HomeMy WebLinkAboutTraffic Operations Analysis
Sp)ort Report
.
Page 1 of 1
. SHORT REPORT
General Information Site Information
Analyst RMB Intersection 136th Street & Rangeline
Road
Agency or Co. A&F Engineering Area Type All other areas
Date Performed 12/20/2004 Ju risdiction Carmel
Time Period AM Peak . - Analysis Year Existing
Volume and Timing Input
EB WB NB SB
LT TH RT LT TH RT LT TH AT LT TH RT
Num. of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
...ana group LTR LTR LTR LTR
Volume (vph) 5 239 32 83 147 17 13 154 95 51 493 25
% Heavy veh 0 0 3 0 4 12 0 8 0 4 2 4
PHF 0.58 0.58 0.58 0.74 0.74 0.74 0.87 0.87 0.87 0.80 0.80 0.80
~ctuated (PIA A A A A A A A A A A A A
Startup lost time 2.0 2.0 2.0 2.0
Ext. eft. green 2.0 2.0 2.0 2.0
Arrival type 3 3 3 3
Unit Extension 3.0 3.0 3.0 3.0
Ped/Bike/RTOR Volume 0 8 0 4 0 23 0 6
...ane Width 9.0 11.0 15.0 13.0
Parking/G rade/Parking N 0 N N 0 N N 0 N N 0 N
Parkinglhr
Bus stopslhr 0 0 0 0
Unit Extension 3.0 3.0 3.0 3.0
Phasing EW Perm 02 03 04 NS Perm 06 07 08
Timing G = 28.0 G= G= G= G = 30.0 G= G= G=
y= 5 y= y= y= y= 5 y= y= y=
Duration of Analysis (hrs) = 0.25 Cycle Length C = 68.0
Lane Group Capacity, Control Delay, and LOS Determination
EB WB NB SB
Adj. flow rate 462 329 275 704
....ane group cap. 688 494 804 796
vIe ratio 0.67 0.67 0.34 0.88
Green ratio 0.41 0.41 0.44 0.44
Unit. delay d1 16.3 16.2 12.5 17.4
Delay factor k 0.24 0.24 0.11 0.41
Increm. delay d2 2.6 3.4 0.3 11.6
PF factor 1.000 1.000 1.000 1.000
Control delay 18.8 19.6 12.8 29.0
Lane group LOS 8 B B C
Apprch. delay 18.8 19.6 12.8 29.0
Approach LOS B B B C
Intersec. delay 22.1 Intersection LOS C
HCS2000™
Copyright <0 2000 University of Rorida? AJI Rights Reserved
Version 4.Je
Short Rerort
.-
Page ] of 1
'-
~ SHORT REPORT
General Information Site Information
Analyst RMB Intersection 136th Street & Rangeline
Road
Agency or Co. A&F Engineering Area Type All other areas
Date Performed 12/20/2004 Jurisdiction Carmel
ime Period PM Peak . - Analysis Year Existing
Volume and Timing Input
EB WB NB SB
IT TH RT LT TH RT IT TH RT LT TH RT
Num. of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Lane group LTR LTR LTR LTR
Volume (vph) 48 272 21 66 132 43 13 568 99 39 320 6
0/0 Heavv veh 0 0 0 0 0 0 15 1 0 3 1 0
PHF 0.82 0.82 0.82 0.79 0.79 0.79 0.96 0.96 0.96 0.87 0.87 0.87
~ctuated(P/A A A A A A A A A A A A A
;c)tartup lost time 2.0 2.0 2.0 2.0
I xt. eft. green 2.0 2.0 2.0 2.0
~rrival type 3 3 3 3
Unit Extension 3.0 3.0 3.0 3.0
PedlBike/RTOR Volume 0 5 0 10 0 24 0 1
_ana Width 9.0 11.0 15.0 13.0
Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N
Parkinglhr
Bus stops/hr 0 0 0 0
Unit Extension 3.0 3.0 3.0 ~.O
Phasing EW Perm 02 03 04 NS Perm 06 07 08
Timing G = 23.0 G= G= G= G = 28.0 G= G= G=
y= 5 y= y= y= y= 5 y= y= y=
Duration of Analysis (hrs) = 0.25 Cycle length C = 61.0
Lane Group Capacity, Control Delay, and LOS Determination
EB WB NB SB
I\dj. flow rate 411 293 684 419
Lane group cap. 586 531 924 801
'w/c ratio 0.70 0.55 0.74 0.52
Green ratio 0.38 0.38 0.46 0.46
Unit. delay d1 16.1 14.9 13.5 11.7
Delay factor k 0.27 0.15 0.30 0.13
Increm. delay d2 3.7 1.2 3.2 0.6
PF factor 1.000 1.000 1.000 1.000
Control delay 19.8 16.2 16.7 12.4
L..ane group LOS B B B B
Apprch. delay 19.8 16.2 16.7 12.4
~pproach LOS 8 8 B B
rntersec. delay 16.3 Intersection LOS 8
HCS2000™
Copyright (Q 2000 University of Aoridat All Rights Reserved
Version 4.le
3
Sh,ort Report
..
