HomeMy WebLinkAbout05100025-Sq. Ft. k. All sidewalks and driveways
seWer and water lines, sept c system, r well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pu,rnp -- Show sump pump pt(s) and discharge line Iocat OhS
p GeOthermal heat pum.p discharge locations
*NOTE: If land is not Within a platted subdivision, a legal description is required,
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The D rector sha I approve or deny the Improvement
Locat on Perm t with n five (5) working days of the rece pt of the wdtten app cation form and accompanying
materials. The Improvement Location Permit shall b.,e issued when the proposed structure, improvement, or use and
its location confon~n in all res~ to this ordinance.'
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL~ WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
THE OFFICE OF BUILDING & ,C, ODE ENFORc,E,?.ENT RECOGNIZES ANy ROOM/AREA DESIGNATED ON
CONSTRuCTIoN PLANS AS A BONUS ROOM TO BE SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
" " AFTER
DETERMINED THAT AN UNFINISHED, BONUS ROOM AREA IS TO BECOME A FINISHED AREA AFTER THE
THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CON~I'RUCTION I$ SUB;1ECT TO FIELD I'NSPECTZON~ AND SflOULD NOT BEGIN PRIOR TO THE
Z$~tlANCE OF THE BUILDING PERI4]T, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginn ng prior to obtaining
a building permit and/or pr~x~eding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06,07, and 29.06.08.
~RCEMENT~ CITY OF CARMEL One Civic Sq.: carmel, IN 46032. P[~. (517) 571-2444,