HomeMy WebLinkAbout05100008-Site Plan95.0
0.691 Ac.:[:
3.=910.86
INV,=899.87
(Lot 25)
NOTE:
1. It shall be the contractors responsibility to determine the exact
location of al existing utilities in the ~cinity of the construction
oreo prior to starting any construction, (ib~ladiog sewer, water and
sumo connections).
2. It shall be tho contractors responsibility for notification and
coordination of ali construction with the respective utility
companies prior to starting any construction.
3. ~his Drawing is based on construction plans or record drawngs
and is not boned on a field survey. Contractor should verify existing
conditions prior to construction.
L: end ~
~ Proposed Elevotio~ per Site
De~opment Pibn
=====~ Dr~oge Flow
~ Uanh~e
U,~.E. Ufullty & Drcinage Easement
D,S,~U.E Dmlnoge Sewer a Utility Eeeement
B.L Building Setback Line
~. C~ted~e
p,p__,, RF.E Proposed Fin Roar Be*3Uon
Property Description: LU/ LAN
Lot 26 in Shelbourne Estates as per plat thereof recorded in Plat Cabinet 3, Slide 91 in the Office of the Recorder of Hamilton
County, Indiana, .
~is is to codify that the sub,ct property does not lie within tho[ Specia Flood Hazard Area Zone A" as said tract plots by
graphic scale on Community Panel Number 18057 C 0205 F of the FlOod Insurance Rote Maps, effective date
Richard A. O~Han, Registered Land Su~e~r. Indiana ~00177
Job ~ 041271