Mishler, Nicholas F
From:Barnes, David R
Sent:Thursday, December 27, 2012 9:22 AM
To:Mishler, Nicholas F; Thomas, John G; Foley, Amanda J; Duncan, Gary R; Redden, Nick
Subject:RE: Fifth Third Bank
Nick: Right-of-Way Dedication was approved by the BPW during the 11/21 meeting.
From: Mishler, Nicholas F
Sent: Thursday, December 27, 2012 9:15 AM
To: Thomas, John G; Foley, Amanda J; Duncan, Gary R; Redden, Nick; Barnes, David R
Subject: Fifth Third Bank
Good morning, are there still right-of-way issues at the Fifth Third Bank at 205 E. Carmel Drive that would prevent issuance of a C/O? I received a call
letting me know that they passed their final but there was a note to get engineering approval prior to issuing a C/O.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
2
Mishler, Nicholas F
From:Lux, Pamela K
Sent:Friday, October 05, 2012 9:29 AM
To:Mishler, Nicholas F
Subject:FW: Fifth Third Bank
Pam Lux
Building and Code Services
City of Carmel
From: Foley, Amanda J
Sent: Friday, October 05, 2012 9:28 AM
To: Blanchard, Jim E; Lux, Pamela K
Cc: Barnes, David R; Duncan, Gary R
Subject: Fifth Third Bank
Jim and Pam,
We just found out this week that the new Fifth Third Bank on Carmel Drive has not dedicated the required right-of-way.
Could you put a hold on their Certificate of Occupancy until the City receives the appropriate documents?
Thank you,
Amanda Foley
Staff Engineer
City of Carmel
Department of Engineering
317-571-2309 (direct)
afoley@carmel.in.gov
3
Mishler, Nicholas F
From:Thomas, John G
Sent:Wednesday, August 08, 2012 4:53 PM
To:'Aaron Lane'; 'MLA'; 'Matt Childress'
Cc:Duncan, Gary R; Foley, Amanda J; Redden, Nick; Barnes, David R; Glaser, Fred J;
Greskamp, Dan; Anderson, Kurt M; Dykstra, Robert D; Mishler, Nicholas F
Subject:5/3 Bank
Good afternoon,
The approved storm water management permit for construction at the 5/3 Bank on Carmel Drive is attached, as well as a
new Owner Acknowledgement Agreement with the project owner's representative's signature for your records. If the
project is over 1 acre, then the Rule 5 permit may be submitted to IDEM at this time. Mark Adams has the approved Right
of Way permit.
Please schedule and hold a pre-construction meeting with Dan Greskamp before resuming construction.
Sincerely,
John Thomas, CPESC, CMS4S
Stormwater Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
4
Mishler, Nicholas F
From:Duncan, Gary R
Sent:Tuesday, August 07, 2012 4:38 PM
To:Mishler, Nicholas F
Subject:FW: 5/3 Bank on Carmel Drive
FYI
From: Thomas, John G
Sent: Tuesday, August 07, 2012 4:20 PM
To: 'Aaron Lane'; 'Matt Childress'; MLA
Cc: Greskamp, Dan; Glaser, Fred J; Anderson, Kurt M; Redden, Nick; Barnes, David R; Duncan, Gary R
Subject: 5/3 Bank on Carmel Drive
Good afternoon,
I drove by the 5/3 Bank demolition today and noticed forms being installed in excavations. A storm water permit has not
be issued for the project. Only demolition has been authorized. All work related to the construction documents must stop
on site until the following is completed;
1. Final Sets have been submitted for stamp and signature.
2. The Right of Way Bond and the Storm Water Bond have been submitted.
3. The Storm Water Permit has been issued.
4. The Pre-Construction meeting has been held.
An inspector will check the site tomorrow to make sure nothing other than demolition is occuring. A formal stop work
order will be placed on the site if necessary.
Please let me know if you have any questions
Sincerely,
John Thomas, CPESC, CMS4S
Stormwater Administrator
City of Carmel Engineering Department
(p) 317-571-2314
(f) 317-571-2439
5
Mishler, Nicholas F
From:Barnes, David R
Sent:Monday, August 06, 2012 11:41 AM
To:Mishler, Nicholas F
Cc:Duncan, Gary R
Subject:RE: Fifth Third Bank
No bonds as of yet, I’ll try to contact the GPD Group (engineer providing the cost estimate) and see what’s holding up
those.
