Loading...
HomeMy WebLinkAbout05020110-Correspondence4105 West 99th Slreet · Carmel, Indiana 46032 (317) 875-7040 . Fax (317) 870-0314 Tested For: Mr. Larry Armstrong Browning Construction, Inc. 6100W. 96th Street / Suite 250 Indianapolis, IN 46278 Project: Mayflower Park - Stanley Steamer W. 99th St. & Mayflower Park Dr. Carmel, IN Type of Footings: Continuous Wall Report No: TD5032-FTG-A Date: Tuesday, March 29, 2005 Location of Footings: All perimeter exterior walls The above referenced footing excavations were inspected at design elevation. A visual classification of the soil, honsel penetrometer, and hand penetrometer tests were performed on the materials in the base of the excavation. The test results indicate soil strengths at or above 2400 psfto a depth of eighteen (18) inches below design elevatiom Sr. Engineering Tech.: ~ SUBSURFACE iNVESTIGATION AND FOUNDATION ENGINEERING CONTRUCTION MATERIALS TESTING AND INSPECTION ENVIRONMENTAL SERVICES 4105 Wes Indiam 46032 870-0314 Report No: TD5032-FTG-A Date: Wednesday, March 30, 2005 100 W. 96th Street / Suite 250 Project: Mayflower Park - Stanley Steamer W. 99th St. & Mayflower Park Dr. Carmel, 1N Type of Footings: Interior Column Pads Location of Footings: Colum lines A-i, 2, 3 The above referenced footing excavations were inspected at design elevation. A visuaI classification of the soil, housel penetrometer, and hand penetrometer tests were performed on the materials in the base of the excavation. The test results indicate soil strengths at or above 3000 psfto a depth of eighteen (18) inches below design elevation. Sr. Engineering Tech.: ~h Hollcmft SUBSURFACE INVESTIGATION AND FOUNDATION ENGINEERING CONTRUCTION MATERIALS TESTING AND INSPECTION ENVIRONMENTAL SERVICES