Loading...
HomeMy WebLinkAboutAs-Built Drawings_AGM-VOG-Rev3 03-02-11.pdfLAWS AND BUILDING SAFETY CODES COVERING THE DESIGN AND USE OFGLAZING, ENTRANCE, WINDOW AND CURTAINWALL PRODUCTS VARY WIDELY.RCB SERVICES, LLC DOES NOT CONTROL THE SELECTION OF PRODUCTCONFIGURATIONS, OPERATING HARDWARE OR GLAZING MATERIALS ANDASSUMES NO RESPONSIBILITY THEREOF. AL L A L U M I N U M F R A M I N G : 2 - C O A T K Y N A R P A I N T T O M A T C H ( K A W N E E R CH A R C O A L G R A Y ) NOTE TO ARCHITECT, GENERAL CONTRACTOR,& ARCHITECTURAL GLASS AND METALPLEASE VERIFY ALL OPENING, REFERENCE, & ANCHOR LOCATIONDIMENSIONS. ALSO PLEASE VERIFY STRUCTURAL INTEGRITY OFALL SURROUNDING CONDITIONS. RCB SERVICES LLC WILLASSUME THE DRAWINGS ARE CORRECT AS DRAWN IF THE ABOVENOTES & SIMILAR NOTES THROUGHOUT ARE NOT ADDRESSED ONRETURNED MARKED-UP DRAWINGS.FROM THE USE OF THESE DRAWINGS BY OTHER TRADES.THESE DRAWINGS REPRESENT RCB SERVICES, LLC INTERPRETATION OF THEAPPLICATION OF PRODUCTS TO THIS PROJECT IN FUNCTIONAL COMPLIANCEWITH THE ARCHITECT'S DRAWINGS AND SPECIFICATIONS. IT IS IMPORTANT THATTHIS INTERPRETATION BE REVIEWED DIMENSIONALLY AND FUNCTIONALLY WITHRESPECT TO ACTUAL ARCHITECT INTENT, INTERFACING CONDITIONS, MATERIALS,RCB SERVICES, LLC WILL ASSUME NO RESPONSIBILITY FOR ERRORS RESULTINGFINAL APPROVAL BY RCB SERVICES'S CUSTOMER CONSTITUTES ACCEPTANCEOF ALL DEVIATIONS TO THE CONTRACT DOCUMENTS MADE BY RCB SERVICES,LLC IN THESE DRAWINGS.AND JOB SITE CONDITIONS. - C U R T A I N W A L L F R A M I N G : E F C O 5 6 0 0 , 2 1 / 2 " X 7 1 / 2 " - C U R T A I N W A L L F R A M I N G : E F C O , 2 " X 4 1 / 2 " - I N T E R I O R S T O R E F R O N T F R A M I N G : E F C O 4 0 1 , 1 3 / 4 " X 4 1 / 2 " - S W I N G E N T R A N C E D O O R S : V I R G I N I A G L A S S A L L - G L A S S D O O R S 1. A L U M I N U M E X T R U S I O N S T O B E 6 0 6 3 T - 5 A N D 6 0 6 3 T - 6 A L L O Y A N D T E M P E R . DESIGN CRITERIADESIGN LOAD S D E T E R M I N E D P E R : DE F L E C T I O N : WI N D P R E S S U R E S : WI N D L O A D : MEAN BUILD'G HT. (FT.):IMPORTANCE FACTOR:WINDSPEED (MPH):INTERNAL PRESS. COEFF.:BUILDING CATEGORY:EXPOSURE CATEGORY:WI N D L O A D : WI N D L O A D : WI N D L O A D : TOPOGRAPHIC FACTOR:DIRECTIONALITY FACTOR (Kd): PS F ( P O S . Z O N E 4 ) PS F ( N E G . Z O N E 4 ) PS F ( P O S . Z O N E 5 ) PS F ( N E G . Z O N E 5 ) (COMPONENTS & CLADDING)IBC 2006 & 20 0 8 I N D I A N A B U I L D I N G C O D E 57B901.15II+/-0.18 19 . 2 20 . 9 19 . 2 25 . 2 L/ 1 7 5 F O R L < 1 3 ' - 6 " L/ 2 4 0 + 1 / 4 " F O R L > = 1 3 ' - 6 " 1.0 0.85 CO V - C O V E R S H E E T KP 0 1 T O K P 0 5 - K E Y P L A N S A N D E L E V A T I O N S HW 0 1 - H A R D W A R E S C H E D U L E S E1 0 1 T O E 1 0 3 - C U R T A I N W A L L E L E V A T I O N S E2 0 1 T O E 2 0 3 - S T O R E F R O N T E L E V A T I O N S D1 0 1 T O D 1 1 8 - C U R T A I N W A L L D E T A I L S D2 0 1 T O D 2 0 8 - S T O R E F R O N T D E T A I L S 02 / 0 2 / 1 1 R E V 2 : R E V I S E D P E R R F I ' S , A R C H I T E C T ' S A N D E N G I N E E R ' S R E V I E W . SH E E T S A D D E D : D 1 1 8 - E X T E R I O R & I N T E R I O R P E R I M E T E R C A U L K I N G ( B Y A G M ) . - " N O T B Y A G M " I M P L I E S ' N O T B Y A R C H I T E C T U R A L G L A S S & M E T A L " . CA R M E L , I N D I A N A VILLAG E O N T H E G R E E N THE A T E R B U I L D I N G ARCHITECT: PEDCOR DESIGN GROUP, LLC084113 ALUMINUM FRAMED ENTRANCES A N D S T O R E F R O N T ; 0 8 4 4 1 3 G L A Z E D A L U M I N U M C U R T A I N W A L L S ; 1/ 4 " C L E A R , 1/ 2 " A I R S P A C E 1/ 4 " C L E A R , C E R A M I C F R I T O R O P A C I C O A T # 4 G3 1/ 4 " C L E A R , 1/ 2 " A I R S P A C E 1/ 4 " C L E A R , S U N G A T E 5 0 0 # 3 G1G2G6 AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CO V E R S H E E T PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- CO V NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 1/ 4 " C L E A R , F T 1/ 2 " A I R S P A C E 1/ 4 " C L E A R , S U N G A T E 5 0 0 # 3 , F T G7 REVISED PER REVIEW AND RFIGAR01/26/11 03 / 0 2 / 1 1 R E V 3 : R E V I S E D P E R A R C H I T E C T ' S R E V I E W A N D P R . 0 1 7 . SH E E T S R E V I S E D : E 1 0 2 , E 2 0 2 A N D D 1 0 6 3 REVISED PER ARCHITECT'S REVIEW03/02/11 GAR3 KE Y P L A N - (N O T T O S C A L E ) AR C H . R E F : KP 0 1 KE Y P L A N S -RC B S E R V I C E S L L C GA R AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 PE D C O R D E S I G N G R O U P , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G AG M 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 -- 09 / 1 5 / 1 0 NO N E 2 09/15/10 GAR 1ST APPROVAL SUBMITTAL1 13 2 B 13 2 A STAGEMANAGER123 STORAGE122 +0'-0" FUTURE OFFICE BLDG, N.I.C. OPEN TO ORCHESTRAPIT BELOW ST A I R 15 3 ST A I R 10 4 STAIR103 RAMP DN.RAMP DN. RAMPDN.RAMPDN. 