From: Mishler, Nicholas F
Sent: Monday, August 06, 2012 11:35 AM
To: Barnes, David R
Cc: Duncan, Gary R
Subject: RE: Fifth Third Bank
Dave, have you received what you need for this yet?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Barnes, David R
Sent: Wednesday, July 18, 2012 1:37 PM
To: Mishler, Nicholas F
Subject: RE: Fifth Third Bank
Nick: I should be receiving the bonds for this within a short amount of time. Other than that, the plans have been
approved by this office. I will immediately let you know when the bonding comes in. – Dave Barnes
From: Mishler, Nicholas F
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
6
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
7
Mishler, Nicholas F
From:Barnes, David R
Sent:Wednesday, July 18, 2012 1:37 PM
To:Mishler, Nicholas F
Subject:RE: Fifth Third Bank
Nick: I should be receiving the bonds for this within a short amount of time. Other than that, the plans have been
approved by this office. I will immediately let you know when the bonding comes in. – Dave Barnes
From: Mishler, Nicholas F
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
8
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Wednesday, July 18, 2012 12:15 PM
To:Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E;
Duffy, John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa,
Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren;
Redden, Nick; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'
Cc:'Aaron Lane'
Subject:RE: Fifth Third Bank
Nick –
We reviewed the architectural building elevations against what was approved by the Plan Commission, and the Final
Elevations are good to go (and are attached). We are okay with the slight change in them removing a window and
adding 2 metal louvers, on the left elevation.
(Plan Commission Docket no. 11110009 DP/ADLS)
Angie Conn
Planning Administrator
Carmel Planning & Zoning Dept.
From: Mishler, Nicholas F
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
9
Please consider the environment before printing this email
10
Mishler, Nicholas F
From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov]
Sent:Wednesday, July 18, 2012 12:04 PM
To:Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E;
Conn, Angelina V; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com'
Cc:'Aaron Lane'
Subject:RE: Fifth Third Bank
Nick
Hamilton County Surveyor’s Office has no outstanding comments or concerns with this project. If you have any
questions, please let me know.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
Hamilton County Surveyor's Office
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
11
12
Mishler, Nicholas F
From:Redden, Nick
Sent:Wednesday, July 18, 2012 11:03 AM
To:Mishler, Nicholas F
Subject:RE: Fifth Third Bank
Good morning, Nick,
We are not ready to approve construction plans yet. Yesterday, I received a check set of plans that I requested to review
before asking to have sent nine sets of plans for final approval. As a matter of fact when I received your e-mail, I was
just now composing a letter to Mr. Kurt Prosser with GPD Group to request that they address comments that were made
in at least two previous reviews.
Nick
From: Mishler, Nicholas F
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
13
Mishler, Nicholas F
From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com]
Sent:Wednesday, July 18, 2012 10:51 AM
To:Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E;
Conn, Angelina V; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc:'Aaron Lane'
Subject:RE: Fifth Third Bank
Duke Energy has discussed the details and does not need additional information at this time.
Thanks,
Shirley Hunter
Sr. Distribution Eng Specialist
Duke Energy
16475 Southpark Dr
Westfield, IN 46074
317.896.6711
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Wednesday, July 18, 2012 10:49 AM
To: Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy,
John M; Duncan, Gary R; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David
W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc: 'Aaron Lane'
Subject: Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
14
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
15
Mishler, Nicholas F
From:Mindham, Daren
Sent:Wednesday, July 18, 2012 10:49 AM
To:Mishler, Nicholas F
Subject:Automatic reply: Fifth Third Bank
I am out of the office until July 23, 2012. I will reply to emails after my return. Please call 571-2417, if
you need immediate assistance.
16
Mishler, Nicholas F
From:Mishler, Nicholas F
Sent:Wednesday, July 18, 2012 10:49 AM
To:Mishler, Nicholas F; 'Pat Portteus'; Akers, William P; Barnes, David R; Blanchard, Jim E;
Conn, Angelina V; Duffy, John M; Duncan, Gary R; Ellison, Christopher M;
'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue;
Mascari, John A; Mindham, Daren; Redden, Nick; 'shirley.hunter@duke-energy.com';
'Greg.Hoyes@hamiltoncounty.in.gov'
Cc:'Aaron Lane'
Subject:Fifth Third Bank
Good morning, I have been contacted by Aaron Lane with GPD Group regarding a proposed Fifth Third Bank in Carmel. Please
see the details of the project below and let me know if you need additional information before we can issue a building permit. I
have also copied Aaron Lane on this email if you want to respond directly to him.
