Ashmoor
Residential Subdivision (PUD)
131st Street & Shelborne Road
Carmel, Indiana 46032
Job #: BDX.003
Date: 10 -17 -13
Prepared by: Eric A. Gleissner, P.E.
Reviewed by: Brian Cross, P.E.
Civil
Site
GROUP, INC
643 Massachusetts Avenue
Suite 200
Indianapolis, IN 46204
Phone: 317- 423 -3305 Fax: 317- 423 -3306
TABLE OF CONTENTS
A. Water Service
B. Sanitary Sewer Service
C. Stormwater Drainage Summary (see calculations for more detailed information)
A. Water Service
Water service will be provided by the City of Carmel Water - Wastewater Utilities.
Water service is available within the existing Shelbourne Estates Subdivision
near the southwest corner of the subject site at the connection with Yancey
Place. This is an 8" water main which we are proposing to connect to and
extend. In addition, there is a 12" water main on the west side of Shelborne
Road which we are also proposing a connection to. There is also a 12" water
main on the north side of West 131st Street; however, we are not proposing a
connection to this main.
B. Sanitary Sewer Service
Sanitary sewer service will be provided by Clay Township Regional Waste
District. There is an existing 8" sewer main within the existing Shelbourne
Estates Subdivision near the southwest corner of the subject site at the
connection with Yancey Place.
Top of Casting Elevation = 912.04
Invert Out Elevation (West) = 903.36
There is also a 12" diameter sewer main located on the south side of West 131st
Street adjacent to the subject site.
Top of Casting Elevation = 912.60
Invert Out Elevation (West) = 897.06
We are proposing connections to both sewers to serve the proposed
development. A stub will be constructed to the southwest along Shelborne Road
for future development per direction from Clay Township Regional Waste District.
The sanitary sewers have adequate depth and capacity to serve the proposed
development.
C. Stormwater Drainage Summary
This section is intended to be a basic summary of the existing and proposed
drainage for the subject site. Please reference the Drainage Calculations for
more detailed information. The existing property drains via overland flow to the
southwest to an existing 24" RCP storm sewer constructed as part of Shelbourne
Estates. The entire subject property is part of the Albert Shaw watershed which
drains southwest ultimately outletting into Boone Creek. The site is vacant and is
used as agricultural farm land currently planted with corn.
A 24 -hour duration storm event was analyzed using the SCS -II rainfall
distribution. Basin "EX1" represents the entire 39.59 acre site including the
existing right -of -way to the centerline of the road of both 131st Street and
Shelborne Road. Per the City of Carmel Stormwater Technical Standards
Manual, we will be providing stormwater detention for the fully developed
conditions of the right -of -way of both 131st Street and Shelborne Road.
Therefore, the allowable release rate will be calculated based on the entire 39.59
acre site to the centerlines of both streets. The following table summarizes the
existing runoff rates of the subject site as it exists today:
Table 1: Existing Conditions
Per the City of Carmel Stormwater Technical Standards Manual, the maximum
allowable release rates in the fully developed condition shall be 0.10 cfs for a 10-
year storm event and 0.30 cfs for a 100 -year storm event. Therefore, the
allowable release rates for this site will be 3.96 cfs and 11.88 cfs for 10 -year and
100 -year storm events respectively.
The proposed drainage patterns for the site will remain nearly identical to the
existing conditions. A 2.38 +1- acre wet detention pond is being proposed along
the western property line to provide stormwater detention and post- construction
stormwater quality (BMPs). Per the City of Carmel Stormwater Technical
Standards Manual, we are providing stormwater detention for the fully developed
conditions of the right -of -way of both 131st Street and Shelborne Road. Basin
"PR1" represents the entire 39.59 acre site including the fully developed
proposed right -of -way to the centerline of the road of both 131St Street and
Shelborne Road. The fully developed curve number was calculated to be 79.0;
however, the City of Carmel Stormwater Technical Standards Manual requires
that the actual curve number be downgraded to the next poorest classification.
Therefore, this results in a downgraded curve number of 84.9 which is what was
used in the hydraulic model.
DRAINAGE BASIN RUNOFF (CFS)
STORM
EVENT
24 -Hour Event
BASIN
EX1
2 -YEAR
25.29 cfs
10 -YEAR
46.75 cfs
100 -YEAR
97.91 cfs
Table 1: Existing Conditions
Per the City of Carmel Stormwater Technical Standards Manual, the maximum
allowable release rates in the fully developed condition shall be 0.10 cfs for a 10-
year storm event and 0.30 cfs for a 100 -year storm event. Therefore, the
allowable release rates for this site will be 3.96 cfs and 11.88 cfs for 10 -year and
100 -year storm events respectively.
The proposed drainage patterns for the site will remain nearly identical to the
existing conditions. A 2.38 +1- acre wet detention pond is being proposed along
the western property line to provide stormwater detention and post- construction
stormwater quality (BMPs). Per the City of Carmel Stormwater Technical
Standards Manual, we are providing stormwater detention for the fully developed
conditions of the right -of -way of both 131st Street and Shelborne Road. Basin
"PR1" represents the entire 39.59 acre site including the fully developed
proposed right -of -way to the centerline of the road of both 131St Street and
Shelborne Road. The fully developed curve number was calculated to be 79.0;
however, the City of Carmel Stormwater Technical Standards Manual requires
that the actual curve number be downgraded to the next poorest classification.
Therefore, this results in a downgraded curve number of 84.9 which is what was
used in the hydraulic model.
The following table identifies the release rates from the site, with the proposed
improvements, AFTER being routed through the proposed detention facility.
STORM
EVENT
DETENTION POND DISCHARGES (CFS)
DETENTION POND STAGE
2 -YEAR
2.15 cfs
908.51'
10 -YEAR
3.77 cfs
909.25'
100 -YEAR
9.38 cfs
910.89'
Table 2: Proposed Conditions
Proposed 10 -year discharge 3.77 cfs < 3.96 cfs (allowable release at
0.1 cfs per acre for 39.59 acres)
Proposed 100 -year discharge 9.38 cfs < 11.88 cfs (allowable release at
0.3 cfs per acre for 39.59 acres)
The existing 24" RCP storm sewer constructed as part of Shelbourne Estates
has been sized to accommodate the runoff from the proposed development. The
storm sewer was constructed at 0.30% which has a calculated capacity of 12.39
cfs with zero head and 17.89 cfs with one foot of head. The maximum discharge
from the proposed development during a 100 -year storm event will be 9.38 cfs;
therefore, there is more than adequate capacity to accommodate the proposed
development.