Loading...
HomeMy WebLinkAbout12090004 Correspondence1 Mishler, Nicholas F From:Don Adams [dadams@Meyer-Najem.com] Sent:Monday, August 05, 2013 4:16 PM To:Mishler, Nicholas F Subject:RE: The Centre Nick, I thought we took care of the Old National Bank fees when we obtained the temp CO __________________________ Don Adams Superintendent Mobile: 317.501.5047 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com 2013 ISA General Contractor of the Year THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, August 05, 2013 4:01 PM To: Don Adams Cc: Lux, Pamela K; Kass, Joslyn; Blanchard, Jim E Subject: The Centre Importance: Low Don, below are the fees that need to be paid to receive C/O’s for The Centre. I have spoken to Angie in Planning & Zoning and she said the screening issues have all been resolved, so once the fees are paid we can issue the remaining C/O’s. Thanks 12090004 – In-line Shops $578 due for 5 additional inspections: 2 additional footings (1/15, 2/5) 2 additional above ceiling (4/4, 4/15) 1 additional final (7/31) 12090005 – Earthfare Shell $345 due for 3 additional inspections: 3 additional under-slab (1/28, 1/30, 2/15) 12090006 – Outlot building $1035 due for 9 additional inspections: 5 additional footings (10/17, 10/22, 10/25, 10/29, 10/30) 2 1 additional under-slab (2/19) 1 additional rough-in (3/8) 1 additional above ceiling (3/14) 1 additional meter base (4/3) 12110044 – Earthfare Interior C/O is attached 12110071 - Old National Bank 346.50 due for 3 additional inspections: 1 additional under-slab (12/13) 2 additional above ceiling (3/22, 4/19) Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 3 Mishler, Nicholas F From:Conn, Angelina V Sent:Monday, August 05, 2013 2:01 PM To:Mishler, Nicholas F Cc:Boone, Rachel M. Subject:RE: The Centre (Rangeline Crossing) Yes, the screening issues have been resolved for Earth Fare. It is ok to issue the final C/O’s for the inline shops and the Old National Bank. Walgreens is a separate permit, right? (DOCS might want to use this site later on for some leverage with the trash dumpster enclosure issues on the overall site… by holding up inspections and/or the final C/O.) Thanks, Angie From: Mishler, Nicholas F Sent: Monday, August 05, 2013 1:55 PM To: Conn, Angelina V Subject: The Centre Angie, are the permits for The Centre ok to issue C/O’s? I have a note in there that they had screening issues that needed to be OK’d by you guys. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 4 Mishler, Nicholas F From:Mindham, Daren Sent:Friday, June 28, 2013 1:00 PM To:Mishler, Nicholas F Subject:The centre landscape inspections I inspected the site today and passed the inspections. However, I am not sure of the exact permit #’s, I have an email out to the them to find out, But I thought I would email you too. I inspected everything so far and all is good except for the corner that has not been started yet. I did pass the old Nat’l bank separately. But what are the other permit numbers? Daren Mindham Urban Forester City of Carmel Department of Community Services One Civic Square Carmel, Indiana 46032 5 Mishler, Nicholas F From:Hollibaugh, Mike P Sent:Wednesday, May 29, 2013 10:41 AM To:Mishler, Nicholas F Subject:RE: Kite - the Center Thanks Nick for checking. You are correct on both matters, ok to issue c/o on new bldg, not ok to demo old bldg. No real timetable on when the hold will be lifted, but hoping to get the issues resolved yet this week. Will let you know. Mike From: Mishler, Nicholas F Sent: Wednesday, May 29, 2013 10:20 AM To: Hollibaugh, Mike P Subject: RE: Kite - the Center Mike, just to clarify, I am ok to issue the C/O for the “new” Old National Bank building, correct? I placed a hold on the old building for no demo permits, but it looks like the new location next door will be ready for a C/O fairly soon. I just wanted to make sure it’s ok when the time comes. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Hollibaugh, Mike P Sent: Wednesday, May 22, 2013 11:46 AM To: Mishler, Nicholas F Cc: Conn, Angelina V; Boone, Rachel M.; Blanchard, Jim E; Brainard, James C Subject: Kite - the Center Nick, will you please place a “hold” on any permits for the Old National building? This is primarily for a demo permit to remove the existing bank building. Need the hold until some details get worked out for Walgreens who will also be wanting to pull a permit for new building very soon. Thank you, let me know if any questions Mike Michael Hollibaugh p. 317 571 2422 6 Mishler, Nicholas F From:Darren Peterson [DPeterson@petersonarchitecture.com] Sent:Friday, May 24, 2013 12:57 PM To:Ellison, Christopher M Cc:Beth Hofmann; Chris Rosman; Mishler, Nicholas F Subject:RE: Request for Information revised Darren L Peterson AIA Principal Architect p e t e r s o n A R C H I T E C T U R E From: Darren Peterson Sent: Friday, May 24, 2013 10:47 AM To: 'CEllison@carmel.in.gov' Cc: Beth Hofmann; Chris Rosman; nmishler@carmel.in.gov Subject: RE: Request for Information Attached is a response to the items listed below and we appreciate your expeditious release of the project Do not hesitate to call with any questions Darren L Peterson AIA Principal Architect m 317.590.0493 dpeterson@petersonarchitecture.com p e t e r s o n A R C H I T E C T U R E 298 south 10th street suite 500 noblesville in 46060 p 317.770.9714 f 317.770.9718 From: Ellison, Christopher M [mailto:CEllison@carmel.in.gov] Sent: Friday, May 17, 2013 8:11 AM To: Eileen Barbour; 'crosman@jgbowers.com' Cc: Ellison, Christopher M; Knott, Bruce; Mishler, Nicholas F Subject: Request for Information My Office has received plans for the proposed Verizon Wireless project located in the Building Shell 1344 S. Rangeline Rd., Carmel, IN. We are unable to complete a review at this time due to missing information on the submitted plans. Please provide the following: 7 1. Provide a detailed life safety plan with detailed occupant load information and calculations along with required exiting information to confirm compliance with the requirements of Chapter 10 of the 2008 Indiana Fire And Building Codes. 2. Provide emergency lighting and exit signage details information to confirm compliance with the requirements of Chapter 10 of the 2008 Indiana Fire And Building Codes. 