10 2 C 10 2 B 10 2 A 112B 14 3 B 143A 111A 111B111C112A118119123122116A116B 126 12 4 125A 125B 12 5 C 12 7 12 8 129 130 131 135 134 133 115B 11 5 A 14 1 13 9 13 7 14 2 142A 14 5 147 15 1 14 9 14 8 15 0 152 108B 10 8 A 106B 106A 100A100BSLAB ST R 14 2 A SL L 11 5 TO I L E T 14 1 STAIR020 CORR.120 SL L 10 8 E. L O B B Y 10 2 SP R I N K L E R / W A T E R RI S E R R M . 12 8 DR E S S I N G RO O M 13 1 DR E S S I N G RO O M 13 5 TO I L E T 13 0 H. C . TO I L E T 13 4 JA N . 13 3 CO A T R O O M 15 3 H. C . T O I L E T 14 9 ST R . 14 5 SL L 14 3 SLL106SLL111 SL L 12 5 RAMP UP117RAMP DN.118 CHAIRLIFT112SLL116 TO I L E T 13 9 DR E S S I N G RO O M 14 0 DR E S S I N G RO O M 13 8 CO R R . 13 2 DR E S S I N G R O O M 13 7 DR E S S I N G R O O M 14 2 JA N . 15 0 CO R R . 15 1 CORR.105 CO R R . 14 6 WO M E N S 14 7 ME N S 14 8 ST A I R - 1 15 2 ST A I R - 2 12 9 CO R R . 13 6 CORR.113CORR.121OFFICE FORPRODUCTION119 EL E C . R O O M 12 7 RE C E I V I N G 12 6 GREEN ROOM124 ST A G E 11 4 MEZZANINE107 VEST.100THEATERSEATING110ELEV.W. LOBBY101 SL O P E U P SLOPE UPRAMP UP RAMP UP RAMP DN. RAMPDN.<PmADrNo><PmAShNo> 1' 7" 2' - 2 " 2'-4" 11" 2' - 4 " 2'-4" 10 " 2'1' - 3 " 8' - 2 " 8' 8'2'1'-3"5" 11 " 6' - 1 0 " 7' - 2 " 8' - 5 " 7' - 9 " 4' - 8 " +8'-8 3/4"+8'-1" +0 ' - 0 " -2 ' - 1 0 1 / 4 " -2 ' - 2 1 / 2 " -1 ' - 6 3 / 4 " -1 1 " +3 1 / 4 " +4 1 / 2 " +1 ' - 0 1 / 4 " +1 ' - 8 " +2 ' - 3 3 / 4 " +2 ' - 1 1 3 / 4 " +3 ' - 7 1 / 4 " +4 ' - 3 " +6 ' - 1 3 / 4 " +6 ' - 9 1 / 2 " +8 ' - 1 " 4' - 7 1 / 2 " 4'-7 1/2" +0 ' - 0 " +0 ' - 0 " -3 ' - 6 " +0 ' - 0 " -6"-1'-0"+0'-0" -1 ' - 2 " -2 ' - 4 " -3 ' - 6 " -3 ' - 6 " -3'-6" +0 ' - 0 " -0'-4 1/2"+0'-0"-1'-1/2"-2'- 1/2"-3'-6"-3'-6"-2'-6"-1'-6"+8'-1" +0 ' - 0 " 9.2 D. 2 E. 5 10.3109.7987 10.8 A.3B.5A.6C C. 9 D. 6 C. 4 C. 5 C. 7 1.711.3 1.5 2 3 3.3 4 5 6 6.9 10.4 10.9 E. 3 E D. 9 D. 5 D. 3 D C. 8 C. 3 C. 2 B.8B.7B.4B.2BA.211A by D21 3'7' by D11 3'-4"7' b y D2 1 3' - 4 " 7' - 2 " by D21 3'7' b y D1 0 3' 7' by TB64'5'-4" by TB74'-5"7'-6 3/4" b y TB 5 4' 5' - 4 " by TB6 4'2' by TB7 4'2' EXT.INT. KE Y P L A N S CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G RC B S E R V I C E S L L C GA R --- 09 / 1 5 / 1 0 KP 0 2 NO N E AG M AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 1ST APPROVAL SUBMITTAL 2 GAR109/15/10 KE Y P L A N - (N O T T O S C A L E ) AR C H . R E F : ACOUSTICALLEDGE ACOUSTICAL LEDGE ACOUSTICALLEDGE ELEVLOBBY2073'-4"4'-10" 1'-3 5/8"3'-4" by D20 6'6'-8" by D12 4'7' b y 5 2' - 6 " 6' - 8 " OBSERVATION212 BO X S E A T I N G 20 9 CORRIDOR202 211 OF F I C E S P A C E 21 0 208B ME C H . H O I S T ST A G I N G 21 1 OP E N T O BE L O W UP OP P . H A N D SI M . ADJACENT OFFICE BLDG, NI.IC. 201B 201A 209 20 0 A 20 4 20 6 B 20 6 A 20 8 A 20 0 B 201C CONTROL ROOM201MECH.CHASE ME C H . CH A S E UP OPEN T O BELO W UP UP ME C H . R O O M 20 6 CORRID O R 203 CO R R I D O R 20 5 ROOFOPEN T O B E L O W SHIPSLADDER ST A I R - 2 20 4 ST A I R - 1 20 8 OPEN T O BELO W ROOF LO U N G E 20 0 ELEV. UP DN . UP DN 3" 3' - 4 " 9" 6'6' 1' 42'1' 3'-4"11 5/8" 9'-8"3'-1"3'-6"3'-1"9.2 D. 2 E. 5 10.3109.7987 10.8 A.3B.5A.6C C. 9 D. 6 C. 4 C. 5 C. 7 1.711.3 1.5 2 3 3.3 4 5 6 6.9 10.4 10.9 E. 3 E D. 9 D. 5 D. 3 D C. 8 C. 3 C. 2 B.8B.7B.4B.2BA.211A b y D1 2 6' 6' - 8 " b y 5 3' - 6 " 10 ' b y 6 5' - 3 / 4 " 7' - 1 0 3 / 4 " b y 7 5' - 3 / 4 " 7' - 1 0 3 / 4 " b y D1 2 3' 7' by D13 3'7' b y TB 0 1' 2' - 2 " b y TB 0 1' 2' - 2 " by TB01'2'-2" by TB01'2'-2" b y TB 0 8" 1' - 2 " by TB08"1'-2" by TB4 3'-4"1' by TB4 3'-4"1' by TB4 3'-4"1' by TB4 3'-4"1' by TB4 3'-4"1' by TB4 3'-4"1' by TB4 3'-4"1' by TB43'-4"1' by TB43'-4"1' by TB43'-4"1' by TB43'-4"1' by TB43'-4"1' by TB43'-4"1' by TB56'-4 3/8"16'-11 7/8" KE Y P L A N S CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G RC B S E R V I C E S L L C GA R --- 09 / 1 5 / 1 0 KP 0 3 NO N E AG M AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 1ST APPROVAL SUBMITTAL 2 GAR109/15/10 KE Y P L A N - (N O T T O S C A L E ) AR C H . R E F : 302303 305 30 4 A 1' - 8 " 2' - 1 0 " 4' 58'-4 " 4'2'-10" 1' - 6 " 6'4'-9"20'-5"7'-7"6'6'-10"10'-3"4' EX P A N S I O N JO I N T AS S E M B L Y FUTURE OFFICE BLDG, N.I.C. STAIR313 30 6 C ELE V . DN.SUSPENDEDGRID SYSTEM(EQUIPMENT)MECHCHASE ME C H CH A S E 310 30 6 B 306A 30 8 31 2 UP OP E N T O BE L O W OPEN TOBELOW CORRIDOR302 CO R R . 