HomeMy WebLinkAbout05100069-Site Plan317~-7200 FAX
~98.76
Community Re,strictions:
Sde Yard = 3'(mn. on one side,)
Rem' Yard = N~A
Aggregate = 12
NOTE:
SUMP PUMP(S) [0 BE PLAC~D
BY BUILDER AS NEEDED.
NOR:
IF DURING THE EXCAVA1]ON PROCESS, ANY GROUNDWAER IS
WITNESSED, THE SCHNEIDER CORP. SHOULD BE NOTIRED
IMMEOIAIELY, THE ~A~ SPACE SHOULD BE RAISED 2' ABOVE
~HE GROUNDWATER LE~r-L AND ADDITIONAL CONS]RUCTION
]~CHNt(~JES SHOULD BE NCONPORA]~D TO A~ATE FUTURE
PROBLEMS.
Note: Sump pump(s) to be
placed by budder ~s needed,
LOT# 442
VB0' .0042353
PO# 00693558
Det~ of G~
Note:. Bugder~
positive draina,
~tructure(s}.
NOE: ~E BASEMENT ELEVATION O~IC][D HERECfl HAS BEEN Ol
AND BASE]) UPON TI'IE PAB GRADES AND OR CONTOURS TAKEN F
CONS]RUCTION PLANS FOR ]HE SUBDM~OR UNLESS STATED, NI
INFORMA11OB ABOUT FLUC~ATING WAIER TABLES, SOIL COND TI~
WPES WITHIN 1HE BUM)lNG AREA HAS BEEN PROVlOED OR STATE
PLAN, IT IS RECOUMENDED THAT BASEMENT RN SHED FLOOR ELE
AT LEAST (1) FOOT ABOVE 1HE NORMAL POOL ELEVATION 0¢ ~
BOOTES OF WAllSR UNLESS A S1UDY 0¢ FACTS REVEALS O1HERWI.
DURING THE EXCAVATION PROCESS, ANY GROUNDWATER IS WITHE
SCHNEIDER ENGINEERING CONP SHOULD BE NOTIRED MMEOIA1ELY,
BASEMBIT ELEVATION SHOULD BE RAISED {2) FEET ABOVE THE G~
LEVEL AND ADDITIONAL CONS]RUCTION TECHNIQUES SHOULD BE IN
TO ALLEVIATE FUIURE PROBLEMS.