Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, May 20, 2013 4:48 PM
To:Knott, Bruce
Cc:Mishler, Nicholas F; Lux, Pamela K
Subject:RE: Barrington of Carmel address change
I seen those I think he was just giving examples. I have a call into him.
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, May 20, 2013 3:59 PM
To: Gary Hubble
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: RE: Barrington of Carmel address change
Gary,
Please see below where I have highlighted. The suite numbers also do not seem to be the same.
Thank you
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, May 20, 2013 1:37 PM
To: Knott, Bruce
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: RE: Barrington of Carmel address change
Looks like they want to name the drive around the project only. I will make sure that we continue to keep the wing
designation attached to the suite or room Number. I will discuss in tomorrow’s owner meeting. I will let you know.
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, May 20, 2013 9:32 AM
To: Gary Hubble
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: FW: Barrington of Carmel address change
Gary,
Please take a look at this email and see how this fits in to our last several conversations.
I usually try to look at things from all sides in case I am missing something. This appears to not correspond to our final
address layout, so we are just reaching to you first.
We need for the outside of the building to correspond to the wing designations i.e. E, A, J, etc. since the room numbers
will also correspond.
If the mailing address is different there may be a workaround that can take place, but address scheme looks more like
things did early on with first floor rooms being addressed with 100, 200, 300 etc.
I am not sure how soon this needs to be decided on so please advise your thoughts as soon as you can.
Have a great Tuesday
Bruce Knott
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, May 13, 2013 10:27 PM
To: Lux, Pamela K
2
Cc: Tcannaday@thebarringtonofcarmel.com; Jonathan Carrier (jcarrier@sqlc.org)
Subject: Barrington of Carmel address change
Pam,
Thanks for taking time to discuss a possible address change for The Barrington of Carmel. Per our discussion the
Executive Director has put together a list of the names in order of preference they would like to see the address changed
to. I have also attached a site plan to aid you in reviewing this request. The IL (Independent Living) apartments are on
the North end of the site (left side of the drawing) and the Assisted Living (including Memory Support and Skilled
Nursing) are on the South end of the site (right side of the drawing). An excerpt from his e-mail is included below:
I have driven around the city a little trying to get an idea as to how some of the streets get their ending, such as Drive,
Lane or Road. Here are the top 5 requests for street names: (there is already a Barrington Drive in town)
1. Barrington Circle
2. Barrington Lane
3. Barrington Blvd
4. Barrington Way
5. Barrington Court
As for numbering I would like to keep it easy so I would suggest 100 and 200 or maybe even 10 and 20. Open to ideas
from the city/county.
So an IL resident's address would look like this:
John Doe
100 Barrington Circle
Suite 1301
Carmel, IN 46032
AL Resident would be:
John Doe
200 Barrington Circle
Suite 110
Carmel, IN 46032
Please let me know if you have any comments or questions.
Thanks,
Mark Shegon
Corporate Vice President
Greystone
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
3
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, May 20, 2013 3:59 PM
To:'Gary Hubble'
Cc:Mishler, Nicholas F; Lux, Pamela K
Subject:RE: Barrington of Carmel address change
Gary,
Please see below where I have highlighted. The suite numbers also do not seem to be the same.
Thank you
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, May 20, 2013 1:37 PM
To: Knott, Bruce
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: RE: Barrington of Carmel address change
Looks like they want to name the drive around the project only. I will make sure that we continue to keep the wing
designation attached to the suite or room Number. I will discuss in tomorrow’s owner meeting. I will let you know.
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, May 20, 2013 9:32 AM
To: Gary Hubble
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: FW: Barrington of Carmel address change
Gary,
Please take a look at this email and see how this fits in to our last several conversations.
I usually try to look at things from all sides in case I am missing something. This appears to not correspond to our final
address layout, so we are just reaching to you first.
We need for the outside of the building to correspond to the wing designations i.e. E, A, J, etc. since the room numbers
will also correspond.
If the mailing address is different there may be a workaround that can take place, but address scheme looks more like
things did early on with first floor rooms being addressed with 100, 200, 300 etc.
I am not sure how soon this needs to be decided on so please advise your thoughts as soon as you can.
Have a great Tuesday
Bruce Knott
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, May 13, 2013 10:27 PM
To: Lux, Pamela K
Cc: Tcannaday@thebarringtonofcarmel.com; Jonathan Carrier (jcarrier@sqlc.org)
Subject: Barrington of Carmel address change
Pam,
Thanks for taking time to discuss a possible address change for The Barrington of Carmel. Per our discussion the
Executive Director has put together a list of the names in order of preference they would like to see the address changed
to. I have also attached a site plan to aid you in reviewing this request. The IL (Independent Living) apartments are on
4
the North end of the site (left side of the drawing) and the Assisted Living (including Memory Support and Skilled
Nursing) are on the South end of the site (right side of the drawing). An excerpt from his e-mail is included below:
I have driven around the city a little trying to get an idea as to how some of the streets get their ending, such as Drive,
Lane or Road. Here are the top 5 requests for street names: (there is already a Barrington Drive in town)
1. Barrington Circle
2. Barrington Lane
3. Barrington Blvd
4. Barrington Way
5. Barrington Court
As for numbering I would like to keep it easy so I would suggest 100 and 200 or maybe even 10 and 20. Open to ideas
from the city/county.
So an IL resident's address would look like this:
John Doe
100 Barrington Circle
Suite 1301
Carmel, IN 46032
AL Resident would be:
John Doe
200 Barrington Circle
Suite 110
Carmel, IN 46032
Please let me know if you have any comments or questions.
Thanks,
Mark Shegon
Corporate Vice President
Greystone
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
5
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, May 20, 2013 1:37 PM
To:Knott, Bruce
Cc:Mishler, Nicholas F; Lux, Pamela K
Subject:RE: Barrington of Carmel address change
Looks like they want to name the drive around the project only. I will make sure that we continue to keep the wing
designation attached to the suite or room Number. I will discuss in tomorrow’s owner meeting. I will let you know.
From: Knott, Bruce [mailto:BKnott@carmel.in.gov]
Sent: Monday, May 20, 2013 9:32 AM
To: Gary Hubble
Cc: Mishler, Nicholas F; Lux, Pamela K
Subject: FW: Barrington of Carmel address change
Gary,
Please take a look at this email and see how this fits in to our last several conversations.
I usually try to look at things from all sides in case I am missing something. This appears to not correspond to our final
address layout, so we are just reaching to you first.
We need for the outside of the building to correspond to the wing designations i.e. E, A, J, etc. since the room numbers
will also correspond.
If the mailing address is different there may be a workaround that can take place, but address scheme looks more like
things did early on with first floor rooms being addressed with 100, 200, 300 etc.
I am not sure how soon this needs to be decided on so please advise your thoughts as soon as you can.
Have a great Tuesday
Bruce Knott
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, May 13, 2013 10:27 PM
To: Lux, Pamela K
Cc: Tcannaday@thebarringtonofcarmel.com; Jonathan Carrier (jcarrier@sqlc.org)
Subject: Barrington of Carmel address change
Pam,
Thanks for taking time to discuss a possible address change for The Barrington of Carmel. Per our discussion the
Executive Director has put together a list of the names in order of preference they would like to see the address changed
to. I have also attached a site plan to aid you in reviewing this request. The IL (Independent Living) apartments are on
the North end of the site (left side of the drawing) and the Assisted Living (including Memory Support and Skilled
Nursing) are on the South end of the site (right side of the drawing). An excerpt from his e-mail is included below:
I have driven around the city a little trying to get an idea as to how some of the streets get their ending, such as Drive,
Lane or Road. Here are the top 5 requests for street names: (there is already a Barrington Drive in town)
1. Barrington Circle
2. Barrington Lane
3. Barrington Blvd
4. Barrington Way
5. Barrington Court
6
As for numbering I would like to keep it easy so I would suggest 100 and 200 or maybe even 10 and 20. Open to ideas
from the city/county.
So an IL resident's address would look like this:
John Doe
100 Barrington Circle
Suite 1301
Carmel, IN 46032
AL Resident would be:
John Doe
200 Barrington Circle
Suite 110
Carmel, IN 46032
Please let me know if you have any comments or questions.
Thanks,
Mark Shegon
Corporate Vice President
Greystone
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
7
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, May 20, 2013 9:32 AM
To:'Gary Hubble (ghubble@LECESSEconstruction.com)'
Cc:Mishler, Nicholas F; Lux, Pamela K
Subject:FW: Barrington of Carmel address change
Gary,
Please take a look at this email and see how this fits in to our last several conversations.
I usually try to look at things from all sides in case I am missing something. This appears to not correspond to our final
address layout, so we are just reaching to you first.
We need for the outside of the building to correspond to the wing designations i.e. E, A, J, etc. since the room numbers
will also correspond.
If the mailing address is different there may be a workaround that can take place, but address scheme looks more like
things did early on with first floor rooms being addressed with 100, 200, 300 etc.
I am not sure how soon this needs to be decided on so please advise your thoughts as soon as you can.
Have a great Tuesday
Bruce Knott
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, May 13, 2013 10:27 PM
To: Lux, Pamela K
Cc: Tcannaday@thebarringtonofcarmel.com; Jonathan Carrier (jcarrier@sqlc.org)
Subject: Barrington of Carmel address change
Pam,
Thanks for taking time to discuss a possible address change for The Barrington of Carmel. Per our discussion the
Executive Director has put together a list of the names in order of preference they would like to see the address changed
to. I have also attached a site plan to aid you in reviewing this request. The IL (Independent Living) apartments are on
the North end of the site (left side of the drawing) and the Assisted Living (including Memory Support and Skilled
Nursing) are on the South end of the site (right side of the drawing). An excerpt from his e-mail is included below:
I have driven around the city a little trying to get an idea as to how some of the streets get their ending, such as Drive,
Lane or Road. Here are the top 5 requests for street names: (there is already a Barrington Drive in town)
1. Barrington Circle
2. Barrington Lane
3. Barrington Blvd
4. Barrington Way
5. Barrington Court
As for numbering I would like to keep it easy so I would suggest 100 and 200 or maybe even 10 and 20. Open to ideas
from the city/county.
So an IL resident's address would look like this:
John Doe
100 Barrington Circle
Suite 1301
8
Carmel, IN 46032
AL Resident would be:
John Doe
200 Barrington Circle
Suite 110
Carmel, IN 46032
Please let me know if you have any comments or questions.
Thanks,
Mark Shegon
Corporate Vice President
Greystone
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
9
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Tuesday, February 26, 2013 4:53 PM
To:Mishler, Nicholas F
Subject:RE: Suite #s
Nick see attached ASI#4
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, February 26, 2013 1:33 PM
To: Gary Hubble
Subject: Suite #s
Hi Gary, do you have pdf plans for all of the suite numbers that have been agreed on? I have looked for this file and I’m not sure I ever received it.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
10
Mishler, Nicholas F
From:Hohlt, William G
Sent:Wednesday, January 30, 2013 3:23 PM
To:Blanchard, Jim E; 'Gary Hubble'
Cc:Mishler, Nicholas F
Subject:RE: Barrington Suite #s
Gary,
I can sit down with you pretty much anytime next week and would also like to have Nick involved re: the scheduling ok?
We will help you out us much as we can to keep it efficient and moving forward.
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Blanchard, Jim E
Sent: Wednesday, January 30, 2013 3:13 PM
To: 'Gary Hubble'
Cc: Hohlt, William G
Subject: RE: Barrington Suite #s
Gary, I have copied Bill Hohlt. Bill will be able to help out with your request.
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Tuesday, January 29, 2013 7:13 AM
To: Blanchard, Jim E
Cc: Tomy Lombardozzi
Subject: RE: Barrington Suite #s
Jim,
we have met with Bruce Knott last week and presented him with the recommended number changes from the city and
from Fire dept. Bruce was happy to see we made all of the requests. We will be moving forward with an official
submission on the new numbers for the project and I will also send them to you and Pam as well.
Second part of the e-mail is we are getting the framing going and we are going to be at a point in a couple of weeks for
framing inspections. I would like to sit down with you next week when you have some time and start discussion our
framing inspections coordination’s and you expectations of what you expect. We will show you the number of units and
common space we will be looking for each trip and you can let me know if it is too many or not enough.
Also I have talked to Bruce about fire caulking inspections and he feels your department will take the lead on this. I
would like to discuss this as well.
I am available Wednesday, Thursday and Friday of next week and all of the days in the following week.
Let me know when we can get together.
Thanks
11
From: Blanchard, Jim E [mailto:JBlanchard@carmel.in.gov]
Sent: Monday, October 29, 2012 8:54 AM
To: Mishler, Nicholas F; Knott, Bruce
Cc: Gary Hubble
Subject: RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
12
Mishler, Nicholas F
From:Keeling, Adrienne M
Sent:Tuesday, November 13, 2012 1:07 PM
To:Mishler, Nicholas F
Subject:Automatic reply: Barrington rendering
I will be away from the office on Tuesday afternoon and all day Wednesday. I will respond as soon as possible.
Adrienne
13
Mishler, Nicholas F
From:Tingley, Connie S
Sent:Tuesday, November 13, 2012 12:39 PM
To:'Kathleen McLaughlin'
Cc:Keeling, Adrienne M; Mishler, Nicholas F
Subject:RE: Barrington rendering
Kathleen,
The Packet 02-17-09 in the Plan Commission Development Plan section (Docket 08120013 ) shows renderings of the
buildings on pages 24-33.
Please let me know if you need something additional.
Connie
From: Kathleen McLaughlin [mailto:kmclaughlin@IBJ.com]
Sent: Tuesday, November 13, 2012 12:03 PM
To: Tingley, Connie S
Subject: RE: Barrington rendering
Connie,
Thanks for your reply. I don’t see any digital files of the architect’s rendering for the Barrington in the places you sent me.
Does your office have the rendering in a .jpg, .gif or other digital format?
Just let me know. If not, I can look elsewhere.
Thanks,
Kathleen McLaughlin
Reporter
Indianapolis Business Journal
direct: (317) 472-5373
receptionist: (317) 634-6200
From: Tingley, Connie S [mailto:CTingley@carmel.in.gov]
Sent: Tuesday, November 13, 2012 10:18 AM
To: Kathleen McLaughlin
Cc: Keeling, Adrienne M; Mishler, Nicholas F
Subject: FW: Barrington rendering
Kathleen,
Adrienne Keeling has forwarded your request to me for information regarding the Barrington.
Below are links for the PUD ordinance passed by the City Council for the rezone and Development Plan submitted to the
Plan Commission.
14
If you have questions regarding the building permits, please contact Nick Mishler in our Building & Code Services
Department nmishler@carmel.in.gov 317-571-2444
PUD (Z-520-08):
http://cocdocs.ci.carmel.in.us/Weblink/DocView.aspx?id=293136&dbid=0
Development Plan (Docket 08120013)
http://cocdocs.ci.carmel.in.us/weblink/Browse.aspx?dbid=0
Please let us know if you need further information.
Connie Tingley
Dept of Community Services
One Civic Square
Carmel, IN 46032
317-571-2417
From: Keeling, Adrienne M
Sent: Tuesday, November 13, 2012 9:23 AM
To: Tingley, Connie S
Subject: FW: Barrington rendering
Hi Connie –
Will you direct her to the PC or Council’s approval on Laserfiche for the renderings?
Thanks,
Adrienne
From: Kathleen McLaughlin [mailto:kmclaughlin@IBJ.com]
Sent: Tuesday, November 13, 2012 9:06 AM
To: Keeling, Adrienne M
Subject: Barrington rendering
Adrienne,
I’m looking for a digital version of the architect’s rendering of the Barrington. I believe the council approved it on Jan. 23
this year. Can you help me with this?
Thank you,
KATHLEEN MCLAUGHLIN
GOVERNMENT & FINANCE REPORTER
Indianapolis Business Journal
317.472.5373
kmclaughlin@ibj.com
Twitter: @IBJgovernment
IBJcom-email.gif
•Find the latest business news
15
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, October 29, 2012 4:59 PM
To:Mishler, Nicholas F
Subject:RE: Barrington Suite #s
Thanks Nick see you there
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Monday, October 29, 2012 4:47 PM
To: Gary Hubble; Knott, Bruce; Blanchard, Jim E
Subject: RE: Barrington Suite #s
Yes, same conference room as our last meeting. 1st floor of City Hall.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, October 29, 2012 4:51 PM
To: Knott, Bruce; Blanchard, Jim E; Mishler, Nicholas F
Subject: RE: Barrington Suite #s
Yes I can make 10:30 and where is DOCS is that Jim's office?
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
16
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Knott, Bruce [BKnott@carmel.in.gov]
Sent: Monday, October 29, 2012 4:16 PM
To: Gary Hubble; Blanchard, Jim E; Mishler, Nicholas F
Subject: RE: Barrington Suite #s
10:30 Tuesday at DOCS! Is that ok? I can’t get there earlier than this.
thanks
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, October 29, 2012 9:14 AM
To: Blanchard, Jim E; Mishler, Nicholas F; Knott, Bruce
Subject: RE: Barrington Suite #s
I am available after 9:30 am Tuesday
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Blanchard, Jim E [JBlanchard@carmel.in.gov]
Sent: Monday, October 29, 2012 8:54 AM
To: Mishler, Nicholas F; Knott, Bruce
Cc: Gary Hubble
Subject: RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
17
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
18
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, October 29, 2012 4:51 PM
To:Knott, Bruce; Blanchard, Jim E; Mishler, Nicholas F
Subject:RE: Barrington Suite #s
Yes I can make 10:30 and where is DOCS is that Jim's office?
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Knott, Bruce [BKnott@carmel.in.gov]
Sent: Monday, October 29, 2012 4:16 PM
To: Gary Hubble; Blanchard, Jim E; Mishler, Nicholas F
Subject: RE: Barrington Suite #s
10:30 Tuesday at DOCS! Is that ok? I can’t get there earlier than this.
thanks
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, October 29, 2012 9:14 AM
To: Blanchard, Jim E; Mishler, Nicholas F; Knott, Bruce
Subject: RE: Barrington Suite #s
I am available after 9:30 am Tuesday
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Blanchard, Jim E [JBlanchard@carmel.in.gov]
Sent: Monday, October 29, 2012 8:54 AM
To: Mishler, Nicholas F; Knott, Bruce
19
Cc: Gary Hubble
Subject: RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
20
Mishler, Nicholas F
From:Knott, Bruce
Sent:Monday, October 29, 2012 4:16 PM
To:'Gary Hubble'; Blanchard, Jim E; Mishler, Nicholas F
Subject:RE: Barrington Suite #s
10:30 Tuesday at DOCS! Is that ok? I can’t get there earlier than this.
thanks
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, October 29, 2012 9:14 AM
To: Blanchard, Jim E; Mishler, Nicholas F; Knott, Bruce
Subject: RE: Barrington Suite #s
I am available after 9:30 am Tuesday
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Blanchard, Jim E [JBlanchard@carmel.in.gov]
Sent: Monday, October 29, 2012 8:54 AM
To: Mishler, Nicholas F; Knott, Bruce
Cc: Gary Hubble
Subject: RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
Thanks,
21
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
22
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, October 29, 2012 9:14 AM
To:Blanchard, Jim E; Mishler, Nicholas F; Knott, Bruce
Subject:RE: Barrington Suite #s
I am available after 9:30 am Tuesday
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Blanchard, Jim E [JBlanchard@carmel.in.gov]
Sent: Monday, October 29, 2012 8:54 AM
To: Mishler, Nicholas F; Knott, Bruce
Cc: Gary Hubble
Subject: RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
23
Mishler, Nicholas F
From:Blanchard, Jim E
Sent:Monday, October 29, 2012 8:54 AM
To:Mishler, Nicholas F; Knott, Bruce
Cc:'Gary Hubble'
Subject:RE: Barrington Suite #s
I am available all day on Tuesday.