30 7 CO R R . 30 9 CO R R I D O R 30 5 CO R R . 30 1 ME C H . P L A T F O R M 31 1 OPE R A T I N G G A L L E R Y 30 6 AUDIO/AMPROOM303 DI M M E R RO O M 31 0 OP E N T O ME C H . R O O M BE L O W RO O F B E L O W CATWALK/OPERATINGGALLERY304SHIPS LADDER ST A I R - 2 30 8 ST A I R - 1 31 2 OP E N T O BE L O W ROOF ROOF OF F I C E S P A C E 30 0 DN . UP DN . DN . 4' 3' - 4 " 5' - 9 " 3'-4"10 ' - 5 " 3" 7' - 6 " 3'7" 3' 7" 1'-8" 1' - 4 " 5" 3'-4"1'-1" 3'-4"5'-3 5/8"9.2 D. 2 E. 5 10.3109.7987 10.8 A.3B.5A.6C C. 9 D. 6 C. 4 C. 5 C. 7 1.711.3 1.5 2 3 3.3 4 5 6 6.9 10.4 10.9 E. 3 E D. 9 D. 5 D. 3 D C. 8 C. 3 C. 2 B.8B.7B.4B.2BA.2A b y TB 6 10 ' 6' by TB6 12'10' b y TB 7 10 ' - 1 / 2 " 6' - 1 / 4 " b y TB 7 5' - 1 / 2 " 6' - 1 / 4 " b y TB 6 5' 6' by TB9 12'-1/2"8'-6 1/2" 11 b y D1 2 3' 7' AB O V E AB O V E AB O V E AB O V E AB O V E AB O V E ABOVE AB O V E AB O V E ABOVE ABOVEABOVEABOVE 11711 N PENNSYLVANIA ST, STE 200 CARMEL, INDIANA 46032 RCB SERVICES LLC GAR KEY ELEVATIONS 09/15/10 - KP04 NONE VILLAGE ON THE GREEN PARCEL 7C-1 THEATER BUILDING PEDCOR DESIGN GROUP, LLC 355 CITY CENTER DRIVE CARMEL, INDIANA 46032 CARMEL, INDIANA 46032 CARMEL THEATER DEVELOPMENT CORPORATION, LLC - - 1S T A P P R O V A L S U B M I T T A L 09 / 1 5 / 1 0 1 GA R 2 ARCHITECTURAL GLASS & METAL CO., INC. 6334 E. 32nd COURT P.O. BOX 19843 INDIANAPOLIS, IN 46226 TEL 317.545.2401 FAX 317.545.2131 AGM ARCH.REF.: PRODUCT: REQ'D THUS = ELEVATION 1/A201 NORTH BRICK LEDGE BRICK LEDGE BRICK LEDGE -1'-0"-1'-0"-16" E.3 D.9 D.6F.4 D.2 C.9 B.2E.5 AB.4DC.8 C.2 B.8 C.J.C.J.C.J.C.J. FIRST FLOOR @ ENTRY C.J.C.J. C.J. C.J.C.J. C.J.C.J. C.J.C.J.C.J. CONTROL ROOM SECOND FLOOR FIRST FLOOR CATWALK/ OBSERVATION GALLERY THIRD FLOOR 1'-4"20'-0"20'-0" +-20'-0"20'-0"1'-4" +30'-2" +16'-8" “ -1'-0" 11711 N PENNSYLVANIA ST, STE 200 CARMEL, INDIANA 46032 RCB SERVICES LLC GAR KEY ELEVATIONS 09/15/10 - KP05 NONE VILLAGE ON THE GREEN PARCEL 7C-1 THEATER BUILDING PEDCOR DESIGN GROUP, LLC 355 CITY CENTER DRIVE CARMEL, INDIANA 46032 CARMEL, INDIANA 46032 CARMEL THEATER DEVELOPMENT CORPORATION, LLC - - 1S T A P P R O V A L S U B M I T T A L 09 / 1 5 / 1 0 1 GA R 2 ARCHITECTURAL GLASS & METAL CO., INC. 6334 E. 32nd COURT P.O. BOX 19843 INDIANAPOLIS, IN 46226 TEL 317.545.2401 FAX 317.545.2131 AGM ARCH.REF.: PRODUCT: REQ'D THUS = ELEVATION 2/A201 WEST BRICK LEDGE BRICK LEDGE BRICK LEDGE -24"-16"-24" 10.411 10 9 8 7 6 5 4 3 C.J. FIRST FLOOR @ ENTRY FIRST FLOOR C.J.C.J.C.J.C.J.C.J.C.J.C.J. C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J. CONTROL ROOM SECOND FLOOR CATWALK/ OBSERVATION GALLERY THIRD FLOOR V.I.F.20'-0"20'-0" +30'-2" +19'-1" “ -1'-0" 1ST APPROVAL SUBMITTAL RC B S E R V I C E S L L C GA R HW 0 1 LI L L Y C O R P O R A T E C E N T E R IN D I A N A P O L I S , I N D I A N A HA R D W A R E SC H E D U L E S - 08 / 2 0 / 1 0 NO N E BR O W N I N G D A Y M U L L I N S D I E R D O R F IN C . 62 6 N O R T H I L L I N O I S S T R E E T IN D I A N A P O L I S , I N D I A N A 4 6 2 0 4 -LT G R O U P , L L C -CI T Y V I E W O N M E R I D I A N AP A R T M E N T B U I L D I N G IN D I A N A P O L I S , I N D I A N A 1 2 GAR08/20/10 AG M AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 REVISED PER REVIEW AND RFI01/26/11 GAR AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L EL E V A T I O N S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- E1 0 1 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 3 @ 1 S T F L O O R / N O R T H AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 1 / 2 " X 7 1 / 2 " 5a / A 6 0 3 , 2 / A 2 0 3 3 CW 5 a AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 1 / 2 " X 7 1 / 2 " 5b / A 6 0 3 , 2 / A 2 0 3 4 CW 5 b 4 @ 1 S T F L O O R / W E S T 4 @ 1ST FLOOR / NORTH ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2 1/2" X 7 1 / 2 " 4/A603, 1/A203 4 CW4 ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2 1/2" X 7 1/2"3/A603, 1/A203 4 CW34 @ 2ND FLOOR / NORTH 1D1012D1011D1012D101 G2 GL2 G2 GL2 1 D1 0 2 2 D1 0 2 2 D1 0 2 1 D1 0 3 G1G1G1 1 D1 0 4 2 D1 0 4 2 D1 0 4 1 D1 0 5 G6 G6 G6 1D1082D1082D1081D108 1 D1 0 9 1 D1 0 9 1 D1 0 9 2 D1 0 9 2 D1 0 9 2 D1 0 9 ARCHITECT/CONTRACTOR NOTE:MUNTIN GRID ASSEMBLY WILL BEFORTHCOMING UNDER SEPARATECOVER. REVISED PER PARTIAL REVIEW AND RFIGAR01/26/11 1 D1 0 7 1 D1 0 7 E1 0 2 CU R T A I N W A L L EL E V A T I O N S -RC B S E R V I C E S L L C GA R NO N E AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 PE D C O R D E S I G N G R O U P , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G AG M 09 / 1 5 / 1 0 2 --35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 09/15/10 GAR 1ST APPROVAL SUBMITTAL1 1 @ 1ST FLOOR / NORTH ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2 1/2" X 7 1/2"7/A603, 1/A204, 2/A313 1 CW7 AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 1 / 2 " X 7 1 / 2 " 6/ A 6 0 3 , 3 / A 3 1 1 , 2 / A 3 1 3 1 CW 6 1 @ 1 S T F L O O R / V E S T I B U L E 1 0 0 N O R T H AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 1 / 2 " X 7 1 / 2 " 8/ A 6 0 3 , 2 / A 2 0 4 , 3 / A 3 1 1 1 CW 8 a 1 @ 1 S T F L O O R / W E S T AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 1 / 2 " X 7 1 / 2 " 8/ A 6 0 3 , 3 / A 3 1 1 , 2 / 3 1 3 1 CW 8 b 1 @ 1 S T F L O O R / V E S T I B U L E 1 0 0 W E S T 1D1112D1113D111 1 D1 1 1 2 D1 1 1 1 D1 1 2 1 D1 1 4 1 D1 1 3 1 D1 0 8 1 D1 0 8 1D115 1 D1 1 6 3 D1 1 7 5 D1 1 7 1 D1 1 7 2 D1 1 7 1 D1 1 7 5 D1 1 7 2 D1 1 7 4 D1 1 7 G1G1 G1G3 G1G3 G1G1 G3 G3 G3 G3 A.3 10.8 10 . 8 A. 3 10 . 4 3 D1 1 8 3 D1 1 8 5 D1 1 8 5 D1 1 8 2 D1 1 8 1 D1 1 8 2 D1 1 8 1 D1 1 8 REVISED PER PARTIAL REVIEW AND RFI01/26/11 GAR 1D116 2 D1 1 5 33 REVISED PER PARTIAL REVIEW AND RFIGAR03/02/113 3 3 3 @ 1ST FLOOR / WEST ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2 1/2" X 7 1/2"9/A603, 2/A205 3 CW9 E1 0 3 CU R T A I N W A L L EL E V A T I O N S -RC B S E R V I C E S L L C GA R NO N E AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 PE D C O R D E S I G N G R O U P , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G AG M 09 / 1 5 / 1 0 2 --35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 09/15/10 GAR 1ST APPROVAL SUBMITTAL1 AG62D1061D106 1 D1 0 7 1D108 ARCHITECT/CONTRACTOR NOTE:MUNTIN GRID ASSEMBLY WILL BEFORTHCOMING UNDER SEPARATECOVER. REVISED PER PARTIAL REVIEW AND RFI01/26/11 GAR AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 " X 4 1 / 2 " 2/ A 6 0 3 , 1 / A 2 0 3 4 SF 2 4 @ R O O F / N O R T H 4 @ R O O F / N O R T H AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 " X 4 1 / 2 " 2a / A 6 0 3 , 1 / A 2 0 3 4 SF 2 a ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2" X 4 1/2"1/A603, 1/A203 4 SF14 @ 3RD FLOOR / NORTH RC B S E R V I C E S L L C GA R ST O R E F R O N T EL E V A T I O N S - E2 0 1 CA R M E L , I N D I A N A 4 6 0 3 2 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 AG M VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 -- 1 1ST APPROVAL SUBMITTALGAR09/15/10 2NO N E G1 TY P G2 TY P G6 TY P G6 1D2012D201 1 D2 0 2 3 D2 0 2 3 D2 0 2 2 D2 0 2 3D2011D2042D204 2 D2 0 6 1 D2 0 6 1 D2 0 6 ARCHITECT/CONTRACTOR NOTE:MUNTIN GRID ASSEMBLY WILL BEFORTHCOMING UNDER SEPARATECOVER.@ CENTER ARCH@ LONG SIDE MULLION@ SHORT SIDE MULLION@ JAMB REVISED PER ARCHITECT'S REVIEW01/26/11 GAR ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 5600 2" X 4 1/2"10a/A603, 2/A203 3 SF10a3 @ 3RD FLOOR / NORTH AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 " X 4 1 / 2 " 10 b / A 6 0 3 , 2 / A 2 0 3 4 SF 1 0 b 4 @ 3 R D F L O O R / W E S T AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 5 6 0 0 2 " X 4 1 / 2 " 11 / A 6 0 3 , 2 / A 2 0 3 7 SF 1 1 3 @ R O O F / N O R T H 4 @ R O O F / W E S T E2 0 2 ST O R E F R O N T EL E V A T I O N S -RC B S E R V I C E S L L C GA R 2NO N E AG M VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --CA R M E L , I N D I A N A 4 6 0 3 2 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 1 GAR09/15/10 1ST APPROVAL SUBMITTAL G1 G6 G6 1D2032D203 3 D2 0 3 4 D2 0 3 1D204 1 D2 0 5 ARCHITECT/CONTRACTOR NOTE:MUNTIN GRID ASSEMBLY WILL BEFORTHCOMING UNDER SEPARATECOVER. REVISED PER ARCHITECT'S REVIEW01/26/11 GAR 1 D2 0 3 1 D2 0 4 2 D2 0 3 3 3 3 REVISED PER ARCHITECT'S REVIEWGAR03/02/113 1D2084D207 3D207G7 RC B S E R V I C E S L L C GA R ST O R E F R O N T EL E V A T I O N S - E2 0 3 09 / 1 5 / 1 0 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G -- 1ST APPROVAL SUBMITTAL09/15/10 GAR1 NO N E 2 AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 AG M 1 D2 0 8 3 D2 0 8 G7 G7 3 D2 0 7 4 D2 0 7 XO X O 2 D2 0 8 ARCH.REF.:PRODUCT:REQ'D THUS =ELEVATIONEFCO 401 1 3/4" X 4 1/2"12/A603 1 SF121 @ 1ST FLOOR / OFFICE FORPRODUCTION 119 1 D2 0 7 2 D2 0 7 AR C H . R E F . : PR O D U C T : RE Q ' D T H U S = EL E V A T I O N EF C O 4 0 1 1 3 / 4 " X 4 1 / 2 " 13 / A 6 0 3 1 SF 1 3 1 @ 2 N D F L O O R / B E T W E E N C O N T R O L 20 1 & A C O U S T I C A L L E D G E REVISED PER ARCHITECT'S REVIEW01/26/11 GAR AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 1 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1 / 2 " 3" 7 1 / 2 " ST O N E , T H R U - W A L L F L A S H I N G , WO O D B L O C K I N G & C A U L K , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , 8" M E T A L S T U D S , B A T T I N S U L . , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 10 . 