HomeMy WebLinkAboutDrainage Report-PCW001Drainage Calculations Prime Car Wash 9805 North Michigan Road Carmel, Indiana 46032 Job #: PCW.001 Date: 10 -15 -13 Prepared by: Eric A. Gleissner, P.E. Reviewed by: Brian Cross, P.E. CivH Site GROUP, INC 643 Massachusetts Avenue Suite 200 Indianapolis, IN 46204 Phone: 317- 423 -3305 Fax: 317- 423 -3306 TABLE OF CONTENTS Section 1: Report A. Project Title B. Project Description C. Design Method and Criteria D. References E. Existing Conditions F. Proposed Conditions G. Stormwater Quality Section 11: Appendix A. Site Information B. Existing Conditions (Exhibits, Calculations, etc.) C. Proposed Conditions (Exhibits, Calculations, etc.) D. ICPR Input Data E. Water Quality Data F. Previously Approved Walnut Creek Drive Drainage Calculations SECTION 1: REPORT A. Project Title Prime Car Wash (9805 North Michigan Road) B. Project Description This project is located on the northeast corner of the intersection of North Michigan Road (U.S. 421) and West 98th Street in Carmel, Indiana. The site totals 1.47 +/- acres in size and was previously occupied by single family homes prior to their demolition. The proposed improvements will consist of a new 10,695 square foot commercial building to serve as a car wash. Also included with the proposed improvements will be utility and drainage infrastructure along with new hard surface for parking and ingress / egress. The existing wet detention facility for West Carmel Marketplace was previously approved by the Hamilton County Surveyor's Office to provide stormwater detention for the subject site in the developed condition. In addition, the Walnut Creek Drive extension and the North Augusta Arm #1- Crooked Creek Regulated Drain extension are currently under construction and have been sized to accommodate the proposed development. These plans and calculations analyze the existing and proposed drainage patterns and will show that the proposed improvements will have no negative effect on drainage conditions in the area. The existing land uses adjacent to the subject site are as follows: North: Commercial / Vacant West: Commercial / Retail South: Commercial / Office East: Institutional / School (under construction) C. Design Method and Criteria 1. Soil Type: Soil maps from the United States Department of Agriculture, Soil Conservation Service, identify Brookston Silty Clay Loam — (Br — 54% Site) and Crosby Silt Loam — (CrA — 46% Site). 2. Design Storm: The 2, 10 and 100 -year storm events have been analyzed for both the existing and proposed overall conditions. The Rational Method was used in pipe sizing calculations. Hydrology / Detention sizing was performed using the SCS -II 24 -hour rainfall distribution and ICPR computer software. 3. Overall Watershed: The existing site drains via overland flow to the west into the existing detention facility for West Carmel Marketplace eventually outletting into Crooked Creek. D. References 1. TR55 Stormwater Design Manual. 2. Hamilton County Soil Survey. 3. Highway Extension and Research Project for Indiana Counties (HERPIC). 4. City of Carmel Stormwater Technical Standards Manual. E. Existing Conditions The subject site totals 1.47 +/- acres in size and was previously occupied by single family homes prior to their demolition. The existing property generally drains via overland flow to the west into the existing detention facility for West Carmel Marketplace eventually outletting into Crooked Creek. Please see attached exhibit "EX1" for existing conditions. The existing wet detention facility for West Carmel Marketplace was previously approved by the Hamilton County Surveyor's Office to provide stormwater detention for the subject site in the developed condition. In addition, the Walnut Creek Drive extension and the North Augusta Arm #1- Crooked Creek Regulated Drain extension are currently under construction and have been sized to accommodate the proposed development. An existing conditions runoff analysis was performed using the Rational Method. Basin "EX1" represents the 1.47 +/- acre subject site as it exists today. The following table summarizes the maximum existing discharge rates for Basin "EX1 ": Table 1: Pre - Developed Existing Conditions DRAINAGE BASIN RUNOFF (CFS) Basin EX1 (1.47 +/- acres) 2 -YEAR 0.94 cfs 10 -YEAR 1.43 cfs 100 -YEAR 2.05 cfs Table 1: Pre - Developed Existing Conditions F. Proposed Conditions The proposed