Loading...
HomeMy WebLinkAbout03 A100 Elevation - floor.pdf� EXISTING TRENCH DRAIN .___________________________- .___________________________- TO REMAIN REMOVE EXISTING FLOORING TO ACCOMMODATE NEW SANITARY SEWER CLEANOUT NOTE: CONTRACTOR TO SHORE-UP EXISTING MASONRY WALL PRIOR TO THE REMOVAL OF ANY MASONRY. � EX�ST�N� ,�° sP��T FA� BLOCK TO REMAIN NEW 12" SPLIT FACE B (RLL IN ExITING OPENII NEW BLOCK TO BE PAI TO MATCH EXISTING CO REMOVE EXISTING OVERHEAD DOOR REMOVE EXISTING CMU WALL TO 8° BELOW FlNISH FLOOR REMOVE EXISTWG OVERHEAD DOOR � �U} �Q� X F w�a >aN O � O � w � �., ��z -�----- 0 0 0 o � � REMOVE (2) ExisTiN� PiPE BOLLARDS AND EXISTING 4 -� R4MPED CONCRETE AS S OWN z2._$.. 2. $.. DEMOLff10N PLAN scn�E i/a"= i'—o" (MATCH EXISTING THICKNESS) AND MATCH EXISTING RAMP ��H EL.E�/ATION VIEW SCALE: 1�S"= 1'-0° � � � �- � -� _� �- � -� — r-� � - - �—� ,was� / / � �— I u / I �r-- � o /idry � � � � � �� i � mop o I i�=J sinks � �°����i eye � � wash / ,o � I , EXISTING TRENCH DR41N ________________� o �______________________� CAR DETAILING AREA I� I I� �� II EXISTING TRENCH DRAIN II�______________________________________________________________________________________________________ _____________________J II II � o� ��� � THERE ARE NO CHANGES TO THE SEE ABOVE FOR ALL ACTIVITY TO dr�nl¢Ing EXISTING USES OF EACH ROOM. BE DONE IN THIS AREA (ONLY ALL EHISTING ROOM NAMES ARFA OF ARCHITECTURAL WORK �o� ���ains SHALL REMAIN THE SAME AFTER BEING DONE) COMPLETION OF PROJECT. I� �i � � \� i I � — 1/� � �I i II I� °,� � I � �, ; -� I �� � � ref I I__ o, �WATER R6ER�� �-----�-�-�—�-�-�—�-�-�—�-----�_ —__�-----��----- 0 00 00 �� ` � OVERALL D(ISfING FLOOR PUW scn�e �/a"= �'—o" TOTAL EXIST. BLDG AREA= 7,200sq.ft � �°� �I J � � __ _ _ _ _ExISTING TRENCH DRAIN _________________� _________________________________J INSTALL NEW CONCRETE FLOOR oF s°tnfok sv+e (s 1�z enc MIX) WITH 10-10-6-6 W.W.F. PEGGED TO EXISTING FLOOR SLAB AT 12" C-C. REPLACE EXISTWG CONCRETE (MATCH EXISTING THICKNESS) AND MATCH EXISTING RAMP —�-----� 0 0 0 Q �� 0 w � � a �3� L W Z z- �� x U w Z Z Q�� � 3inw W � w zwr � � ��� Q U � �zz �oa ? c� v� o� / 01 I ' � 8. 8.. 14. O..x 14. 0., OHD 2. 8.' ROOR PUW scn�: i/a��— r_�° DOOR SCHEDULE: o, ia._o„x ia._o„ nsulated metal overhead dooc (6'-0° high lift door) Installed per manufacturers specifications with new elec. door opener (push botton and remote access) W � � � � � E E VERSAT'ILE CONSTRUCTION GROUP, LLC. 5ID Eos[ imq RooJ, SuIA 610 W�i\elanE. IMiono <618I Fn'�3V5}2}5]9 Fa= SI]53?358i � C� � �.y � .. C3 � O ^d ,O ��� �a �� rl .,..� ;-� W s-. � � i�Y iH � � L � •O � a�� � 1� � A Job No.: Date Stamped: 13047 8-5-13 Drawn By Checked By Scale: �aw <ae �/a.._�._o.. CAD FlLE�. G:\13047\a100 elewtion — floor.dwq ,,,,,����A�B,,,� o �� ��,nE�� F�o; No. * 19700309 * � S�iE� ,/'�!��M11 � �� CERTIFIED BY: THIS DR4WING IS THE PROPERTY OF VERSATILE CONSTRUCTION GROUP LLC AND IS NOT TO BE USED FOR ANY OTHER PURPOSE THAN THE PROJECT DESCRIBED HEREIN. ;�E� nnE A100