9 7 1 5 / 1 6 " 4" T O B . O . S T U D 4" T O B . O . S T U D JOINT SEALANTAT SILL & JAMBS(NOT BY AGM)JOINT SEALANTAT HEAD(NOT BY AGM) ST O N E , T H R U - W A L L F L A S H I N G , WO O D B L O C K I N G & C A U L K , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , 8" M E T A L S T U D S , B A T T I N S U L . , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 4 ) @ V E R T I C A L (2 ) I N E A C H L E G O F A N C H O R C L I P 1/ 2 " 1" VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) 1/ 2 " 1" #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 4 ) @ V E R T I C A L (2 ) I N E A C H L E G O F A N C H O R C L I P VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 2 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8 1 / 4 " 3" TO BRICK 10 . 9 7 1 / 2 " 3/4" BR I C K , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , 8" M E T A L S T U D S , HS S T U B E & S T E E L P L A T E , BA T T I N S U L . , V A P O R B A R R I E R , 5/ 8 " G W B , (N O T B Y A G M ) 7 1 / 1 6 " 3 1 / 4 " T O B . O . S T U D #1 2 - 2 4 T E K # 5 S C R E W S (2 ) P E R J A M B F - C L I P AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 3 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8" C M U B L O C K I N G , 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 10 . 9 8 1 / 4 " 7 1 / 1 6 " ALUM FLASHING(BY AGM) 1/ 4 " D P O W E R S W E D G E - B O L T (2 ) P E R J A M B F - C L I P 2 1 / 2 " M I N . S P A C I N G 2 1 / 2 " E M B E D M E N T 2 1 / 2 " M I N . E D G E D I S T A N C E 2 1 / 2 " M I N . ED G E D I S T A N C E 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 4 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8 1 / 4 " 3" 7 1 / 2 " 3/4" SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 3 1 / 4 " BR I C K , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , BA T T I N S U L . , V A P O R B A R R I E R , 5/ 8 " G W B , (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R J A M B F - C L I P 1" 1" VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 5 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 10 . 9 7 1 / 1 6 " ALUM FLASHING(BY AGM) 8" C M U B L O C K I N G , 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 2 1 / 2 " M I N . ED G E D I S T A N C E 1/ 4 " D P O W E R S W E D G E - B O L T (2 ) P E R J A M B F - C L I P 2 1 / 2 " M I N . S P A C I N G 2 1 / 2 " E M B E D M E N T 2 1 / 2 " M I N . E D G E D I S T A N C E 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 6 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 3 03/02/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1 / 2 " 3" TO BRICK 7 1 / 2 " 3" TO BRICK 3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) SP A N D R E L C U R T A I N W A L L IN S U L A T I O N D O W N T O SL A B (B Y A G M ) A 1/ 2 " BR I C K , S T O N E , T H R U - W A L L F L A S H I N G , WO O D B L O C K I N G & C A U L K , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , 8" M E T A L S T U D S , B A T T I N S U L . , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) JOINT SEALANTAT SILL & JAMBS(NOT BY AGM)JOINT SEALANTAT HEAD(NOT BY AGM) BR I C K , S T O N E , T H R U - W A L L F L A S H I N G , WO O D B L O C K I N G & C A U L K , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , 8" M E T A L S T U D S , B A T T I N S U L . , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R J A M B F - C L I P 1/ 2 " 1" VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) 1/ 2 " 1" #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 4 ) @ V E R T I C A L (2 ) I N E A C H L E G O F A N C H O R C L I P VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) EX T E N D S D O W N T O FL O O R S L A B + 1 6 ' - 8 " (N O T B Y A G M ) 3 3 3 NO S P A N D R E L I N S U L A T I O N NO S T U D W A L L A N D G Y P AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 7 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR A 4" 1 1 / 2 " 8" BEN T S T L P L T 1 / 4 " x 8 " + 3 " x 4 " W/ 2 1 / 2 " x 9 / 1 6 " S L O T T E D H O L E ; (1) @ J A M B S 1/2" D G R A D E 5 B O L T ; 027 - 4 7 7 S E P A R A T O R ( 0 . 