Loading...
HomeMy WebLinkAbout05100069-Site Plan317~-7200 FAX ~98.76 Community Re,strictions: Sde Yard = 3'(mn. on one side,) Rem' Yard = N~A Aggregate = 12 NOTE: SUMP PUMP(S) [0 BE PLAC~D BY BUILDER AS NEEDED. NOR: IF DURING THE EXCAVA1]ON PROCESS, ANY GROUNDWAER IS WITNESSED, THE SCHNEIDER CORP. SHOULD BE NOTIRED IMMEOIAIELY, THE ~A~ SPACE SHOULD BE RAISED 2' ABOVE ~HE GROUNDWATER LE~r-L AND ADDITIONAL CONS]RUCTION ]~CHNt(~JES SHOULD BE NCONPORA]~D TO A~ATE FUTURE PROBLEMS. Note: Sump pump(s) to be placed by budder ~s needed, LOT# 442 VB0' .0042353 PO# 00693558 Det~ of G~ Note:. Bugder~ positive draina, ~tructure(s}. NOE: ~E BASEMENT ELEVATION O~IC][D HERECfl HAS BEEN Ol AND BASE]) UPON TI'IE PAB GRADES AND OR CONTOURS TAKEN F CONS]RUCTION PLANS FOR ]HE SUBDM~OR UNLESS STATED, NI INFORMA11OB ABOUT FLUC~ATING WAIER TABLES, SOIL COND TI~ WPES WITHIN 1HE BUM)lNG AREA HAS BEEN PROVlOED OR STATE PLAN, IT IS RECOUMENDED THAT BASEMENT RN SHED FLOOR ELE AT LEAST (1) FOOT ABOVE 1HE NORMAL POOL ELEVATION 0¢ ~ BOOTES OF WAllSR UNLESS A S1UDY 0¢ FACTS REVEALS O1HERWI. DURING THE EXCAVATION PROCESS, ANY GROUNDWATER IS WITHE SCHNEIDER ENGINEERING CONP SHOULD BE NOTIRED MMEOIA1ELY, BASEMBIT ELEVATION SHOULD BE RAISED {2) FEET ABOVE THE G~ LEVEL AND ADDITIONAL CONS]RUCTION TECHNIQUES SHOULD BE IN TO ALLEVIATE FUIURE PROBLEMS.