Project: Fifth Third Bank
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
17
Mishler, Nicholas F
From:Aaron Lane [alane@gpdgroup.com]
Sent:Wednesday, July 18, 2012 10:28 AM
To:Mishler, Nicholas F
Subject:RE: 5/3 Bank Improvement Location Permit Submittal
Nick,
Address: 205 E Carmel Drive
Square Footage of the building: 10,400 SF
Two Story Building with Drive-Thru
Demolition of existing building
Installation of new Water Service line bored underneath Carmel Drive
Landscaping throughout site (Approval may be outstanding)
Stormwater PPP controls (Approval may be outstanding)
New Electric Service
New Telephone Service
Reusing existing Curb Cut
Please let me know if you would like additional information. Thank you.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov]
Sent: Tuesday, July 17, 2012 2:03 PM
To: Aaron Lane
Subject: RE: 5/3 Bank Improvement Location Permit Submittal
Aaron, I’m trying to figure out what you still need in order to apply for your permit. Can you send me the details of the project,
such as Square footage, address, etc? I will then forward that information to the various departments to see where the project
stands.
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
18
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Friday, July 13, 2012 3:19 PM
To: Mishler, Nicholas F
Subject: 5/3 Bank Improvement Location Permit Submittal
Mr. Mishler,
Attached are the approval documents from the City of Carmel. SWPPP is still pending and we anticipate approval on
7/16. The CDR release will also be obtained on approximately 7/16. Please plan accordingly with these dates as we
hope to start construction of the Fifth Third Site on 7/23. Please let me know if you have any questions or comments.
Thank you very much for your time.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
19
Mishler, Nicholas F
From:Aaron Lane [alane@gpdgroup.com]
Sent:Friday, July 13, 2012 3:19 PM
To:Mishler, Nicholas F
Subject:5/3 Bank Improvement Location Permit Submittal
Mr. Mishler,
Attached are the approval documents from the City of Carmel. SWPPP is still pending and we anticipate approval on
7/16. The CDR release will also be obtained on approximately 7/16. Please plan accordingly with these dates as we
hope to start construction of the Fifth Third Site on 7/23. Please let me know if you have any questions or comments.
Thank you very much for your time.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
20
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, July 10, 2012 10:02 AM
To:'Aaron Lane'
Cc:Mishler, Nicholas F
Subject:RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Thanks for the clarification, Aaron.
Angie Conn
Planning Administrator
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, July 10, 2012 9:49 AM
To: Conn, Angelina V
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
We have not as we are still awaiting approval from the State for the Construction Design Release. We are looking to
remove the existing building as soon as possible and will obtain additional permits while this process is commencing.
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Tuesday, July 10, 2012 9:42 AM
To: Aaron Lane
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Aaron –
as a side note, have you received approval for your building permit yet from the Building & Code Service Dept. (aka
Building Permits Dept.)?
Angie Conn
Planning Administrator
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, July 10, 2012 9:26 AM
To: Conn, Angelina V
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
21
Do you happen to know the status of the reviews and approvals for this project? We are looking to start construction
next Monday 7/16 and am having trouble getting in touch with John Thomas for obtaining SWPPP approval for
submitting to IDEM. Please let me know. Thank you.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Wednesday, June 27, 2012 1:31 PM
To: Aaron Lane
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Thanks, Aaron. Got the paper copies today.
Also, the City Forester, Daren Mindham, is working with Angela Bushong on getting the landscape plan revised, to
address the conflict between the plantings required along the south property line and the rear cross access easement.
That email is attached, for your info.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, June 26, 2012 9:45 AM
To: Conn, Angelina V
Subject: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
Attached is the response to comments letter for all agencies, Construction Documents (Zip file), and Trip Generation
Report for your review and approval. Hard copies will follow. Please let me know if you have any questions, comments,
or concerns. Thank you.
Sincerely,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
22
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
23
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, July 10, 2012 9:41 AM
To:Mishler, Nicholas F
Subject:RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Sorry Nick! – I thought you guys received a building permit request for a new bank building at 205 E. Carmel Dr. (I
suppose they should not be starting construction if there is no building permit!)
Plan Commission Docket No. 11110009 DP/ADLS: Fifth Third Bank.
The applicant seeks site plan and design approval for a new bank building. The site is located at 205 E. Carmel Dr.
The site is B-8/Business and lies within the Carmel Dr. – Rangeline Rd. Overlay Zone. Filed by Kurt Prosser of the
GPD Group.
Angie Conn
Planning Administrator
From: Mishler, Nicholas F
Sent: Tuesday, July 10, 2012 9:36 AM
To: Conn, Angelina V
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Angie, this is the first time I’ve ever heard of this project. Is this a new bank?