improvements will consist of a new 10,695 square foot commercial building to serve as a car wash. Also included with the proposed improvements will be utility and drainage infrastructure along with new hard surface for parking and ingress / egress. A Downstream Defender 4' diameter hydrodynamic separator structure along with a Snout oil /water separator will be specified to address the stormwater quality requirements. The existing wet detention facility for West Carmel Marketplace was previously approved by the Hamilton County Surveyor's Office to provide stormwater detention for the subject site in the developed condition. In addition, the Walnut Creek Drive extension and the North Augusta Arm #1- Crooked Creek Regulated Drain extension are currently under construction and have been sized to accommodate the proposed development. Therefore, stormwater detention for the proposed development will not be required. The following table summarizes the total discharge rates from Basin "EX2" with the proposed building expansion during the 2 -year, 10 -year and 100 -year storm events: G. Stormwater Quality An offline Downstream Defender 4' diameter hydrodynamic separator will be proposed to address the Stormwater Quality requirements. In addition, a Snout oil /water separator will be proposed on the BMP diversion structure with a 2' sump prior to discharging into the regulated drain storm sewer system. Based on data provided by Downstream Defender, this particular structure has a maximum treatment flow capacity of 3.00 cfs. The required treatment flow rate has been calculated based on the CNwq at 1.08 cfs per the City of Carmel Stormwater Technical Standards Manual. Therefore, the Downstream Defender 4' diameter structure is an ideal fit for this application. DRAINAGE BASIN RUNOFF (CFS) Basin PR1 (1.47 +/- acres) 2 -YEAR 2.43 cfs 10 -YEAR 3.75 cfs 100 -YEAR 5.41 cfs G. Stormwater Quality An offline Downstream Defender 4' diameter hydrodynamic separator will be proposed to address the Stormwater Quality requirements. In addition, a Snout oil /water separator will be proposed on the BMP diversion structure with a 2' sump prior to discharging into the regulated drain storm sewer system. Based on data provided by Downstream Defender, this particular structure has a maximum treatment flow capacity of 3.00 cfs. The required treatment flow rate has been calculated based on the CNwq at 1.08 cfs per the City of Carmel Stormwater Technical Standards Manual. Therefore, the Downstream Defender 4' diameter structure is an ideal fit for this application. SECTION 11: APPENDIX A. Site Information Soil Map — Hamilton County, Indiana Map Unit Legend Hamilton County, Indiana (IN057) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Br Brookston silty clay loam 0.8 53.5% CrA Crosby silt loam, 0 to 3 percent slopes 0.7 1.4 46.5% Totals for Area of Interest 100.0% USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 9/30/2013 Page 3 of 3 B. Existing Conditions EXISTING CONDITIONS Runoff Curve Coefficient Number Impervious Area = 0.90 98 Open Area = 0.20 67 * *Open Space (Good Condition) Gravel /Stone = 0.50 86.8 Miami Silt Loam (MmB2 - 46% Site) Type "C" Soil Brookston Silty Clay Loam (Br - 54% Site) Type "B" Soil BASIN (EX1) - Overall Site Impervious Area Open Area Stone Total Total Composite Composite (ft ^2) (ft ^2) (ft ^2) (ft ^2) (Acres) "CN" 0 64044 0 64044 1.47 67.0 0.20 Overland flow seg. 1 Shallow Concentrated Flow Basin name Length (ft) S % n T_t (min) Length (ft) S % Paved/Un (P or U) Vel. (ft/s) T_t (min) T_c (min) EX1 100 1.00 0.150 13 1 1.00 U 1.61 0 13 CIVIL SITE GROUP, INC. EXISTING RUNOFF CALCULATION - RATIONAL METHOD PROJECT NAME PRIME CAR WASH STORM FREQUENCY DESIGN YEAR 2 10/15/13 PROJECT No. PCW.003 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total EX1 1.47 0.20 0.29 13 3.19 0.94 STORM FREQUENCY DESIGN YEAR 10 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total EX1 1.47 0.20 0.29 13 4.88 1.43 STORM FREQUENCY DESIGN YEAR 100 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total EX1 1.47 0.20 0.29 13 6.97 2.05 Page 1 C. Proposed Conditions PROPOSED CONDITIONS Runoff Curve Coefficient Number Impervious Area = 0.90 98 **Rooftop Open Area = 0.15 67 ` *Moderately Pervious Soil with Turf Impervious Area = 0.85 98 **Pavement Miami Silt Loam (MmB2 - 46% Site) Type "C" Soil Brookston Silty Clay Loam (Br - 54% Site) Type "B" Soil ON