3. Provide details on the occupancy separation wall to show compliance with Section 508 of the 2008 Indiana Building Code. 4. The building shell has a fire alarm system installed. Provide detailed fire alarm system device location information. Respectfully, Capt. Chris Ellison Carmel Fire Dept. 317-571-2621 8 Mishler, Nicholas F From:Hollibaugh, Mike P Sent:Wednesday, May 22, 2013 11:46 AM To:Mishler, Nicholas F Cc:Conn, Angelina V; Boone, Rachel M.; Blanchard, Jim E; Brainard, James C Subject:Kite - the Center Nick, will you please place a “hold” on any permits for the Old National building? This is primarily for a demo permit to remove the existing bank building. Need the hold until some details get worked out for Walgreens who will also be wanting to pull a permit for new building very soon. Thank you, let me know if any questions Mike Michael Hollibaugh p. 317 571 2422 9 Mishler, Nicholas F From:Conn, Angelina V Sent:Monday, February 18, 2013 10:02 AM To:'Rick Radabaugh' Cc:Boone, Rachel M.; Donahue-Wold, Alexia K; Mishler, Nicholas F; 'Joy Skidmore' Subject:MacKenzie River Pizza Co. final approved elevations (The Corner) Good morning, Rick - The stamped, approved elevations are attached as a PDF. These elevations are also now in Laser Fiche online. Click this link to take you directly to the scanned copy of the approved elevations online, under docket no. 12050011 ADLS Amend: http://cocdocs.ci.carmel.in.us/Weblink/DocView.aspx?id=895878&dbid=0 , and you can print to pdf, once you get to that webpage. Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 10 Mishler, Nicholas F From:Chad Apple [capple@Meyer-Najem.com] Sent:Wednesday, February 13, 2013 9:00 AM To:Mishler, Nicholas F Subject:FW: City BBQ Nick, Did you happen to get my email from yesterday? I had a few that went out with attachments that did not get delivered. Please let me know if you received it or if you have any questions regarding it. Thanks, Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Chad Apple Sent: Tuesday, February 12, 2013 11:22 AM To: 'Mishler, Nicholas F' Subject: RE: City BBQ Nick, Please see the attached letter as requested. Please let me know if you have any questions. Thanks, Chad From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, February 12, 2013 11:00 AM To: Chad Apple 11 Subject: RE: City BBQ Importance: Low Do you have a state release or are you exempt? If you are exempt, we will need a letter from your architect stating this. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Tuesday, February 12, 2013 10:56 AM To: Mishler, Nicholas F Subject: RE: City BBQ Nick, We were not awarded the build out on City Barbeque, but the landlord informed us that the demising wall is outlined on the Tenant drawings. Does that help? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, February 12, 2013 9:22 AM To: Chad Apple Subject: RE: City BBQ Importance: Low Chad, have you received the state CDR for the City BBQ white box yet? Thanks, Nick Mishler Administrative Assistant 12 Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 3:32 PM To: Mishler, Nicholas F Subject: RE: City BBQ Thanks for the information. I appreciate your assistance. Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 3:31 PM To: Chad Apple Subject: FW: City BBQ Importance: Low Chad, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 13 From: Ellison, Christopher M Sent: Thursday, January 10, 2013 3:23 PM To: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: City BBQ I know that City BBQ plan has already been sent to the State. I would question if the 2 hour wall construction and detail was included on the tenant construction plans reviewed by the State as is Required. Also the State sent in a request for information on 1/8/12, so I guess there was some missing information. If they want to include the 2 hour rated wall it in the tenant work and if it was not on the tenant plans as is being reviewed by the state then an addendum to the tenant plans we have to be sent to the state for review. Chris Ellison CFD From: Mishler, Nicholas F Sent: Thursday, January 10, 2013 2:55 PM To: Ellison, Christopher M; Blanchard, Jim E Subject: FW: City BBQ See below… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 2:08 PM To: Mishler, Nicholas F Subject: RE: City BBQ If we remove the 2 hour wall from our portion of the work, and have that become a part of the tenant construction (which will have a SDR), will the letter suffice for our permitting and what we need to accomplish? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com 14 THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 11:34 AM To: Chad Apple Cc: Ellison, Christopher M; Blanchard, Jim E Subject: City BBQ Importance: Low Chad, regarding the plans for City BBQ, both Chris Ellison with CFD and our Building Commissioner Jim Blanchard have indicated that your portion of the project will actually require a State Design Release. This is due to the fact that a two hour rated wall is being constructed. We can hold the plans here and review them once you receive a state release. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 15 Mishler, Nicholas F From:Chad Apple [capple@Meyer-Najem.com] Sent:Tuesday, February 12, 2013 11:22 AM To:Mishler, Nicholas F Subject:RE: City BBQ Nick, Please see the attached letter as requested. Please let me know if you have any questions. Thanks, Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, February 12, 2013 11:00 AM To: Chad Apple Subject: RE: City BBQ Importance: Low Do you have a state release or are you exempt? If you are exempt, we will need a letter from your architect stating this. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Tuesday, February 12, 2013 10:56 AM To: Mishler, Nicholas F Subject: RE: City BBQ 16 Nick, We were not awarded the build out on City Barbeque, but the landlord informed us that the demising wall is outlined on the Tenant drawings. Does that help? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, February 12, 2013 9:22 AM To: Chad Apple Subject: RE: City BBQ Importance: Low Chad, have you received the state CDR for the City BBQ white box yet? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 3:32 PM To: Mishler, Nicholas F Subject: RE: City BBQ Thanks for the information. I appreciate your assistance. Chad __________________________ Chad Apple Estimator 17 Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 3:31 PM To: Chad Apple Subject: FW: City BBQ Importance: Low Chad, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Ellison, Christopher M Sent: Thursday, January 10, 2013 3:23 PM To: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: City BBQ I know that City BBQ plan has already been sent to the State. I would question if the 2 hour wall construction and detail was included on the tenant construction plans reviewed by the State as is Required. Also the State sent in a request for information on 1/8/12, so I guess there was some missing information. If they want to include the 2 hour rated wall it in the tenant work and if it was not on the tenant plans as is being reviewed by the state then an addendum to the tenant plans we have to be sent to the state for review. Chris Ellison CFD From: Mishler, Nicholas F Sent: Thursday, January 10, 2013 2:55 PM To: Ellison, Christopher M; Blanchard, Jim E Subject: FW: City BBQ 18 See below… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 2:08 PM To: Mishler, Nicholas F Subject: RE: City BBQ If we remove the 2 hour wall from our portion of the work, and have that become a part of the tenant construction (which will have a SDR), will the letter suffice for our permitting and what we need to accomplish? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 11:34 AM To: Chad Apple Cc: Ellison, Christopher M; Blanchard, Jim E Subject: City BBQ Importance: Low Chad, regarding the plans for City BBQ, both Chris Ellison with CFD and our Building Commissioner Jim Blanchard have indicated that your portion of the project will actually require a State Design Release. This is due to the fact that a two hour rated wall is being constructed. We can hold the plans here and review them once you receive a state release. 19 If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 20 Mishler, Nicholas F From:Chad Apple [capple@Meyer-Najem.com] Sent:Tuesday, February 12, 2013 10:56 AM To:Mishler, Nicholas F Subject:RE: City BBQ Nick, We were not awarded the build out on City Barbeque, but the landlord informed us that the demising wall is outlined on the Tenant drawings. Does that help? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, February 12, 2013 9:22 AM To: Chad Apple Subject: RE: City BBQ Importance: Low Chad, have you received the state CDR for the City BBQ white box yet? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 3:32 PM To: Mishler, Nicholas F Subject: RE: City BBQ 21 Thanks for the information. I appreciate your assistance. Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 3:31 PM To: Chad Apple Subject: FW: City BBQ Importance: Low Chad, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Ellison, Christopher M Sent: Thursday, January 10, 2013 3:23 PM To: Mishler, Nicholas F; Blanchard, Jim E Subject: RE: City BBQ I know that City BBQ plan has already been sent to the State. I would question if the 2 hour wall construction and detail was included on the tenant construction plans reviewed by the State as is Required. Also the State sent in a request for information on 1/8/12, so I guess there was some missing information. If they want to include the 2 hour rated wall it in the tenant work and if it was not on the tenant plans as is being reviewed by the state then an addendum to the tenant plans we have to be sent to the state for review. 22 Chris Ellison CFD From: Mishler, Nicholas F Sent: Thursday, January 10, 2013 2:55 PM To: Ellison, Christopher M; Blanchard, Jim E Subject: FW: City BBQ See below… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Chad Apple [mailto:capple@Meyer-Najem.com] Sent: Thursday, January 10, 2013 2:08 PM To: Mishler, Nicholas F Subject: RE: City BBQ If we remove the 2 hour wall from our portion of the work, and have that become a part of the tenant construction (which will have a SDR), will the letter suffice for our permitting and what we need to accomplish? Chad __________________________ Chad Apple Estimator Office: 317.577.0007 Fax: 317.813.7241 Mobile: 317.557.3969 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. 23 From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Thursday, January 10, 2013 11:34 AM To: Chad Apple Cc: Ellison, Christopher M; Blanchard, Jim E Subject: City BBQ Importance: Low Chad, regarding the plans for City BBQ, both Chris Ellison with CFD and our Building Commissioner Jim Blanchard have indicated that your portion of the project will actually require a State Design Release. This is due to the fact that a two hour rated wall is being constructed. We can hold the plans here and review them once you receive a state release. If you have any questions, let me know. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 24 Mishler, Nicholas F From:Conn, Angelina V Sent:Monday, February 11, 2013 12:58 PM To:'Rick Radabaugh'; Motz, Lisa Cc:Donahue-Wold, Alexia K; Tingley, Connie S; Mishler, Nicholas F; Blanchard, Jim E Subject:Approved Elevations for Earth Fare at The Centre Good afternoon, Rick – Attached are the stamped, approved final building elevations. We have placed a copy of this in the plan commission file, and Lisa will also add a pdf of this to laser fiche , within docket no. 12030008 ADLS Amend The Centre, Anchor Store, Grocery Store. (Lisa, please add the .pdf to laser fiche.) Thanks, Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 Office: 317-571-2417 | Direct: 317-571-2281 | Fax: 317-571-2426 | E-mail: aconn@carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail 25 Mishler, Nicholas F From:Conn, Angelina V Sent:Wednesday, November 07, 2012 5:50 PM To:Tingley, Connie S Cc:Mishler, Nicholas F Subject:The Corner - New Restaurant (#12050011 ADLS Amend) Connie-Please add this color sample to laser fiche. It is the exterior walk-in cooler color for Mackenzie River Pizza, at the Corner. Thanks! Nick – if you have not done so already, please allow them to move on with their remodel. Thanks, Angie Conn, Planning