Loading...
HomeMy WebLinkAboutJE3.PDF� � EOJ SEE PLA I � I CONT. L3x3 NOT BY CANAM BEAM SLOTS FOR 1!2" DIA BOLTS 3 1/2" GA. WHERE SHOWN 'I. ON PLAN 2" JOIST SECTIOfV i REF ; 71S404, 2 & 3/S413 (BOLTS NOT BY CANAM) � SLOT FOR FOR 3/4" DIA BOLTS 5" GAGE 1/4" ' .� On BEARING ASSEMBL NOT BY CANAM W-BEAMJ � `" SEE PLAN I 1 1/2" COLUMN DO NOT WELD BC SEE PLAN TO PLATE - BY OTHERS GIRDER SECTION A REF. : NOT PROVIDED (BOLTS NOT BY CANAM) ERECTOR/ APPROVER NOTE : of PANEL POINT MORE THAN 3" P= 200# i ..,,,.,. TYP FIELD INSTALLED (2) L2x2x1/4 (EA SIDE) NOT BY CANAM SLOTS FOR 1/2" DIA 9��TS �„1l2 STD GA 31/2" GA, ��;, � .... .--- —. . _..JN 'I' ON PLAN JOIST SECTION 2 REF : 10/5404 (BOLTS NOT 8Y CANAM) � � 2�� SLOTS FOR 1/2" DIA BOLTS EOJ @ 3 1/2" GA. SEE PLA i 3/16" 2" n CONT. L3x3 NOT BY CANAM P= 200# MORE THAN 3" REF.: 91S404 of PANEL POINT CONCENTRATED LOADS ON JOISTS WHEN LOADS OCCUR AT A DISTANCE GREATER THAN THREE INCHES FROM A PANEL POINT, A STRUT ANGLE MUSTBE FURNISHED & INSTALLED (BY OTHERS) IN THE FIELD TO CARRY THE LOAD TO AN OPpOSITE PANEL POINT AS SHOWN. NOTE; APPLIES TO AlL STANDARD, KCS AND SPECIAL JOISTS WITH CONCENTRATED LOA�S. 0 "W"COLUMN SEE PLAN DO NOT WELD STABILIZER PLATE NOT BY CANAM JOIST SECTIOIV K REF : 2/5413 (BOLTS NOT BY CANAM) � SLOTS FOR 1/2" DIA BOLTS I 2 1/4" @ 31/2" GA. WHERE SHOWN e�e ON PLAN �� 3/16„ 2" a �,,;��;; SLOTS FOR 1/2" DIA BOLTS 2 1/4" .. (::i��°�i 1/4" @ 3 1/2" GA. 2 2 1/2"� �2 1/2" 1/8" 2" @ GIRDER ONLY 2" ��8�� JOIST GIF2DER � ��g�� 2„ MIN 7 C � � %7 � BEAM-1 I ' ��� �_ _ �\ �`���,�, ��%���� /� �� � i BEAM or GIRDER �� `'�`' �� � KNEE BRACE KNEE BRACE � SEE PLAN FOR LOCATIONS SEE PLAN SEE PLAN FOR LOCATIONS JOIST S�CTION 3 JOIST SECTIOiV 4 REF : 8/S404, 5/S416 REF : 8/5404, 5/S416 (BOLTS'NOT BY CANAM @ BEAM) (BOLTS BY CANAM) (BOLTS BY CANAM @ GIRDER) � i 2 �/2^ SLOTS FOR 1/2"f� BOLTS 3 1/2" GA. � 1" i m _ 2,�z�, RI COLUMN- SEE PLAN 0 ANGLE NOT BY CANAM STABILIZER ❑ NOT BY CANAM � JOIST SECTION L REF : NOT PROVIDED (BOLTS NOT BY CANAM) WELDED-X BRIDGING USE ALL DROPS. SEE PLAN FOR PIECE MARK HORIZ. BRIDGING CUT TO FIT IN FIELD LAP TO BE 2" MIN �. 11"� � —�r �r � � 1 FIELD WELD SEE SPEC 5.4 FIELD WELD SEE SPEC 5.4 1/8�� COLUMN- SEE PLAN BEAM FIELD WELD SEE SPEC 5.4 � � i I � 2 1/2" SLOTS FOR 1/2"�J BOLTS 3 1/2" GA. 0 2 1/2" ANGLE ' NOT BY CANAM STABILIZER NOT BY CANAM JOIST SECTION F REF : NOT PROVIDED (BOLTS NOT BY CANAM) TYPICAL H4�RIZONTAL & CROSS WELDED BRIDGING DETAIL �� I I �r FIELD WELD SEE SPEC 5.4 ��� � ����.� JOIST ARE STAGGERED JOIST SECTION 5 REF : NOT PROVIDED ' �- SLOTS FOR 1/2" DIA BOLTS JOIST ARE STAGGERED JOIST SECTION 6 REF : NOT PROVIDED UPLIFT BRIDGING WELDED-X BRIDGING CUT TO FIT IN FIELD LAP TO BE 2" MIN SEE PLAN FOR PIECE MARK USE ALL DROPS. �r �r- I � r / / FIELD WELD ��8�� SEE SPEC 5,4 , FIELD WELD SEE SPEC 5.4 TYPICAL UPLIFT BRIDGING DETAIL REF: NOT PROVIDED 118" GENERALNOTES t. All p�oducta provided by Canem Steel Corporation In wnnedion wllh Ihls drawlnB are subJectto Canam Steel Corporalion's SlenderdTermsendCondlFons(orJolstSeles, Byeccepting the product, the purchaser acknowledges Ihe� fhey heve recelved antl reNawea ihese terms antl contlillons. 2. Mlnimum deslgn requiremente lo be per S.J.I. (end S,D,I. When deck fs aupplied by Canem) letesleditlan, unlass othenvlae noted herein. 3. Paint-One shop coet Grey Primer (Spacificetions provided upon requesl) 4. The Issuance of Ihls drawing tloes not wnstitule 1ha ecceptence of a customers order. I, 5. C�L010, Cenam Steel Coryoratlon. tJneuthorized use of ' lhe drawing and Informelbn pravitled hareln Is sUiclly (oNitltlen. 