SITE (PR1) Impervious Area Open Area Impervious Area Total Total Composite Composite Rofftop (ft ^2) (ft ^2) Pavement (ft ^2) (ft ^2) (Acres) "CN" 12378 22331 29335 64044 1.47 87.2 0.62 Overland flow seg. 1 Shallow Concentrated Flow Basin name Length (ft) S % n T_t (min) Length S (ft) % Paved/Un (P or U) Vel. (ft /s) T_t (min) T_c (min) PR1 (SEE STORM SEWER SPREADSHEET) 18 CIVIL SITE GROUP, INC. PROPOSED RUNOFF CALCULATION - RATIONAL METHOD PROJECT NAME PRIME CAR WASH STORM FREQUENCY DESIGN YEAR 2 PROJECT No. PCW.003 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total PR1 1.47 0.62 0.91 18 2.67 2.43 STORM FREQUENCY DESIGN YEAR 10 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total PR1 1.47 0.62 0.91 18 4.12 3.75 STORM FREQUENCY DESIGN YEAR 100 LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA from to sub total inlet drain total PR1 1.47 0.62 0.91 18 5.94 5.41 Page 2 CIVIL SITE GROUP, INC. STORM DRAIN FLOW TABULATION FORM • RATIONAL METHOD 10/15/13 PROJECT NAME PRIME CAR WASH PROJECT No. PCW.003 STORM FREQUENCY DESIGN YEAR 10 COMPUTED BY: EAG CHECKED BY: EAG CALCULATED D E S I G N HGL Headloss LOCATION from INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. min) INT. '9" "Q" = CIA PIPE (ull) n = 0.013 Pipe length Pipe slope Max Q full Max V full MANHOLE in MH out MH MH DEPTH TC -INV Coeff. at Manhole LOCA TION to sub total inlet drain total size slope vel. INV out INV in FROM TO 0.19 103 0.14 15.39 0.72 0.10 12 5 1.13 5 6.98 0.70 2.52 878.55 878.31 106 105 T.C.= 883.50 879.03 879.02 878.98 878.94 878.61 878.58 878.52 878.48 103 Cover = 102 Cover = 101 Cover = 100 Cover = 4.00 3.00 4.01 3.01 5.39 3.89 6.35 4.85 0.50 0.50 0.50 0.50 103 103 102 0.82 0.14 0.10 5.00 1.90 6.90 6.98 0.70 12 0.04 0.90 102 0.66 2.89 3.68 879.50 878.82 103 102 16.96 4.49 102 0.30 0.05 0.67 0.20 0.23 7 2.52 7 6.44 1.29 104 104 0.11 0.70 T.C.= 882.73 102 102 101 0.54 0.44 0.30 6.90 0.80 7.70 6.31 1.90 12 0.29 2.43 116 0.31 1.98 2.52 878.72 878.37 102 101 17.64 4.27 101 0.29 0.06 0.68 0.20 0.23 6 2.52 6 6.76 1.33 101 T.C.= 882.73 101 101 100 0.73 0.88 17.64 0.39 18.03 4.19 3.70 18 0.12 2.09 49 0.18 4.46 2.52 877.34 877.25 101 100 100 0.00 0.00 0.00 5 5 6.98 0.00 T.C.= 883.50 100 100 702 0.73 0.88 18.03 0.19 18.23 4.14 3.66 18 0.12 2.07 24 0.18 4.46 2.52 877.15 877.10 100 702 Above = 877.10 878.45 = T.W. Above = Page 1 877.59 106 0.36 0.53 0.19 14 14 4.67 0.89 T.C.= 881.55 878.68 878.67 878.62 878.61 878.56 878.55 106 Cover = 105 Cover = 104 Cover = 3.00 2.00 5.37 4.12 5.30 4.05 0.50 0.50 0.50 106 106 105 0.36 0.19 14.25 1.13 15.39 4.67 0.89 12 0.06 1.13 77 0,31 1.98 2.52 878.55 878.31 106 105 105 0.16 0.73 0.12 5 5 6.98 0.82 T.C.= 883.43 105 105 104 0.52 0.31 15.39 1.58 16.96 4.49 1.38 15 0.05 1.13 107 0.23 3.10 2.52 878.06 877.82 105 104 104 0.11 0.70 0.08 5 5 6.98 0.54 T.C.= 883.02 104 104 101 0.63 0.38 16.96 0.68 17.64 4.27 1.64 15 0.06 1.34 54 0.23 3.10 2.52 877.72 877.59 104 101 Above = Page 1 877.59 Runoff Coefficient Impervious Area = 0.90 Rooftop Greenspace = 0.20 Slightly Pervious Soil with Turf Gravel /Stone = 0.85 Impervious Area = 0.85 Pavement BASIN (103) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ftA2) (Acres) "C" 3679 1127 1311 0 6117 0.14 0.72 BASIN (102) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ftA2) (Acres) "C" 7479 1790 3793 0 13062 0.30 0.67 BASIN (101) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ftA2) (Acres) "C" 7133 1928 3415 0 12476 0.29 0.68 BASIN (106) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ft ^2) (Acres) 1014 6382 8104 0 15500 0.36 0.53 BASIN (105) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ftA2) (Acres) 4474 1151 1323 0 6948 0.16 0.73 BASIN (104) Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft ^2) - Pavement (ft ^2) - Rooftop (ft ^2) (ft ^2) (ftA2) (Acres) 3581 0 1063 0 4644 0.11 0.70 BASIN (702) Existing Structure Impervious Area Impervious Area Greenspace Stone Total Total Composite (ft^2) - Pavement (ft^2) - Rooftop (ft^2) (ft^2) (ft ^2) (Acres) 4248 0 1826 0 6074 0.14 0.65 TOTAL TO EXISTING STRUCTURE #702 Stone (ft^2) 0 10 -Year Total Total Composite Percent (ft^2) (Acres) "C" Impervious ( %) 64821 1.49 0.65 68% Impervious Area Impervious Area Greenspace (ft^2) - Pavement (ft^2) - Rooftop (ft^2) 31608 12378 20835 STORM FREQUENCY DESIGN YEAR TOTAL AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA sub total inlet drain total Ex. 702 1.49 0.65 0.97 18 