From: Mishler, Nicholas F
Sent: Friday, October 26, 2012 1:37 PM
To: Knott, Bruce; Blanchard, Jim E
Cc: 'Gary Hubble'
Subject: Barrington Suite #s
Bruce & Jim,
I just talked to Gary with the Barrington and he would like to schedule a time next week to discuss the suite numbering for The
Barrington. He has spoken to the owners of the property and would like to update us on where this stands.
Would you be able to meet sometime Monday or Tuesday? Gary said he can be here whenever we are all available.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
24
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Friday, October 26, 2012 12:27 PM
To:Mishler, Nicholas F
Subject:RE: Barrington
14,720 sq. ft
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Friday, October 26, 2012 11:58 AM
To: Gary Hubble
Subject: RE: Barrington
Gary, how much square footage is being added to the parking garage?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Thursday, October 25, 2012 3:36 PM
To: Mishler, Nicholas F
Subject: RE: Barrington
yes plus the cd as well I will drop them off in the am
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
25
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Thursday, October 25, 2012 8:27 AM
To: Gary Hubble
Subject: Barrington
Gary, have you been able to get two additional sets of building plans for the plan revision for the Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
26
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Thursday, October 25, 2012 3:36 PM
To:Mishler, Nicholas F
Subject:RE: Barrington
yes plus the cd as well I will drop them off in the am
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Thursday, October 25, 2012 8:27 AM
To: Gary Hubble
Subject: Barrington
Gary, have you been able to get two additional sets of building plans for the plan revision for the Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
27
Mishler, Nicholas F
From:Hollibaugh, Mike P
Sent:Tuesday, September 04, 2012 1:12 PM
To:Mishler, Nicholas F
Cc:Blanchard, Jim E; Hohlt, William G
Subject:RE: Barrington Park & Rec Fees
Yes, as long as they understand what they owe us, and we have a commitment from them that the check will be here
soon…
From: Mishler, Nicholas F
Sent: Tuesday, September 04, 2012 12:52 PM
To: Hollibaugh, Mike P
Cc: Blanchard, Jim E; Hohlt, William G
Subject: Barrington Park & Rec Fees
Mike, I know we had discussed issuing the permit for the Barrington prior to utility fees. Are we going to do the same thing with
the Park & Rec fees? I have received the check from the builder for the building permit fees, but the PRIF, utility, and sewer fees
are all still due as far as I know. Do you want me to take those fees out so I can issue, and then add them back afterwards and
put a hold on inspections?
Please let me know when you get a chance.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
28
Mishler, Nicholas F
From:Sheeks, Cindy L
Sent:Thursday, August 30, 2012 5:41 PM
To:Mishler, Nicholas F
Subject:RE: wiring instructions
No, it was not paid yesterday. It was too late to send the wire instructions.
From: Mishler, Nicholas F
Sent: Thursday, August 30, 2012 4:01 PM
To: Sheeks, Cindy L; Stewart, Lisa M; Blanchard, Jim E; Hollibaugh, Mike P
Subject: RE: wiring instructions
Good afternoon-
I misunderstood this and thought it said the PRIF was paid yesterday. Will this check be sent to the clerk-treasurer’s office?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Stewart, Lisa M
Sent: Thursday, August 30, 2012 2:18 PM
To: Mishler, Nicholas F; Blanchard, Jim E; Hollibaugh, Mike P
Subject: FW: wiring instructions
FYI
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Sheeks, Cindy L
Sent: Thursday, August 30, 2012 10:17 AM
To: Stewart, Lisa M; Blanchard, Jim E; Spearman, Ted A; Duncan, Gary R; Duffy, John M
Subject: FW: wiring instructions
29
The Barring project fees will be paid by check, not wire
transfer. The deadline for the wire instructions was yesterday.
I was not aware the deadline was so soon.
From: Cordray, Diana L
Sent: Wednesday, August 29, 2012 3:39 PM
To: Sheeks, Cindy L
Subject: FW: wiring instructions
Diana L. Cordray
Carmel Clerk Treasurer
(317)571-2414
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Wednesday, August 29, 2012 3:28 PM
To: Cordray, Diana L
Cc: Mark Shegon; jiblanchford@carmel.in.gov
Subject: FW: wiring instructions
Diana, below are the fees to be paid to 3 Carmel entities by wire if you can provide the wiring instructions to me today.
Clay Regional will be paid separately, thanks.
From: Kati Mimms <kmimms@greystonecommunities.com>
Date: August 29, 2012 2:26:05 PM EDT
To: Mark Shegon <mshegon@greystonecommunities.com>
Subject: RE: wiring instructions
Water Impact Fees – City of Carmel Utilities (John Duffy) $410,957.72
Road Impact Fees – City of Carmel (Gary Duncan) $108,900.00
Park & Recreation Impact Fees – City of Carmel (Mike Hollibaugh) $215,116.00
Sewer Fees – Clay Township Regional Waste District (Ryan Hartman) $303,035.00
--
Kati Mimms
Senior Associate | Greystone
Office: 972-402-3774 | Fax: 972-402-3727
Email: kmimms@greystonecommunities.com
30
From: Mark Shegon
Sent: Wednesday, August 29, 2012 1:23 PM
To: Kati Mimms
Subject: wiring instructions
Hey if you can send me a quick breakout of the fees for water, sewer, parks and recs and road
impact along with who it is set to go to I can get the wiring instructions.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
31
Mishler, Nicholas F
From:Stewart, Lisa M
Sent:Thursday, August 30, 2012 4:13 PM
To:Mishler, Nicholas F
Subject:RE: wiring instructions
I don’t know the answer to that
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Mishler, Nicholas F
Sent: Thursday, August 30, 2012 4:01 PM
To: Sheeks, Cindy L; Stewart, Lisa M; Blanchard, Jim E; Hollibaugh, Mike P
Subject: RE: wiring instructions
Good afternoon-
I misunderstood this and thought it said the PRIF was paid yesterday. Will this check be sent to the clerk-treasurer’s office?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Stewart, Lisa M
Sent: Thursday, August 30, 2012 2:18 PM
To: Mishler, Nicholas F; Blanchard, Jim E; Hollibaugh, Mike P
Subject: FW: wiring instructions
FYI
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
32
From: Sheeks, Cindy L
Sent: Thursday, August 30, 2012 10:17 AM
To: Stewart, Lisa M; Blanchard, Jim E; Spearman, Ted A; Duncan, Gary R; Duffy, John M
Subject: FW: wiring instructions
The Barring project fees will be paid by check, not wire
transfer. The deadline for the wire instructions was yesterday.
I was not aware the deadline was so soon.
From: Cordray, Diana L
Sent: Wednesday, August 29, 2012 3:39 PM
To: Sheeks, Cindy L
Subject: FW: wiring instructions
Diana L. Cordray
Carmel Clerk Treasurer
(317)571-2414
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Wednesday, August 29, 2012 3:28 PM
To: Cordray, Diana L
Cc: Mark Shegon; jiblanchford@carmel.in.gov
Subject: FW: wiring instructions
Diana, below are the fees to be paid to 3 Carmel entities by wire if you can provide the wiring instructions to me today.
Clay Regional will be paid separately, thanks.
From: Kati Mimms <kmimms@greystonecommunities.com>
Date: August 29, 2012 2:26:05 PM EDT
To: Mark Shegon <mshegon@greystonecommunities.com>
Subject: RE: wiring instructions
Water Impact Fees – City of Carmel Utilities (John Duffy) $410,957.72
Road Impact Fees – City of Carmel (Gary Duncan) $108,900.00
Park & Recreation Impact Fees – City of Carmel (Mike Hollibaugh) $215,116.00
Sewer Fees – Clay Township Regional Waste District (Ryan Hartman) $303,035.00
--
Kati Mimms
33
Senior Associate | Greystone
Office: 972-402-3774 | Fax: 972-402-3727
Email: kmimms@greystonecommunities.com
From: Mark Shegon
Sent: Wednesday, August 29, 2012 1:23 PM
To: Kati Mimms
Subject: wiring instructions
Hey if you can send me a quick breakout of the fees for water, sewer, parks and recs and road
impact along with who it is set to go to I can get the wiring instructions.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
34
Mishler, Nicholas F
From:Ron Chabot [rchabot@lecesseconstruction.com]
Sent:Thursday, August 30, 2012 3:24 PM
To:Mishler, Nicholas F
Cc:Gary Hubble
Subject:RE: Barrington - Bulding Permit Fee Total
Nick:
Thanks.
Gary will deliver a check for $60,537.00 to your office on 9/4.
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com
From concept to completion we build it as if it's our own.
-----Original Message-----
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, August 30, 2012 12:19 PM
To: Ron Chabot
Cc: Gary Hubble
Subject: RE: Barrington - Bulding Permit Fee Total
Ron, the total building permit fees without the Park & Rec Impact Fee is $60,537.00.
The Park & Rec Impact Fee is $195,567.00.
Total fees are $256,104.00
As I mentioned on the phone, I believe there are still Clay Township sewer fees due as well.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
-----Original Message-----
From: Ron Chabot [mailto:rchabot@lecesseconstruction.com]
Sent: Wednesday, August 29, 2012 7:09 PM
To: Mishler, Nicholas F
Cc: Gary Hubble
Subject: RE: Barrington - Bulding Permit Fee Total
35
Nick:
Thanks for the update. The amount for our check should only be for the Building Permits. The other impact fees are by the developer
and will be (if not already) paid separately by them.
Thanks,
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com
From concept to completion we build it as if it's our own.
-----Original Message-----
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, August 29, 2012 7:02 PM
To: Ron Chabot
Cc: Gary Hubble
Subject: RE: Barrington - Bulding Permit Fee Total
Ron, Jim left early today and I didnt have a chance to go over the fees with him. Also, from what I understand the Park & Rec Impact
fees may have been wired over today along with tge utilities fees. I need to find out for sure if this is the case so I know whether to
remove them from the permit fees.
I will look into both issues tomorrow morning and give you a call.
________________________________________
From: Ron Chabot [rchabot@lecesseconstruction.com]
Sent: Wednesday, August 29, 2012 6:09 PM
To: Mishler, Nicholas F
Cc: Gary Hubble
Subject: Barrington - Bulding Permit Fee Total
Nick:
Per our conversation today, please let me know the total fee required. We are planning to expedite a check and need the amount asap.
Thanks,
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com<http://www.lecesseconstruction.com/>
From concept to completion we build it as if it's our own.
36
Mishler, Nicholas F
From:Stewart, Lisa M
Sent:Thursday, August 30, 2012 2:18 PM
To:Mishler, Nicholas F; Blanchard, Jim E; Hollibaugh, Mike P
Subject:FW: wiring instructions
FYI
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Sheeks, Cindy L
Sent: Thursday, August 30, 2012 10:17 AM
To: Stewart, Lisa M; Blanchard, Jim E; Spearman, Ted A; Duncan, Gary R; Duffy, John M
Subject: FW: wiring instructions
The Barring project fees will be paid by check, not wire
transfer. The deadline for the wire instructions was yesterday.
I was not aware the deadline was so soon.
From: Cordray, Diana L
Sent: Wednesday, August 29, 2012 3:39 PM
To: Sheeks, Cindy L
Subject: FW: wiring instructions
Diana L. Cordray
Carmel Clerk Treasurer
(317)571-2414
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Wednesday, August 29, 2012 3:28 PM
To: Cordray, Diana L
Cc: Mark Shegon; jiblanchford@carmel.in.gov
Subject: FW: wiring instructions
Diana, below are the fees to be paid to 3 Carmel entities by wire if you can provide the wiring instructions to me today.
Clay Regional will be paid separately, thanks.
37
From: Kati Mimms <kmimms@greystonecommunities.com>
Date: August 29, 2012 2:26:05 PM EDT
To: Mark Shegon <mshegon@greystonecommunities.com>
Subject: RE: wiring instructions
Water Impact Fees – City of Carmel Utilities (John Duffy) $410,957.72
Road Impact Fees – City of Carmel (Gary Duncan) $108,900.00
Park & Recreation Impact Fees – City of Carmel (Mike Hollibaugh) $215,116.00
Sewer Fees – Clay Township Regional Waste District (Ryan Hartman) $303,035.00
--
Kati Mimms
Senior Associate | Greystone
Office: 972-402-3774 | Fax: 972-402-3727
Email: kmimms@greystonecommunities.com
From: Mark Shegon
Sent: Wednesday, August 29, 2012 1:23 PM
To: Kati Mimms
Subject: wiring instructions
Hey if you can send me a quick breakout of the fees for water, sewer, parks and recs and road
impact along with who it is set to go to I can get the wiring instructions.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
38
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
39
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Thursday, August 30, 2012 1:03 PM
To:Mishler, Nicholas F
Subject:RE: The Barrington
I know what you mean
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
From: Mishler, Nicholas F
Sent: Thursday, August 30, 2012 1:01 PM
To: Kempa, Lisa L
Subject: RE: The Barrington
Ok nevermind. I got about 10 emails yesterday Re: the Barrington in about a 10 minute span so I guess I just skipped over it…
It’s been one of those weeks.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Kempa, Lisa L
Sent: Thursday, August 30, 2012 12:59 PM
To: Mishler, Nicholas F
Subject: RE: The Barrington
Did you get my email yesterday?
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
From: Mishler, Nicholas F
Sent: Thursday, August 30, 2012 12:57 PM
To: Kempa, Lisa L
Subject: The Barrington
Lisa, I saw an email yesterday that the Barrington had sent a wire transfer to the clerk-treasurer’s office in the amount of
$378,283.50. Is this the total for all water availability?
40
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
41
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Thursday, August 30, 2012 12:59 PM
To:Mishler, Nicholas F
Subject:RE: The Barrington
Did you get my email yesterday?
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
From: Mishler, Nicholas F
Sent: Thursday, August 30, 2012 12:57 PM
To: Kempa, Lisa L
Subject: The Barrington
Lisa, I saw an email yesterday that the Barrington had sent a wire transfer to the clerk-treasurer’s office in the amount of
$378,283.50. Is this the total for all water availability?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
42
Mishler, Nicholas F
From:Tingley, Connie S
Sent:Thursday, August 30, 2012 8:12 AM
To:Stewart, Lisa M; Mishler, Nicholas F
Cc:Sheeks, Cindy L
Subject:RE: Barrington $$$$$$$$$$$$$$$$
I’ll talk to Cindy next week. It looks like it is all Utility $$.
Thanks for the heads up.
ct
From: Stewart, Lisa M
Sent: Wednesday, August 29, 2012 3:32 PM
To: Mishler, Nicholas F; Tingley, Connie S
Subject: FW: Barrington $$$$$$$$$$$$$$$$
Nick, FYI – they will be doing a wire transfer.
Connie, FYI
Not sure if this affects your monthly numbers…….
Lisa
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Sheeks, Cindy L
Sent: Wednesday, August 29, 2012 3:17 PM
To: Stewart, Lisa M
Subject: FW: Barrington $$$$$$$$$$$$$$$$
From: Spearman, Ted A
Sent: Wednesday, August 29, 2012 3:13 PM
To: Sheeks, Cindy L
Subject: Barrington $$$$$$$$$$$$$$$$
601 - ,150.00 inspect fee?? misc
609 - 338,642.50 water connection
43
610 - 39,491.00 water availability
Total 378,283.50
44
Mishler, Nicholas F
From:Ron Chabot [rchabot@lecesseconstruction.com]
Sent:Wednesday, August 29, 2012 7:09 PM
To:Mishler, Nicholas F
Cc:Gary Hubble
Subject:RE: Barrington - Bulding Permit Fee Total
Nick:
Thanks for the update. The amount for our check should only be for the Building Permits. The other impact fees are by the developer
and will be (if not already) paid separately by them.
Thanks,
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com
From concept to completion we build it as if it's our own.
-----Original Message-----
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, August 29, 2012 7:02 PM
To: Ron Chabot
Cc: Gary Hubble
Subject: RE: Barrington - Bulding Permit Fee Total
Ron, Jim left early today and I didnt have a chance to go over the fees with him. Also, from what I understand the Park & Rec Impact
fees may have been wired over today along with tge utilities fees. I need to find out for sure if this is the case so I know whether to
remove them from the permit fees.
I will look into both issues tomorrow morning and give you a call.
________________________________________
From: Ron Chabot [rchabot@lecesseconstruction.com]
Sent: Wednesday, August 29, 2012 6:09 PM
To: Mishler, Nicholas F
Cc: Gary Hubble
Subject: Barrington - Bulding Permit Fee Total
Nick:
Per our conversation today, please let me know the total fee required. We are planning to expedite a check and need the amount asap.
Thanks,
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
45
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com<http://www.lecesseconstruction.com/>
From concept to completion we build it as if it's our own.
46
Mishler, Nicholas F
From:Ron Chabot [rchabot@lecesseconstruction.com]
Sent:Wednesday, August 29, 2012 6:09 PM
To:Mishler, Nicholas F
Cc:Gary Hubble
Subject:Barrington - Bulding Permit Fee Total
Nick:
Per our conversation today, please let me know the total fee required. We are planning to expedite a check and need
the amount asap.
Thanks,
Ron
Ron Chabot
Project Manager
LECESSE Construction
75 Thruway Park Drive
West Henrietta, NY 14586
585-334-4490 ext 3269 office
585-794-3734 cell
www.lecesseconstruction.com
From concept to completion we build it as if it's our own.
47
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Wednesday, August 29, 2012 4:26 PM
To:Mishler, Nicholas F; Barnes, David R; Sy, Rebecca A; Pace, Paul V; Cook, Steve L
Subject:barrington
The Barrington water fees have been paid ($378283.50). Their irrigation fees have also been paid ($32674.22). They are
ok. This is private so no bonds are required.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2267
48
Mishler, Nicholas F
From:Stewart, Lisa M
Sent:Wednesday, August 29, 2012 3:59 PM
To:Mishler, Nicholas F
Subject:FW: wiring instructions
Nick,
Please see the PRIF fee below – is that correct? Please let me know.
