Loading...
HomeMy WebLinkAboutCorrespondence (1.01.1 Conn, Angelina V From: Paul G. Reis [preis @kdlegal.com] Sent: Friday, June 07, 2013 9:21 AM To: Conn, Angelina V Cc: Boone, Rachel M. Subject: Spectrum Revised West Building Elevation and Bracketing Highlights Attachments: CAIN elv (ADLS-A0-141 u-g&h-130605).pdf; CAIN elv(ADLS-A5-141 u-g&h-130605).pdf; CAIN elv(ADLS-A5c-141u-g&h-130605).pdf; CAIN elv(ADLS-A5.2-141u-g&h-130605).pdf; CAIN elv (ADLS-A5.7's-141 u-g&h-130605).pdf Angie I am forwarding the revised building elevations and bracketing drawings for your review with Rachel. Upon your approval,We will file the supplemental information booklet for the Plan Commission.Thanks. Best regards, Paul Paul G.Reis Partner Krieg DeVault LLP 1 12800 N Meridian Street I Suite 300 I Carmel,IN 46032 Phone:317-238-6293 I Cell:317-431-0063 I Fax:317-636-1507 >preis@kdlegal.com l tvww knegdevault com (N Card,l;Bo4 :IE I DE VAULT Indiana I Illinois I Georgia I Florida I Minnesota CONFIDENTIALITY STATEMENT This e-mail message is for the sole use of the recipient(s)and may contain confidential and privileged information.Any unauthorized review,use,disclosure or distribution is prohibited.If you are not the intended recipient(s),please contact the sender by reply e-mail and destroy all copies of the original message.IRS Circular 230 Notice:Advice rendered in this communication,including attachments,on U.S.tax issues(i)is not intended or written to be used,and it cannot be used,for the purpose of avoiding penalties that may be imposed by the IRS on taxpayers,and(ii)may not be used or referred to in promoting,marketing or recommending a partnership or other entity,investment plan or arrangement.This notice is intended to comply with Section 10.35 of IRS Circular 230,which is located at http://www.irs.gov/pub/irs-pdf/pcir230.pdf. From: Andrew Royster [mailto:aroyster(a�spectrumretirement.com] Sent: Thursday, June 06, 2013 7:09 PM To: rboonetcarmel.in.aov Cc: Mike Longfellow; Paul G. Reis Subject: Spectrum"Carmel Senior Living—revised west elevations& bracket locations Hi Rachel. "In response to comments at the last meeting, we have added around 1,600sf of brick to the West elevation. We added one story of brick at the North &South ends,which are most visible to neighboring residences. In the less visible middle of the elevation, which is directly adjacent to the Pump Station, we added brick up to the window sills. This brick wainscot also allows us to continue to emphasize the vertical massing elements of the Bumpout& Entry. Attached are the sheets showing the changes. I am attaching some drawings to clarify bracket locations. I will also be sending a 24x36 set to you with all the updated sheets. Please contact me if you have questions or comments.Thanks. ^' Andrew Royster .Senior Project Manager • 1 7F, SPECTRUM N:411Jl I,Wt1N!EUFLW[191411111y1 4k{ 200 Spruce St.,Suite 200 Denver,CO 80230 ph:303.360.8812 tax:303.360.8814 arovster@spectrumretirement.com Check out our digital lifestyle magazine! 2 Boone, Rachel M. From: Paul G. Reis [preis @kdlegal.com] Sent: Tuesday, May 07, 2013 3:21 PM To: Conn, Angelina V; Boone, Rachel M. Subject: Additional Information for Spectrum Retirement Community Angie and Rachel: Good afternoon. I just spoke with Rachel to confirm that this information was not previously sent to you. My apologies. I am assuming (dangerous)that Drew is bringing the revised plans with the dimensions. See you at 6. Best regards, Paul 1-Unit Types 52 Studios (15 in Memory Care, 23 in Assisted Living, 14 in Independent Living) 71 One-Bedrooms (30 in Assisted,41 in Independent) 18 Two-Bedrooms (18 in Independent) 141 Total Units 2-Six Car Garages We will add a 2'-4" high (to match a height found on the main building) masonry base on rear& side elevs(I don't think we need brick in between the overhead doors). 3-Site Sign The sign face has not been finally designed but will be complimentary to the signage for the overall development and the apartment signage. 4-New Path Striping I have emailed Eric Carter to see if this is something he can add today. 5-Building Offsets I have added dimensions to the last 1st Floor Plan we submitted, but I will state the dimensions here: Starting from the north end of the West Wing on the Outside Elev(facing multifamily development),& measured at building corners &column corners at ground level: From the north end of the building to the Memory Care Core Bumpout—100'-0" (Memory Care Core Bumpout length-72'-7 1/4") From the Memory Care Core Bumpout to the Assisted Living Entry Porch—89'-2 3/8" (Assisted Living Entry Porch length—20'-0") From the Assisted Living Entry Porch to the Projecting False Deck—77'-6" (Projecting False Deck length—17'-4") From the Projecting False Deck to the south end of the building—59'-11 5/8" Starting from the north end of the West Wing on the Inside Elev(facing the Courtyard), & measured at building corners&column corners at ground level: From the north end of the building to the Memory Care Memory Garden Porch—100'- 0" (its only 87'-9 5/8" to the 7' high Memory Garden Wall) (Memory Care Memory Garden Porch length - 25'-3 1/4", & Memory Garden Wall Length -97'-0") From Memory Care Memory Garden Porch to the Building Core-89'-4 3/4" (& again, its only 29'-9 7/8" from the 7' high Memory Garden Wall to the Core) (Building Core depth—roughly 86'-31/4") &the Courtyard Elev from the Core to the south end of the building is 135'-8", with two inset areas 81'-7 1/4" apart Paul G.Reis Partner Krieg DeVault LLP 1 12800 N Meridian Street I Suite 300 I Carmel, IN 46032 Phone:317-238-6293 I Cell:317-431-0063 I Fax:317-636-1507 1