Administrator 26 Mishler, Nicholas F From:Danielle Tritt [DanielleT@answersinc.com] Sent:Friday, October 12, 2012 9:12 AM To:Mishler, Nicholas F Subject:RE: Permit ready for pick-up Great! Thank You. Danielle Tritt ANSWERS, Inc. 450 Weidman Road St. Louis, MO 63011 (636) 386-6707 (636) 386-7207 FAX Description: Description: Description: Answers Logo ASK INNOVATE DESIGN IMPLEMENT www.answersinc.com From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Friday, October 12, 2012 8:06 AM To: Danielle Tritt Subject: Permit ready for pick-up Good morning- The following building permit has been reviewed and is now ready for pick-up: ********** Panera Bread Cost: $1943.80 ********** We accept exact cash or check. If paying by check, please make your check payable to City of Carmel. Our office is open for financial transactions from 8:00am until 4:30pm, Monday through Friday. If you have any questions, please feel free to contact our office at (317) 571-2444. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 27 Please consider the environment before printing this email 28 Mishler, Nicholas F From:Lux, Pamela K Sent:Wednesday, October 03, 2012 11:39 AM To:'Beaty, Lori'; Campbell, Scott; Daley, Penny J; Donahue-Wold, Alexia K; Duffy, John M; Ellison, Christopher M; 'Gajownik, Brooke'; Kempa, Lisa L; 'Kirkman, Jason'; Knott, Bruce; Krueskamp, Theresa A; McCoy, David W; Mishler, Nicholas F; 'Owens, Cynthia'; 'Richardson, Mary A'; 'Schwemmin, Bonnie'; Shanayda, Kurt A; Spears, Jack J; 'abeldell@kiterealty.com'; 'jskidmore@kiterealty.com' Subject:The Centre Redevelopment <<AddressesReport.rtf>> The attached addresses have been assigned for The Centre Redevelopment. If you have any questions or concerns, please do not hesitate to contact me at 317-571-2444. Thank you--- Pam Lux Building and Code Services City of Carmel 29 Mishler, Nicholas F From:Jeff Mroz [jmroz@Meyer-Najem.com] Sent:Monday, October 01, 2012 10:00 AM To:Mishler, Nicholas F Subject:RE: Centre Retail Center - Rangeline & 116th When you say that ARCH and STR was added on September 7th, does this mean that ARCH and STR are still under review with Carmel or that they have been released? It sounds like we will be waiting on the state for the MECH, ELEC, and PLUM for a while longer. I would like to be able to complete the shell of the Earth Fare. If that means I need to submit an amendment to the FDN release to get the ARCH and STR, I will do that. I know I’m the one confused here, so thanks for your help. __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, October 01, 2012 9:27 AM To: Jeff Mroz Subject: RE: Centre Retail Center - Rangeline & 116th Importance: Low The only thing I show is that ARCH & STR was added on September 7th. MECH, ELEC, FA, PLUM has not been submitted. Thanks, Nick Mishler 30 Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jeff Mroz [mailto:jmroz@Meyer-Najem.com] Sent: Monday, October 01, 2012 9:23 AM To: Mishler, Nicholas F Subject: Centre Retail Center - Rangeline & 116th Nick, I am looking for some confirmation. I have attached the EarthFare SDR and foundation (only) release. Am I correct in saying that we have applied for the remainder of the permit (ARCH, ELEC, FA, MECH, PLUM, and STR) and that we are waiting on Carmel’s approval? __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. 31 Mishler, Nicholas F From:Jeff Mroz [jmroz@Meyer-Najem.com] Sent:Monday, October 01, 2012 9:33 AM To:Mishler, Nicholas F Subject:RE: Centre Retail Center - Rangeline & 116th Thanks. I’ll be right over to apply for the remainder. __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Monday, October 01, 2012 9:27 AM To: Jeff Mroz Subject: RE: Centre Retail Center - Rangeline & 116th Importance: Low The only thing I show is that ARCH & STR was added on September 7th. MECH, ELEC, FA, PLUM has not been submitted. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jeff Mroz [mailto:jmroz@Meyer-Najem.com] Sent: Monday, October 01, 2012 9:23 AM 32 To: Mishler, Nicholas F Subject: Centre Retail Center - Rangeline & 116th Nick, I am looking for some confirmation. I have attached the EarthFare SDR and foundation (only) release. Am I correct in saying that we have applied for the remainder of the permit (ARCH, ELEC, FA, MECH, PLUM, and STR) and that we are waiting on Carmel’s approval? __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. 33 Mishler, Nicholas F From:Jeff Mroz [jmroz@Meyer-Najem.com] Sent:Monday, October 01, 2012 9:23 AM To:Mishler, Nicholas F Subject:Centre Retail Center - Rangeline & 116th Nick, I am looking for some confirmation. I have attached the EarthFare SDR and foundation (only) release. Am I correct in saying that we have applied for the remainder of the permit (ARCH, ELEC, FA, MECH, PLUM, and STR) and that we are waiting on Carmel’s approval? __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. 34 Mishler, Nicholas F From:Thomas, John G Sent:Friday, September 28, 2012 3:33 PM To:'Colin Patterson' Cc:Duncan, Gary R; Foley, Amanda J; Rick Radabaugh; Rich Kelly; Joy Skidmore; Ashley Bedell; Redden, Nick; Barnes, David R; Mishler, Nicholas F Subject:RE: Kite-The Centre Final O&M Manual Good afternoon, The Approved Storm Water Permit for the The Centre is attached. Please schedule a preconstruction meeting with Dan Greskamp prior to any construction activities at 571-2307. Please let me know if you have any questions and have a good weekend. Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Colin Patterson [mailto:cpatterson@af-eng.com] Sent: Friday, September 28, 2012 1:08 PM To: Thomas, John G Cc: Duncan, Gary R; Foley, Amanda J; Rick Radabaugh; Rich Kelly; Joy Skidmore; Ashley Bedell Subject: Kite-The Centre Final O&M Manual John, I dropped off the final O&M Manual with original owner signature and notarized acknowledgement agreement for you at your front desk. Please contact me with any questions. Thank you, Colin R Patterson, PE af-logo-1200-width-new- 8365 Keystone Crossing, Suite 201 Indianapolis, In 46240 Office (317) 202-0864 Cell (317) 989-6564 cpatterson@af-eng.com 35 Mishler, Nicholas F From:Kempa, Lisa L Sent:Thursday, September 13, 2012 3:55 PM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. I talked to john about this again yesterday and he said he needs to look into it. Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Thursday, September 13, 2012 3:28 PM To: Kempa, Lisa L Subject: RE: The Centre @ 1342 S. Range Line Rd. Lisa, do you have any updates on this? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, September 04, 2012 1:54 PM To: Mishler, Nicholas F Subject: RE: The Centre @ 1342 S. Range Line Rd. I need to talk to John about that one, I know he has questions Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Tuesday, September 04, 2012 1:52 PM To: Kempa, Lisa L Subject: RE: The Centre @ 1342 S. Range Line Rd. Lisa, have you received what you needed on this project? Thanks, 36 Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, August 28, 2012 12:14 PM To: Mishler, Nicholas F Subject: RE: The Centre @ 1342 S. Range Line Rd. I will need a set (paper) for sewer and a set for water to review. Thank you. Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 37 Mishler, Nicholas F From:Jeff Mroz [jmroz@Meyer-Najem.com] Sent:Wednesday, September 05, 2012 8:47 AM To:Mishler, Nicholas F Subject:RE: Earthfare Shell Thanks Nick. I assume this is for the Earthfare Shell only. Does this happen to include the OIutlot building as well? Thanks for the follow up. __________________________ Jeff Mroz Superintendent Mobile: 317.557.4696 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, September 04, 2012 5:15 PM To: Jeff Mroz Subject: Earthfare Shell Importance: Low Jeff, the building commissioner is releasing this permit for foundation only. You can pick it up at any time. The total fee is $6,970.02. We accept exact cash or check made payable to City of Carmel. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 38 Please consider the environment before printing this email 39 Mishler, Nicholas F From:Duncan, Gary R Sent:Wednesday, September 05, 2012 8:45 AM To:Mishler, Nicholas F; Thomas, John G Cc:Foley, Amanda J; Glaser, Fred J; Greskamp, Dan; Barnes, David R; Redden, Nick Subject:RE: The Centre We are still working through some comments. From: Mishler, Nicholas F Sent: Tuesday, September 04, 2012 1:40 PM To: Thomas, John G; Duncan, Gary R Cc: Foley, Amanda J; Glaser, Fred J; Greskamp, Dan; Barnes, David R; Redden, Nick Subject: RE: The Centre Good afternoon- Can someone send me the status of the Centre with engineering? What would they still need to issue the building permits when they are reviewed? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Thomas, John G Sent: Tuesday, August 28, 2012 4:03 PM To: Duncan, Gary R; Rick Radabaugh Cc: Colin Patterson; Joy Skidmore; Foley, Amanda J; Mishler, Nicholas F; Glaser, Fred J; Greskamp, Dan; Anderson, Kurt M; Barnes, David R; Redden, Nick Subject: The Centre Good afternoon, The Storm Water Demolition Permit for the Centre Redevelopment is attached. Once you receive the Demolition Permit from the Building and Code department you can schedule a pre-construction meeting with Dan Greskamp (571-2307 or dgreskamp@carmel.in.gov). This should be held before beginning demolition activities. Please let me know if you have any questions and have a good day. Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 40 Mishler, Nicholas F From:Thomas, John G Sent:Tuesday, September 04, 2012 4:21 PM To:Mishler, Nicholas F; Duncan, Gary R Cc:Foley, Amanda J; Glaser, Fred J; Greskamp, Dan; Barnes, David R; Redden, Nick Subject:RE: The Centre The construction plans are still in review. They still need engineering approval and the full storm water permit. Approval could be a few weeks out. Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Mishler, Nicholas F Sent: Tuesday, September 04, 2012 1:40 PM To: Thomas, John G; Duncan, Gary R Cc: Foley, Amanda J; Glaser, Fred J; Greskamp, Dan; Barnes, David R; Redden, Nick Subject: RE: The Centre Good afternoon- Can someone send me the status of the Centre with engineering? What would they still need to issue the building permits when they are reviewed? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Thomas, John G Sent: Tuesday, August 28, 2012 4:03 PM To: Duncan, Gary R; Rick Radabaugh Cc: Colin Patterson; Joy Skidmore; Foley, Amanda J; Mishler, Nicholas F; Glaser, Fred J; Greskamp, Dan; Anderson, Kurt M; Barnes, David R; Redden, Nick Subject: The Centre Good afternoon, The Storm Water Demolition Permit for the Centre Redevelopment is attached. Once you receive the Demolition Permit from the Building and Code department you can schedule a pre-construction meeting with Dan Greskamp (571-2307 or dgreskamp@carmel.in.gov). This should be held before beginning demolition activities. Please let me know if you have any questions and have a good day. 41 Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 42 Mishler, Nicholas F From:Kempa, Lisa L Sent:Tuesday, September 04, 2012 1:54 PM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. I need to talk to John about that one, I know he has questions Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Tuesday, September 04, 2012 1:52 PM To: Kempa, Lisa L Subject: RE: The Centre @ 1342 S. Range Line Rd. Lisa, have you received what you needed on this project? Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Kempa, Lisa L Sent: Tuesday, August 28, 2012 12:14 PM To: Mishler, Nicholas F Subject: RE: The Centre @ 1342 S. Range Line Rd. I will need a set (paper) for sewer and a set for water to review. Thank you. Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. 43 Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 44 Mishler, Nicholas F From:Barnes, David R Sent:Tuesday, September 04, 2012 1:40 PM To:Mishler, Nicholas F Subject:Automatic reply: The Centre Will be out of office Tuesday 9/4 45 Mishler, Nicholas F From:Conn, Angelina V Sent:Wednesday, August 29, 2012 10:52 AM To:Mishler, Nicholas F Cc:'Jeremy Dixon, LEED Green Associate' Subject:RE: The Centre @ 1342 S. Range Line Rd. Nick – We just received the latest building elevations for earth fare, and will probably approve them, administratively, this week. Angie From: Conn, Angelina V Sent: Tuesday, August 28, 2012 11:32 AM To: Mishler, Nicholas F Cc: Jeremy Dixon, LEED Green Associate; 'Ashley Bedell'; Donahue-Wold, Alexia K Subject: RE: The Centre @ 1342 S. Range Line Rd. Nick – The Planning/Zoning Dept. is still working with Kite (Ashley Bedell) to get the final exterior architectural building elevations approved, relating to plan commission Docket No. 12030008 ADLS Amend: The Centre - Anchor Store/Grocery Store. Kite needs to get those elevations approved for Earth Fare. Also, the Planning/Zoning Dept. needs PDF files of the final site plan and architectural building elevations, so that we can make sure what they want to build is what was approved by the Plan Commission. Thanks! Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell 46 The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 47 Mishler, Nicholas F From:Thomas, John G Sent:Tuesday, August 28, 2012 4:03 PM To:Duncan, Gary R; Rick Radabaugh Cc:Colin Patterson; Joy Skidmore; Foley, Amanda J; Mishler, Nicholas F; Glaser, Fred J; Greskamp, Dan; Anderson, Kurt M; Barnes, David R; Redden, Nick Subject:The Centre Good afternoon, The Storm Water Demolition Permit for the Centre Redevelopment is attached. Once you receive the Demolition Permit from the Building and Code department you can schedule a pre-construction meeting with Dan Greskamp (571-2307 or dgreskamp@carmel.in.gov). This should be held before beginning demolition activities. Please let me know if you have any questions and have a good day. Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 48 Mishler, Nicholas F From:Thomas, John G Sent:Tuesday, August 28, 2012 3:59 PM To:Mishler, Nicholas F; Duncan, Gary R; Redden, Nick; Barnes, David R; Foley, Amanda J Subject:RE: The Centre Demo Hi Nick, You can release them for the demolition. I am sending out the SW Demolition permit today. Thanks for checking! Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 1:10 PM To: Duncan, Gary R; Thomas, John G; Redden, Nick; Barnes, David R Subject: The Centre Demo I just wanted to verify that engineering is OK with the Demolition at this location? We received this application finally and it does have a ROW permit, but nothing else. I figured a lot of the things you need will be required prior to the building permit being issued, but I just wanted to make sure the demo is ok to release. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 49 Mishler, Nicholas F From:Kempa, Lisa L Sent:Tuesday, August 28, 2012 12:14 PM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. I will need a set (paper) for sewer and a set for water to review. Thank you. Lisa Kempa Carmel Utilities 760 Third Avenue SW Carmel, IN 46032 317/571-2267 From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 50 Mishler, Nicholas F From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com] Sent:Tuesday, August 28, 2012 11:36 AM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. Thanks Nick. That makes more sense. From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:21 AM To: Hunter, Shirley A Subject: FW: The Centre @ 1342 S. Range Line Rd. Shirley, see below… Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email From: Jeremy Dixon, LEED Green Associate [mailto:jdixon@Meyer-Najem.com] Sent: Tuesday, August 28, 2012 11:20 AM To: Mishler, Nicholas F Subject: Re: The Centre @ 1342 S. Range Line Rd. Nick This is not technically an addition, it is the removal do the existing canopies & facade, then installation of new canopy/facade. On Aug 28, 2012, at 11:13 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote: Jeremy, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email __________________________ Jeremy Dixon, LEED Green Associate Senior Project Manager Office: 317.813.6223 51 Fax: 317.813.7223 Mobile: 317.538.0965 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Hunter, Shirley A [mailto:Shirley.Hunter@duke-energy.com] Sent: Tuesday, August 28, 2012 11:13 AM To: Mishler, Nicholas F Subject: RE: The Centre @ 1342 S. Range Line Rd. Nick, I am not aware of the 30,468 sq ft In-line shops addition. Can you let me know where this is located at the existing site? Shirley Hunter Sr. Distribution Eng Specialist Duke Energy 16475 Southpark Dr Westfield, IN 46074 317.896.6711 From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition 52 • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 53 Mishler, Nicholas F From:Conn, Angelina V Sent:Tuesday, August 28, 2012 11:32 AM To:Mishler, Nicholas F Cc:Jeremy Dixon, LEED Green Associate; 'Ashley Bedell'; Donahue-Wold, Alexia K Subject:RE: The Centre @ 1342 S. Range Line Rd. Nick – The Planning/Zoning Dept. is still working with Kite (Ashley Bedell) to get the final exterior architectural building elevations approved, relating to plan commission Docket No. 12030008 ADLS Amend: The Centre - Anchor Store/Grocery Store. Kite needs to get those elevations approved for Earth Fare. Also, the Planning/Zoning Dept. needs PDF files of the final site plan and architectural building elevations, so that we can make sure what they want to build is what was approved by the Plan Commission. Thanks! Angie Conn, Planning Administrator City of Carmel Planning & Zoning Division Dept. of Community Services 1 Civic Square, 3rd Flr. Carmel, IN 46032 O: 317-571-2417 | F: 317-571-2426 | E: aconn@carmel.in.gov W: www.carmeldocs.com Please consider the environment before printing this e-mail From: Mishler, Nicholas F Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 54 55 Mishler, Nicholas F From:Jeremy Dixon, LEED Green Associate [jdixon@Meyer-Najem.com] Sent:Tuesday, August 28, 2012 11:20 AM To:Mishler, Nicholas F Subject:Re: The Centre @ 1342 S. Range Line Rd. Nick This is not technically an addition, it is the removal do the existing canopies & facade, then installation of new canopy/facade. On Aug 28, 2012, at 11:13 AM, "Mishler, Nicholas F" <nmishler@carmel.in.gov> wrote: Jeremy, see below. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email __________________________ Jeremy Dixon, LEED Green Associate Senior Project Manager Office: 317.813.6223 Fax: 317.813.7223 Mobile: 317.538.0965 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Hunter, Shirley A [mailto:Shirley.Hunter@duke-energy.com] Sent: Tuesday, August 28, 2012 11:13 AM 56 To: Mishler, Nicholas F Subject: RE: The Centre @ 1342 S. Range Line Rd. Nick, I am not aware of the 30,468 sq ft In-line shops addition. Can you let me know where this is located at the existing site? Shirley Hunter Sr. Distribution Eng Specialist Duke Energy 16475 Southpark Dr Westfield, IN 46074 317.896.6711 From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 57 Mishler, Nicholas F From:Hunter, Shirley A [Shirley.Hunter@duke-energy.com] Sent:Tuesday, August 28, 2012 11:13 AM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. Nick, I am not aware of the 30,468 sq ft In-line shops addition. Can you let me know where this is located at the existing site? Shirley Hunter Sr. Distribution Eng Specialist Duke Energy 16475 Southpark Dr Westfield, IN 46074 317.896.6711 From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 58 Mishler, Nicholas F From:Greg R. Hoyes [Greg.Hoyes@hamiltoncounty.in.gov] Sent:Tuesday, August 28, 2012 11:08 AM To:Mishler, Nicholas F; Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; Lux, Pamela K Cc:Jeremy Dixon, LEED Green Associate Subject:RE: The Centre @ 1342 S. Range Line Rd. Nick This project does not fall in a regulated drain watershed, so we have no involvement. If you have any questions, please let me know. Greg Hoyes, AC, CFM, CPESC Plan Reviewer Hamilton County Surveyor's Office From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; Greg R. Hoyes; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. • 30,468 sq ft In-line shops addition • 16,174 sq ft Outlot building • 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 Please consider the environment before printing this email 59 Mishler, Nicholas F From:Ryan Hartman [Ryan.Hartman@CTRWD.ORG] Sent:Tuesday, August 28, 2012 11:04 AM To:Mishler, Nicholas F Subject:RE: The Centre @ 1342 S. Range Line Rd. Nick, This project in not in our service territory. Thank you. Description: C:\Users\ryan\AppData\Roaming\Microsoft\Signatures\Dark Green Logo (Ryan Hartman)-Image01.bmp Ryan Hartman, District Engineer Clay Township Regional Waste District 10701 N. College Avenue, Suite A Indianapolis, Indiana 46280 Phone - 317-844-9200 Mobile - 317-997-0618 Website - www.ctrwd.org Email - ryan.hartman@ctrwd.org From: Mishler, Nicholas F [mailto:nmishler@carmel.in.gov] Sent: Tuesday, August 28, 2012 11:01 AM To: Akers, William P; Barnes, David R; Blanchard, Jim E; Conn, Angelina V; Duffy, John M; Ellison, Christopher M; 'ryan.hartman@ctrwd.org'; Kempa, Lisa L; Knott, Bruce; Littlejohn, David W; Maki, Sue; Mascari, John A; Mindham, Daren; Redden, Nick; Thomas, John G; Foley, Amanda J; 'shirley.hunter@duke-energy.com'; 'Greg.Hoyes@hamiltoncounty.in.gov'; Lux, Pamela K Cc: Jeremy Dixon, LEED Green Associate Subject: The Centre @ 1342 S. Range Line Rd. Good morning- I received the following plans for new additions to The Centre at 1342 S. Range Line Rd. · 30,468 sq ft In-line shops addition · 16,174 sq ft Outlot building · 25,000 sq ft earthfare shell The plans will not be reviewed by our department until the demolition permit is applied for, issued, and the site inspection is complete, but I wanted to send this so the builder will get an initial idea of what each department will require. If you need to see a digital copy of plans, let me know and I can send them to you. Thanks, 60 Nick Mishler Administrative Assistant Building & Code Services (317) 571-2489 P Please consider the environment before printing this email 61 Mishler, Nicholas F From:Jeremy Dixon, LEED Green Associate [jdixon@Meyer-Najem.com] Sent:Friday, August 24, 2012 2:41 PM To:Joy Skidmore; Mishler, Nicholas F Cc:Al Abell; Jeff Mroz; Rick Radabaugh Subject:RE: The Centre - Building Permits All I received a call from Morgan at the Health Dept and she is signing the form and will fax to Joy & myself. __________________________ Jeremy Dixon, LEED Green Associate Senior Project Manager Office: 317.813.6223 Fax: 317.813.7223 Mobile: 317.538.0965 MEYER NAJEM CONSTRUCTION, LLC BUILDING VALUE. BUILDING SOLUTIONS. www.meyer-najem.com THINK GREEN! Please consider the environment before printing this email. This message (and any associated files) is intended only for the use of the individual or entity to which it is addressed and may contain information that is confidential, subject to copyright or constitutes a trade secret. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this message, or files associated with this message, is strictly prohibited. Internet communications cannot be guaranteed to be secure or error-free as information could be intercepted, corrupted, lost, destroyed, arrive late or incomplete, or contain viruses. Therefore, we do not accept responsibility for any errors or omissions that are present in this message, or any attachment, that have arisen as a result of e-mail transmission. Any views or opinions presented are solely those of the author and do not necessarily represent those of the company. From: Joy Skidmore [mailto:jskidmore@kiterealty.com] Sent: Friday, August 24, 2012 2:05 PM To: Jeremy Dixon, LEED Green Associate; nmishler@carmel.in.gov Cc: Al Abell; Jeff Mroz; Rick Radabaugh Subject: The Centre - Building Permits Importance: Low Jeremy, I spoke with Nick in the building department and cleared up some confusion. Nick – Please let me know if any of this information is incorrect. 1. Demo permit a. Must be signed by Barry at the Health Department before Carmel will accept it. I faxed it to him first thing this morning. (Al – If you have not done so already, please follow up with him) b. It must be approved by the Building Commissioner prior to approval 62 c. John Thomas will need to send an email to Nick stating EC is ok. 2. Building Permits a. I need to send a summary of the project to Nick. He will then forward my summary to several parties. Many will reply that they do not need to review anything since this project has already been approved through TAC. I plan on sending this today. b. On Monday, he will accept the building plans for review. Please be sure to include the PDF plans as well as the three sets for all the buildings. c. Permits cannot be issued until demo is complete and approvals are obtained from all other agencies listed on the permit application. The Fire Department will not start review until all approvals are obtained, but Nick will try to have all other reviews complete prior to receiving all other approvals. d. Site will need to be inspected after demolition prior to building permit issuance. Thank you, Joy Skidmore | Project Manager, Construction Services 317 578 5154 [direct] 317 409 0554 [cell] 317 577 5600 [main] 317 577 5605 [fax] Kite Realty Group 30 South Meridian Street, Suite 1100 Indianapolis, IN 46204 63 Mishler, Nicholas F From:Joy Skidmore [jskidmore@kiterealty.com] Sent:Friday, August 24, 2012 2:05 PM To:Jeremy Dixon, LEED Green Associate; Mishler, Nicholas F Cc:Al Abell; jmroz@meyer-najem.com; Rick Radabaugh Subject:The Centre - Building Permits Jeremy, I spoke with Nick in the building department and cleared up some confusion. Nick – Please let me know if any of this information is incorrect. 