18 4.12 3.99 DESIGN TO EXISTING STRUCTURE #702 10 -Year STORM FREQUENCY DESIGN YEAR TOTAL AREA ACRES COEF. "C" CA SUM CA TIME CONC. (min) INT. "1" "Q" = CIA sub total inlet drain total Ex. 702 1.39 0.65 0.90 5 5 6.98 6.31 Page 1 Time of Concentration Worksheet Based on TR -55 PROJECT: PRIME CAR WASH JOB #: PCW.003 Typical values for Manning's n 2 year, 24 hour rainfall = 2.90 inches Typical values for Manning's n Overland Flow Channel Flow short grass dense grass pavement 0.150 0.240 0.011 grass concrete rip -rap 0.030 0.015 0.035 Overland flow seg. 1 Overland flow seg. 2 Shallow Concentrated Flow Channel Flow Basin name Length S n (ft) % T_t (min) Length S (ft) % n T_t (min) Length S ?aved/Ut Vel. (ft) % (P or U) (ft /s) T_t (min) Length (ft) a Pw r S (s.f) (ft) (ft) % n Vel. (ft /s) T_t (min) T_c (min) 103 22 1.00 0.150 4 16 1.00 0.011 0 5 102 37 1.00 0.150 6 16 1.00 0.011 0 7 101 29 1.00 0.150 5 24 1.00 0.011 1 6 100 5 106 100 1.00 0.150 14 65 1.00 U 1.61 1 14 105 21 1.00 0.150 4 40 1.00 0.011 1 5 104 9 1.00 0.150 2 60 1.00 0.011 1 5 Page 1 D. I PRIn u data ___= Basins Name: PR1 Group: POST Unit Hydrograph: Uh484 Rainfall File: Rainfall Amount(in): 0.000 Area(ac): 1.490 Curve Number: 96.30 DCIA( %): 0.00 Node: PR1 Status: Onsite Type: SCS Unit Hydrograph CN Peaking Factor: 484.0 Storm Duration(hrs): 0.00 Time of Conc(min): 18.00 Time Shift(hrs): 0.00 Max Allowable Q(cfs): 999999.000 ___= Nodes Name: BOUNDARY Group: POST Type: Time /Stage Time(hrs) 0.00 12.00 24.00 Stage(ft) 100.000 100.000 100.000 Base Flow(cfs): 0.000 Init Stage(ft): 100.000 Warn Stage(ft): 100.000 ___= Hydrology Simulations Name: 24HR Filename: P: \PCW.003 - 98th and Michigan - Armstrong \Drainage \ICPR \24HR.R32 Override Defaults: Yes Storm Duration(hrs): 24.00 Rainfall File: Scsii -24 Rainfall Amount(in): 1.00 Time(hrs) Print Inc(min) 30.000 5.00 ___= Routing Simulations Name: 100YR -24HR Hydrology Sim: 100YR -24HR Filename: P: \HHR.001 - Dunkin Donuts PetSuites - 9800 Michigan Road \Drainage \ICPR \100YR- 24HR.I32 Execute: Yes Restart: No Alternative: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) Print Inc(min) 999.000 15.000 Patch: No Delta Z Factor: 0.00500 End Time(hrs): 25.00 Max Calc Time(sec): 60.0000 Boundary Flows: Group Run POST Yes Name: 10YR -24HR Hydrology Sim: 10YR -24HR Filename: P: \HHR.001 - Dunkin Donuts PetSuites - 9800 Michigan Road \Drainage \ICPR \10YR- 24HR.I32 Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) 999.000 Group POST Print Inc(min) 15.000 Run Yes Delta Z Factor: 0.00500 End Time(hrs): 25.00 Max Calc Time(sec): 60.0000 Boundary Flows: Name: WAT -QUAL Hydrology Sim: 24HR Filename: P: \PCW.003 - 98th and Michigan - Armstrong \Drainage \ICPR \WAT- QUAL.132 Execute: Yes Alternative: No Restart: No Patch: No Max Delta Z(ft): 1.00 Time Step Optimizer: 10.000 Start Time(hrs): 0.000 Min Calc Time(sec): 0.5000 Boundary Stages: Time(hrs) 999.000 Group POST Print Inc(min) 15.000 Run Yes Delta Z Factor: 0.00500 End Time(hrs): 25.00 Max Calc Time(sec): 60.0000 Boundary Flows: E. Water Quality Data Basin Name: PR1 Group Name: POST Simulation: 24HR Node Name: PR1 Basin Type: SCS Unit Hydrograph Unit Hydrograph: Uh484 Peaking Fator: 484.0 Spec Time Inc (min): 2.40 Comp Time Inc (min): 2.40 Rainfall File: Scsii -24 Rainfall Amount (in): 1.000 Storm Duration (hrs): 24.00 Status: Onsite Time of Conc (min): 18.00 Time Shift (hrs): 0.00 Area (ac): 1.490 Vol of Unit Hyd (in): 1.001 Curve Number: 96.300 DCIA ( %): 0.000 Time Max (hrs): 12.08 Flow Max (cfs): 1.08 Runoff Volume (in): 0.651 Runoff Volume (ft3): 3521 Diversion Structure Design Pipe Diameter Exiting Diversion Structure (104) Flowing into BMP = 12 inches Cross Sectional Area "A" = 0.79 ft ^2 Min. Overflow Weir Height (Structure 104) = 877.57 ft Stormwater Quality Peak Treatment Flow Rate = 1.08 cfs Pipe BMP to 100 CALCULATED D E S I G N "Q" = CIA PIPE (full) n = 0.013 Pipe length Pipe slope Max Q full Max V full MANHOLE size slope vel. INV out INV in T.C.