3 1 " ) BET W E E N S T E E L A N C H O R & A L U M I N U M M U L L I O N 3" 3/ 1 6 " 3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 8 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1/2"4" STONE, WEATHER BARRIER,5/8" SHEATH,8" METAL STUDS, BATT INSUL.,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)JOINT SEALANTAT SILL & JAMBS(NOT BY AGM) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 0 9 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8 1/4"3 1/4" STONE, WEATHER BARRIER,5/8" SHEATH,8" METAL STUDS, BATT INSUL.,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)JOINT SEALANTAT SILL & JAMBS(NOT BY AGM) 8 1/4" SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 3 1/4" STONE, WEATHER BARRIER, 5/8" SHEATH, 8" METAL STUDS, BATT INSUL., VAPOR BARRIER, 5/8" GWB, (NOT BY AGM) JO I N T S E A L A N T AT S I L L & J A M B S (N O T B Y A G M ) 2 1 / 2 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 0 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8 1/4" SPANDREL CUR T A I N W A L L INSULATION(BY AGM) 3 1/4" STONE, WEATHER BARRIER,5/8" SHEATH,8" METAL STUDS, BATT INSUL.,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)JOINT SEALANTAT SILL & JAMBS(NOT BY AGM)2 1/2" STUDS,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM) DE T A I L N O L O N G E R U S E D AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 1 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 8 13/16" MULLION EXTENSION 1/ 8 " F O R M E D AL U M I N U M C L O S U R E #1 0 H W H T E K S C R E W (B Y A G M ) 1/8" FORMEDALUMINUM CLOSURE(BY AGM)EXTENDED JAMB MULLIO N (BY AGM)COORDINATE W/ OTHERTRADES CONTRACTORS (2) #12-24 TEK #5 S C R E W S ONE IN EACH LEG CO O R D I N A T E W / O T H E R TR A D E S C O N T R A C T O R S 7 1 / 2 " 5 3/8" 1/ 2 " (2 ) 1 / 4 " D P O W E R S W E D G E - B O L T ON E I N E A C H L E G 2 1 / 2 " E M B E D M E N T 2 1 / 2 " M I N . E D G E D I S T A N C E AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 2 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR (2 ) 1 / 4 " D P O W E R S W E D G E - B O L T ON E I N E A C H L E G 2 1 / 2 " E M B E D M E N T 2 1 / 2 " M I N . E D G E D I S T A N C E CO N C R E T E F L O O R D E C K (N O T B Y A G M ) 21" MULLION EXTENSION EX T E N D E D J A M B M U L L I O N (B Y A G M ) CO O R D I N A T E W / O T H E R TR A D E S C O N T R A C T O R S 1/8" FORMEDALUMINUM CLOSURE(BY AGM) EX T E N D E D J A M B M U L L I O N (B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 3 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1/2" BR I C K , S T O N E , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , B A T T IN S U L . , V A P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) JOINT SEALANTAT SILL & JAMBS(NOT BY AGM) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R J A M B F - C L I P VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 4 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR EX T E N D E D J A M B M U L L I O N (B Y A G M ) (2 ) 1 / 4 " D P O W E R S W E D G E - B O L T ON E I N E A C H L E G 2 1 / 2 " E M B E D M E N T 2 1 / 2 " M I N . E D G E D I S T A N C E CO N C R E T E F L O O R D E C K (N O T B Y A G M ) 7 1 / 2 " 1/8" FORMEDALUMINUM CLOSURE(BY AGM)28 1/4" MULLION EXTENSION (VIF) EX T E N D E D J A M B M U L L I O N (B Y A G M ) LOUVER GRILLE(NOT BY AGM) CO O R D I N A T E W / O T H E R TR A D E S C O N T R A C T O R S 4 AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 5 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1/2" 12 " 1/ 8 " F O R M E D AL U M I N U M C L O S U R E #1 0 H W H T E K S C R E W (B Y A G M ) 162-300 STEEL REINFORCING 1/2"1/ 2 " 11 3 / 1 6 " 1/ 8 " F O R M E D AL U M I N U M C L O S U R E #1 0 H W H T E K S C R E W (B Y A G M ) 162-300 STEEL REINFORCING 1/ 2 " AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 6 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 7 1/2" 12 " 11 3/16" 1/ 8 " F O R M E D AL U M I N U M C L O S U R E #1 0 H W H T E K S C R E W (B Y A G M ) 1/8" FOR M E D ALUMINUM CLOS U R E (BY A G M ) HS S 5 x 5 x 3 / 8 (N O T B Y A G M ) A. 3 10 . 8 2 3 / 4 " 2 3/4" 162-300 STEEL REINFORCING 16 2 - 3 0 0 S T E E L R E I N F O R C I N G 1/2" 1/ 2 " AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 7 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR 01/26/11 REVISED PER ARCHITECT'S REVIEWGAR 1/4"FLOOR CLOSER& COVER PLATE(BY AGM)1 3/16"TYPE 'B' CONTINUOUSBOTTOM RAIL TRANSOM PIVOT PATCH VIR 92 - 0 5 W/ WALL MTG. PLATE BEYOND 2 1/16"DLO1/8"2 1/16"DO 1/2" TRANSOM GLASS2 1/16"DO 1/ 8 " DO 2 5 / 8 " 'B ' D O O R R A I L 1/ 8 " F O R M E D AL U M I N U M C L O S U R E #1 0 H W H T E K S C R E W (B Y A G M ) 3 3/4" C.L. 162-300 STEEL REINFORCING 1/ 8 " GL A S S S I Z E DO 'B ' D O O R R A I L GL A S S S I Z E JO I N T S E A L A N T AT S I L L & J A M B S (N O T B Y A G M ) 1/ 8 " DO 2 5 / 8 " 3 3/4" C.L. 