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Sheeks, Cindy L
Sent: Wednesday, August 29, 2012 3:56 PM
To: Stewart, Lisa M; Duffy, John M; McBride, Mike T; Duncan, Gary R
Subject: FW: wiring instructions
Do these numbers look correct from Barrington?
From: Cordray, Diana L
Sent: Wednesday, August 29, 2012 3:39 PM
To: Sheeks, Cindy L
Subject: FW: wiring instructions
Diana L. Cordray
Carmel Clerk Treasurer
(317)571-2414
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Wednesday, August 29, 2012 3:28 PM
To: Cordray, Diana L
Cc: Mark Shegon; jiblanchford@carmel.in.gov
Subject: FW: wiring instructions
Diana, below are the fees to be paid to 3 Carmel entities by wire if you can provide the wiring instructions to me today.
Clay Regional will be paid separately, thanks.
From: Kati Mimms <kmimms@greystonecommunities.com>
Date: August 29, 2012 2:26:05 PM EDT
49
To: Mark Shegon <mshegon@greystonecommunities.com>
Subject: RE: wiring instructions
Water Impact Fees – City of Carmel Utilities (John Duffy) $410,957.72
Road Impact Fees – City of Carmel (Gary Duncan) $108,900.00
Park & Recreation Impact Fees – City of Carmel (Mike Hollibaugh) $215,116.00
Sewer Fees – Clay Township Regional Waste District (Ryan Hartman) $303,035.00
--
Kati Mimms
Senior Associate | Greystone
Office: 972-402-3774 | Fax: 972-402-3727
Email: kmimms@greystonecommunities.com
From: Mark Shegon
Sent: Wednesday, August 29, 2012 1:23 PM
To: Kati Mimms
Subject: wiring instructions
Hey if you can send me a quick breakout of the fees for water, sewer, parks and recs and road
impact along with who it is set to go to I can get the wiring instructions.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
225 E. John Carpenter Freeway, Suite 700
Irving TX 75062
www.greystonecommunities.com
50
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
51
Mishler, Nicholas F
From:Stewart, Lisa M
Sent:Wednesday, August 29, 2012 3:32 PM
To:Mishler, Nicholas F; Tingley, Connie S
Subject:FW: Barrington $$$$$$$$$$$$$$$$
Nick, FYI – they will be doing a wire transfer.
Connie, FYI
Not sure if this affects your monthly numbers…….
Lisa
Lisa M. Stewart
Office Administrator
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317-571-2418
From: Sheeks, Cindy L
Sent: Wednesday, August 29, 2012 3:17 PM
To: Stewart, Lisa M
Subject: FW: Barrington $$$$$$$$$$$$$$$$
From: Spearman, Ted A
Sent: Wednesday, August 29, 2012 3:13 PM
To: Sheeks, Cindy L
Subject: Barrington $$$$$$$$$$$$$$$$
601 - ,150.00 inspect fee?? misc
609 - 338,642.50 water connection
610 - 39,491.00 water availability
Total 378,283.50
52
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Wednesday, August 29, 2012 10:15 AM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel Project schedules
Nick
In the ILU area C&D wing there is 39 units (green area)
In the ILU area B wing there is 33 units (orange)
In the ILU area A wing there are 15 units (pink)
In the ILU area D&E wing there is 54 units (blue)
Let me know if you need anything else
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Wednesday, August 29, 2012 9:53 AM
To: Gary Hubble
Subject: RE: Barrington of Carmel Project schedules
Gary, do you have a breakdown of the number of units for each of the buildings at the Barrington? All I have is 141 total, but
don’t have the breakdown of this. I am trying to calculate the fees.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, July 23, 2012 10:34 AM
To: Blanchard, Jim E
Cc: Mishler, Nicholas F; wholt@carmel.in.gov; Ron Chabot
Subject: Barrington of Carmel Project schedules
Jim,
53
please see the 2 attached schedules for the Barrington project. the first one is the entire construction schedule and the
2nd is just where I have the City of Carmel (COC) scheduled for inspections with durations.
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
54
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, August 13, 2012 9:34 AM
To:Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:RE: Barrington
Ok – thanks Nick
From: Mishler, Nicholas F
Sent: Monday, August 13, 2012 9:17 AM
To: Duffy, John M
Cc: Kempa, Lisa L
Subject: RE: Barrington
We have been holding this permit up pending the payment to you guys. They are aware that we will not issue until until the
utilities payment is made and they know the amount they need to pay. Usually Jim Blanchard doesn’t have a problem with basic
site prep work being done as long as engineering is OK with it.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duffy, John M
Sent: Monday, August 13, 2012 9:14 AM
To: Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: Barrington
Nick,
Do you the permit status for Barrington? They have been doing some clearing and moving dirt, and possible doing some
survey work. They haen’t paid fees yet, so I am just curious. Thanks
J Duffy
John Duffy
Director
City of Carmel Utilities
760 Third Ave. SW
Carmel, IN 46032
317-571-2451
55
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, August 13, 2012 9:14 AM
To:Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:Barrington
Nick,
Do you the permit status for Barrington? They have been doing some clearing and moving dirt, and possible doing some
survey work. They haen’t paid fees yet, so I am just curious. Thanks
J Duffy
John Duffy
Director
City of Carmel Utilities
760 Third Ave. SW
Carmel, IN 46032
317-571-2451
56
Mishler, Nicholas F
From:Hohlt, William G
Sent:Tuesday, July 24, 2012 7:34 AM
To:Mishler, Nicholas F
Subject:FW: Barrington of Carmel Project schedules
Can you print these off on large paper for me please?
William Hohlt
Deputy Building Commissioner
City of Carmel
317.571.2470
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, July 23, 2012 10:40 AM
To: Blanchard, Jim E
Cc: Mishler, Nicholas F; wholt@carmel.in.gov; Ron Chabot
Subject: Barrington of Carmel Project schedules
Jim,
please see the 2 attached schedules for the Barrington project. the first one is the entire construction schedule and the
2nd is just where I have the City of Carmel (COC) scheduled for inspections with durations.
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
57
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, July 23, 2012 10:34 AM
To:Blanchard, Jim E
Cc:Mishler, Nicholas F; wholt@carmel.in.gov; Ron Chabot
Subject:Barrington of Carmel Project schedules
Jim,
please see the 2 attached schedules for the Barrington project. the first one is the entire construction schedule and the
2nd is just where I have the City of Carmel (COC) scheduled for inspections with durations.
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
58
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Friday, July 20, 2012 8:53 AM
To:Mishler, Nicholas F
Cc:Ron Chabot
Subject:RE: Applications
yes that is correct
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Friday, July 20, 2012 8:31 AM
To: Gary Hubble
Cc: Ron Chabot
Subject: RE: Applications
Gary, so just to confirm there are 263 total units?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Thursday, July 19, 2012 3:31 PM
To: Mishler, Nicholas F
Cc: Ron Chabot
Subject: RE: Applications
Nick, here are the unit counts per each area.
area.
# 1 ILU/ALU commons -- no units (commons space)
# 2 ILU C&D units -- 41 total all 3 floors
# 3 MC/ALU units -- 82 total all 3 floors
# 4 SNF units -- 38 total
# 5 ILU B units -- 33 total all 3 floors
# 6 ILU A units -- 15 total all 3 floors
59
# 7 ILU D&E units -- 54 total all 3 floors
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Thursday, July 19, 2012 9:19 AM
To: Ron Chabot
Cc: Gary Hubble
Subject: Applications
Good morning, I have attached the applications you submitted today. One thing I forgot to have you write on the apps is a
breakdown of how many units for each section of the building. If you can just email me that information I would appreciate it.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
60
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Thursday, July 19, 2012 3:31 PM
To:Mishler, Nicholas F
Cc:Ron Chabot
Subject:RE: Applications
Nick, here are the unit counts per each area.
area.
# 1 ILU/ALU commons -- no units (commons space)
# 2 ILU C&D units -- 41 total all 3 floors
# 3 MC/ALU units -- 82 total all 3 floors
# 4 SNF units -- 38 total
# 5 ILU B units -- 33 total all 3 floors
# 6 ILU A units -- 15 total all 3 floors
# 7 ILU D&E units -- 54 total all 3 floors
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
From: Mishler, Nicholas F [nmishler@carmel.in.gov]
Sent: Thursday, July 19, 2012 9:19 AM
To: Ron Chabot
Cc: Gary Hubble
Subject: Applications
Good morning, I have attached the applications you submitted today. One thing I forgot to have you write on the apps is a
breakdown of how many units for each section of the building. If you can just email me that information I would appreciate it.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
61
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Thursday, July 19, 2012 10:03 AM
To:Mishler, Nicholas F
Cc:Ron Chabot
Subject:Re: Applications
Ok will do
Sent from my iPhone
On Jul 19, 2012, at 9:25 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
> Good morning, I have attached the applications you submitted today. One thing I forgot to have you write on the apps is a
breakdown of how many units for each section of the building. If you can just email me that information I would appreciate it.
>
>
> Thanks,
>
> Nick Mishler
> Administrative Assistant
> Building & Code Services
> (317) 571-2489
>
> P Please consider the environment before printing this email
>
> <noreply@cityofcarmel.gov_20120719_081746.pdf>
62
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Tuesday, July 17, 2012 4:25 PM
To:Blanchard, Jim E
Cc:Mishler, Nicholas F
Subject:FW: building permits
Importance:High
Jim I left you a voice mail earlier this afternoon as a follow up to this previous e-mail. Like I mentioned I am having a
conference call with some of the investors on the project tomorrow and I would like to have you confirm that per our
last conversation The Barrington project can be issued permits upon payment of all fees, and submission of the permit
applications as described below.
Thanks again for all of your help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Mark Shegon
Sent: Monday, July 09, 2012 3:58 PM
To: Blanchard, Jim E; nmishler@carmel.in.gov
Subject: building permits
Jim,
Thanks for your time this afternoon and again we truly appreciate the continued support of the City of Carmel. Per our
discussion, The Barrington project will have one master permit and several sub-permits that will tie to the phased
turnover schedule included in the construction drawings, which will allow for a more efficient inspection and approval
process and an orderly dissemination of certificates of occupancy. The Architect and General Contractor will fill out the
additional applications and resubmit them to your office later this week.
At that time, with the exception of the payment of the permits fees, availability, connection and impact fees or any
other required city fees, you are now in a position to issue building permits for this project. Additionally, limited site
work may begin now, and can include, General Contractor mobilization, installation of erosion control barriers, erection
of construction fencing, site clearing and rough grading activities.
Thanks again for your help over the past few years and we look forward to working with your department in the future.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
63
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
64
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Wednesday, July 11, 2012 11:21 AM
To:Mark Shegon; Ken Murry; David Trinkner
Cc:Ron Chabot; Blanchard, Jim E; Mishler, Nicholas F; Bill OHanlon
Subject:RE: Building permits
Mark, I just got off the phone with Jim Blanchard. we will be setting up the permits based on the phased turnovers. There will be 7 for
each turnover plus 1 for the master permit as you indicated in your e-mail. Ron and I will be in Carmel all next week and we will fill
out all of those permits for Jim at the first part of the week.
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
________________________________________
From: Mark Shegon [mshegon@greystonecommunities.com]
Sent: Wednesday, July 11, 2012 10:49 AM
To: Gary Hubble; Ken Murry; David Trinkner
Subject: Building permits
Hey how is the permit thing coming? Jim Blanchard agreed that the best way to permit the project was to have 1 master permit and
then have sub-permits for each area per the phased turnover drawing. That way we can pull certificates of occupancy that coordinate
with our phasing. I think that is the only thing holding up the final approval of the permits. So let's get this out soon.
Sent from my iPhone
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be
legally privileged. It is intended solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or
any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. If you have received this e-mail in error,
please notify the sender and permanently delete the e-mail, and any attachments, immediately as you should not retain, copy or use
this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
65
Mishler, Nicholas F
From:David Trinkner [datrin@agarch.com]
Sent:Monday, July 09, 2012 5:14 PM
To:Mishler, Nicholas F
Subject:071101 The Barrington
Nick,
Attached are copies of the state releases for all of the plan approvals for our Barrington project. Please contact me if you
have any questions. Thanks.
David A Trinkner, Senior Associate
datrin@agarch.com www.agarch.com
1414 Underwood Ave - Suite 301
Wauwatosa, WI 53213
414.431.3131 414.431.0531 fax
66
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, July 09, 2012 4:58 PM
To:Blanchard, Jim E; Mishler, Nicholas F
Subject:building permits
Jim,
Thanks for your time this afternoon and again we truly appreciate the continued support of the City of Carmel. Per our
discussion, The Barrington project will have one master permit and several sub-permits that will tie to the phased
turnover schedule included in the construction drawings, which will allow for a more efficient inspection and approval
process and an orderly dissemination of certificates of occupancy. The Architect and General Contractor will fill out the
additional applications and resubmit them to your office later this week.
At that time, with the exception of the payment of the permits fees, availability, connection and impact fees or any
other required city fees, you are now in a position to issue building permits for this project. Additionally, limited site
work may begin now, and can include, General Contractor mobilization, installation of erosion control barriers, erection
of construction fencing, site clearing and rough grading activities.
Thanks again for your help over the past few years and we look forward to working with your department in the future.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
67
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, July 09, 2012 1:01 PM
To:Mishler, Nicholas F
Subject:RE: Barrington Addendum 5
I am tied up in meetings all day until about 3:00 central. I can give him a call then. Is there a problem with the
addendum?
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, July 09, 2012 11:54 AM
To: Mark Shegon
Subject: RE: Barrington Addendum 5
Mark, please contact our Building Commissioner, Jim Blanchard at 317-571-2450. He should be back in the office in about 30
minutes.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, July 09, 2012 12:37 PM
To: Mishler, Nicholas F
Subject: Barrington Addendum 5
Nick,
Can you please give me an update on the status of your departments review of Addendum 5 for the Barrington project?
I believe it was sent in a week or so ago and it has already been reviewed at the state level and approved.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
68
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
69
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, July 09, 2012 12:58 PM
To:Mishler, Nicholas F
Subject:RE: bank inspectors permit request
Thanks!
Angie Conn
Planning Administrator
From: Mishler, Nicholas F
Sent: Monday, July 09, 2012 12:58 PM
To: Conn, Angelina V; Lux, Pamela K
Subject: RE: bank inspectors permit request
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Monday, July 09, 2012 12:52 PM
To: Mishler, Nicholas F; Lux, Pamela K
Subject: FW: bank inspectors permit request
Hi – is a word document of this on the s drive?
Angie Conn
Planning Administrator
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, July 09, 2012 12:44 PM
To: Conn, Angelina V
Cc: rward@rw-engineering.com
Subject: bank inspectors permit request
Angie, do you have a Microsoft word version of this document that you can share with me? I think it covers all the bases
and I can simply add a column that addresses the status of The Barrington project relative to the permitting
requirements listed. That might be the quickest and easiest way to deal with their request and prevent you from having
to waste any time dealing with it.
Thanks for your help.
Mark Shegon
70
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
71
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, July 09, 2012 12:52 PM
To:Mishler, Nicholas F; Lux, Pamela K
Subject:FW: bank inspectors permit request
Hi – is a word document of this on the s drive?
Angie Conn
Planning Administrator
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, July 09, 2012 12:44 PM
To: Conn, Angelina V
Cc: rward@rw-engineering.com
Subject: bank inspectors permit request
Angie, do you have a Microsoft word version of this document that you can share with me? I think it covers all the bases
and I can simply add a column that addresses the status of The Barrington project relative to the permitting
requirements listed. That might be the quickest and easiest way to deal with their request and prevent you from having
to waste any time dealing with it.
Thanks for your help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
72
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, July 09, 2012 12:43 PM
To:Mark Shegon; Roger Ward
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: The Barrington CCRC
Mark,
Thanks for the update. Checks are fine.
J Duffy
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, July 09, 2012 12:35 PM
To: Roger Ward; Duffy, John M
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
We anticipate closing the financing and funding the project sometime during the last 2 weeks of August. An exact date
has not been established yet. Typically the day the project is funded we can wire the money for the permits to the city.
If you would like for us to do that we just need wiring instructions, otherwise we will have checks cut and it will take a
few days to have them signed and overnighted via FedEx.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 11:27 AM
To: Duffy, John M; Mark Shegon
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
John,
I am including our client in this email. They are finalizing their financing and would anticipate the fees being paid shortly
after the financing is secured.
Thank you,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
73
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:12 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry it is attached now. It would be helpful to know approximately when the fees will be paid. Thanks for your help.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 12:07 PM
To: Duffy, John M
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
I didn't get your attachment.
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:04 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
74
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
75
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
76
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, July 09, 2012 12:37 PM
To:Mishler, Nicholas F
Subject:Barrington Addendum 5
Nick,
Can you please give me an update on the status of your departments review of Addendum 5 for the Barrington project?
I believe it was sent in a week or so ago and it has already been reviewed at the state level and approved.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
77
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, July 09, 2012 12:35 PM
To:Roger Ward; Duffy, John M
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: The Barrington CCRC
We anticipate closing the financing and funding the project sometime during the last 2 weeks of August. An exact date
has not been established yet. Typically the day the project is funded we can wire the money for the permits to the city.
If you would like for us to do that we just need wiring instructions, otherwise we will have checks cut and it will take a
few days to have them signed and overnighted via FedEx.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 11:27 AM
To: Duffy, John M; Mark Shegon
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
John,
I am including our client in this email. They are finalizing their financing and would anticipate the fees being paid shortly
after the financing is secured.
Thank you,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:12 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
78
Roger,
Sorry it is attached now. It would be helpful to know approximately when the fees will be paid. Thanks for your help.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 12:07 PM
To: Duffy, John M
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
I didn't get your attachment.
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:04 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
79
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
80
Mishler, Nicholas F
From:Roger Ward [RWard@rw-engineering.com]
Sent:Monday, July 09, 2012 12:27 PM
To:Duffy, John M; Mark Shegon
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: The Barrington CCRC
John,
I am including our client in this email. They are finalizing their financing and would anticipate the fees being paid shortly
after the financing is secured.
Thank you,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:12 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry it is attached now. It would be helpful to know approximately when the fees will be paid. Thanks for your help.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 12:07 PM
To: Duffy, John M
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
I didn't get your attachment.
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
81
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:04 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
82
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
83
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, July 09, 2012 12:12 PM
To:Roger Ward
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: The Barrington CCRC
Roger,
Sorry it is attached now. It would be helpful to know approximately when the fees will be paid. Thanks for your help.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Monday, July 09, 2012 12:07 PM
To: Duffy, John M
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: RE: The Barrington CCRC
I didn't get your attachment.