Thanks,
Nick Mishler
Administrative Assistant
Building & Code Services
(317) 571-2489
Please consider the environment before printing this email
From: Conn, Angelina V
Sent: Tuesday, July 10, 2012 9:34 AM
To: 'Aaron Lane'
Cc: Thomas, John G; Duncan, Gary R; Foley, Amanda J; Mishler, Nicholas F
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Good morning, Aaron –
I can only give you the status from the Planning & Zoning Dept. which I am a part of, and we are okay with you moving
forward.
Please work with the City Engineering Dept. to check on the status of their approvals…. I have also copied John Thomas
and Gary Duncan on this email, too. Their number is 317-571-2444.
(I have also copied Nick Mishler with the Building Permits Dept., as well, as he might be coordinating with all the
Departments to make sure everything is okay for the release of the building permit. His number is 571-2444. )
Sincerely,
Angie Conn
Planning Administrator
24
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, July 10, 2012 9:26 AM
To: Conn, Angelina V
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
Do you happen to know the status of the reviews and approvals for this project? We are looking to start construction
next Monday 7/16 and am having trouble getting in touch with John Thomas for obtaining SWPPP approval for
submitting to IDEM. Please let me know. Thank you.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Wednesday, June 27, 2012 1:31 PM
To: Aaron Lane
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Thanks, Aaron. Got the paper copies today.
Also, the City Forester, Daren Mindham, is working with Angela Bushong on getting the landscape plan revised, to
address the conflict between the plantings required along the south property line and the rear cross access easement.
That email is attached, for your info.
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, June 26, 2012 9:45 AM
To: Conn, Angelina V
Subject: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
Attached is the response to comments letter for all agencies, Construction Documents (Zip file), and Trip Generation
Report for your review and approval. Hard copies will follow. Please let me know if you have any questions, comments,
or concerns. Thank you.
25
Sincerely,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
26
Mishler, Nicholas F
From:Conn, Angelina V
Sent:Tuesday, July 10, 2012 9:34 AM
To:'Aaron Lane'
Cc:Thomas, John G; Duncan, Gary R; Foley, Amanda J; Mishler, Nicholas F
Subject:RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Good morning, Aaron –
I can only give you the status from the Planning & Zoning Dept. which I am a part of, and we are okay with you moving
forward.
Please work with the City Engineering Dept. to check on the status of their approvals…. I have also copied John Thomas
and Gary Duncan on this email, too. Their number is 317-571-2444.
(I have also copied Nick Mishler with the Building Permits Dept., as well, as he might be coordinating with all the
Departments to make sure everything is okay for the release of the building permit. His number is 571-2444. )
Sincerely,
Angie Conn
Planning Administrator
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, July 10, 2012 9:26 AM
To: Conn, Angelina V
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
Do you happen to know the status of the reviews and approvals for this project? We are looking to start construction
next Monday 7/16 and am having trouble getting in touch with John Thomas for obtaining SWPPP approval for
submitting to IDEM. Please let me know. Thank you.
Respectfully,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.
From: Conn, Angelina V [mailto:Aconn@carmel.in.gov]
Sent: Wednesday, June 27, 2012 1:31 PM
To: Aaron Lane
Subject: RE: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Thanks, Aaron. Got the paper copies today.
Also, the City Forester, Daren Mindham, is working with Angela Bushong on getting the landscape plan revised, to
address the conflict between the plantings required along the south property line and the rear cross access easement.
That email is attached, for your info.
27
Thanks!
Angie Conn, Planning Administrator
City of Carmel Planning & Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel, IN 46032
O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov
W: www.carmeldocs.com
Please consider the environment before printing this e-mail
From: Aaron Lane [mailto:alane@gpdgroup.com]
Sent: Tuesday, June 26, 2012 9:45 AM
To: Conn, Angelina V
Subject: Carmel Response to Comments 6/26 - Fifth Third Bank construction plans
Ms. Conn,
Attached is the response to comments letter for all agencies, Construction Documents (Zip file), and Trip Generation
Report for your review and approval. Hard copies will follow. Please let me know if you have any questions, comments,
or concerns. Thank you.
Sincerely,
Aaron R. Lane, E.I.
GPD GROUP
Glaus, Pyle, Schomer, Burns & DeHaven, Inc.
1801 Watermark Drive, Suite 150 Columbus, OH 43215 gpdgroup.com
tel / 614.210.0751 dir / 614.859.1611 cel / 614.395.6030 fax / 614.210.0752
AKRON / ATLANTA / CLEVELAND / COLUMBUS / INDIANAPOLIS / LOUISVILLE / MARION / PHOENIX / SEATTLE
/ YOUNGSTOWN
Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information.
Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the
original message. Please consider the environment before printing this email.