HomeMy WebLinkAbout05020110-Correspondence4105 West 99th Slreet · Carmel, Indiana 46032
(317) 875-7040 . Fax (317) 870-0314
Tested For:
Mr. Larry Armstrong
Browning Construction, Inc.
6100W. 96th Street / Suite 250
Indianapolis, IN 46278
Project:
Mayflower Park - Stanley Steamer
W. 99th St. & Mayflower Park Dr.
Carmel, IN
Type of Footings: Continuous Wall
Report No: TD5032-FTG-A
Date: Tuesday, March 29, 2005
Location of Footings: All perimeter exterior walls
The above referenced footing excavations were inspected at design elevation. A visual classification of the
soil, honsel penetrometer, and hand penetrometer tests were performed on the materials in the base of the
excavation. The test results indicate soil strengths at or above 2400 psfto a depth of eighteen (18) inches
below design elevatiom
Sr. Engineering Tech.: ~
SUBSURFACE iNVESTIGATION AND FOUNDATION ENGINEERING
CONTRUCTION MATERIALS TESTING AND INSPECTION
ENVIRONMENTAL SERVICES
4105 Wes
Indiam 46032
870-0314
Report No: TD5032-FTG-A
Date: Wednesday, March 30, 2005
100 W. 96th Street / Suite 250
Project:
Mayflower Park - Stanley Steamer
W. 99th St. & Mayflower Park Dr.
Carmel, 1N
Type of Footings: Interior Column Pads
Location of Footings: Colum lines A-i, 2, 3
The above referenced footing excavations were inspected at design elevation. A visuaI classification of the
soil, housel penetrometer, and hand penetrometer tests were performed on the materials in the base of the
excavation. The test results indicate soil strengths at or above 3000 psfto a depth of eighteen (18) inches
below design elevation.
Sr. Engineering Tech.: ~h Hollcmft
SUBSURFACE INVESTIGATION AND FOUNDATION ENGINEERING
CONTRUCTION MATERIALS TESTING AND INSPECTION
ENVIRONMENTAL SERVICES