= 883.50 1.08 12 0.09 = 1.38 8 = 1.250 = 3.98 5.07 = 877.25 = 877.15 Area of Pipe Used by Stormwater Quality Peak Treatment Flow Rate = 0.250 ft ^2 Min. Depth of Flow in Pipe for Stormwater Quality Peak Treatment Flow Rate = 0.32 ft Min. Structure 106 Weir Wall Elevation = 877.57 ft * *SET STRUCTURE 104 WEIR WALL ELEVATION = 877.65' Max Flow Capacity of Pipe Flowing Full (A = 0.79 ftA2) "Qfuii" = 3.98 cfs Required Treatment Flow Capacity of Pipe "Q" = 1.08 cfs Q / Qfull = 0.27 this is a ratio A = (Q / Qfuu) x Afull = 0.213 ft ^2 A = [r^2(c- sino)] / 2 Solve for cp = 137.33 degrees Q= 2 {arcoss[(r- d) /r]} Solve for "d" = 0.32 feet F. Previously Approved Walnut Creek Drive Drainage Calculations Drainage Calculations Walnut Creek Drive Extension & Utility Infrastructure 9805, 9807 N Michigan Rd.; 3746 West 98th Street Carmel, Indiana Job #: ADI.002 Date: 08 -20 -2010 REVISED: 03 -22 -2011 Prepared by: Brian Cross, P.E. Reviewed by: Eric A. Gleissner, P.E. No. PE10910647 e , STATE OF ,I tv v '�,,-- ,!ONAL Eg ,, �� „ „�y� cos J GROUP, INC 643 Massachusetts Avenue Suite 200 Indianapolis, IN 46204 Phone: 317-423-3305 Fax: 317- 423 -3306 TABLE OF CONTENTS Section 1: Report A. Project Title B. Project Drainage Summary C. Design Method and Criteria D. References Section 11: Appendix A. Site Information B. Proposed Conditions (exhibits, calculations, etc.) C. Hamilton County Surveyor's Office Approval — June, 2007 SECTION 1: REPORT A. Project Title Walnut Creek Drive Extension & Utility Infrastructure (9805, 9807 N Michigan Rd., 3746 West 98th Street) B. Project Drainage Summary The project proposes to connect the Walnut Creek Drive (private) access road from the West Carmel Marketplace development south to West 98th Street. The construction of this drive connection requires existing utilities to be relocated along with the extension of the North Augusta Arm #1- Crooked Creek Regulated Drain designed to accommodate the future commercial development along Michigan Road and W. 98th Street. Approved design plans (11/2009) for the North Augusta Arm #1- Crooked Creek Regulated Drain are on file with the Hamilton County Surveyor's Office. This project is located at the northeast corner of the intersection of Michigan Road and 98th Street in Hamilton County, Indiana. The proposed construction activity will be disturbing approximately 0.88 acres. The construction area will be disturbing existing open green space and landscape buffer area within Common Area Block E Drainage Easement of West Carmel Marketplace. The proposed improvements will consist of installing drainage infrastructure to extend the North Augusta Arm #1- Crooked Creek Regulated Drain (ALL storm structures EXCEPT FOR STR. #701, #704, & #EX1 will be part of this Regulated Drain extension), provide road drainage for Walnut Creek Drive, and establish drainage infrastructure sized to accommodate the future commercial development along Michigan Road and W. 98th Street. These plans and calculations will provide the area of North Augusta the opportunity to be positioned for future redevelopment by providing a viable stormwater drainage connection point. The previously approved North Augusta Arm #1- Crooked Creek Regulated Drain terminates at Str. #611 on Lot #63 North Augusta and is designed to accommodate Basin 611 post - developed conditions (3.59 Ac; CN =91.2; Tc =8). The 10 -yr full flow design capacity of the 24 -inch diameter pipe is 16.43cfs. The stormwater detention pond system of West Carmel Marketplace includes Basin 611 post - developed conditions in an updated analysis performed by Woolpert, LLP in June, 2007 and reviewed / approved by the Hamilton County Surveyor's Office (Letter on File). Separate stormwater detention is NOT required for the 3.59 Ac post - developed area of Basin 611. The existing land uses adjacent to the subject site are as follows: North: Commercial West: Commercial / Residential South: Residential East: Residential C. Design Method and Criteria 1. Soil Type: Soil maps from the United States Department of Agriculture, Soil Conservation Service, identify Brookston Silty Clay Loam — (Br) and Crosby Silt Loam (CrA). 2. Design Storm: The 10 -year storm event utilizing a 2- yr /24 -hr rainfall depth of 2.66- inches for Time of Concentration calculations has been analyzed for the proposed storm sewer pipe sizing calculations. The NRCS type 11 rainfall distribution was used in the hydrology calculations. 3. Overall Watershed: Crooked Creek Regulated Drain. D. References 1. TR55 Stormwater Design Manual. 2. Hamilton County Soil Survey. 