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:04 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
84
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
85
86
Mishler, Nicholas F
From:Roger Ward [RWard@rw-engineering.com]
Sent:Monday, July 09, 2012 12:07 PM
To:Duffy, John M
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:RE: The Barrington CCRC
I didn't get your attachment.
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, July 09, 2012 12:04 PM
To: Roger Ward
Cc: Kempa, Lisa L; Mishler, Nicholas F
Subject: FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
87
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
88
Mishler, Nicholas F
From:Duffy, John M
Sent:Monday, July 09, 2012 12:04 PM
To:Roger Ward
Cc:Kempa, Lisa L; Mishler, Nicholas F
Subject:FW: The Barrington CCRC
Roger,
The only left as far as Carmel Water is concerned is the payment of fees. I have attached a copy of the invoice that was
previously sent. Should a copy of this be sent to the owner? Thanks
J Duffy
From: Duffy, John M
Sent: Sunday, July 08, 2012 8:28 AM
To: 'Roger Ward'
Cc: Mishler, Nicholas F
Subject: RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
89
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
90
Mishler, Nicholas F
From:Duffy, John M
Sent:Sunday, July 08, 2012 8:28 AM
To:Roger Ward
Cc:Mishler, Nicholas F
Subject:RE: The Barrington CCRC
Roger,
Sorry for not responding sooner to this. Carmel water has no issues with these changes.
J Duffy
From: Roger Ward [mailto:RWard@rw-engineering.com]
Sent: Friday, June 22, 2012 8:50 AM
To: Conn, Angelina V; Donahue-Wold, Alexia K; Mindham, Daren; Littlejohn, David W; Akers, William P; Huffman, David;
Thomas, John G; greg.hoyes@hamiltoncounty.in.gov; gilko@crossroadengineers.com; Duncan, Gary R; Redden, Nick;
david.lucas@hamiltoncounty.in.gov; Hohlt, William G; Blanchard, Jim E; Duffy, John M; Green, Timothy J; Ellison,
Christopher M; Krueskamp, Theresa A; Forward for Westermeier, Mark; jason.lemaster@hamiltoncounty.in.gov;
brooke.gajownik@hamiltoncounty.in.gov; jason.kirkman@mybrighthouse.com; shirley.hunter@duke-energy.com;
gary.mcnamee@duke-energy.com; jlclark@vectren.com; dan.davenport@aes.com; dwhiting@citizensenergygroup.com;
rfarrand@ccs.k12.in.us; Ryan Hartman; troy.yackle@sug.com; doland.w.wise@usps.gov; sk4986@att.com
Cc: David Trinkner; Mark Shegon
Subject: The Barrington CCRC
Dear TAC Members,
I wanted to update you on the proposed Barrington CCRC project located north of 116th Street along Guilford Road in
Carmel, Indiana. Construction is slated to begin this August, and there have been some minor revisions to the approved
plans. These changes have been discussed with the office of Community Services, and they have directed us to submit
these plans to you as a courtesy.
Please be aware that we have made the following revisions to the plans:
1. Added underground parking at Wing A. Net add of 7 stalls of parking.
2. Squared off corner of building at Wing A to accommodate new underground parking and created additional
storage space.
3. Added underground parking at Wings D and portion of wing E. Net add of 33 spaces (total of 142 underground
spaces vs. 102 previously).
4. The proposed parking changes occur below grade. As such, there will not need to be changes to the previously
approved site plan or the site engineering.
Please let us know if anyone has any questions or concerns regarding these minor changes. And let us know if you are in
need of any additional information prior to our start of construction.
Please note that the team expects to submit the state approved plans for this additional work to the city some time early
next week. Your quick response to any questions or concerns regarding this work is greatly appreciated.
Thank you for your time, and we appreciate your assistance with our project.
Sincerely,
91
Roger Ward PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(317) 251-1738
(Fax) 251-1923
www.rw-engineering.com
92
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, July 06, 2012 3:26 PM
To:Mishler, Nicholas F
Subject:RE: The Barrington CCRC on Guilford Rd
Thank you.
Angie Conn
Planning Administrator
From: Mishler, Nicholas F
Sent: Friday, July 06, 2012 3:22 PM
To: Conn, Angelina V
Cc: Lux, Pamela K
Subject: RE: The Barrington CCRC on Guilford Rd
The latest info I have is they still need to pay their water/sewer availability. This is per Lisa Kempa @ Carmel Utilities and Ryan
Hartman @ CTRWD.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Friday, July 06, 2012 3:15 PM
To: Mishler, Nicholas F
Cc: Lux, Pamela K
Subject: The Barrington CCRC on Guilford Rd
Hi, Nick –
the owner would like a letter from DOCS that they can give the Lender for financing. I can write the letter, but I need to
ask you some questions first:
What is the status of the building permit approval? Have all departments signed off on the project yet? ( I heard that
there might be some outstanding fees they need to pay.)
Please let me know.
Thank you!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
93
94
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, July 06, 2012 3:15 PM
To:Mishler, Nicholas F
Cc:Lux, Pamela K
Subject:The Barrington CCRC on Guilford Rd
Hi, Nick –
the owner would like a letter from DOCS that they can give the Lender for financing. I can write the letter, but I need to
ask you some questions first:
What is the status of the building permit approval? Have all departments signed off on the project yet? ( I heard that
there might be some outstanding fees they need to pay.)
Please let me know.
Thank you!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
95
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Thursday, July 05, 2012 4:48 PM
To:Mishler, Nicholas F
Cc:Ron Chabot
Subject:Re: Barrington of Carmel Project
Yes thanks
Sent from my iPhone
On Jul 5, 2012, at 4:47 PM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Gary, I received plans in the mail last week for the Barrington and when I spoke to David Trinkner to clarify
what these were, he said these were for changes to what was initially submitted. After beginning his review,
our Building Commissioner thinks they may actually be for the parking garage, which has not yet been applied
for. If these plans are for the parking garage, or another building that has not yet been applied for, it will need
it’s own application to be completed.
I can send a stack of the applications if you would like, as it looks like there may be 5 buildings total.
Let me know,
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Gary Hubble [mailto:ghubble@LECESSEconstruction.com]
Sent: Monday, June 04, 2012 11:09 AM
To: Mishler, Nicholas F
Cc: Ron Chabot
Subject: Barrington of Carmel Project
Nick I received your name from David Trinkner who is the Architect for the Barrington of Carmel CCRC
project. I will be the project superintendent and I will be in Carmel this Wednesday and Thursday. I will
be meeting with the site contractor and possibly John Thomas of Carmel storm water on Wednesday and
hoping to stop by and Meet you on Thursday. I have also asked Chris Ellison of the Fire dept to meet on
Thursday as well. If you have any time Thursday please let me know. I would like to review with you, as
we have with Chris Ellison the phased turnover and any additional requirements needed for the project.
I can be reached by e-mail and my cell phone # is 585-202-1407. thank you
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
96
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
97
Mishler, Nicholas F
From:Akers, William P
Sent:Thursday, June 07, 2012 2:29 PM
To:Lux, Pamela K; Knott, Bruce; Mishler, Nicholas F
Cc:Blanchard, Jim E
Subject:RE: Barrington Senior Living
As of now, I am available most of that week anytime….however that could change at any time. First of all we will need an
updated site plan showing all the
Buildings involved in this project with street layout and proposed street names on the plans they want to use….or a list of
names wanting to use. If you have a site plan we can look it over as well if I don’t get any by then. Plus this will give you
all a chance to work with the fabulous, city Fire Marshall, Bruce Knott…..I tell ya…I will miss that funny guy..
Take care
Bill
From: Lux, Pamela K
Sent: Thursday, June 07, 2012 11:28 AM
To: Akers, William P; Knott, Bruce; Mishler, Nicholas F
Cc: Blanchard, Jim E
Subject: Barrington Senior Living
Good Morning---
This morning Gary Hubble –senior superintendent for Lecesse Construction—stopped to introduce himself. He let us
know they are beginning to move dirt on July 9, 2012. Jim Blanchard would like to begin the addressing process. Would
be available to meet during the week of July 16-20th? Please let me know. Thanks!
Pam Lux
Building and Code Services
City of Carmel
98
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Thursday, June 07, 2012 11:28 AM
To:Akers, William P; Knott, Bruce; Mishler, Nicholas F
Cc:Blanchard, Jim E
Subject:Barrington Senior Living
Good Morning---
This morning Gary Hubble –senior superintendent for Lecesse Construction—stopped to introduce himself. He let us
know they are beginning to move dirt on July 9, 2012. Jim Blanchard would like to begin the addressing process. Would
be available to meet during the week of July 16-20th? Please let me know. Thanks!
Pam Lux
Building and Code Services
City of Carmel
99
Mishler, Nicholas F
From:Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent:Monday, June 04, 2012 11:30 AM
To:Mishler, Nicholas F
Cc:Lux, Pamela K
Subject:RE: Barrington of Carmel
Will do….thanks Nick.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, June 04, 2012 11:19 AM
To: Ryan Hartman
Cc: Lux, Pamela K
Subject: RE: Barrington of Carmel
OK thanks. It looks like sewer and water just need to be paid before we can issue the permit. If this should happen in the next
two weeks, can you also copy Pam Lux on the email? I will be out of the office from Friday, June 8 through Thursday, June 14 so
she will be covering for me.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Monday, June 04, 2012 11:20 AM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel
No…not yet.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, June 04, 2012 11:15 AM
100
To: Ryan Hartman
Subject: RE: Barrington of Carmel
Ryan, have you received payment yet on the Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Thursday, October 06, 2011 1:36 PM
To: Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A;
Duffy, John M; Duncan, Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn,
David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: RE: Barrington of Carmel
Nick,
We are waiting on payment prior to issuing the sanitary sewer permit.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
101
(317) 571-2489
Please consider the environment before printing this email
102
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Monday, June 04, 2012 11:21 AM
To:Mishler, Nicholas F
Subject:RE: The Barrington
Will do. Have a good time off
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Monday, June 04, 2012 11:18 AM
To: Kempa, Lisa L
Cc: Lux, Pamela K
Subject: RE: The Barrington
OK thanks. It looks like sewer and water just need to be paid before we can issue the permit. If this should happen in the next
two weeks, can you also copy Pam Lux on the email? I will be out of the office from Friday, June 8 through Thursday, June 14 so
she will be covering for me.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Kempa, Lisa L
Sent: Monday, June 04, 2012 11:14 AM
To: Mishler, Nicholas F
Subject: RE: The Barrington
No they haven’t
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Monday, June 04, 2012 11:10 AM
To: Kempa, Lisa L
Subject: The Barrington
103
Lisa, has the Barrington paid their water/sewer availability yet?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
104
Mishler, Nicholas F
From:Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent:Monday, June 04, 2012 11:20 AM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel
No…not yet.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Monday, June 04, 2012 11:15 AM
To: Ryan Hartman
Subject: RE: Barrington of Carmel
Ryan, have you received payment yet on the Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Thursday, October 06, 2011 1:36 PM
To: Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A;
Duffy, John M; Duncan, Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn,
David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: RE: Barrington of Carmel
Nick,
We are waiting on payment prior to issuing the sanitary sewer permit.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
105
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
106
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Monday, June 04, 2012 11:14 AM
To:Mishler, Nicholas F
Subject:RE: The Barrington
No they haven’t
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Monday, June 04, 2012 11:10 AM
To: Kempa, Lisa L
Subject: The Barrington
Lisa, has the Barrington paid their water/sewer availability yet?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
107
Mishler, Nicholas F
From:Gary Hubble [ghubble@LECESSEconstruction.com]
Sent:Monday, June 04, 2012 11:09 AM
To:Mishler, Nicholas F
Cc:Ron Chabot
Subject:Barrington of Carmel Project
Nick I received your name from David Trinkner who is the Architect for the Barrington of Carmel CCRC project. I will be
the project superintendent and I will be in Carmel this Wednesday and Thursday. I will be meeting with the site
contractor and possibly John Thomas of Carmel storm water on Wednesday and hoping to stop by and Meet you on
Thursday. I have also asked Chris Ellison of the Fire dept to meet on Thursday as well. If you have any time Thursday
please let me know. I would like to review with you, as we have with Chris Ellison the phased turnover and any
additional requirements needed for the project.
I can be reached by e-mail and my cell phone # is 585-202-1407. thank you
Gary Hubble
Senior Superintendent
LECESSE Construction Services
"Celebrating 60 Years"
"From Concept to Completion We build it as if it's our own."
Cp 585-202-1407
www.lecesseconstruction.com
108
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Tuesday, May 15, 2012 8:50 PM
To:Mishler, Nicholas F
Subject:RE: Barrington permit review
Nick any new news on the status of the permit review. We had a call with the finance team today and they were curious
if the city had completed its review of the documents and was in a position to issue the Building Permit subject to
payment of necessary fees and required meetings etc.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, May 09, 2012 7:37 AM
To: Mark Shegon
Cc: Ellison, Christopher M; Blanchard, Jim E
Subject: RE: Barrington permit review
Mark-
I believe Chris Ellison (CFD) and our building commissioner Jim Blanchard are both OK with starting site work, but that is where
it stands right now. If you have any questions they are both copied on this email.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, May 08, 2012 10:47 AM
To: Mishler, Nicholas F
Subject: Barrington permit review
Nick,
I just wanted to check with you and see how the Barrington review was going? Do you guys have any questions or
comments? Just let me know and I can have the design team get in touch with you.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
109
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
110
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Wednesday, May 09, 2012 8:46 AM
To:Mishler, Nicholas F
Cc:Mark Shegon; Blanchard, Jim E
Subject:Re: Barrington permit review
I have no objection to site work beginning.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On May 9, 2012, at 8:37 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Mark-
I believe Chris Ellison (CFD) and our building commissioner Jim Blanchard are both OK with starting site work,
but that is where it stands right now. If you have any questions they are both copied on this email.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, May 08, 2012 10:47 AM
To: Mishler, Nicholas F
Subject: Barrington permit review
Nick,
I just wanted to check with you and see how the Barrington review was going? Do you guys have any
questions or comments? Just let me know and I can have the design team get in touch with you.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally
privileged. It is intended solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action
111
taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. If you have received this e-mail in error, please notify the
sender and permanently delete the e-mail, and any attachments, immediately as you should not retain, copy or use this e-mail or any
attachment for any purpose, nor disclose all or any part of the contents to any other person.
112
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Tuesday, May 08, 2012 10:47 AM
To:Mishler, Nicholas F
Subject:Barrington permit review
Nick,
I just wanted to check with you and see how the Barrington review was going? Do you guys have any questions or
comments? Just let me know and I can have the design team get in touch with you.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
113
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Thursday, May 03, 2012 2:47 PM
To:Mishler, Nicholas F
Cc:Knott, Bruce
Subject:Barrington Project
Nick,
I am working through the Barrington Project plans. I have reviewed the site plan and have no objection to site work
beginning. It will take me some time to get through the main building plans. I am working through them.
Thanks,
Chris Ellison
CFD
317-571-2621
114
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, April 25, 2012 1:38 PM
To:Mishler, Nicholas F
Subject:RE: Barrington Engineering Dept. performance bonds
Nick, thanks so much for the update. I really appreciate your help over the last few months.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, April 25, 2012 12:24 PM
To: Mark Shegon; Duncan, Gary R
Cc: Barnes, David R; DCoots@chwlaw.com
Subject: RE: Barrington Engineering Dept. performance bonds
Mark, I just received the email from engineering that their department is OK with this project. I am submitting the plans to our
building commissioner and Carmel Fire Department for review. Our review time is typically one week. If you need anything else,
let me know.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, April 17, 2012 3:14 PM
To: Duncan, Gary R; Mishler, Nicholas F
Cc: Barnes, David R; DCoots@chwlaw.com
Subject: RE: Barrington Engineering Dept. performance bonds
Gentlemen,
Roger Ward will be delivering the bonds this afternoon. Please let me know if there is anything else required prior to
the start of the permit review process.
Thanks again for all you help.
Mark Shegon
115
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Friday, February 10, 2012 7:42 AM
To: Mishler, Nicholas F
Cc: Mark Shegon; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
116
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
117
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, April 25, 2012 1:17 PM
To:Mishler, Nicholas F; Duncan, Gary R; Foley, Amanda J
Cc:Thomas, John G; Redden, Nick
Subject:RE: Barrington Engineering Dept. performance bonds
Nicholas: We have received the final bond for this today (Wed 4/25), engineering is ok with everything.
From: Mishler, Nicholas F
Sent: Friday, April 20, 2012 4:58 PM
To: Barnes, David R; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Wednesday, April 18, 2012 3:38 PM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Nick: We’ve got a hiccup on the bonding, should be worked out very soon.
From: Mishler, Nicholas F
Sent: Wednesday, April 18, 2012 3:37 PM
To: Duncan, Gary R
Cc: Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Hey Gary, please let me know when Engineering is OK with this so we can get the project in for review.
Thanks!
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
118
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, April 17, 2012 3:14 PM
To: Duncan, Gary R; Mishler, Nicholas F
Cc: Barnes, David R; DCoots@chwlaw.com
Subject: RE: Barrington Engineering Dept. performance bonds
Gentlemen,
Roger Ward will be delivering the bonds this afternoon. Please let me know if there is anything else required prior to
the start of the permit review process.
Thanks again for all you help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Friday, February 10, 2012 7:42 AM
To: Mishler, Nicholas F
Cc: Mark Shegon; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
119
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
120
Mishler, Nicholas F
From:Barnes, David R
Sent:Monday, April 23, 2012 7:51 AM
To:Mishler, Nicholas F
Cc:Duncan, Gary R
Subject:RE: Barrington Engineering Dept. performance bonds
Nick: I am to receive the bond for ROW either today (4/23) or tomorrow. I’ll let you know as soon as it comes in.
From: Mishler, Nicholas F
Sent: Friday, April 20, 2012 4:58 PM
To: Barnes, David R; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Wednesday, April 18, 2012 3:38 PM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Nick: We’ve got a hiccup on the bonding, should be worked out very soon.
From: Mishler, Nicholas F
Sent: Wednesday, April 18, 2012 3:37 PM
To: Duncan, Gary R
Cc: Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Hey Gary, please let me know when Engineering is OK with this so we can get the project in for review.
Thanks!
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, April 17, 2012 3:14 PM
121
To: Duncan, Gary R; Mishler, Nicholas F
Cc: Barnes, David R; DCoots@chwlaw.com
Subject: RE: Barrington Engineering Dept. performance bonds
Gentlemen,
Roger Ward will be delivering the bonds this afternoon. Please let me know if there is anything else required prior to
the start of the permit review process.
Thanks again for all you help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Friday, February 10, 2012 7:42 AM
To: Mishler, Nicholas F
Cc: Mark Shegon; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
122
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
123
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, April 18, 2012 3:38 PM
To:Mishler, Nicholas F; Duncan, Gary R
Subject:RE: Barrington Engineering Dept. performance bonds
Nick: We’ve got a hiccup on the bonding, should be worked out very soon.