1. Demo permit a. Must be signed by Barry at the Health Department before Carmel will accept it. I faxed it to him first thing this morning. (Al – If you have not done so already, please follow up with him) b. It must be approved by the Building Commissioner prior to approval c. John Thomas will need to send an email to Nick stating EC is ok. 2. Building Permits a. I need to send a summary of the project to Nick. He will then forward my summary to several parties. Many will reply that they do not need to review anything since this project has already been approved through TAC. I plan on sending this today. b. On Monday, he will accept the building plans for review. Please be sure to include the PDF plans as well as the three sets for all the buildings. c. Permits cannot be issued until demo is complete and approvals are obtained from all other agencies listed on the permit application. The Fire Department will not start review until all approvals are obtained, but Nick will try to have all other reviews complete prior to receiving all other approvals. d. Site will need to be inspected after demolition prior to building permit issuance. Thank you, Joy Skidmore | Project Manager, Construction Services 317 578 5154 [direct] 317 409 0554 [cell] 317 577 5600 [main] 317 577 5605 [fax] Kite Realty Group 30 South Meridian Street, Suite 1100 Indianapolis, IN 46204 64 Mishler, Nicholas F From:Colin Patterson [cpatterson@af-eng.com] Sent:Friday, August 03, 2012 10:58 AM To:Thomas, John G Cc:Mishler, Nicholas F; Duncan, Gary R; Foley, Amanda J; Barnes, David R; Glaser, Fred J; Redden, Nick Subject:RE: The Centre Thank you John, I will forward the below information to our client. Colin R Patterson, PE af-logo-1200-width-new- 8365 Keystone Crossing, Suite 201 Indianapolis, In 46240 Office (317) 202-0864 Cell (317) 989-6564 cpatterson@af-eng.com From: Thomas, John G [mailto:jthomas@carmel.in.gov] Sent: Friday, August 03, 2012 10:51 AM To: Colin Patterson Cc: Mishler, Nicholas F; Duncan, Gary R; Foley, Amanda J; Barnes, David R; Glaser, Fred J; Redden, Nick Subject: The Centre Good morning Colin, I've reviewed the demolition and storm water plan for the project. The following will need to be addressed before I can issue the storm water permit for the demolition. 1. A "right of way permit" will need to be obtained from Fred Glaser. Permit requires the posting of a $5000 license and permit bond. Please call Fred at 571-2677 for more information. The following item will have to be addressed before any demolition within the right of way can begin; 2. It appears a few entrances and some sidewalk in the right of way will be demolished. Closure of the sidewalk for this demolition will Board of Public Works approval. Please contact Dave Barnes in our office at 571-2364. The following will have to be addressed before the site entrance can be moved. 3. The vacating of an existing curb cut and the relocating of a site entrance will require Board of Public works approval. Please contact Dave for this as well. 4. The construction documents will have to be approved and the construction phase storm water permit issued. Coordinated through our department. After each storm water permit is issued, a pre-construction meeting must be held with our department before any acitivity begins on that phase of the project. Please call Dan Greskamp to schedule, after receiving the storm water permit at 571- 2307. Please let me know if you have any questions and have a good day. Sincerely, 65 John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439 66 Mishler, Nicholas F From:Thomas, John G Sent:Friday, August 03, 2012 10:51 AM To:'Colin Patterson' Cc:Mishler, Nicholas F; Duncan, Gary R; Foley, Amanda J; Barnes, David R; Glaser, Fred J; Redden, Nick Subject:The Centre Good morning Colin, I've reviewed the demolition and storm water plan for the project. The following will need to be addressed before I can issue the storm water permit for the demolition. 1. A "right of way permit" will need to be obtained from Fred Glaser. Permit requires the posting of a $5000 license and permit bond. Please call Fred at 571-2677 for more information. The following item will have to be addressed before any demolition within the right of way can begin; 2. It appears a few entrances and some sidewalk in the right of way will be demolished. Closure of the sidewalk for this demolition will Board of Public Works approval. Please contact Dave Barnes in our office at 571-2364. The following will have to be addressed before the site entrance can be moved. 3. The vacating of an existing curb cut and the relocating of a site entrance will require Board of Public works approval. Please contact Dave for this as well. 4. The construction documents will have to be approved and the construction phase storm water permit issued. Coordinated through our department. After each storm water permit is issued, a pre-construction meeting must be held with our department before any acitivity begins on that phase of the project. Please call Dan Greskamp to schedule, after receiving the storm water permit at 571- 2307. Please let me know if you have any questions and have a good day. Sincerely, John Thomas, CPESC, CMS4S Stormwater Administrator City of Carmel Engineering Department (p) 317-571-2314 (f) 317-571-2439