HomeMy WebLinkAbout05090093-Sq. Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks &. filed system) and/or well locations
m. Drainage flow arrows
n, All drainage swales and subsurface facilities (retention / detention areas, etc...)
o, Sump pump -- Show sump pump pit(s) and discharge line locations
p, Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required.
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director snail approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the wdtten application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in alt respects to this ordinance."
IN ADD~FiON TO THE ABOVE-L~STED SUBMFI'TAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORHAT~ON RELATZVE TO COMMZI'MENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNZTY SERWCES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATZON MAY BE REQUESTED BY, AND V~LL BE PROWDED TO THE BUILDING INSPECTOR, IF
THE SUBM~TED PLANS ARE NOT OF SUFFICIENT CLARTTY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMpI ~ANCE W~rH ALL APPLtCABLE CODES AND ORDINANCES.
SUBM~'TAL OF ADDiTiONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INiTiAL SUBMZI-fAL, WILL
EXTEND THE T~HE iT TAKES COMPLETE THE PERMIT REVIEW.
~ THE OFF~CE OF BUILDING & CODE ENFORCEMENT RECOGNIZESANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM"TO BE .N.: UPIABLE. UNFINISHED SPACE. IE AN AREA SO
LABELED IS TO BE A FiNISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF ~T IS
DETERMINED THAT AN UN~NISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA A~ER THE
ISSUANCe, THE PLANS AND PERMYr RECORDS MUS~_ BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
~ ALL CONSTRUCTION IS SUB3ECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE
~ ISSUANCE OF THE BUILDING PERMIT, ONCE THE PERHFf IS ISSUED, WORK SHOULD NOT BE POURED,
tEIJJJ J INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
~ a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
I con~tutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06,07, and 29.06.08.
BUILDING ~ CODE ENFORCEMENT; CIT~ OF CARMEL. One Civic Sq.; Carmel, IN 445032. Dh. ~'317) 57'[.2444.
I, the u / on the
the
it,/Services. I further
certif7 re to comply
Code:
true and accurate,
Community Services regarding the truth of the
BASEMI
(Finished
Unfinished)
~ below ~s
lot knowingly or intentionally
otherwise mislead the Dept. of
Iressed therein.
Front
Porch
Rear
Total Sq,
Ft. of
Garages
TOTAL
DATE
NAME PRZNTED
S:Permits/FORMS/RESIDENTIAL PROCEDURES
2of2