From: Mishler, Nicholas F
Sent: Wednesday, April 18, 2012 3:37 PM
To: Duncan, Gary R
Cc: Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Hey Gary, please let me know when Engineering is OK with this so we can get the project in for review.
Thanks!
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Tuesday, April 17, 2012 3:14 PM
To: Duncan, Gary R; Mishler, Nicholas F
Cc: Barnes, David R; DCoots@chwlaw.com
Subject: RE: Barrington Engineering Dept. performance bonds
Gentlemen,
Roger Ward will be delivering the bonds this afternoon. Please let me know if there is anything else required prior to
the start of the permit review process.
Thanks again for all you help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Friday, February 10, 2012 7:42 AM
To: Mishler, Nicholas F
124
Cc: Mark Shegon; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
125
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
126
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Tuesday, April 17, 2012 3:14 PM
To:Duncan, Gary R; Mishler, Nicholas F
Cc:Barnes, David R; DCoots@chwlaw.com
Subject:RE: Barrington Engineering Dept. performance bonds
Gentlemen,
Roger Ward will be delivering the bonds this afternoon. Please let me know if there is anything else required prior to
the start of the permit review process.
Thanks again for all you help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Duncan, Gary R [mailto:gduncan@carmel.in.gov]
Sent: Friday, February 10, 2012 7:42 AM
To: Mishler, Nicholas F
Cc: Mark Shegon; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
127
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
128
Mishler, Nicholas F
From:Barnes, David R
Sent:Thursday, March 29, 2012 1:32 PM
To:Mishler, Nicholas F
Cc:Duncan, Gary R
Subject:RE: Barrington Engineering Dept. performance bonds
Nick: I’ll let Gary put his nickel in this also, but the plans have been signed for 4 months now by both Mike and John
Duffy. We still do not have any bonds provided.
From: Mishler, Nicholas F
Sent: Thursday, March 29, 2012 1:19 PM
To: Duncan, Gary R; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Gary, where do we stand on this? Any updates?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duncan, Gary R
Sent: Thursday, February 23, 2012 8:24 AM
To: Barnes, David R; Mishler, Nicholas F
Subject: RE: Barrington Engineering Dept. performance bonds
Mr. Deichmann is aware that we have no further issues with the estimates. I expect bonding ASAP.
From: Barnes, David R
Sent: Wednesday, February 22, 2012 3:23 PM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Nick: We have just received a revised engineer’s estimate, likely we will give them the ok to provide bonds based on
that…however, as of today, no bonds in place yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 22, 2012 3:11 PM
To: Duncan, Gary R; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Any updates on this?
Thanks,
Nick Mishler
129
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duncan, Gary R
Sent: Friday, February 10, 2012 9:01 AM
To: Barnes, David R; Mishler, Nicholas F
Subject: RE: Barrington Engineering Dept. performance bonds
Thanks Dave…so no bonds yet?
From: Barnes, David R
Sent: Friday, February 10, 2012 8:46 AM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: FW: Barrington Engineering Dept. performance bonds
Gary: Just to update you on the status. I have already replied to Mr. Shegon with examples of our accepted bond
format.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
130
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Thursday, February 23, 2012 8:24 AM
To:Barnes, David R; Mishler, Nicholas F
Subject:RE: Barrington Engineering Dept. performance bonds
Mr. Deichmann is aware that we have no further issues with the estimates. I expect bonding ASAP.
From: Barnes, David R
Sent: Wednesday, February 22, 2012 3:23 PM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: RE: Barrington Engineering Dept. performance bonds
Nick: We have just received a revised engineer’s estimate, likely we will give them the ok to provide bonds based on
that…however, as of today, no bonds in place yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 22, 2012 3:11 PM
To: Duncan, Gary R; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duncan, Gary R
Sent: Friday, February 10, 2012 9:01 AM
To: Barnes, David R; Mishler, Nicholas F
Subject: RE: Barrington Engineering Dept. performance bonds
Thanks Dave…so no bonds yet?
From: Barnes, David R
Sent: Friday, February 10, 2012 8:46 AM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: FW: Barrington Engineering Dept. performance bonds
Gary: Just to update you on the status. I have already replied to Mr. Shegon with examples of our accepted bond
format.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
131
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
132
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, February 22, 2012 3:23 PM
To:Mishler, Nicholas F; Duncan, Gary R
Subject:RE: Barrington Engineering Dept. performance bonds
Nick: We have just received a revised engineer’s estimate, likely we will give them the ok to provide bonds based on
that…however, as of today, no bonds in place yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 22, 2012 3:11 PM
To: Duncan, Gary R; Barnes, David R
Subject: RE: Barrington Engineering Dept. performance bonds
Any updates on this?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duncan, Gary R
Sent: Friday, February 10, 2012 9:01 AM
To: Barnes, David R; Mishler, Nicholas F
Subject: RE: Barrington Engineering Dept. performance bonds
Thanks Dave…so no bonds yet?
From: Barnes, David R
Sent: Friday, February 10, 2012 8:46 AM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: FW: Barrington Engineering Dept. performance bonds
Gary: Just to update you on the status. I have already replied to Mr. Shegon with examples of our accepted bond
format.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
133
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
134
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, February 13, 2012 12:47 PM
To:'Dave Coots'
Cc:Mark Shegon; Duncan, Gary R; Mishler, Nicholas F
Subject:RE: Barrington Fee Checklist
For planning & zoning: You have already paid the ADLS Amendment filing fee, so that is done. Other fees will be fees for
any sign permits; that application can be found online at: http://www.carmel.in.gov/index.aspx?page=82 .
Also, through the Building Permits Dept, there will also be some type of fee assessed to go along with the Parks &
Recreation Impact Fee (PRIF), but that is so many thousands of dollars per equivalent dwelling unit, so I am not sure how
the Building Permits Dept will charge per CCRC unit, in this instance. Here is a link to that ordinance requirement for
PRIF, chapter 29.07.04: http://www.carmel.in.gov/Modules/ShowDocument.aspx?documentid=1702
Those are all the planning/zoning fees I can think of right now…
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
Check out our new website: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Monday, February 13, 2012 12:27 PM
To: Conn, Angelina V; Duncan, Gary R
Cc: Mark Shegon
Subject: FW: Barrington Fee Checklist
Angie and Gary,
Below is Nick Mishler’s response to Mark Shegon’s request to get a budget put together for future fees to be
paid to Carmel/Clay Township in order to obtain a building permit and the costs of inspection. I have provided Mark
with the DOCS 2012 Fee Schedule from the City’s website; however want to confirm that all fees due to
DOCS(application for review fees) and Engineering(TAC) have been paid and that no additional fees are due to you as
suggested might be by Nick’s email.
Secondly, from my review of the fee schedule, Mark has addressed all of the entities charging an application fee. The
“road impact” fee he addresses is the cost of improvements the Barrington will have to make to Guilford plus the multi-
purpose path. There is no other road impact fee to be charged.
Thanks for you response.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Friday, February 10, 2012 4:02 PM
To: Dave Coots
Subject: FW: Barrington Fee Checklist
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, February 10, 2012 2:55 PM
135
To: Mark Shegon
Subject: RE: Barrington Fee Checklist
Mark, I probably shouldn’t speak for other departments regarding what their requirements are. I know from my experience
that departments such as Planning & Zoning, Engineering, etc will also occasionally charge fees but you would really need to talk
to them to make sure their requirements are met. I have attached the new commercial project requirements so you can see
everyone who is involved with the project.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Friday, February 10, 2012 3:45 PM
To: Mishler, Nicholas F
Subject: Barrington Fee Checklist
Importance: High
Nick,
I hate to keep bothering you but I wanted to close the loop on this item. Do you guys have some sort of all inclusive fee
checklist? I want to make sure I have everything covered in my budget as this goes out for financing. I currently have
information from the city on the following:
Water fee
Sewer fee
Building permit fee
Parks and Recreation fee
Road impact fee
Do you think I am missing anything?
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
136
Mishler, Nicholas F
From:Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent:Monday, February 13, 2012 8:17 AM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Ellison, Christopher M; Kempa, Lisa L; Knott, Bruce;
Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas,
John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard;
David Lucas; Mark Shegon
Subject:RE: Barrington of Carmel
Nick,
The plans have been approved and a sanitary sewer permit can be issued once fees are paid. Thank you.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, February 03, 2012 12:56 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Ellison,
Christopher M; Ryan Hartman; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham,
Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry
Beard; David Lucas; Mark Shegon
Subject: Barrington of Carmel
Good afternoon-
I have received the application and plans for the Barrington of Carmel. You may already be familiar with the project but if not, I have
attached the original email I had sent in October with project summary. Please let me know if you have any issues with these plans
being reviewed and a building permit being issued.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
137
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Friday, February 10, 2012 3:45 PM
To:Mishler, Nicholas F
Subject:Barrington Fee Checklist
Importance:High
Nick,
I hate to keep bothering you but I wanted to close the loop on this item. Do you guys have some sort of all inclusive fee
checklist? I want to make sure I have everything covered in my budget as this goes out for financing. I currently have
information from the city on the following:
Water fee
Sewer fee
Building permit fee
Parks and Recreation fee
Road impact fee
Do you think I am missing anything?
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
138
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Friday, February 10, 2012 9:01 AM
To:Barnes, David R; Mishler, Nicholas F
Subject:RE: Barrington Engineering Dept. performance bonds
Thanks Dave…so no bonds yet?
From: Barnes, David R
Sent: Friday, February 10, 2012 8:46 AM
To: Mishler, Nicholas F; Duncan, Gary R
Subject: FW: Barrington Engineering Dept. performance bonds
Gary: Just to update you on the status. I have already replied to Mr. Shegon with examples of our accepted bond
format.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
139
Mishler, Nicholas F
From:Barnes, David R
Sent:Friday, February 10, 2012 8:46 AM
To:Mishler, Nicholas F; Duncan, Gary R
Subject:FW: Barrington Engineering Dept. performance bonds
Gary: Just to update you on the status. I have already replied to Mr. Shegon with examples of our accepted bond
format.
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
140
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Friday, February 10, 2012 8:42 AM
To:Mishler, Nicholas F
Cc:'Mark Shegon'; Barnes, David R
Subject:RE: Barrington Engineering Dept. performance bonds
Good morning Nick. The last correspondence I had was that bonds were being ordered. Not sure if they have been
received. I will confirm.
Gary
From: Mishler, Nicholas F
Sent: Friday, February 10, 2012 8:39 AM
To: Duncan, Gary R
Cc: 'Mark Shegon'
Subject: FW: Barrington Engineering Dept. performance bonds
Gary, see below…can you help with this? Dave Barnes’ email has an out-of-office notification from June so I’m not sure this got
to him.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, February 09, 2012 5:43 PM
To: Mishler, Nicholas F; Barnes, David R
Subject: Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
141
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
142
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Thursday, February 09, 2012 5:48 PM
To:Mishler, Nicholas F
Subject:FW: Barrington Engineering Dept. performance bonds
Not sure what to make of this. Do I need to contact someone else? Maybe I have an old e-mail address?
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Thursday, February 09, 2012 4:43 PM
To: Mark Shegon
Subject: Automatic reply: Barrington Engineering Dept. performance bonds
I will be out of the office from June 17th to June 27th. I will be back in the office on June 27th if you need
immediate assistance please call 571-2441. Dave Barnes
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
143
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Thursday, February 09, 2012 5:43 PM
To:Mishler, Nicholas F; Barnes, David R
Subject:Barrington Engineering Dept. performance bonds
David,
I anticipate having the final numbers from the engineer and general contractor this afternoon or tomorrow for the items
that need to covered by the performance bond. Are there any special requirements for the bonds, or so you have a
standard form you like to see? Any info you could provide would be helpful.
Thanks,
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
144
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Thursday, February 09, 2012 5:25 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel
Nick we have not awarded the subcontracts yet but at this time we see Valenti-Held as the frontrunner.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, February 08, 2012 3:13 PM
To: Mark Shegon
Subject: RE: Barrington of Carmel
Do you happen to know yet who your Utilities Excavator is going to be? I’m trying to get this reviewed/released and this is one
of the pieces of info I will need.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Wednesday, February 08, 2012 4:10 PM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel
Nick,
Thanks the engineer and general contractor are working on the estimate of the total amount that needs to be bonded.
As soon as I have that I will be in touch with David to discuss any special provisions of the bonds.
Thanks again for your help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, February 08, 2012 3:03 PM
145
To: Mark Shegon
Subject: FW: Barrington of Carmel
Mark, see below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Wednesday, February 08, 2012 4:00 PM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel
I have not received any bonding for that project yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 08, 2012 4:00 PM
To: Barnes, David R
Subject: RE: Barrington of Carmel
Good afternoon David, have you received what you had been waiting for on The Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Friday, February 03, 2012 1:06 PM
To: Mishler, Nicholas F
Cc: Duncan, Gary R; Conn, Angelina V; Thomas, John G
Subject: RE: Barrington of Carmel
Nicholas: No performance bonds have been supplied to Engineering yet.
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
146
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
147
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, February 08, 2012 4:10 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel
Nick,
Thanks the engineer and general contractor are working on the estimate of the total amount that needs to be bonded.
As soon as I have that I will be in touch with David to discuss any special provisions of the bonds.
Thanks again for your help.
Mark Shegon
Corporate Vice President
Development Services
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, February 08, 2012 3:03 PM
To: Mark Shegon
Subject: FW: Barrington of Carmel
Mark, see below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Wednesday, February 08, 2012 4:00 PM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel
I have not received any bonding for that project yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 08, 2012 4:00 PM
To: Barnes, David R
Subject: RE: Barrington of Carmel
148
Good afternoon David, have you received what you had been waiting for on The Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Friday, February 03, 2012 1:06 PM
To: Mishler, Nicholas F
Cc: Duncan, Gary R; Conn, Angelina V; Thomas, John G
Subject: RE: Barrington of Carmel
Nicholas: No performance bonds have been supplied to Engineering yet.
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
149
Mishler, Nicholas F
From:Duffy, John M
Sent:Wednesday, February 08, 2012 4:02 PM
To:Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:RE: Barrington of Carmel
Nick,
They have not paid as of yet. I think it was their intent to pay them when they were cleared to pull the permit.
J Duffy
From: Mishler, Nicholas F
Sent: Wednesday, February 08, 2012 3:59 PM
To: Duffy, John M
Subject: RE: Barrington of Carmel
Hi John, have these fees been paid yet? I just want to make sure we’re ok to review these plans.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duffy, John M
Sent: Sunday, February 05, 2012 8:41 AM
To: Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A;
Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari,
John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas; Mark Shegon
Subject: RE: Barrington of Carmel
Nick,
They will need to pay their fees, but Carmel water has no other issues. Thanks
J Duffy
From: Mishler, Nicholas F
Sent: Friday, February 03, 2012 12:56 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Ellison,
Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A;
Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov;
Larry Beard; David Lucas; Mark Shegon
Subject: Barrington of Carmel
Good afternoon-
150
I have received the application and plans for the Barrington of Carmel. You may already be familiar with the project but if not, I have
attached the original email I had sent in October with project summary. Please let me know if you have any issues with these plans
being reviewed and a building permit being issued.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
151
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, February 08, 2012 4:00 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel
I have not received any bonding for that project yet.
From: Mishler, Nicholas F
Sent: Wednesday, February 08, 2012 4:00 PM
To: Barnes, David R
Subject: RE: Barrington of Carmel
Good afternoon David, have you received what you had been waiting for on The Barrington?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Friday, February 03, 2012 1:06 PM
To: Mishler, Nicholas F
Cc: Duncan, Gary R; Conn, Angelina V; Thomas, John G
Subject: RE: Barrington of Carmel
Nicholas: No performance bonds have been supplied to Engineering yet.
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
152
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
153
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, February 08, 2012 4:00 PM
To:Mishler, Nicholas F
Subject:Automatic reply: Barrington of Carmel
I will be out of the office from June 17th to June 27th. I will be back in the office on June 27th if you need
immediate assistance please call 571-2441. Dave Barnes
154
Mishler, Nicholas F
From:Duffy, John M
Sent:Sunday, February 05, 2012 8:41 AM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott,
Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick;
Thomas, John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov;
Larry Beard; David Lucas; Mark Shegon
Subject:RE: Barrington of Carmel
Nick,
They will need to pay their fees, but Carmel water has no other issues. Thanks
J Duffy
From: Mishler, Nicholas F
Sent: Friday, February 03, 2012 12:56 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Ellison,
Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A;
Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov;
Larry Beard; David Lucas; Mark Shegon
Subject: Barrington of Carmel
Good afternoon-
I have received the application and plans for the Barrington of Carmel. You may already be familiar with the project but if not, I have
attached the original email I had sent in October with project summary. Please let me know if you have any issues with these plans
being reviewed and a building permit being issued.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
155
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Friday, February 03, 2012 3:13 PM
To:Mishler, Nicholas F
Cc:Mark Shegon; Thomas, John G; Barnes, David R
Subject:RE: Barrington of Carmel
Nick
The Hamilton County Surveyor's Office has issued our permits and have no outstanding issues. If you have any
questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, February 03, 2012 12:56 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Ellison,
Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A;
Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com; Greg R. Hoyes; Larry D. Beard;
David E. Lucas; Mark Shegon
Subject: Barrington of Carmel
Good afternoon-
I have received the application and plans for the Barrington of Carmel. You may already be familiar with the project but if not, I have
attached the original email I had sent in October with project summary. Please let me know if you have any issues with these plans
being reviewed and a building permit being issued.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
156
Mishler, Nicholas F
From:Barnes, David R
Sent:Friday, February 03, 2012 1:06 PM
To:Mishler, Nicholas F
Cc:Duncan, Gary R; Conn, Angelina V; Thomas, John G
Subject:RE: Barrington of Carmel
Nicholas: No performance bonds have been supplied to Engineering yet.
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
157
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, February 03, 2012 12:58 PM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Druley, Elizabeth A;
Duffy, John M; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce;
Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas,
John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard;
David Lucas; Mark Shegon
Cc:Hollibaugh, Mike P
Subject:RE: Barrington of Carmel
Nick-
The Planning/Zoning Dept. is okay with this project moving forward.
-Angie Conn, Planning Administrator
From: Mishler, Nicholas F
Sent: Friday, February 03, 2012 12:56 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Ellison,
Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A;
Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov;
Larry Beard; David Lucas; Mark Shegon
Subject: Barrington of Carmel
Good afternoon-
I have received the application and plans for the Barrington of Carmel. You may already be familiar with the project but if not, I have
attached the original email I had sent in October with project summary. Please let me know if you have any issues with these plans
being reviewed and a building permit being issued.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
158
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, January 31, 2012 10:03 AM
To:'Mark Shegon'
Cc:'Dave Coots'; Mishler, Nicholas F; Blanchard, Jim E; 'David Trinkner'; 'Ric D’Amico'; Tingley,
Connie S
Subject:Letter of Grant for Docket No. 11100001 ADLS Amend: The Barrington of Carmel CCRC
(Park Place PUD)
Mark –
Attached is the Letter of Grant. The paper copy is in the mail.