3. Hamilton County Stormwater Technical Standards 4. Highway Extension and Research Project for Indiana Counties (HERPIC). SECTION 11: APPENDIX A. Site Information Soil Map — Hamilton County, Indiana MAP LEGEND Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Units Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot A Other Special Line Features Gully • Short Steep Slope Other Political Features 0 Cities Water Features Oceans Streams and Canals Transportation +++ Rails ,.. Interstate Highways US Routes Major Roads Local Roads MAP INFORMATION Map Scale: 1:4,810 if printed on A size (8.5" x 11 ") sheet. The soil surveys that comprise your AOI were mapped at 1:15,840. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 16N NAD83 This product is generated from the USDA -NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hamilton County, Indiana Survey Area Data: Version 8, Dec 11, 2008 Date(s) aerial images were photographed: 7/19/2003 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/6/2009 Page 2 of 3 Soil Map — Hamilton County, Indiana Map Unit Legend Hamilton County, Indiana (IN057) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Br Brookston silty clay loam 30.5 27.8% CrA Crosby silt loam, 0 to 3 percent slopes 62.8 57.3% MmB2 Miami silt loam, 2 to 6 percent slopes, eroded 6.6 6.0% Sh Shoals silt loam 9.8 8.9% Totals for Area of Interest 109.7 100.0% usun Natural Resources Web Soil Survey grin Conservation Service National Cooperative Soil Survey 7/6/2009 Page 3 of 3 B. Proposed Conditions ARMSTRONG ARM EXTENSION CALCULATED DESIGN LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. min) INT. "I" "Q" = CIA PIPE (full) n = 0.012 Pipe length Pipe slope Max Q full Max V full MANHOLE from to sub total inlet drain total size slope vel. INV out INV in 0.20 615 0.00 5.29 0.68 0.00 15 5 1.04 5 6.40 0.00 2.85 878.00 877.96 703 0.07 T.C.= 882.50 615 614 5 0.46 6.40 0.38 0.33 8.29 4.40 12.69 5.41 1.79 24 0.01 0.57 150 0.12 8.49 2.70 876.00 875.82 0.13 614 0.00 8.29 0.15 0.00 15 5 0.59 5 6.40 0.00 2.85 878.30 878.25 T.C.= 882.90 614 613 2.25 1.53 12.69 0.58 13.28 4.52 6.91 24 0.08 2.20 77 0.12 8.49 2.70 875.72 875.63 613 0.05 0.15 0.01 5 5 6.40 0.05 T.C.= 883.00 613 611 2.30 1.54 13.28 1.02 14.29 4.42 6.80 24 0.08 2.16 132 0.45 16.43 5.23 875.50 874.90 611 0.07 0.15 0.01 5 5 6.40 0.07 T.C.= 882.25 611 END 2.37 1.55 14.29 0.55 14.85 4.27 6.61 24 0.07 2.10 70 0.45 16.43 5.23 874.80 874.49 CIVIL SITE GROUP, INC STORM DRAIN FLOW TABULATION FORM - RATIONAL METHOD 07/31/12 PROJECT NAME WALNUT CREEK DRIVE EXTENSION PROJECT No. ADI.002 STORM FREQUENCY DESIGN YEAR 10 COMPUTED BY: CHECKED BY: BSC BSC HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 705 0.27 0.74 0.20 5 5 6.40 1.28 GUT= 882.00 705 615 0.27 0.20 5.00 0.29 5.29 6.40 1.28 15 0.03 1.04 18 0.25 3.50 2.85 878.00 877.96 HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 704 0.12 0.59 0.07 7 7 5.85 0.41 T.C.= 881.50 704 703 0.12 0.07 7 1.04 7.73 5.85 0.41 12 0.01 0.53 33 0.30 2.11 2.69 878.50 878.40 703 0.07 0.85 0.06 5 5 6.40 0.38 GUT= 882.00 703 615 0.19 0.13 7.73 0.57 8.29 5.55 0.72 15 0.01 0.59 20 0.25 3.50 2.85 878.30 878.25 HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 706 0.40 0.74 0.30 5 5 6.40 1.89 GUT= 882.50 706 614 0.40 0.30 5.00 0.17 5.17 6.40 1.89 15 0.07 1.54 16 0.20 3.13 2.55 878.00 877.97 HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 702 1.39 0.65 0.90 5 5 6.40 5.78 GUT= 882.50 702 614 1.39 0.90 5.00 0.08 5.08 6.40 5.78 18 0.26 3.27 16 0.30 6.23 3.53 877.00 876.95 HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 701 1.00 0.68 0.68 5 5 6.40 4.35 T.C.= 881.00 701 EX1 1.00 0.68 5.00 0.29 5.29 6.40 4.35 18 0.15 2.46 43 0.23 5.46 3.09 878.10 878.00 HGL in MH out MH 876.42 876.42 876.41 876.37 876.31 876.27 876.17 876.14 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.42 877.82 876.42 877.72 876.41 877.63 876.37 877.50 876.31 876.90 876.27 876.80 876.17 876.49 876.14 878.97 705 4.00 0.50 I 705 879.25 878.97 878.96 Cover = 2.75 Ir 705 615 879.21 878.96 878.96 START HGL 879.26 704 3.00 0.50 879.26 Cover = 2.00 879.26 703 3.70 0.50 879.25 Cover = 2.45 879.25 START HGL 879.00 878.98 878.97 878.28 878.19 878.15 879.31 879.26 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.26 879.26 879.26 879.25 706 4.50 0.50 706 879.25 879.00 Cover = 3.25 706 614 879.22 878.98 START HGL 702 5.50 0.50 702 878.50 878.28 Cover = 4.00 702 614 878.45 878.19 START HGL 701 2.90 0.50 701 879.60 879.31 Cover = 1.40 701 EX1 879.50 879.26 ARMSTRONG ARM EXTENSION CALCULATED DESIGN LOCATION INLET AREA ACRES COEF. "C" CA SUM CA TIME CONC. min) INT. "I" "Q" = CIA PIPE (full) n = 0.012 Pipe length Pipe slope Max Q full Max V full MANHOLE from to sub total inlet drain total size slope vel. INV out INV in 0.20 615 0.00 5.20 0.68 0.00 15 5 1.48 5 9.12 0.00 2.85 878.00 877.96 703 0.07 T.C.