Loading...
HomeMy WebLinkAbout05100008-Site Plan95.0 0.691 Ac.:[: 3.=910.86 INV,=899.87 (Lot 25) NOTE: 1. It shall be the contractors responsibility to determine the exact location of al existing utilities in the ~cinity of the construction oreo prior to starting any construction, (ib~ladiog sewer, water and sumo connections). 2. It shall be tho contractors responsibility for notification and coordination of ali construction with the respective utility companies prior to starting any construction. 3. ~his Drawing is based on construction plans or record drawngs and is not boned on a field survey. Contractor should verify existing conditions prior to construction. L: end ~ ~ Proposed Elevotio~ per Site De~opment Pibn =====~ Dr~oge Flow ~ Uanh~e U,~.E. Ufullty & Drcinage Easement D,S,~U.E Dmlnoge Sewer a Utility Eeeement B.L Building Setback Line ~. C~ted~e p,p__,, RF.E Proposed Fin Roar Be*3Uon Property Description: LU/ LAN Lot 26 in Shelbourne Estates as per plat thereof recorded in Plat Cabinet 3, Slide 91 in the Office of the Recorder of Hamilton County, Indiana, . ~is is to codify that the sub,ct property does not lie within tho[ Specia Flood Hazard Area Zone A" as said tract plots by graphic scale on Community Panel Number 18057 C 0205 F of the FlOod Insurance Rote Maps, effective date Richard A. O~Han, Registered Land Su~e~r. Indiana ~00177 Job ~ 041271