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
Check out our new website: www.carmeldocs.com
Please consider the environment before printing this e-mail
159
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, January 31, 2012 9:37 AM
To:Mishler, Nicholas F
Cc:Blanchard, Jim E
Subject:FW: Greystone/Barrington CCRC letter
FYI – letter from Mike H.
And I will work on the Letter of Grant today and get you a copy, too.;
-Angie
From: Hollibaugh, Mike P
Sent: Tuesday, January 24, 2012 6:06 PM
To: 'Dave Coots'
Cc: Conn, Angelina V
Subject: RE: Greystone
Dave,
Attached is a letter to Mr. R Goodman, regarding the status of Barrington of Carmel. The original letter has been sent
via mail, via 1st Class postage.
Please let me know if you have any further questions or concerns.
Sincerely,
Mike Hollibaugh
From: Dave Coots [mailto:DCoots@chwlaw.com]
Sent: Thursday, January 12, 2012 11:46 AM
To: Hollibaugh, Mike P
Cc: Conn, Angelina V
Subject: FW: Greystone
Mike, attached is a letter I spoke with Angie about asking you as department chair to confirm to The Barrington and its
bond underwriters that once required project bonds are provided and permit fees paid, construction permits would be
issued by Carmel. (I am told the permit fees will exceed $1.2 million and thus cannot be paid until the economic
development bonds are funded). It seems the bond purchasers want an “all done” letter so they know when they
purchase an EDC bond that the project will be built and no further approvals are required except the permitting
process. As you know, Mark Shegon was told that the permit fees had to be paid before “approvals(permits) could be
issued. Utilities agreed to wait for awhile for its fees to be paid, but CRWD wouldn’t. We think this letter will satisfy the
bond underwriter and its counsel and thus the request for you to put this letter on DOCS letterhead and your signature.
If you would then mail it and perhaps email a signed copy to me, I would appreciate it. If you have any issues, please
call or email. Thanks.
From: Joy Jackson
Sent: Thursday, January 12, 2012 11:31 AM
To: Dave Coots
Subject: Greystone
160
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Tuesday, October 25, 2011 11:48 AM
To:Mishler, Nicholas F
Subject:FW: The Barrington of Carmel
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Tuesday, October 25, 2011 10:11 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: The Barrington of Carmel
Non-Enforcement of Drainage Easement for Barrington. Please contact me with any questions.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Tuesday, October 25, 2011 11:04 AM
To: Ben Deichmann
Subject: RE: The Barrington of Carmel
Ben
Here you go.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Tuesday, October 25, 2011 9:47 AM
To: Greg R. Hoyes
Subject: RE: The Barrington of Carmel
Greg,
Could you send me the Drainage Board approval of the Non-Enforcement for the Barrington Project? Please let me know
if you have any questions.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
161
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Thursday, October 06, 2011 2:54 PM
To: Ben Deichmann
Cc: Mark Shegon; Ric D'Amico
Subject: RE: The Barrington of Carmel
Ben
Attached is the approved outlet permit for the project. If you have any questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Thursday, October 06, 2011 11:11 AM
To: Greg R. Hoyes
Cc: Mark Shegon; Ric D'Amico
Subject: RE: The Barrington of Carmel
Thanks Greg. We’ll let you know if we need anything else.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Thursday, October 06, 2011 11:07 AM
To: Ben Deichmann
Cc: Mark Shegon; Ric D'Amico
Subject: RE: The Barrington of Carmel
Ben
We don't generate approval letters for projects. Either the approved outlet permit will work, which you will have later
today, or Carmel Building Department e-mails TAC members to make sure everything is good to go. Unless they have
changed something that I don't know about, you can move forward with the building permit application without anything
from us.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Thursday, October 06, 2011 10:37 AM
To: Greg R. Hoyes
Cc: Mark Shegon; Ric D'Amico
Subject: RE: The Barrington of Carmel
162
Greg,
Could I get an approval letter from your office? The Carmel Building department is asking for an approval letter from
various entities and I don’t think they’ll accept your email. Please contact me with any questions and I appreciate you
help.
Thank you,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Thursday, October 06, 2011 8:41 AM
To: Ben Deichmann
Subject: RE: The Barrington of Carmel
Ben
Yes, all items appear to have been addressed. The outlet permit will be issued later today and the non-enforcement will
go to the Drainage Board for approval on 10-24-11. If you have any questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, October 05, 2011 8:30 AM
To: Greg R. Hoyes
Subject: RE: The Barrington of Carmel
Greg,
The corrected applications should have been mailed to you on Friday of last week. Please let me know if you have
received them and if you have any questions.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Tuesday, September 20, 2011 3:35 PM
To: Ben Deichmann
Subject: RE: The Barrington of Carmel
Ben
The have been received by our office, but not to my desk yet. I will let you know if I need anything when I get them.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
163
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Tuesday, September 13, 2011 2:32 PM
To: Greg R. Hoyes
Subject: RE: The Barrington of Carmel
Greg,
I mailed the outlet permit request and non-enforcement applications to your attention this past Friday. Please be on the
look out for them and let me know if you have any questions and when we can get a copy for our records. Please contact
me with any questions.
Sincerely,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg R. Hoyes [mailto:Greg.Hoyes@hamiltoncounty.in.gov]
Sent: Tuesday, July 12, 2011 3:18 PM
To: Ben Deichmann
Cc: Mark Shegon; Duncan, Gary R; jthomas@carmel.in.gov; Conn, Angelina V; 'Greg Ilko'
Subject: RE: The Barrington of Carmel
Ben
I will need the same revised plans and drainage calculation you are sending to Greg Ilko and I also need permits that
were listed in my 1-14-2009 comments letter. Other then that, I believe we had everything else worked out per my March
2009 e-mail. If you have any questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Tuesday, July 12, 2011 8:24 AM
To: Conn, Angelina V; jthomas@carmel.in.gov; Greg R. Hoyes; Duncan, Gary R; Duffy, John M; Ellison, Christopher M;
tkrueskamp@carmel.in.gov; Kirkman, Jason C.; shirley.hunter@duke-energy.com; McNamee, Gary S;
jlclark@vectren.com; dan.davenport@aes.com; duane.whiting@veoliawaterna.com; Ryan Hartman; sk4986@att.com;
Cook, Steve L; Pace, Paul V
Cc: Mark Shegon
Subject: The Barrington of Carmel
Dear Carmel TAC member,
As you may or may not know, the developer for the Barrington of Carmel project is ready to resume permitting. We met
with Carmel Planning and Engineering staff and they have indicated that we can proceed under our initial TAC filing back
in 2008. I have attached a copy of the current site plan for your reference.
164
The purpose of this email is to serve as both a notice of the project resumption and to see if there are any outstanding
items in regards to your prior review. Please let me know if you have any questions and we look forward to working with
you.
Sincerely,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
7474 Noel Road
Indianapolis, IN 46278
(ph) 317-251-1738 ext.205
(fx) 317-251-1923
www.rw-engineering.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
165
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Friday, October 14, 2011 6:12 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel_BPW approval
Nick,
I wanted to check with you and see how things are going with the approval letters. Seems like most of them are in now
based on the e-mails I have seen. Maybe we are still waiting on Angie’s final review and possibly the fire departments.
Can you let me know which other ones may still be outstanding and if there is anything I can do to help wrap this portion
of the review up.
Thanks again for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, October 05, 2011 2:52 PM
To: Mark Shegon
Subject: FW: Barrington of Carmel_BPW approval
Mark, see below. Please call me when you get a chance. (317) 571-2489.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Kempa, Lisa L
Sent: Wednesday, October 05, 2011 3:45 PM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel_BPW approval
Ok thanks Nick, we need their fees paid upfront. Ben Dichman was given fee
statement in July.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
166
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Wednesday, October 05, 2011 3:41 PM
To: Kempa, Lisa L
Subject: FW: Barrington of Carmel_BPW approval
Lisa, see below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Wednesday, October 05, 2011 3:31 PM
To: Mishler, Nicholas F
Subject: FW: Barrington of Carmel_BPW approval
Nick,
Thanks again for reviewing the outstanding approvals needed for the Barrington. This is the first of a number of e-mails I
have related to the various items listed on the sheet you gave us. I will call you first thing tomorrow to review and see if
I missed anything. Also Angie is going to talk to Mike about the timing of the payment for the water and sewer fees and
confirm our earlier discussions that payment could be made at the time of financing.
I appreciate your help,
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, September 21, 2011 9:49 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: Barrington of Carmel_BPW approval
Mark and Ric,
The driveways and work within the right-of-way were approved this morning at the BPW meeting. Minutes will be
available in a couple of weeks and I can forward them to you, if need be.
Thanks,
Ben Deichmann PE, LEED AP
167
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Wednesday, September 21, 2011 10:39 AM
To: Ben Deichmann
Subject: Barrington of Carmel
Ben: FYI, the items submitted to the Carmel BPW for Barrington were approved at the meeting this morning. (Curb
Cuts, pathway closure, open pavement cut, lane closure)
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
168
Mishler, Nicholas F
From:Steve Hormann [Steve_Hormann@edwardroseapts.com]
Sent:Friday, October 14, 2011 2:03 PM
To:Mishler, Nicholas F
Subject:RE: Plumber/Excavator
Nick,
MPD Excavating provided a certificate of insurance and bond (copies attached) to Lisa Kempa earlier today and she said
MPD would be put in the system.
The plumbing license is No. PC11003246 and is held in the name of Kim R. Howard, an employee of FasTrack
Mechanical. Sorry for the confusion about that.
Steve
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Friday, October 14, 2011 9:49 AM
To: Steve Hormann
Subject: Plumber/Excavator
Steve, were you able to get in touch with Lisa Kempa at utilities to get the excavator’s bond figured out? Also, I have searched the
state license database for FasTrack Mechanical who you have listed as the plumber and I’m not able to find them. Do you have
another state license number or maybe the name of one of the individual plumbers that works there?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
169
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, October 14, 2011 9:10 AM
To:'Mark Shegon'
Cc:Mishler, Nicholas F; Hollibaugh, Mike P
Subject:FW: Grace period for Project Fees for Barrington of Carmel?
HI, Mark – what date to you anticipate you would be able to pay the fees? Can we get something in writing about that,
like a commitment on when the fees would be paid? That way, we know when to expect payment and can track it
and/or enforce it.
Thanks, and have a nice weekend,
-Angie Conn, Planning Administrator
From: Mishler, Nicholas F
Sent: Thursday, October 13, 2011 4:32 PM
To: Conn, Angelina V
Subject: RE: Grace period for Project Fees for Barrington of Carmel?
Angie, is Mike H. ok with the building permit payment being delayed? I just need to know how we should handle this once the plans
are reviewed.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Thursday, October 13, 2011 4:16 PM
To: 'Mark Shegon'
Cc: McBride, Mike T; Duncan, Gary R; Mishler, Nicholas F
Subject: FW: Grace period for Project Fees for Barrington of Carmel?
Mark –
FYI – comments from the Carmel Engineering Dept. Gary Duncan with the Engineering Dept. is having some email
issues and wanted me to forward this to you, and also find out if what he has outlined below is sufficient for the lender
and if you are agreeable to these conditions… Please let him/me know.
(I have copied him and Mike McBride on this email.)
-Angie Conn, Planning Administrator
From: Duncan, Gary R
Sent: Thursday, October 13, 2011 4:11 PM
To: Conn, Angelina V; Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Grace period for Project Fees for Barrington of Carmel?
170
The Department of Engineering has no remaining plan review comments. The plans do not currently show the storm
water BMP easements, but this requirement can be waived given the current circumstances.
As there are no remaining plan comments, the Department is in a position to approve the construction plans provided
that it is acknowledged by Greystone Communities that the following must still be satisfied before starting construction:
1. Required Performance Bonds are provided
2. A Right-Of-Way Permit is obtained
3. The final Storm Water Quality System Operations and Maintenance Manual is submitted
4. The Storm Water Management permit is approved
5. Final construction plans are approved
6. A Pre-construction meeting is held
And Greystone Communities acknowledges that the following must be provided and/or satisfied prior to making a
request for temporary or permanent Certificate of Occupancy of the entire building or any portions thereof:
1. A formal commitment to vacate the southernmost entrance is provided that is consistent with the conditions of
BPW approval of the southernmost entrance.
2. The on-site storm water quality system easements are granted to the City
3. Right-of-way dedications are made to the City
4. Payment associated with compliance with the City’s Thoroughfare Plan is made
Angie, I am having problems emailing to outside sources…would you forward this to Mark and ask if what I have outlines
above is sufficient for the lender and if he is agreeable to these conditions.
Thanks so much,
Gary
From: Conn, Angelina V
Sent: Monday, October 10, 2011 12:13 PM
To: Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject: Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace
period to get all these fees and payments done, while still being able to move forward with the building permitting
process. Below he explains the time period for the closing a municipal bond funded project like the Barrington. Feel
free to email Mark with any questions or letting him know what you need from him to get this slight delay in payments
done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
171
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is
actually $1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water
(we just got that finalized a week or so ago). That does not include any tap or connection fees for other utilities like
electrical or gas, we are trying to finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it
contains all the details and financial terms of the project. In order to issue this document (which is subject to Securities
and Exchange Commission rules) I have to have basically everything ready to go, all approvals, all permits, all contracts
executed and the construction contract done and awaiting execution by the owner. If there is anything that is not
complete the investors may consider it a “risk item” and decide to ask for higher interest rates, which is bad. In a
situation like this one, where extremely large impact fees are involved the bond investors will typically accept letters
from the city/utilities stating that everything is in order and all that needs to happen to secure building permits is for the
fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities to make an
exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but
that may slip by a week or so based on capital market requirements, there is at least one other project ahead of this
one.
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the
POS, any changes that are required are made to the POS and it is reissued as the Official Statement and the bond
investors commit to purchasing certain amounts of bonds to fund the project. During this period the bond investor
place orders and purchase the bonds. The money goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the
attorneys and the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that
have deferred fees are paid via wire transfer that day. Typically, the next day the contractor will show up and request
the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
172
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
173
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, October 13, 2011 8:23 PM
To:Mishler, Nicholas F
Subject:Re: Grace period for Project Fees for Barrington of Carmel?
Yeah, i just think we need something in writing from them, stating a 'pay by' date...
Sent from my Verizon Wireless Phone
----- Reply message -----
From: "Mishler, Nicholas F" <nmishler@carmel.in.gov>
Date: Thu, Oct 13, 2011 4:31 pm
Subject: Grace period for Project Fees for Barrington of Carmel?
To: "Conn, Angelina V" <Aconn@carmel.in.gov>
Angie, is Mike H. ok with the building permit payment being delayed? I just need to know how we should handle this once the plans
are reviewed.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Thursday, October 13, 2011 4:16 PM
To: 'Mark Shegon'
Cc: McBride, Mike T; Duncan, Gary R; Mishler, Nicholas F
Subject: FW: Grace period for Project Fees for Barrington of Carmel?
Mark –
FYI – comments from the Carmel Engineering Dept. Gary Duncan with the Engineering Dept. is having some email issues and
wanted me to forward this to you, and also find out if what he has outlined below is sufficient for the lender and if you are agreeable to
these conditions… Please let him/me know.
174
(I have copied him and Mike McBride on this email.)
-Angie Conn, Planning Administrator
From: Duncan, Gary R
Sent: Thursday, October 13, 2011 4:11 PM
To: Conn, Angelina V; Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Grace period for Project Fees for Barrington of Carmel?
The Department of Engineering has no remaining plan review comments. The plans do not currently show the storm water BMP
easements, but this requirement can be waived given the current circumstances.
As there are no remaining plan comments, the Department is in a position to approve the construction plans provided that it is
acknowledged by Greystone Communities that the following must still be satisfied before starting construction:
1. Required Performance Bonds are provided
2. A Right-Of-Way Permit is obtained
3. The final Storm Water Quality System Operations and Maintenance Manual is submitted
4. The Storm Water Management permit is approved
5. Final construction plans are approved
6. A Pre-construction meeting is held
And Greystone Communities acknowledges that the following must be provided and/or satisfied prior to making a request for
temporary or permanent Certificate of Occupancy of the entire building or any portions thereof:
1. A formal commitment to vacate the southernmost entrance is provided that is consistent with the conditions of BPW approval of
the southernmost entrance.
2. The on-site storm water quality system easements are granted to the City
3. Right-of-way dedications are made to the City
4. Payment associated with compliance with the City’s Thoroughfare Plan is made
Angie, I am having problems emailing to outside sources…would you forward this to Mark and ask if what I have outlines above is
sufficient for the lender and if he is agreeable to these conditions.
Thanks so much,
175
Gary
From: Conn, Angelina V
Sent: Monday, October 10, 2011 12:13 PM
To: Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject: Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace period to get all
these fees and payments done, while still being able to move forward with the building permitting process. Below he explains the
time period for the closing a municipal bond funded project like the Barrington. Feel free to email Mark with any questions or letting
him know what you need from him to get this slight delay in payments done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is actually
$1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water (we just got that
finalized a week or so ago). That does not include any tap or connection fees for other utilities like electrical or gas, we are trying to
finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
176
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it contains all the
details and financial terms of the project. In order to issue this document (which is subject to Securities and Exchange Commission
rules) I have to have basically everything ready to go, all approvals, all permits, all contracts executed and the construction contract
done and awaiting execution by the owner. If there is anything that is not complete the investors may consider it a “risk item” and
decide to ask for higher interest rates, which is bad. In a situation like this one, where extremely large impact fees are involved the
bond investors will typically accept letters from the city/utilities stating that everything is in order and all that needs to happen to
secure building permits is for the fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities
to make an exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but that
may slip by a week or so based on capital market requirements, there is at least one other project ahead of this one.
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the POS, any
changes that are required are made to the POS and it is reissued as the Official Statement and the bond investors commit to purchasing
certain amounts of bonds to fund the project. During this period the bond investor place orders and purchase the bonds. The money
goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the attorneys and
the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that have deferred fees are paid via
wire transfer that day. Typically, the next day the contractor will show up and request the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
177
________________________________
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be
legally privileged. It is intended solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or
any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. If you have received this e-mail in error,
please notify the sender and permanently delete the e-mail, and any attachments, immediately as you should not retain, copy or use
this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
178
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, October 13, 2011 4:16 PM
To:'Mark Shegon'
Cc:McBride, Mike T; Duncan, Gary R; Mishler, Nicholas F
Subject:FW: Grace period for Project Fees for Barrington of Carmel?