= 882.50 615 614 5 0.46 9.12 0.54 0.33 7.80 2.98 10.77 7.99 2.64 24 0.01 0.84 150 0.12 8.49 2.70 876.00 875.82 0.13 614 0.00 7.80 0.15 0.00 15 5 0.86 5 9.12 0.00 2.85 878.30 878.25 T.C.= 882.90 614 613 2.25 1.53 10.77 0.37 11.15 7.09 10.85 24 0.20 3.45 77 0.12 8.49 2.70 875.72 875.63 613 0.05 0.15 0.01 5 5 9.12 0.07 T.C. 883.00 613 611 2.30 1.54 11.15 0.64 11.79 6.99 10.75 24 0.19 3.42 132 0.45 16.43 5.23 875.50 874.90 611 0.07 0.15 0.01 5 5 9.12 0.10 T.C.= 882.25 611 END 2.37 1.55 11.79 0.35 12.13 6.83 10.58 24 0.19 3.37 70 0.45 16.43 5.23 874.80 874.49 CIVIL SITE GROUP, INC STORM DRAIN FLOW TABULATION FORM - RATIONAL METHOD 07/31/12 PROJECT NAME WALNUT CREEK DRIVE EXTENSION PROJECT No. ADI.002 STORM FREQUENCY DESIGN YEAR 100 COMPUTED BY: CHECKED BY: BSC BSC HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 705 0.27 0.74 0.20 5 5 9.12 1.82 GUT= 882.00 705 615 0.27 0.20 5.00 0.20 5.20 9.12 1.82 15 0.07 1.48 18 0.25 3.50 2.85 878.00 877.96 HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 704 0.12 0.59 0.07 7 7 8.40 0.59 T.C.= 881.50 704 703 0.12 0.07 7 0.73 7.41 8.40 0.59 12 0.02 0.76 33 0.30 2.11 2.69 878.50 878.40 703 0.07 0.85 0.06 5 5 9.12 0.54 GUT= 882.00 703 615 0.19 0.13 7.41 0.39 7.80 8.13 1.06 15 0.02 0.86 20 0.25 3.50 2.85 878.30 878.25 HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 706 0.40 0.74 0.30 5 5 9.12 2.70 GUT= 882.50 706 614 0.40 0.30 5.00 0.12 5.12 9.12 2.70 15 0.15 2.20 16 0.20 3.13 2.55 878.00 877.97 HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 702 1.39 0.65 0.90 5 5 9.12 8.24 GUT= 882.50 702 614 1.39 0.90 5.00 0.06 5.06 9.12 8.24 18 0.52 4.66 16 0.30 6.23 3.53 877.00 876.95 HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 701 1.00 0.68 0.68 5 5 9.12 6.20 T.C.= 881.00 701 EX1 1.00 0.68 5.00 0.20 5.20 9.12 6.20 18 0.30 3.51 43 0.23 5.46 3.09 878.10 878.00 HGL in MH out MH 876.91 876.91 876.89 876.80 876.65 876.56 876.31 876.22 876.09 Headloss MH DEPTH Coeff. at TC -INV Manhole 615 6.50 0.50 Cover = 4.50 614 7.18 0.50 Cover = 5.18 613 7.50 0.50 Cover = 5.50 611 7.45 0.50 Cover = 5.45 START HGL LOCA TION FROM TO 615 615 614 614 614 613 613 613 611 611 611 END Top Pipe HGL 878.00 876.91 877.82 876.91 877.72 876.89 877.63 876.80 877.50 876.65 876.90 876.56 876.80 876.31 876.49 876.22 878.98 705 4.00 0.50 I 705 879.25 878.98 878.97 Cover = 2.75 Ir 705 615 879.21 878.97 878.96 START HGL 879.27 704 3.00 0.50 879.27 Cover = 2.00 879.26 703 3.70 0.50 879.26 Cover = 2.45 879.25 START HGL 879.03 878.99 878.97 878.40 878.23 878.15 879.42 879.33 879.20 START HGL 704 704 703 703 703 615 879.50 879.40 879.55 879.50 879.27 879.27 879.26 879.26 706 4.50 0.50 706 879.25 879.03 Cover = 3.25 706 614 879.22 878.99 START HGL 702 5.50 0.50 702 878.50 878.40 Cover = 4.00 702 614 878.45 878.23 START HGL 701 2.90 0.50 701 879.60 879.42 Cover = 1.40 701 EX1 879.50 879.33 STORM SEWER PIPE BASINS Impervious Area = Greenspace = Gravel /Stone = Impervious Area = Runoff Coefficient 0.90 0.15 0.85 0.85 Weighted Curve Number CN 98 Rooftop 70.5 89.0 98.0 Asphalt **Open Space Lawn (Good Condition) Brookston Silty Clay Loam (Br - 35% Site) Type "B" Soil - CN 61 Crosby Silt Loam (CrA - 65% Site) Type "C" Soil - CN 74 BASIN (706) - Commercial Land Use assumed Impervious Area Impervious Area (ft ^2) - Asphalt (ft ^2) - Rooftop 10477 4000 Greenspace (ftA2) 2984 BASIN (705) - Commercial Land Use assumed Impervious Area Impervious Area (ft ^2) - Asphalt (ft ^2) - Rooftop 8894 1000 Greenspace (ft ^2) 1965 BASIN (704) - W 98TH ST HALF R/W Impervious Area Impervious Area Greenspace (ft ^2) - Asphalt (ft ^2) - Rooftop (ft ^2) 2880 0 2539 Stone Total Total Composite Composite (ft ^2) (ft ^2) (Acres) "C" "CN" 0 17461 0.40 0.74 93.3 Stone Total Total Composite Composite (ft ^2) (ft ^2) (Acres) "C" "CN" 0 11858 0.27 0.74 93.4 Stone Total Total Composite Composite (ft ^2) (ft ^2) (Acres) "C" "CN" 432 5419 0.12 0.59 92.2 BASIN (703) - W 98TH ST & WALNUT CREEK DRIVE PVMT Impervious Area Impervious Area (ft ^2) - Asphalt (ft ^2) - Rooftop 3006 0 Greenspace (ft ^2) 0 BASIN (702) - Commercial Land Use assumed Impervious Area Impervious Area Greenspace (ft ^2) - Asphalt (ft ^2) - Rooftop (ftA2) 30317 12000 18317 BASIN (701) - Commercial Land Use assumed Impervious Area Impervious