6. Cam6arw111 be furnlshad on allJals�s and�lalglyders (aee S.J.I. latesl edllian for epproxlmele cem6er) unteas specifcally modified by ihe conVact tlocuments. Cambe� and deliection must be consldered when datailing Gaming adjacenl or framing toJoists argirders. 7. The deslgn fs besed upon load In(ortnallon specitleally submitted la CenamSleelCorporellon. Naspecialloedsorntherforcasheve 6een proNdetl for unless purcheser hae requaeted Ihem In Wrltlnp. Such speciel loads or other forces shell Include, withoul Ilmitation; uplifl,concenireted loeds from mof top unils, exlel loeds Gnm kicker anBlas, etc. B. Cenam's eraclian drewinBs herein were prepered usln8 tha SUudural porUon of Iha conlracl drewings as its primery guide usfng ihe Archltecturei drawings (when provlded) onlyfor misaing Informetion or fordarificalion. Cenamdoesnotacceptenyresponsibiliryfor discrepancies belween the Struclurel and Archltecturel drewings. ERECTION NOTES 1. This drewing is lo be usad oNy 1or Ihe ereIXion of producle supplied hy Canem Steel Corporatlon es Intllrated by an erectlon merk on Ihe plans entl/orseclions. 2. Cenam Steel Corporatlon le not responsible (ar�he handlin8 antl oracllon ot meterlals il supplies, The desl9n end menufeclure af lhe meteriels essumes that they ere hendled In eccordance wllh all eppliceble lews and regulalions. Canam Steel Corporalion Is not rasponsl6le for eny misheMling ar feliure fo properly erect the meterlel: 3. Cenam Steel Corporelion hes not ezeminetl eny Beld conditlons antl assumasnotesponsibilityforenyslleconditlone. Purchesermus[ nolity Canam Sloal Corporalion of any discrepencles between the field condifions end Cenem Steel Corporellon'e Flle end Field Use drawinga. 4. Any madificetion oFmeterial supplied 6y Cenem Steel Carporatlon vrithout prior wrltten consent wHl aulomallcally releese Cenem Tiom all Ilablllty wlth respecl to such maletlal. ERECTOR'S NOTE: •IN BAY9 6P�0' OR LES3� THE FOLLOWIN6 APPLIE6 TO ANY COLUMN JOISTS OR J015T5 NEAR A CALUMN: • THESE JOISTS NAVE N0T BEEN DE9IGNE� TO SIIPPORT AN EMPLOYEE WITHOUT BRIOOING INSTALLEO. • THE9E J019T3 ARE NOT 09HA J019T3 DESIONE� FOR STABILITY PER SIIBPART R 7828.]6'/(eH3J, • SPECIAL EREC710N METHO�S MIIST BE INCORPORATED. • EMPLOYERe WILL BE CON6IDERED TO BE IN COMPLIANCE WITM 19YBJS7�e)(3) IF THEY ERECT THESE JOI5T5 EITHER BV: (1) IN9TALLINO Bft10GIN0 OR OTHERWI9E STABILILNO THE JOIST PRIOR TO RELEASING THE HOISTINO CA6LE, OR (2) ftELEASINO TNE CABIE WITHWT MqVINO A WORKER ON THE JOISTS. • 00 NOT ALLOW EM%.OYEES ON THESE JOISTS UNTIL AOEQUNTELY STA9ILIZED. CONSULT THE OSHA SAFETY STANDARD9 FOR SPECIFIC9. -IN BAYS GREATER THPN 60'-0, J015T5 AT OF NEAR COLUMNSSHAILeEEftECTEDINTANOEM(PAIRJWITH �. ANADJACENTJOIST.ALL9RIDGINGMUSTBEINSTALLEO � BEFOAE LIFfING AND THE PAIR OF JOISTS M115� 9E SECURED TO THEIR SUPPORT 9EFORE RELEASING THE HOISTIN6 LINE 7HI5 RE�IIIREM11ENiMAY BE WAIVE� UNDER CEftTAINCON�RI0N5. CONSULTTHEOSHASAFETY STAN�MDS FO(i SPECIFICS. DESIGN METHOD: ASD� LRFDD FACTORE� REVISIONNO:I DATE: I DESCRIPTION DATE SEM FOR FIELO VSE: 57P5R010 OATE SENT FORAPPftOVAI: 4H62070 0 i T :° � °�s S�� I a � ; F � �, . � �� � STEEL� OPo.n•. owiemceowuo�. PLUS Jolsts end 9too1 DocK 160, Savl� Eilla ftaoE, JacXSandtla, FL, 9225d Pho�re;(AD1)]01A99BFaa:(p04)TB1�YU04 Eme:l: pm7u�mrom.vm NM!E:CT VILLAGE ON THE GREEN THTR. �ocnnoN: CARMEL, IN *�: SECTIONS cusroMen: INDIANA STEEL FABRICATING u+cNREm: pEDCOR DESIGN GROUP enaixeea: MCCOMAS ENGINEERING PENEHEOBT: UMKNBY: N.1G �'T• ioor ioasko anazoio Jacksonvllle ow,mnaNO: cxECRZOen cncatner: o�ie P�^+E=*�� JE3 Of $ I�0! r,s seemm� i ananF