HomeMy WebLinkAboutcompliance-report-20130628.pdfProject Title: CARMEL PROJECT Report date: 06/28/13
Data filename: C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck Page 1 of 4
COMcheck Software Version 3.9.2
Envelope Compliance Certificate
90.1 (2007) Standard
Section 1: Project Information
Project Type: New Construction
Project Title : CARMEL PROJECT
Construction Site:Owner/Agent:Designer/Contractor:
89 First Ave SW
Carmel, IN 46032
Basil Pappas
Basil Pappas Building & Design
11897 E 300N
Sheridan, IN 46069
317-372-3496
bgpappas@tds.net
Stephen Hoffman
Hoffman Engineers P.C.
8261 Baseline Road
Paragon, IN 46166
765-537-2991
steve@hoffmanengineers.com
Section 2: General Information
Building Location (for weather data):Carmel, Indiana
Climate Zone:5a
Building Space Conditioning Type(s):Nonresidential
Vertical Glazing / Wall Area Pct.:13%
Building Type Floor Area
Retail4199
Section 3: Envelope Assemblies
Envelope PASSES: Design 8% better than code.
Climate-Specific Requirements:
Component Name/Description Gross
Area or
Perimeter
Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget
U-Factor(a)
Roof 1: Insulation Entirely Above Deck4199---36.00.0270.048
Exterior Wall 1: Concrete Block:8", Partially Grouted, Cells
Empty,Normal Density , Furring: Metal
36940.020.10.0430.090
Window 1: Metal Frame with Thermal Break:Double Pane with
Low-E, Clear, SHGC 0.69
267------0.6100.550
Door 1: Insulated Metal, Swinging42------0.6700.700
Door 2: Glass (> 50% glazing):Metal Frame, Clear, Entrance Door,
SHGC 0.80
211------0.6300.800
Floor 1: Slab-On-Grade:Heated, Vertical 2 ft.259---10.0------
(a) Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 90.1 (2007) Standard
requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - TitleSignatureDate
STEPHEN C. HOFFMAN P.E. 06/28/13
Project Title: CARMEL PROJECT Report date: 06/28/13
Data filename: C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck Page 2 of 4
Project Notes:
Shell building for Tenant Finish
Project Title: CARMEL PROJECT Report date: 06/28/13
Data filename: C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck Page 3 of 4
COMcheck Software Version 3.9.2
Exterior Lighting Compliance
Certificate
90.1 (2007) Standard
Section 1: Project Information
Project Type: New Construction
Project Title : CARMEL PROJECT
Construction Site:Owner/Agent:Designer/Contractor:
89 First Ave SW
Carmel, IN 46032
Basil Pappas
Basil Pappas Building & Design
11897 E 300N
Sheridan, IN 46069
317-372-3496
bgpappas@tds.net
Stephen Hoffman
Hoffman Engineers P.C.
8261 Baseline Road
Paragon, IN 46166
765-537-2991
steve@hoffmanengineers.com
Section 2: Exterior Lighting Area/Surface Power Calculation
A
Exterior Area/Surface
B
Quantity
C
Allowed
Watts
/ Unit
D
Tradable
Wattage
E
Allowed
Watts
(B x C)
F
Proposed
Watts
Main entry/exit23 ft of door width30Yes6901242
Other entry/exit6 ft of door width20Yes1200
Walkway < 10 feet wide259 ft of walkway length1Yes2590
Parking area(s)3792 ft20.15Yes5690
Total Tradable Watts* =16381242
Total Allowed Watts =1638
Total Allowed Supplemental Watts** =82
* Wattage tradeoffs are only allowed between tradable areas/surfaces.
** A supplemental allowance equal to 5% of total allowed wattage may be applied toward compliance of both non-tradable and tradable
areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
D
Fixture
Watt.
E
(C X D)
Main entry/exit (23 ft of door width): Tradable Wattage
Compact Fluorescent 1: BIAX 50W: Electronic:123541242
Other entry/exit (6 ft of door width): Tradable Wattage
Walkway < 10 feet wide (259 ft of walkway length): Tradable Wattage
Parking area(s) (3792 ft2): Tradable Wattage
Total Tradable Proposed Watts =1242
Section 4: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 90.1 (2007)
Standard requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - TitleSignatureDate
STEPHEN C. HOFFMAN P.E. 06/28/13
Project Title: CARMEL PROJECT Report date: 06/28/13
Data filename: C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL, IN\COMcheck.cckPage 4 of 4
COMcheck Software Version 3.9.2
Mechanical Compliance Certificate
90.1 (2007) Standard
Section 1: Project Information
Project Type: New Construction
Project Title : CARMEL PROJECT
Construction Site:Owner/Agent:Designer/Contractor:
89 First Ave SW
Carmel, IN 46032
Basil Pappas
Basil Pappas Building & Design
11897 E 300N
Sheridan, IN 46069
317-372-3496
bgpappas@tds.net
Stephen Hoffman
Hoffman Engineers P.C.