'B ' D O O R R A I L AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R CU R T A I N W A L L DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D1 1 8 NO N E 01/26/112 1 ADDED SHEET PER PARTIAL REVIEW AND RFIGAR 3" 1/2" 1 3/4"1-1/4" FROM EDGE OF GLASS TO C.L. OF 5/8"D HOLE DLO 1 1 / 8 " 3 3 / 4 " C . L . VI R G I N I A G L A S S H E A V Y D U T Y 1/ 4 " A L U M I N U M F I N B R A C K E T 1/ 4 " F H S C R E W , @ 1 2 " C T C 1/ 4 " - 2 0 F S H M S S / S @ 1 2 " C T C TRANSOM PIVOT PATCH VIR 92-05W/ WALL MTG. PLATE BEYOND TRANSOMDOOR2 1/16"DLO1/8"2 1/16"DO1/8"DO2 1/2"CURTAIN WALLMULLION SEE DETAIL 4 BELOW SEE DETAIL 5 BELOW TR A N S O M S T O P P A T C H V I R 9 2 - 0 7 TR A N S O M DO O R DO O R 1/8"DO 2 5/8"3 3/4" C.L.TRANSOM PIVOT PATCH VIR 92-05W/ WALL MTG. PLATE BEYOND 1/ 8 " GL A S S S I Z E 3 3/4" C.L. 1/ 2 " T R A N S O M G L A S S SI L I C O N E S E A L A N T AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D2 0 1 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR REVISED PER ARCHITECT'S REVIEWGAR01/26/11 ST O N E , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , BA T T I N S U L . , V A P O R B A R R I E R , 5/ 8 " G W B , (N O T B Y A G M ) 3" 7" T O B . O . S T U D 4 1/2" BR I C K , S T O N E , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , B A T T IN S U L . , V A P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) JOINT SEALANTAT SILL & JAMBS(NOT BY AGM)JOINT SEALANTAT HEAD(NOT BY AGM) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R F & T - C L I P 1/ 8 " A L U M S T R A P P L T . VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R F & T - C L I P 1/ 8 " A L U M S T R A P P L T . AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D2 0 2 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR REVISED PER ARCHITECT'S REVIEW01/26/11 GAR 4 1/2"SPANDREL CURTAINWALLINSULATION(BY AGM)EIFS, WEATHER BARRIER,5/8" SHEATH,8" METAL STUDS, BATT INSUL.,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (NO T B Y A G M ) #12-14 TEK #3 SCR E W S (2) @ JAMBS, (2) @ V E R T I C A L ONE IN EACH LEG O F T - C L I P VERIFY TRACK IS18 GA. MINIMUM(NOT BY AGM)3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (NO T B Y A G M ) EIFS, WEATHER BARRIER,5/8" SHEATH,8" METAL STUDS, BATT INSUL.,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)VERIFY TRACK IS18 GA. MINIMUM(NOT BY AGM)#12-14 TEK #3 SCR E W S (2) @ JAMBS, (2) @ V E R T I C A L ONE IN EACH LEG O F T - C L I P 4 1 / 2 " SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 7 1/4" 3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) EI F S , W E A T H E R B A R R I E R , 5/ 8 " S H E A T H , 8" M E T A L S T U D S , B A T T I N S U L . , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 2 ) @ V E R T I C A L ON E I N E A C H L E G O F T - C L I P VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 2 ) @ V E R T I C A L ON E I N E A C H L E G O F T - C L I P AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D2 0 3 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR REVISED PER ARCHITECT'S REVIEW01/26/11 GAR BR I C K , S T O N E , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , B A T T IN S U L . , V A P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) 6" S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 4 1 / 2 " 6" S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) ST O N E , T H R U - W A L L F L A S H I N G , WE A T H E R B A R R I E R , 5 / 8 " S H E A T H , LI N T E L A N G L E , 8 " M E T A L S T U D S , BA T T I N S U L . , V A P O R B A R R I E R , 5/ 8 " G W B , (N O T B Y A G M ) JO I N T S E A L A N T AT S I L L & J A M B S (N O T B Y A G M ) JO I N T S E A L A N T AT H E A D (N O T B Y A G M ) VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R J A M B F - C L I P 1/ 8 " A L U M S T R A P P L T . VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) #1 2 - 1 4 T E K # 3 S C R E W S (2 ) P E R J A M B F - C L I P 1/ 8 " A L U M S T R A P P L T . 