Mark –
FYI – comments from the Carmel Engineering Dept. Gary Duncan with the Engineering Dept. is having some email
issues and wanted me to forward this to you, and also find out if what he has outlined below is sufficient for the lender
and if you are agreeable to these conditions… Please let him/me know.
(I have copied him and Mike McBride on this email.)
-Angie Conn, Planning Administrator
From: Duncan, Gary R
Sent: Thursday, October 13, 2011 4:11 PM
To: Conn, Angelina V; Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Mishler, Nicholas F; Blanchard, Jim E
Subject: RE: Grace period for Project Fees for Barrington of Carmel?
The Department of Engineering has no remaining plan review comments. The plans do not currently show the storm
water BMP easements, but this requirement can be waived given the current circumstances.
As there are no remaining plan comments, the Department is in a position to approve the construction plans provided
that it is acknowledged by Greystone Communities that the following must still be satisfied before starting construction:
1. Required Performance Bonds are provided
2. A Right-Of-Way Permit is obtained
3. The final Storm Water Quality System Operations and Maintenance Manual is submitted
4. The Storm Water Management permit is approved
5. Final construction plans are approved
6. A Pre-construction meeting is held
And Greystone Communities acknowledges that the following must be provided and/or satisfied prior to making a
request for temporary or permanent Certificate of Occupancy of the entire building or any portions thereof:
1. A formal commitment to vacate the southernmost entrance is provided that is consistent with the conditions of
BPW approval of the southernmost entrance.
2. The on-site storm water quality system easements are granted to the City
3. Right-of-way dedications are made to the City
4. Payment associated with compliance with the City’s Thoroughfare Plan is made
Angie, I am having problems emailing to outside sources…would you forward this to Mark and ask if what I have outlines
above is sufficient for the lender and if he is agreeable to these conditions.
Thanks so much,
Gary
From: Conn, Angelina V
Sent: Monday, October 10, 2011 12:13 PM
To: Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
179
Cc: Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject: Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace
period to get all these fees and payments done, while still being able to move forward with the building permitting
process. Below he explains the time period for the closing a municipal bond funded project like the Barrington. Feel
free to email Mark with any questions or letting him know what you need from him to get this slight delay in payments
done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is
actually $1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water
(we just got that finalized a week or so ago). That does not include any tap or connection fees for other utilities like
electrical or gas, we are trying to finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it
contains all the details and financial terms of the project. In order to issue this document (which is subject to Securities
and Exchange Commission rules) I have to have basically everything ready to go, all approvals, all permits, all contracts
executed and the construction contract done and awaiting execution by the owner. If there is anything that is not
complete the investors may consider it a “risk item” and decide to ask for higher interest rates, which is bad. In a
situation like this one, where extremely large impact fees are involved the bond investors will typically accept letters
from the city/utilities stating that everything is in order and all that needs to happen to secure building permits is for the
fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities to make an
exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but
that may slip by a week or so based on capital market requirements, there is at least one other project ahead of this
one.
180
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the
POS, any changes that are required are made to the POS and it is reissued as the Official Statement and the bond
investors commit to purchasing certain amounts of bonds to fund the project. During this period the bond investor
place orders and purchase the bonds. The money goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the
attorneys and the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that
have deferred fees are paid via wire transfer that day. Typically, the next day the contractor will show up and request
the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
181
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Thursday, October 13, 2011 4:11 PM
To:Conn, Angelina V; Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc:Mishler, Nicholas F; Blanchard, Jim E
Subject:RE: Grace period for Project Fees for Barrington of Carmel?
The Department of Engineering has no remaining plan review comments. The plans do not currently show the storm
water BMP easements, but this requirement can be waived given the current circumstances.
As there are no remaining plan comments, the Department is in a position to approve the construction plans provided
that it is acknowledged by Greystone Communities that the following must still be satisfied before starting construction:
1. Required Performance Bonds are provided
2. A Right-Of-Way Permit is obtained
3. The final Storm Water Quality System Operations and Maintenance Manual is submitted
4. The Storm Water Management permit is approved
5. Final construction plans are approved
6. A Pre-construction meeting is held
And Greystone Communities acknowledges that the following must be provided and/or satisfied prior to making a
request for temporary or permanent Certificate of Occupancy of the entire building or any portions thereof:
1. A formal commitment to vacate the southernmost entrance is provided that is consistent with the conditions of
BPW approval of the southernmost entrance.
2. The on-site storm water quality system easements are granted to the City
3. Right-of-way dedications are made to the City
4. Payment associated with compliance with the City’s Thoroughfare Plan is made
Angie, I am having problems emailing to outside sources…would you forward this to Mark and ask if what I have outlines
above is sufficient for the lender and if he is agreeable to these conditions.
Thanks so much,
Gary
From: Conn, Angelina V
Sent: Monday, October 10, 2011 12:13 PM
To: Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject: Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace
period to get all these fees and payments done, while still being able to move forward with the building permitting
process. Below he explains the time period for the closing a municipal bond funded project like the Barrington. Feel
free to email Mark with any questions or letting him know what you need from him to get this slight delay in payments
done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
182
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is
actually $1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water
(we just got that finalized a week or so ago). That does not include any tap or connection fees for other utilities like
electrical or gas, we are trying to finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it
contains all the details and financial terms of the project. In order to issue this document (which is subject to Securities
and Exchange Commission rules) I have to have basically everything ready to go, all approvals, all permits, all contracts
executed and the construction contract done and awaiting execution by the owner. If there is anything that is not
complete the investors may consider it a “risk item” and decide to ask for higher interest rates, which is bad. In a
situation like this one, where extremely large impact fees are involved the bond investors will typically accept letters
from the city/utilities stating that everything is in order and all that needs to happen to secure building permits is for the
fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities to make an
exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but
that may slip by a week or so based on capital market requirements, there is at least one other project ahead of this
one.
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the
POS, any changes that are required are made to the POS and it is reissued as the Official Statement and the bond
investors commit to purchasing certain amounts of bonds to fund the project. During this period the bond investor
place orders and purchase the bonds. The money goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the
attorneys and the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that
have deferred fees are paid via wire transfer that day. Typically, the next day the contractor will show up and request
the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
183
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
184
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Thursday, October 13, 2011 1:25 PM
To:Conn, Angelina V; Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc:Mishler, Nicholas F; Blanchard, Jim E
Subject:RE: Grace period for Project Fees for Barrington of Carmel?
Am I reading this correctly in that they are agreeable to hold building permits until all fees are paid?
From: Conn, Angelina V
Sent: Monday, October 10, 2011 12:13 PM
To: Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc: Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject: Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace
period to get all these fees and payments done, while still being able to move forward with the building permitting
process. Below he explains the time period for the closing a municipal bond funded project like the Barrington. Feel
free to email Mark with any questions or letting him know what you need from him to get this slight delay in payments
done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is
actually $1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water
(we just got that finalized a week or so ago). That does not include any tap or connection fees for other utilities like
electrical or gas, we are trying to finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
185
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it
contains all the details and financial terms of the project. In order to issue this document (which is subject to Securities
and Exchange Commission rules) I have to have basically everything ready to go, all approvals, all permits, all contracts
executed and the construction contract done and awaiting execution by the owner. If there is anything that is not
complete the investors may consider it a “risk item” and decide to ask for higher interest rates, which is bad. In a
situation like this one, where extremely large impact fees are involved the bond investors will typically accept letters
from the city/utilities stating that everything is in order and all that needs to happen to secure building permits is for the
fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities to make an
exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but
that may slip by a week or so based on capital market requirements, there is at least one other project ahead of this
one.
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the
POS, any changes that are required are made to the POS and it is reissued as the Official Statement and the bond
investors commit to purchasing certain amounts of bonds to fund the project. During this period the bond investor
place orders and purchase the bonds. The money goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the
attorneys and the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that
have deferred fees are paid via wire transfer that day. Typically, the next day the contractor will show up and request
the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
186
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, October 10, 2011 12:55 PM
To:Mishler, Nicholas F
Subject:FW: 071101 The barrington
State Fire Marshal’s office approval
From: David Trinkner [mailto:datrin@agarch.com]
Sent: Monday, October 03, 2011 9:22 AM
To: Mark Shegon; Ric D’Amico
Cc: Ken Ogden; wohanlon@LECESSEconstruction.com; Steve Alexander; Joe Silvers
Subject: 071101 The barrington
Attached is a copy of the Construction Design Release (plan approval) from the state fire marshal’s office. There is no
response required with this release, only standard comments that we will need to verify. As noted, this does not include
approval for the sprinkler system, or the kitchen hood. Those items will need to be submitted by the design/build
contractor when they are available.
David A. Trinkner
AG Architecture – www.agarch.com
1414 Underwood Ave.
Wauwatosa, WI 53213
414.431.3131.
414.431.0531 fax
From: brobison@dhs.in.gov [mailto:brobison@dhs.in.gov]
Sent: Monday, October 03, 2011 6:26 AM
To: David Trinkner; raygoodman@aol.com; ekassig@dhs.in.gov; jblanchard@carmel.in.gov
Subject: Project 353561 cdr information attached.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
187
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Monday, October 10, 2011 12:50 PM
To:Mishler, Nicholas F
Subject:FW: 071101 The Barrington
Nick this is the approval from the State Health Department.
From: David Trinkner [mailto:datrin@agarch.com]
Sent: Monday, September 19, 2011 2:12 PM
To: Mark Shegon; Ric D’Amico
Cc: Ken Ogden; John Cronin; Steve Alexander; Ben Deichmann
Subject: 071101 The Barrington
Attached please find a copy of the State Health Department approval for the Barrington licensed areas (Residential Care
and Comprehensive Care). The approval does not list the sprinkler head layout for skilled as part of the approval –
Dennis Ehlers was willing to approve the plans with the understanding that we were in the process of generating sprinkler
drawings and that we would provide within the near future.
Ben, please see the comments regarding sewer piping.
Thanks.
David Trinkner
AG Architecture
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
188
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Monday, October 10, 2011 12:13 PM
To:Duffy, John M; 'Ryan Hartman'; Hollibaugh, Mike P; McBride, Mike T
Cc:Duncan, Gary R; Mishler, Nicholas F; Blanchard, Jim E
Subject:Grace period for Project Fees for Barrington of Carmel?
Gentlemen – below is the additional info that Mark Shegon wanted me to pass along to you, as he is asking for a grace
period to get all these fees and payments done, while still being able to move forward with the building permitting
process. Below he explains the time period for the closing a municipal bond funded project like the Barrington. Feel
free to email Mark with any questions or letting him know what you need from him to get this slight delay in payments
done.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Sunday, October 09, 2011 6:12 PM
To: Conn, Angelina V
Subject: Project Fees
Angie,
I was wrong the other day when I quoted $500,000-600,000 for fees, the current estimate for fees for the Barrington is
actually $1.1M. and that number will go up slightly when I add in the increase to the water fee for the irrigation water
(we just got that finalized a week or so ago). That does not include any tap or connection fees for other utilities like
electrical or gas, we are trying to finalize that now. The breakout estimate for the city related items is as follows.
Water $378,134
Sewer $302,935
Parks and Recreation $195,567
Road Impact $120,000
Building permit $110,000
Total $1,106,636
As I mentioned funding a municipal bond project is way different than a conventional bank transaction.
The 3 basic steps for closing a municipal bond funded project like the Barrington are;
-Issue the Preliminary Official Statement or “POS”(6 to 8 weeks) – this is basically the offer to the bond investors, it
contains all the details and financial terms of the project. In order to issue this document (which is subject to Securities
and Exchange Commission rules) I have to have basically everything ready to go, all approvals, all permits, all contracts
executed and the construction contract done and awaiting execution by the owner. If there is anything that is not
complete the investors may consider it a “risk item” and decide to ask for higher interest rates, which is bad. In a
situation like this one, where extremely large impact fees are involved the bond investors will typically accept letters
from the city/utilities stating that everything is in order and all that needs to happen to secure building permits is for the
189
fees to be paid. So, that is why I am asking for the “all done” letters and for the various city entities to make an
exception regarding when their fees are due. We have targeted the week of the 17th of October to issue the POS, but
that may slip by a week or so based on capital market requirements, there is at least one other project ahead of this
one.
-Issue the Official Statement / Pricing the Bonds or “OS”(2 to 4 weeks) – After the bond investors have reviewed the
POS, any changes that are required are made to the POS and it is reissued as the Official Statement and the bond
investors commit to purchasing certain amounts of bonds to fund the project. During this period the bond investor
place orders and purchase the bonds. The money goes into an account and awaits transfer to the trustee at closing
-Closing and Financing (2 to 3 days) – All the documents are executed over a 2-3 day period after final review by the
attorneys and the bond proceeds are sent to the account controlled by a trustee. At closing all the various groups that
have deferred fees are paid via wire transfer that day. Typically, the next day the contractor will show up and request
the building permit and start work.
Again I will be happy to talk thru any questions you or Mike or any of the other city staff may have.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
190
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Sunday, October 09, 2011 12:53 PM
To:Mishler, Nicholas F
Subject:FW: Barrington Address/Bill Akers letter
For your records.
From: Akers, William P [mailto:WAkers@carmel.in.gov]
Sent: Monday, August 01, 2011 9:35 AM
To: Mark Shegon
Subject: RE: Barrington Address
Mark,
Here is the official letter verifying the address assigned to the future “Barrington of Carmel”
Bill
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Monday, August 01, 2011 10:01 AM
To: Akers, William P
Subject: RE: Barrington Address
Thanks Bill, I appreciate the quick turnaround.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Akers, William P [mailto:WAkers@carmel.in.gov]
Sent: Monday, August 01, 2011 8:14 AM
To: Conn, Angelina V; Mark Shegon
Cc: Ric D’Amico
Subject: RE: Barrington Address
I have given the following address to this development:
1335 S Guilford Rd Carmel, Indiana 46032.
I will be sending an official letter confirming this address assignment to Mark later this week.
Thanks
Bill
191
From: Conn, Angelina V
Sent: Thursday, July 28, 2011 3:29 PM
To: 'Mark Shegon'
Cc: Ric D’Amico; Akers, William P
Subject: RE: Barrington Address
Hi, Mark - Bill Akers in the 911 Communications Dept. can issue you the official street address.
Bill – the tax parcel ID number is 17-09-36-00-00-054.101, and the site is just north of 116th St, along the east side
of Guilford Rd.. Please reply all.
Thanks!
-Angie Conn, Planning Administrator
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Thursday, July 28, 2011 3:25 PM
To: Conn, Angelina V
Cc: Ric D’Amico
Subject: Barrington Address
Angie we are in the process of filling out all the paperwork to submit the Barrington drawings and specs for permit and
several of the documents are asking for the address. I have gone back thru my e-mails but I could not find anything that
listed one. Have you guys assigned an address to the site yet? If so could you please forward it on to me, if not, can you
please let me know what to put on the forms.
Thanks so much for your help.
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
192
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Friday, October 07, 2011 7:07 PM
To:Mishler, Nicholas F
Subject:FW: The Barrington of Carmel
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Thursday, October 06, 2011 9:40 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: The Barrington of Carmel
Approval letter from Clay Township Regional Waste.
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Ryan Hartman [mailto:Ryan.Hartman@CTRWD.ORG]
Sent: Thursday, October 06, 2011 9:48 AM
To: Ben Deichmann
Subject: The Barrington of Carmel
Ben,
Please see attached.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
193
Mishler, Nicholas F
From:Larry D. Beard [Larry.Beard@hamiltoncounty.in.gov]
Sent:Friday, October 07, 2011 4:24 PM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; David E. Lucas
Cc:Mark Shegon; Jason T. LeMaster; Amanda S. Beaver; Morgan E. Johnson; Amy C. Ballman;
Tammy L. Gleber
Subject:RE: Barrington of Carmel
Nick,
If the food preparation area and food employees' sanitation practices are not inspected by the Indiana State Department
of Health, the county health department would permit and inspect the facility. The permitting procedures can be found at
www.hamiltoncounty.in.gov.
Thanks.
Larry Beard
Hamilton County Health Department
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry D. Beard; David E. Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
194
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Friday, October 07, 2011 11:52 AM
To:Mishler, Nicholas F
Cc:'Ryan Hartman'; Duncan, Gary R; McBride, Mike T; Hollibaugh, Mike P; Duffy, John M
Subject:RE: Barrington of Carmel - fees
Thanks, Nick - any word on what Ryan Hartman or Gary Duncan/Mike McBride wrote about the fees?
I am getting a memo from Mark Shegon this afternoon, explaining their request to delay payment of all these fees until
they get funding at closing, which is in a few weeks…. Fees such as sewer fees, water fees, road impact fees, parks &
recreation impact fee, etc…. I guess that is when their lender will give them all the money for all fees, construction,
etc…..
Stay tuned!
-Angie Conn, Planning Administrator
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 4:14 PM
To: Conn, Angelina V
Subject: FW: Barrington of Carmel
Angie, FYI…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Duffy, John M
Sent: Thursday, October 06, 2011 3:52 PM
To: Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: RE: Barrington of Carmel
Nick,
No issues related to water infrastructure. We are willing to allow them to pay their availability and connection fees prior to
breaking ground. I would prefer to have them paid now, but if they can’t pay them until they have a permit I am ok on
waiting. We more than likely will send them a separate invoice that states the fees are payable prior to breaking ground.
Thanks, and let me know if you have any questions.
J Duffy
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
195
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
196
Mishler, Nicholas F
From:David E. Lucas [David.Lucas@hamiltoncounty.in.gov]
Sent:Friday, October 07, 2011 8:56 AM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry D. Beard
Cc:Mark Shegon
Subject:RE: Barrington of Carmel
Nick,
This project is outside of Highway jurisdiction. No comments or concerns.
Sincerely,
David E. Lucas
HCHD Project Coordinator
1700 South 10th Street
Noblesville, IN 46060
Phone: 770-4474
Fax: 776-9814
e-mail: david.lucas@hamiltoncounty.in.gov
website: www.hamiltoncounty.in.gov
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry D. Beard; David E. Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
197
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, October 06, 2011 5:39 PM
To:Mishler, Nicholas F
Cc:Hollibaugh, Mike P
Subject:Re: Barrington of Carmel
Thanks!
Sent from my Verizon Wireless Phone
----- Reply message -----
From: "Mishler, Nicholas F" <nmishler@carmel.in.gov>
Date: Thu, Oct 6, 2011 4:14 pm
Subject: Barrington of Carmel
To: "Conn, Angelina V" <Aconn@carmel.in.gov>
Angie, FYI…
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
From: Duffy, John M
Sent: Thursday, October 06, 2011 3:52 PM
To: Mishler, Nicholas F
Cc: Kempa, Lisa L
Subject: RE: Barrington of Carmel
Nick,
No issues related to water infrastructure. We are willing to allow them to pay their availability and connection fees prior to breaking
198
ground. I would prefer to have them paid now, but if they can’t pay them until they have a permit I am ok on waiting. We more than
likely will send them a separate invoice that states the fees are payable prior to breaking ground. Thanks, and let me know if you have
any questions.
