HomeMy WebLinkAbout05100015-Sq. Ft. k. All sidewa ks and drveways
I. Sewer and water lines, septic system, (tanks & filea system) and/or well locations
m. Drainage flow arrows
n, All drainage swales and subsurface facilities (retention / detention areas, etc...)
o Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge Iocatons
*NOTE: If land is not within a platted subdivision, a legal description is required.
FURTHER NOTES / NQTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29 04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written applicatiori ~orm and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
IN ADDITION TO THE ABOVELLT~-rED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR VVILL BE PROVIDED
WITH ANY INFORMATION RJ::LiATI~E TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED BY,AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE ~; · ~F ! :NI HEF SPACE. IFANAREASO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM"AREA IS TO BECOME A FINISHED AREA ~
ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCTION IS SUB3ECT TO F/ELD INSPECT[ON, AND SHOULD NOT BEGt'N PR/OR TO THE
ISSUANCE OF THE BUILDING PERMZT, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED.
INSULATED/COVERED, AND/OR OCCUPIED PRIORTO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BL/ILPlNG &CODE ENFORCEMENT: CITY OFCAP, A4EL One Civic Sq,; Catmel~ IN 46052. Ph. (517)571-2444.
on the
1 the
¥ Services I further
and fluxes. Failure to comply
~ below is
ntenrionally
mislead the Dept. of
TOTAL
(Finished and
AP P L!CANT~S SIGNATU P,E DATE