8261 Baseline Road
Paragon, IN 46166
765-537-2991
steve@hoffmanengineers.com
Section 2: General Information
Building Location (for weather data):Carmel, Indiana
Climate Zone:5a
Section 3: Mechanical Systems List
Quantity System Type & Description
2HVAC System 1 (Single Zone) :
Heating: 2 each - Duct Furnace, Gas, Capacity = 120 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency = 80.00% Ec
Cooling: 2 each - Rooftop Package Unit, Capacity = 60 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 13.00 SEER, Required Efficiency = 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 2000 CFM, 1 motor nameplate hp
Section 5: Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications
and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007)
Standard requirements in COMcheck Version 3.9.2 and to comply with the mandatory requirements in the Requirements Checklist.
Name - TitleSignatureDate
Section 6: Post Construction Compliance Statement
❑HVAC record drawings of the actual installation and performance data for each equipment provided to the owner within 90 days after
system acceptance.
❑HVAC O&M documents for all mechanical equipment and system provided to the owner within 90 days after system acceptance.
❑Written HVAC balancing report provided to the owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-NameSignatureDate
STEPHEN C. HOFFMAN P.E. 06/28/13
N/A
N/A N/A
N/A
N/A
N/A
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 3.9.2
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,
the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where
compliance is itemized in a separate table, a reference to that table is provided.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 1 of
06/28/13Report date:
11
90.1 (2007)
Standard Plan Review Complies?Comments/Assumptions
4.2.2
[PR1]1
Plans and/or specifications provide all
information with which compliance can be
determined for the building envelope and
document where exceptions to the standard
are claimed.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
4.2.2, 6.4.2
[PR2]1
Plans, specifications, and/or calculations
provide all information with which
compliance can be determined for the
mechanical systems and equipment and
document where exceptions to the standard
are claimed. Load calculations per
acceptable engineering standards and
handbooks.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
4.2.2, 7.4.1
[PR3]1
Plans, specifications, and/or calculations
provide all information with which
compliance can be determined for the
service water heating systems and
equipment and document where exceptions
to the standard are claimed. Hot water
system sized per manufacturer's sizing
guide.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[PR5]1
Detailed instructions for HVAC systems
commissioning included on the plans or
specifications for projects >=50,000 ft2.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 2 of
06/28/13Report date:
11
90.1 (2007)
Standard Footing / Foundation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.5.3.3
[FO1]1
Below-grade wall insulation R-value.R-_____R-_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.5.3.5
[FO3]1
Slab edge insulation R-value.R-_____
Unheated
Heated
R-_____
Unheated
Heated
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.1.2
[FO4]1
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.3.5
[FO5]1
Slab edge insulation depth/length._____ ft _____ ft Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.1.7.3
[FO7]1
Insulation in contact with the ground
has <=0.3% water absorption rate per
ASTM C272.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.3.8
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 3 of
06/28/13Report date:
11
90.1 (2007)
Standard Framing / Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.4.3.2
[FR1]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Fenestration_____
cfm/ft2
Doors_____
cfm/ft2
Fenestration_____
cfm/ft2
Doors_____
cfm/ft2
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.4.3.4
[FR4]3
Vestibules are installed where
building entrances separate
conditioned space from the exterior,
and meet exterior envelope
requirements. Doors have self-closing
devices, and are >=7 ft apart.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.4.3a
[FR8]1
Vertical fenestration U-Factor.U-_____U-_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.5.4.3b
[FR9]1
Skylight fenestration U-Factor.U-_____U-_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.5.4.4.1
[FR10]1
Vertical fenestration SHGC value.SHGC:_____SHGC:_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.5.4.4.2
[FR11]1
Skylight SHGC value.SHGC:_____SHGC:_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.2.1,
5.8.2.4
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.2.2
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.2.3,
5.5.3.6
[FR14]2
U-factor of opaque doors associated
with the building thermal envelope
meets requirements.
U-_____
Swinging
Nonswinging
U-_____
Swinging
Nonswinging
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 4 of
06/28/13Report date:
11
90.1 (2007)
Standard Mechanical Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency verified.
Non-NAECA HVAC equipment
labeled as meeting 90.1.
Efficiency:_____Efficiency:_____Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for
values.
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
6.4.3.4.2,
6.4.3.4.3,
6.4.3.4.4
[ME4]3
Outdoor air and exhaust systems
have motorized dampers that
automatically shut when not in use
and meet maximum leakage rates.
Check gravity dampers where
allowed.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Gravity dampers
acceptable in buildings 3 stories.
6.4.3.4.5
[ME5]3
Ventilation fans >0.75 hp have
automatic controls to shut off fan
when not required.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: HVAC systems
intended to operate continuously.
6.4.3.9
[ME6]1
Demand control ventilation provided
for spaces >500 ft2 and >40
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Systems with a
design outdoor airflow less than
1200 cfm.
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage. Insulation
outside of the conditioned space and
associated with cooling systems is
vapor retardant.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.2
[ME8]2
HVAC ducts and plenums insulated.R-_____R-_____Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness._____ in._____ in.Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.1
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
See the Mechanical Systems list for
values for HVAC System 1.