J Duffy
________________________________
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan, Gary R;
Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A;
Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry
Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
P Please consider the environment before printing this email
199
Mishler, Nicholas F
From:Duffy, John M
Sent:Thursday, October 06, 2011 3:52 PM
To:Mishler, Nicholas F
Cc:Kempa, Lisa L
Subject:RE: Barrington of Carmel
Nick,
No issues related to water infrastructure. We are willing to allow them to pay their availability and connection fees prior to
breaking ground. I would prefer to have them paid now, but if they can’t pay them until they have a permit I am ok on
waiting. We more than likely will send them a separate invoice that states the fees are payable prior to breaking ground.
Thanks, and let me know if you have any questions.
J Duffy
From: Mishler, Nicholas F
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'; 'Larry Beard'; 'David Lucas'
Cc: 'Mark Shegon'
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
200
Mishler, Nicholas F
From:Ryan Hartman [Ryan.Hartman@CTRWD.ORG]
Sent:Thursday, October 06, 2011 1:36 PM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc:Mark Shegon
Subject:RE: Barrington of Carmel
Nick,
We are waiting on payment prior to issuing the sanitary sewer permit.
Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green
Logo (Ryan Hartman)-Image01.bmp
Ryan Hartman, District Engineer
Clay Township Regional Waste District
10701 N. College Avenue, Suite A Indianapolis, Indiana 46280
Phone - 317-844-9200 Fax - 317-844-9203 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
201
Mishler, Nicholas F
From:Ellison, Christopher M
Sent:Thursday, October 06, 2011 1:32 PM
To:Mishler, Nicholas F
Subject:Re: Barrington of Carmel
We have no issues at this time.
Chris Ellison
Carmel Fire Dept.
Sent from my iPhone
On Oct 6, 2011, at 1:19 PM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a
future 375,000 sq. ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the
project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
<Barrington Project Description.pdf>
202
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Thursday, October 06, 2011 1:24 PM
To:'Hunter, Shirley A'; Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc:Mark Shegon
Subject:RE: Barrington of Carmel
Nick - They still need to pay the adls amendment petition filing fee for Docket No. 11100001 ADLS Amend, and our
department is still reviewing the amended architectural building elevations, but are close to approving them and
sending out the approval letter.
-Angie Conn, Planning Administrator
From: Hunter, Shirley A [mailto:Shirley.Hunter@duke-energy.com]
Sent: Thursday, October 06, 2011 1:23 PM
To: Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A;
Duffy, John M; Duncan, Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn,
David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: RE: Barrington of Carmel
Duke Energy has no objections to the building permit application.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
203
Please consider the environment before printing this email
204
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Thursday, October 06, 2011 1:23 PM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc:Mark Shegon
Subject:RE: Barrington of Carmel
Duke Energy has no objections to the building permit application.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard; David Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
205
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Thursday, October 06, 2011 1:23 PM
To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V;
Druley, Elizabeth A; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-
energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry D. Beard; David E. Lucas
Cc:Mark Shegon
Subject:RE: Barrington of Carmel
Nick
Permits being issued and nothing outstanding from HCSO.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Thursday, October 06, 2011 1:20 PM
To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A; Duffy, John M; Duncan,
Gary R; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; shirley.hunter@duke-energy.com;
Greg.Hoyes@hamiltoncounty.in.gov; Larry D. Beard; David E. Lucas
Cc: Mark Shegon
Subject: Barrington of Carmel
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a future 375,000 sq.
ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
206
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Thursday, October 06, 2011 1:21 PM
To:Mishler, Nicholas F
Cc:Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Druley, Elizabeth A;
Duffy, John M; Ellison, Christopher M; ryan.hartman@ctrwd.org; Kempa, Lisa L; Knott, Bruce;
Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas,
John G; shirley.hunter@duke-energy.com; Greg.Hoyes@hamiltoncounty.in.gov; Larry Beard;
David Lucas; Mark Shegon
Subject:Re: Barrington of Carmel
We are still finishing up approvals. Trying to get wrapped up. I believe they still need to secure bpw approvals.
Sent from my iPhone
On Oct 6, 2011, at 13:19, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote:
Good afternoon,
I have been communicating with Mark Shegon of Greystone Development regarding The Barrington of Carmel, a
future 375,000 sq. ft. senior living center located on 19.5 acres of land at 1335 S. Guilford Rd. I have attached the
project description sheet.
If you have any issues that would prevent this building permit from being reviewed/released, please let me know.
I have copied Mark on this email so you may also contact him directly with questions.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
207
<Barrington Project Description.pdf>
208
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Thursday, October 06, 2011 1:09 PM
To:Mishler, Nicholas F
Subject:Emailing: Barrington Project Description
Importance:High
Nick,
Attached is a description of the project per your request. If there is any additional info you need add to it please let me know and I
will make the changes for you today.
Thanks,
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
Your message is ready to be sent with the following file or link attachments:
Barrington Project Description
Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check
your e-mail security settings to determine how attachments are handled.
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be
legally privileged. It is intended solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or
any action taken or omitted to be taken in reliance on it, is prohibited and may be unlawful. If you have received this e-mail in error,
please notify the sender and permanently delete the e-mail, and any attachments, immediately as you should not retain, copy or use
this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
209
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, October 05, 2011 4:35 PM
To:Mishler, Nicholas F
Subject:FW: Barrington of Carmel Landscape Plans
From: Kevin K. Parsons [mailto:kkp@landarkkt.com]
Sent: Tuesday, September 20, 2011 11:46 AM
To: 'Ben Deichmann'; Mark Shegon
Subject: FW: Barrington of Carmel Landscape Plans
Ben and Mark:
This is the Carmel Approval email of the Landscape Plans.
Thanks,, Kevin
From: Jonathan Guard [mailto:jguard@landarkkt.com]
Sent: Wednesday, August 03, 2011 10:20 AM
To: Mark Shegon
Cc: Kevin Parsons
Subject: FW: Barrington of Carmel Landscape Plans
The Barrington landscape plans have been approved by the City of Carmel. Attached is the stamped approval.
Thanks,
Jonathan Guard
Landscape Architect
Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.
212 West 10th Street, Suite A-290
Indianapolis, IN 46202
PH: 317.955.9155
FX: 317.955.9455
web: www.landarkkt.com
email: jguard@landarkkt.com
From: Mindham, Daren [mailto:dmindham@carmel.in.gov]
Sent: Wednesday, August 03, 2011 9:58 AM
To: Jonathan Guard
Cc: Conn, Angelina V
Subject: RE: Barrington of Carmel Landscape Plans
I have stamped and approved the landscape plans. I have attached a pdf copy with the stamp. If you would like a full size
set stamped please submit a copy for me to stamp for you.
Ps. I noticed after I stamped them that Communities is spelled wrong in the Title Block.
Daren Mindham
Urban Forester
City of Carmel
Department of Community Services
One Civic Square
210
Carmel, Indiana 46032
Office: 317-571-2283
From: Jonathan Guard [mailto:jguard@landarkkt.com]
Sent: Tuesday, August 02, 2011 3:19 PM
To: Mindham, Daren
Cc: Conn, Angelina V
Subject: RE: Barrington of Carmel Landscape Plans
Daren,
Attached are revised PDF files for the Barrington of Carmel Landscape plans. We have reduced the total number of
proposed Maples on site from 61 down to 31, and have replaced them with a variety of trees from the approved list. We
have also added the tree protection fence on Sheet L102 on the Northeast corner of the site. Please let us know if you
have any further questions or comments.
Thank you,
Jonathan Guard
Landscape Architect
Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.Kevin K. Parsons & Associates, Inc.
212 West 10th Street, Suite A-290
Indianapolis, IN 46202
PH: 317.955.9155
FX: 317.955.9455
web: www.landarkkt.com
email: jguard@landarkkt.com
From: Mindham, Daren [mailto:dmindham@carmel.in.gov]
Sent: Monday, August 01, 2011 3:26 PM
To: kkp@landarkkt.com
Cc: Conn, Angelina V
Subject: RE: Barrington of Carmel Landscape Plans
Kevin,
The following email represents comments for this project specifically addressing the area of urban forestry. I
have reviewed the drawings and offer the following comments:
URBAN FORESTRY REVIEW COMMENTS
1) I am not sure if I am missing something or finally catching it, but on Sheet L102, shouldn’t there be Tree
Protection Fencing notated like sheet L106 around the wooded area to be preserved?
2) Also, with the advent of more invasive critters (Press Release
http://www.aphis.usda.gov/newsroom/2011/06/pdf/adult_detection_ALBpdf) I am newly committed on
limiting the number of maples on new projects to near zero. Could you please review the maple population
and substitute the maples for different genus’? For example, seedless sweetgum, Japanese Zelkova,
yellowwood, to name a few. A tree list is also attached. However many you can change will be appreciated,
but in this project, not expected at this point of the game.
Please illustrate how these comments will be addressed by letter or revised plan. If you have any questions, feel free to
contact me. Thanks.
Sincerely,
Daren Mindham
211
Urban Forester
City of Carmel
Department of Community Services
One Civic Square
Carmel, Indiana 46032
Office: 317-571-2283
From: Kevin K. Parsons [mailto:kkp@landarkkt.com]
Sent: Thursday, July 28, 2011 4:03 PM
To: Mindham, Daren; Conn, Angelina V
Subject: Barrington of Carmel Landscape Plans
Daren and Angelina:
Attached are the latest and hopefully final landscape plans for the Barrington of Carmel. These will replace the plans
you had on file, and are for your review and approval. Please call or email to discuss or to answer questions.
Thanks,
Kevin
Kevin K. Parsons ASLA
Kevin K. Parsons & Associates, Inc.
Landscape Architecture Urban Design Land Planning
212 W. 10th Street, Suite A-290
Indianapolis, IN 46202
PH: 317.955.9155
FX: 317.955.9455
email: kkp@landarkkt.com
web: www.landarkkt.com
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
212
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Wednesday, October 05, 2011 4:12 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel_BPW approval
Yes, thanks for telling him that. I’ll keep you updated, you too me. Thanks.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Wednesday, October 05, 2011 4:06 PM
To: Kempa, Lisa L
Subject: RE: Barrington of Carmel_BPW approval
Thanks Lisa, can you keep me updated on this as you hear from the developer? He just said he was going to talk to Mike Hollibaugh
about postponing the water availability and I informed him that it’s two totally separate departments.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Kempa, Lisa L
Sent: Wednesday, October 05, 2011 3:45 PM
To: Mishler, Nicholas F
Subject: RE: Barrington of Carmel_BPW approval
Ok thanks Nick, we need their fees paid upfront. Ben Dichman was given fee
statement in July.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Wednesday, October 05, 2011 3:41 PM
To: Kempa, Lisa L
Subject: FW: Barrington of Carmel_BPW approval
Lisa, see below.
213
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Wednesday, October 05, 2011 3:31 PM
To: Mishler, Nicholas F
Subject: FW: Barrington of Carmel_BPW approval
Nick,
Thanks again for reviewing the outstanding approvals needed for the Barrington. This is the first of a number of e-mails I
have related to the various items listed on the sheet you gave us. I will call you first thing tomorrow to review and see if
I missed anything. Also Angie is going to talk to Mike about the timing of the payment for the water and sewer fees and
confirm our earlier discussions that payment could be made at the time of financing.
I appreciate your help,
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, September 21, 2011 9:49 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: Barrington of Carmel_BPW approval
Mark and Ric,
The driveways and work within the right-of-way were approved this morning at the BPW meeting. Minutes will be
available in a couple of weeks and I can forward them to you, if need be.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Wednesday, September 21, 2011 10:39 AM
To: Ben Deichmann
Subject: Barrington of Carmel
214
Ben: FYI, the items submitted to the Carmel BPW for Barrington were approved at the meeting this morning. (Curb
Cuts, pathway closure, open pavement cut, lane closure)
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
215
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, October 05, 2011 3:49 PM
To:Mishler, Nicholas F
Subject:FW: The Barrington of Carmel
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Thursday, March 26, 2009 1:51 PM
To: Mark Shegon
Cc: Roger Ward
Subject: FW: The Barrington of Carmel
Mark,
Here is a copy of the drainage approval letter for the Barrington project. Please contact me with any questions.
Thank you,
Ben Deichmann, P.E.
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Greg Ilko [mailto:gilko@crossroadengineers.com]
Sent: Thursday, March 26, 2009 2:46 PM
To: Ben Deichmann; 'Bob Bleich'
Cc: Gary Duncan; 'Greg Hoyes'
Subject: RE: The Barrington of Carmel
Ben,
Please find our approval letter attached. Call with questions.
Sincerely,
Gregory J. Ilko
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
Office: 317.780.1555 ext. 112
Fax: 317.780.6525
www.crossroadengineers.com
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, March 18, 2009 9:04 AM
To: Bob Bleich
Cc: Greg Ilko
Subject: RE: The Barrington of Carmel
Bob,
216
I wanted to see how your review was going with the plans I sent on 02-25-09. Please contact me with any questions.
Thank you,
Ben Deichmann, P.E.
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
(cell) 317-690-1928
www.rw-engineering.com
From: Bob Bleich [mailto:bbleich@crossroadengineers.com]
Sent: Wednesday, January 14, 2009 3:31 PM
To: Ben Deichmann
Cc: 'Greg Ilko'; Duncan, Gary R; 'Greg Hoyes'
Subject: The Barrington of Carmel
Ben:
After discussions with the Hamilton County Surveyors Office today, we have prepared an addendum to our
comment letter dated December 31, 2008. This addendum is attached.
If you have any questions, please feel free to give me a call.
Robert A. Bleich
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
office: 317.780.1555 ext. 143
mobile: 317.417.4130
fax: 317.780.6525
web: www.crossroadengineers.com
No virus found in this outgoing message.
Checked by AVG.
Version: 7.5.552 / Virus Database: 270.10.5/1885 - Release Date: 1/9/2009 7:59 PM
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
217
Mishler, Nicholas F
From:Kempa, Lisa L
Sent:Wednesday, October 05, 2011 3:45 PM
To:Mishler, Nicholas F
Subject:RE: Barrington of Carmel_BPW approval
Ok thanks Nick, we need their fees paid upfront. Ben Dichman was given fee
statement in July.
Lisa Kempa
Carmel Utilities
760 Third Avenue SW
Carmel, IN 46032
317/571-2443
From: Mishler, Nicholas F
Sent: Wednesday, October 05, 2011 3:41 PM
To: Kempa, Lisa L
Subject: FW: Barrington of Carmel_BPW approval
Lisa, see below.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Mark Shegon [mailto:mshegon@greystonecommunities.com]
Sent: Wednesday, October 05, 2011 3:31 PM
To: Mishler, Nicholas F
Subject: FW: Barrington of Carmel_BPW approval
Nick,
Thanks again for reviewing the outstanding approvals needed for the Barrington. This is the first of a number of e-mails I
have related to the various items listed on the sheet you gave us. I will call you first thing tomorrow to review and see if
I missed anything. Also Angie is going to talk to Mike about the timing of the payment for the water and sewer fees and
confirm our earlier discussions that payment could be made at the time of financing.
I appreciate your help,
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
218
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, September 21, 2011 9:49 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: Barrington of Carmel_BPW approval
Mark and Ric,
The driveways and work within the right-of-way were approved this morning at the BPW meeting. Minutes will be
available in a couple of weeks and I can forward them to you, if need be.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Wednesday, September 21, 2011 10:39 AM
To: Ben Deichmann
Subject: Barrington of Carmel
Ben: FYI, the items submitted to the Carmel BPW for Barrington were approved at the meeting this morning. (Curb
Cuts, pathway closure, open pavement cut, lane closure)
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
219
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, October 05, 2011 3:45 PM
To:Mishler, Nicholas F
Subject:FW: Barrington
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Monday, September 19, 2011 9:32 AM
To: Mark Shegon; Ric D’Amico
Cc: Ken Ogden
Subject: FW: Barrington
FYI
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Duffy, John M [mailto:JDuffy@carmel.in.gov]
Sent: Monday, September 19, 2011 9:37 AM
To: Ben Deichmann
Cc: Kempa, Lisa L
Subject: Barrington
Ben,
I have confirmed that there are no outstanding issues with regard to your water line plan for Barrington. As far as Carmel
Water is concerned you are good to go. Prior to starting construction please contact the water distribution office at 733-
2855 to schedule a pre-con meeting. Thank you and please let me know if you have any questions.
John Duffy
Director
City of Carmel Utilities
760 Third Ave. SW
Carmel, IN 46032
317-571-2451
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.
220
Mishler, Nicholas F
From:Mark Shegon [mshegon@greystonecommunities.com]
Sent:Wednesday, October 05, 2011 3:31 PM
To:Mishler, Nicholas F
Subject:FW: Barrington of Carmel_BPW approval
Nick,
Thanks again for reviewing the outstanding approvals needed for the Barrington. This is the first of a number of e-mails I
have related to the various items listed on the sheet you gave us. I will call you first thing tomorrow to review and see if
I missed anything. Also Angie is going to talk to Mike about the timing of the payment for the water and sewer fees and
confirm our earlier discussions that payment could be made at the time of financing.
I appreciate your help,
Mark Shegon
Vice President - Development
Greystone Communities, Inc.
222 W. Las Colinas Blvd. Suite 2100
Irving TX 75039
From: Ben Deichmann [mailto:BDeichmann@rw-engineering.com]
Sent: Wednesday, September 21, 2011 9:49 AM
To: Mark Shegon; Ric D’Amico
Subject: FW: Barrington of Carmel_BPW approval
Mark and Ric,
The driveways and work within the right-of-way were approved this morning at the BPW meeting. Minutes will be
available in a couple of weeks and I can forward them to you, if need be.
Thanks,
Ben Deichmann PE, LEED AP
Roger Ward Engineering, Inc.
(ph) 317-251-1738 ext.205
www.rw-engineering.com
From: Barnes, David R [mailto:dbarnes@carmel.in.gov]
Sent: Wednesday, September 21, 2011 10:39 AM
To: Ben Deichmann
Subject: Barrington of Carmel
Ben: FYI, the items submitted to the Carmel BPW for Barrington were approved at the meeting this morning. (Curb
Cuts, pathway closure, open pavement cut, lane closure)
Greystone Communities Confidentiality Notice: The information in this e-mail and any attachments are confidential and may be legally privileged. It is intended
solely for the addressee. If you are not the intended recipient, any disclosure, copying, distribution or any action taken or omitted to be taken in reliance on it, is
prohibited and may be unlawful. If you have received this e-mail in error, please notify the sender and permanently delete the e-mail, and any attachments,
immediately as you should not retain, copy or use this e-mail or any attachment for any purpose, nor disclose all or any part of the contents to any other person.