Area Greenspace (ft ^2) - Asphalt (ft ^2) - Rooftop (ft ^2) 26126 6500 10918 TOTAL BASINS Impervious Area (ft ^2) - Asphalt 81699 Impervious Area (ft ^2) - Rooftop 23500 Greenspace (ft "2) 36722 Stone Total Total Composite Composite (ft ^2) (ft ^2) (Acres) "C" "CN" 0 3006 0.07 0.85 98.0 Stone Total Total Composite Composite (ftA2) (ft^2) (Acres) "C" "CN" 0 60633 1.39 0.65 89.7 Stone Total Total Composite Composite (ft ^2) (ft ^2) (Acres) "C" "CN" 0 43544 1.00 0.68 91.1 Stone (ft ^2 ) 432 Total (ft ^2) 141921 Total (Acres) 3.26 Composite Composite "C" "CN" 0.68 91.2 Time of Concentration Worksheet Based on TR -55 PROJECT: ARMSTRONG ARM EXTENSION JOB #: ADZ002 Typical values for Manning's n 2 year, 24 hour rainfall = 2.66 inches Typical values for Manning's n Overland Flow Channel Flow short grass dense grass pavement 0.150 0.240 0.011 grass concrete rip -rap 0.030 0.015 0.035 Overland flow seg. 1 Overland flow seg. 2 Shallow Concentrated Flow Channel Flow Basin name Length S (ft) % n T_t (min) Length S (ft) % n T_t (min) Length S Paved/Ui Vel. (ft) % (P or U) (ft /s) T t (min) Length (ft) a Pw (s.£) (ft) r S (ft) % n Vel. (ft /s) T t (min) T_c (min) 615 5 614 5 613 5 705 5 704 12 2.08 0.011 0 30 1.00 0.150 5 100 1.00 U 1.61 1 7 703 5 706 5 702 5 701 5 C. Hamilton County Surveyor's Office Approval - June, 2007 07/19/2007 11:41 3177769628 HAMILTON CO SURVEYOR PAGE 01/03 HAMILTON COUNTY SURVEYOR'S OFFICE FACSIMILE TRANSMITTAL SHEET TO: Chris Laysttom COMPANY: Woolpert LLP FROM Greg Hoyes DATE: JULY 19, 2007 FAX NUMBER 291 -5805 NO. OF PAGES INCLUDING COVER: 3 PHONE NUMBER: 299 -7500 REFERENCE NUMBER: RE: West Carmel Marketplace YOUR PROJECT NUMBER: C7 URGENT QI I;OR REVIEW ❑ PLEASE COMMENT ❑ PLEASE REPLY El PLEASE. RECYCLE. 10,N The information contained in this facsimile message is intended only for the use of the individual or entity nand above. If the reader is not the intended recipient or an employee, or agent of the intended recipient who is responsible for delivering it to the intended recipient, you arc hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this FAX in error, please notify us immediately by telephone at (317) 776 -8495, and return the original to the address below by U.S. Mail. ONE HAMILTON COUNTY SQUARE:. SUITE 188 NO13LESVILLE, IN 46060.2230 PHONE: (317)776 -8495 FAX: (317)776 -9620 97/19/2007 11:41 3177769628 July 19, 2007 HAMILTON CO SURVEYOR - yOR'S DFF! . • �,p �N a -' •Jai r 9 'J 1I �� � _ fr �F�IF1 �_f { !- �a _ i� .� ) I`r,�,A' J r Y4 /J / PAGE 02/03 ,Kenton C. 'IC' ird. Si:n'cyor of .Hirmilton Crnfniy 'Phone (, ;r; )77644 )j 7ri.P (.317) 7715-,162.1 Woolpert LLP ATTN: Chris Laystrom 7140 Waldemar Drive Indianapolis, II4T 46268 VIA FACSIMILE: 291 -5805 RE: West Carmel Marketplace — Armstrong Property Dear Mr. Laystrom: Salle 1 SS One J'(irmilion County Square ,. Vohlc.rdllc, Imlirrnn 4 (Otir -2 ! I1 We have reviewed the drainage calculations submitted to the Hamilton County Surveyor's Office on June 29, 2007 for this project and have the following comments: 1. The project is located in the unincorporated area and MS4 jurisdiction of Hamilton County. 2. The project falls in the Crook Creek Regulated Drain Watershed. This drain has an allowable release rate of 0.1 cfs per acre for the 1 to 10 year 24 hour storm event and 0.27 cfs per acre for the 11 to 100 year 24 hour storm event. 3. The proposed site DOES NOT fall in a Carmel Wellhead Protection Area. 4. HCSO does agree with the revised drainage report for. West Cannel Marketplace and adequate detention volume does exist in West Carmel Marketplace for the storm water runoff from the additional area (Armstrong property). The development of the Armstrong property (2.90 acres) will now be considered part of the master drainage plan for West Carmel Marketplace. 5. This approval is for detention volume only and does not grant approval for any construction plans, storm sewers, drainage patterns, or BMPs for the Armstrong project. Those plans will be reviewed for approval when they are submitted and the necessary permits will be required at that time. 0711912007 11:41 3177769628 HAMILTON CO SURVEYOR PAGE 03/03 6. Please note the additional comments may be warranted at a later date. Should you have arty questions, I can be reached at 317- 776 -8495. Sincerely, Greg Ho es, AC, CFM Plan Reviewer CC: Christine Barton - Holmes — Carmel DOCD Brian Cross — Civil Site Group