6.5.2.3
[ME19]3
Dehumidification controls provided to
prevent reheating, recooling, mixing of
hot and cold airstreams or concurrent
heating and cooling of the same
airstream.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.5.4.1
[ME25]3
HVAC pumping systems >10 hp
designed for variable fluid flow.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Minimum flow is less
than required for proper
operation and pump power =75
hp.
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70% of
design supply air.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 5 of
06/28/13Report date:
11
90.1 (2007)
Standard Mechanical Rough-In Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.5.7.1
[ME32]2
Kitchen hoods >5,000 cfm have make
up air >=50% of exhaust air volume.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
6.5.7.2
[ME33]1
Fume hoods exhaust systems
>=15,000 cfm have VAV hood
exhaust and supply systems, direct
make-up air or heat recovery.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
6.5.8.1
[ME34]3
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does
not apply.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
See the Mechanical Systems list for
values for HVAC System 1.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 6 of
06/28/13Report date:
11
90.1 (2007)
Standard Rough-In Electrical Inspection Complies?Comments/Assumptions
9.4.1.3
[EL3]2
Automatic lighting controls for exterior
lighting installed.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
9.4.4
[EL7]1
Exterior grounds lighting over 100 W
provides >60 lm/W unless on motion sensor
or fixture is exempt from scope of code or
from external LPD.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Lighting designated as required by a health or life safety
statute, ordinance, or regulation.
10.4.1
[EL9]2
Electric motors meet requirements where
applicable.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 7 of
06/28/13Report date:
11
90.1 (2007)
Standard Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.4.3.1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.3.1
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
R-_____
Above deck
Metal
Attic
R-_____
Above deck
Metal
Attic
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.1.2,
5.8.1.3
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in 12.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.3.1.1
[IN5]3
High-albedo roofs meet solar
reflectance of 0.70 and thermal
emittance of 0.75 or SRI of 82.
SR:_____
SRI:_____
SR:_____
SRI:_____
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.3.2
[IN6]1
Above-grade wall insulation R-value.R-_____
Mass
Metal
Steel
Wood
R-_____
Mass
Metal
Steel
Wood
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.1.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.5.3.4
[IN8]1
Floor insulation R-value.R-_____
Mass
Steel
Wood
R-_____
Mass
Steel
Wood
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table
for values.
5.8.1.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.4
[IN11]2
Eaves are baffled to deflect air to
above the insulation.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.5
[IN12]2
Insulation is installed in substantial
contact with the inside surface
separating conditioned space from
unconditional space.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.6
[IN13]2
Recessed equipment installed in
building envelope assemblies does
not compress the adjacent insulation.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.7
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 8 of
06/28/13Report date:
11
90.1 (2007)
Standard Insulation Inspection Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
5.8.1.7.1
[IN15]2
Attics and mechanical rooms have
insulation protected where adjacent to
attic or equipment access.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.7.2
[IN16]2
Foundation vents do not interfere with
insulation.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
5.8.1.8
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 9 of
06/28/13Report date:
11
90.1 (2007)
Standard Final Inspection Complies?Comments/Assumptions
5.4.3.3
[FI1]1
Weatherseals installed on all loading dock
cargo doors in Climate Zones 4-8.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.3.1.2,
6.4.3.2,
6.4.3.3,
6.4.3.3.1,
6.4.3.3.2
[FI3]2
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Thermostats requiring manual changeover between heating
and cooling.
6.4.3.3.3
[FI4]2
Systems with air capacity >10,000 cfm
include optimum start controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Systems designed for continuous operation.
See the Mechanical Systems list for values for HVAC System 1.
6.4.3.7
[FI6]3
When humidification and dehumidification
are provided to a zone, simultaneous
operation is prohibited.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
Furnished O&M manuals for HVAC systems
within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system balancing
report is provided for HVAC systems
serving zones >5,000 ft2 of conditioned
area.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: Requirement does not apply.
6.7.2.4
[FI10]1
HVAC control systems have been tested to
ensure proper operation, calibration and
adjustment of controls.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
9.4.5
[FI19]1
Exterior lighting power is consistent with
what is shown on the approved lighting
plans, demonstrating proposed watts are
less than or equal to allowed watts.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
6.4.3.2
[FI20]1
Temperature controls have setpoint overlap
restrictions.
Complies
Does Not Comply
Not Observable
Not Applicable
Requirement will be met.
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least one
automatic shutdown control.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: null.
6.4.3.3.2
[FI22]1
Setback controls allow automatic restart
and temporary operation as required for
maintenance.
Complies
Does Not Comply
Not Observable
Not Applicable
Exception: null.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 10 of
06/28/13Report date:
11
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CARMEL PROJECT
C:\Documents and Settings\John Carson\My Documents\Drawings\89 1ST AVE SW - CARMEL,
IN\COMcheck.cck
Page 11 of11
06/28/13Report