4 1/2"SPANDREL CURTAINWALLINSULATION(BY AGM)STONE, THRU-WALL F L A S H I N G , WEATHER BARRIER, 5 / 8 " S H E A T H , LINTEL ANGLE, 8" ME T A L S T U D S , BATT INSUL., VAPOR B A R R I E R , 5/8" GWB,(NOT BY AGM)BRICK, STONE, THRU - W A L L F L A S H I N G , WEATHER BARRIER, 5 / 8 " S H E A T H , LINTEL ANGLE, 8" ME T A L S T U D S , B A T T INSUL., VAPOR BARR I E R , 5 / 8 " G W B , (NOT BY AGM)JOINT SEALANTAT SILL & JAMBS(NOT BY AGM)JOINT SEALANTAT HEAD(NOT BY AGM)#12-14 T E K # 3 S C R E W S (2) PER J A M B F - C L I P 1/8" ALU M S T R A P P L T . VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) VE R I F Y T R A C K I S 18 G A . M I N I M U M (N O T B Y A G M ) #12-14 T E K # 3 S C R E W S (2) PER J A M B F - C L I P 1/8" ALU M S T R A P P L T . AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D2 0 4 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR REVISED PER ARCHITECT'S REVIEW01/26/11 GAR 4 1/2"7" BRICK/STONE, WEATHER BARRIER,5/8" SHEATH, 8" METAL STUDS,BATT INSUL., VAPOR BARRIER, 5/8"GWB,(NOT BY AGM)JO I N T S E A L A N T AT S I L L & J A M B S (NO T B Y A G M ) AG M CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 09 / 1 5 / 1 0 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S PE D C O R D E S I G N G R O U P , L L C AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 --- D2 0 5 NO N E 09/15/10 2 1 1ST APPROVAL SUBMITTALGAR REVISED PER ARCHITECT'S REVIEW01/26/11 GAR 4 1/2"7" BRICK/STONE, WEATHER BARRIER,5/8" SHEATH, 8" METAL STUDS,BATT INSUL., VAPOR BARRIER, 5/8"GWB,(NOT BY AGM)3 5/8" STUDS,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM)SPANDREL CURTAINWALLINSULATION(BY AGM)JOINT SEALANTAT SILL & JAMBS(NOT BY AGM) ST O R E F R O N T DE T A I L S RC B S E R V I C E S L L C GA R - D2 0 6 PE D C O R D E S I G N G R O U P , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C -- NO N E 09 / 1 5 / 1 0 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L , I N D I A N A 4 6 0 3 2 1 2 AG M GAR 1ST APPROVAL SUBMITTAL09/15/10 AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 REVISED PER ARCHITECT'S REVIEW01/26/11 GAR SP A N D R E L C U R T A I N W A L L IN S U L A T I O N (B Y A G M ) 4 1/2" SPANDREL CURTA I N W A L L INSULATION(BY AGM) 4 7/8" 3 5/8" STUDS,VAPOR BARRIER, 5/8" GWB,(NOT BY AGM) 3 5 / 8 " S T U D S , VA P O R B A R R I E R , 5 / 8 " G W B , (N O T B Y A G M ) EIFS, WEATHER BARRIER,5/8" SHEATH, 8" METAL STUDS,BATT INSUL., VAPOR BARRIER, 5/8"GWB,(NOT BY AGM) RC B S E R V I C E S L L C GA R ST O R E F R O N T DE T A I L S D2 0 7 AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 --- 09 / 1 5 / 1 0 NO N E CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 PE D C O R D E S I G N G R O U P , L L C 09/15/10 1ST APPROVAL SUBMITTALGAR 2 1 AG M REVISED PER ARCHITECT'S REVIEW01/26/11 GAR SL I D I N G W I N D O W S Y S T E M (B Y A G M ) SL I D I N G W I N D O W S Y S T E M (B Y A G M ) 450-CG-0 0 3 S I L L 450-CG-0 0 4 G L A S S S T O P 027-074 S T D G A S K E T 450-126 S H I M S U P P O R T 450-CG-00 1 H E A D 450-126 S H I M S U P P O R T 027-074 S T D G A S K E T 45 0 - C G - 0 0 1 H E A D 45 0 - 1 2 6 S H I M S U P P O R T 45 0 - 0 8 7 P O C K E T F I L L E R 45 0 - C G - 0 0 1 H E A D 45 0 - 1 2 6 S H I M S U P P O R T 45 0 - 0 8 7 P O C K E T F I L L E R #12-14 TE K # 3 S C R E W S (2) @ JAM B S , ( 2 ) @ V E R T I C A L #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 2 ) @ V E R T I C A L #12-14 TE K # 3 S C R E W S (2) @ JAM B S , ( 2 ) @ V E R T I C A L #1 2 - 1 4 T E K # 3 S C R E W S (2 ) @ J A M B S , ( 2 ) @ V E R T I C A L VE R I F Y 1 8 G A . MI N I M U M S T U D S OR S I M I L A R ( T Y P . ) (N O T B Y A G M ) 11 7 1 1 N P E N N S Y L V A N I A S T , S T E 2 0 0 CA R M E L , I N D I A N A 4 6 0 3 2 CA R M E L T H E A T E R D E V E L O P M E N T CO R P O R A T I O N , L L C ST O R E F R O N T DE T A I L S RC B S E R V I C E S L L C GA R 09 / 1 5 / 1 0 -- D2 0 8 NO N E 1ST APPROVAL SUBMITTAL PE D C O R D E S I G N G R O U P , L L C 35 5 C I T Y C E N T E R D R I V E CA R M E L , I N D I A N A 4 6 0 3 2 VI L L A G E O N T H E G R E E N PA R C E L 7 C - 1 T H E A T E R B U I L D I N G CA R M E L , I N D I A N A 4 6 0 3 2 - 1 2 GAR09/15/10 AG M AR C H I T E C T U R A L G L A S S & M E T A L C O . , I N C . 63 3 4 E . 3 2 n d C O U R T P. O . B O X 1 9 8 4 3 IN D I A N A P O L I S , I N 4 6 2 2 6 TE L 3 1 7 . 5 4 5 . 2 4 0 1 FA X 3 1 7 . 5 4 5 . 2 1 3 1 REVISED PER ARCHITECT'S REVIEW01/26/11 GAR SLIDING WINDOW SYSTEM(BY AGM) SL I D I N G W I N D O W S Y S T E M (B Y A G M ) 45 0 - C G - 0 0 1 M U L L I O N 45 0 - 1 2 6 S H I M S U P P O R T 02 7 - 0 7 4 S T D G A S K E T 45 0 - C G - 0 0 1 M U L L I O N 45 0 - C G - 0 0 2 F I L L E R 02 7 - 0 7 4 S T D G A S K E T 450-CG-001 MULLION450-126 SHIM SUPPORT450-087 POCKET FILLER 45 0 - 0 8 7 P O C K E T F I L L E R