING AGENCIES, SHALL NOT REQUIRE
THEM TO ASSUME RESPONSIBILITIES FOR THE APPROVED CONSTRUCTION DOCUMENTS,
FOR ANY MISINTERPRETATION OF THE APPROVED CONSTRUCTION DOCUMENTS BY THE
CONTRACTORS DURING CONSTRUCTION, OR FOR THE MEANS AND METHODS OF
CONSTRUCTION, NOR FOR SAFETY ON THE JOB SITE.
H) WORK IDENTIFIED TO NOT MEET THE REQUIREMENTS OF THIS POLICY OR THE
APPROVED CONSTRUCTION DOCUMENTS, UNACCEPTABLE WORK, WHETHER THE RESULT
OF POOR WORKMANSHIP, USE OF DEFECTIVE MATERIALS, DAMAGE THROUGH
CARELESSNESS, OR ANY OTHER CAUSE FOUND TO EXIST PRIOR TO THE FINAL
ACCEPTANCE OF THE WORK, SHALL BE REMOVED IMMEDIATELY AND REPLACED IN AN
ACCEPTABLE MANNER AT THE CONTRACTOR'S EXPENSE.
I) IF THE CONTRACTOR FAILS TO COMPLY FORTHWITH WITH ANY ORDER MADE UNDER
THE PROVISIONS OF THIS SUBSECTION, THE ENGINEER WILL HAVE AUTHORITY TO
CAUSE UNACCEPTABLE WORK TO BE REMEDIED OR REMOVED AND REPLACED; TO
CAUSE UNAUTHORIZED WORK TO BE REMOVED; AND TO DEDUCT THE COSTS FROM
ANY MONIES DUE OR TO BECOME DUE.
J)WORK DONE CONTRARY TO INSTRUCTIONS PROVIDED BY THE ENGINEER SHALL BE
CONSIDERED UNACCEPTABLE AND SUBJECT TO IMMEDIATE REMOVAL AND REPLACEMENT
IN ACCORDANCE WITH THE INSTRUCTIONS PROVIDED BY THE ENGINEER.
6) ACCEPTANCE
A) BEFORE ACCEPTANCE OF THE CONCRETE CURB, THE ENGINEER SHALL DETERMINE
IF THE IMPROVEMENTS ARE IN SUBSTANTIAL COMPLIANCE WITH THIS POLICY (EXCEPT
FOR ANY VARIANCES GRANTED) AND THE APPROVED CONSTRUCTION DOCUMENTS.
B) THE ENGINEER MAY, AT HIS SOLE DISCRETION, ACCEPT WORK THAT IS NOT IN
CONFORMANCE WITH THIS POLICY PROVIDED THAT THE WORK IS BONDED FOR A
PERIOD GREATER THAN THREE YEARS. THE ENGINEER SHALL ESTABLISH THE EXTENDED
BONDING REQUIREMENT.
0rnN U
f- M O -
� ul c
v pn N u') .
❑v- �
z z m U
g -�'p
w C6 QOw y
0
cnQ�
0Zrn
co Q r�
I z ,r,
r_
M
J
w
i U
Z z -
O
W
z cj
a
U
==
<
I..
■■N■
■momom
of
AQ
QPQ► O+
Q ' p Cs J �, QQ oco
G;
CERTIFIED BY
W
2
Cc
a
0
LL 0
O� �o
w w N
y c� cm
uj cc
a m rz a .
N 910
Q0 a
> z °� z
t/� J _ a
(1) .j w
WSW gi
zzm o.r
J a a ,
Lu a
= do
O y A
pZ z
Z ;R 9
a
a
LEI
Z
REVISIONS
CITY
OF CARMEL
SPECIFICATIONS
SHEET NO.
C.700
OF
DATE: 05/17/2013
DRAWN BY: JCS
CHK'D BY:
RLN
JOB N0.
2013.00569