Page 1 of 1
. SHORT REPORT
General Information Site Information
~nalyst RMB Intersection 136th Street & Rangeline
Road
Agency or Co. A&F Engineering Area Type All other areas
Date Performed 12/20/2004 Ju risdiction Carmel
Time Period AM Peak . - Analysis Year Existing+Proposed
Volume and Timing Input
EB WB NB SB
LT TH RT LT TH RT LT TH RT LT TH RT
Num. of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
Lane group LTR LTR LTR LTR
Volume (vph) 8 248 36 83 149 19 14 155 95 61 498 27
0/0 Heavy veh 0 0 3 0 4 12 0 8 0 4 2 4
PHF 0.58 0.58 0.58 0.74 0.74 0.74 0.87 0.87 0.87 0.80 0.80 0.80
~etuated (PIA A A A A A A A A A A A A
Startup lost time 2.0 2.0 2.0 2.0
Ext. eff. green 2.0 2.0 2.0 2.0
Arrival type 3 3 3 3
Unit Extension 3.0 3.0 3.0 3.0
Ped/Bike/RTOR Volume 0 8 0 4 0 23 0 6
Lane Width 9.0 11.0 15.0 13.0
Parking/Grade/Parldng N 0 N N 0 N N 0 N N 0 N
Parkinglhr
Bus stopslhr 0 0 0 0
Unit Extension 3.0 3.0 3.0 3.0
Phasing EW Perm 02 03 04 NS Perm 06 07 08
rriming G = 23.0 G= G= G= G = 28.0 G= G= G=
y= 5 y= y= y= y= 5 y= y= y=
Duration of Analysis (hrs) = 0.25 Cycle Length C = 61.0
Lane Group Capacity, Control Delay, and LOS Determination
EB WB NB SB
~dj. flow rate 490 333 277 724
l-ana group cap. 626 425 834 819
vIe ratio 0.78 0.78 0.33 0.88
Green ratio 0.38 0.38 0.46 0.46
Unif. delay d1 16.8 16.8 10.5 15.0
Delay factor k 0.33 0.33 0.11 0.41
Increm. delay d2 6.4 9.3 0.2 11.3
PF factor 1.000 1.000 1.000 1.000
Control delay 23.2 26.1 10.8 26.3
Lane group LOS C C B C
Appreh. delay 23.2 26.1 10.8 26.3
~pproach LOS C C I B C
Intersec. delay 23.1 Intersection LOS C
HCS2000™
Copyright <0 2000 University of Aoridal' All Rights Reserved
Version 4. Ie
4
Shf.)rt Rerort
..
Page I of ]
. SHORT REPORT
General Information ~ite Information
IAnalyst RMB Intersection 136th Street & Rangeline
Road
IAgency or Co. A&F Engineering Area Type All other areas
Date Performed 12/20/2004
Time Period PM Peak . - Ju risdiction Carmel
Analysis Year Existing+Proposed
Volume and Timing Input
EB WB NB S8
LT TH RT LT TH RT LT TH RT LT TH RT
Num. of Lanes 0 1 0 0 1 0 0 1 0 0 1 0
_ane group LTR LTR LTR LTR
Volume (vph) 51 276 23 66 140 53 17 572 99 44 322 9
0/0 Heavy veh 0 0 0 0 0 0 15 1 0 3 1 0
PHF 0.82 0.82 0.82 0.79 0.79 0.79 0.96 0.96 0.96 0.87 0.87 0.87
~ctuated (PIA A A A A A A A A A A A A
~tartup lost time 2.0 2.0 2.0 2.0
Ext. eft. green 2.0 2.0 2.0 2.0
Arrival type 3 3 3 3
Unit Extension 3.0 3.0 3.0 3.0
Ped/Bike/RTOR Volume 0 5 0 13 0 24 0 2
Lane Width 9.0 11.0 15.0 13.0
Parking/Grade/Parking N 0 N N 0 N N 0 N N 0 N
Parking/hr
Bus stops/hr 0 0 0 0
Unit Extension 3.0 3.0 3.0 3.0
Phasing EW Perm 02 03 04 NS Perm 06 07 08
rnmin9 G = 24.0 G= G= G= G = 27.0 G= G= G=
Y= 5 y= y= y= y= 5 y= y= y=
Duration of Analysis (hrs) = 0.25 Cvcle Length C = 61.0
Lane Group Capacity, Control Delay, and LOS Determination
EB WB NB 58
~dj. flow rate 421 312 692 429
l-ana group cap. 607 563 886 752
vIe ratio 0.69 0.55 0.78 0.57
Green ratio 0.39 0.39 0.44 0.44
Unif. delay d1 15.4 14.4 14.5 12.7
Del~y factor k 0.26 0.15 0.33 0.16
Increm. delay d2 3.4 1.2 4.6 1.0
PF factor 1.000 1.000 1.000 1.000
Control delay 18.9 15.6 19.0 13.7
_ane group LOS B B B 8
Apprch. delay 18.9 15.6 19.0 13.7
~pproach LOS B 'B B B
Intersec. delay 17.2 Intersection LOS B
HCS2000™
Copyright (Q 2000 University of Aorida~ AJl Rights Reserved
Version 4.Je
5
..
A & F ENGINEERING CO., LLC
TRAFFIC VOLUME SUMMARY
CLIENT:
INTERSECTION:
DATE:
CENTEX HOMES
136TH & RANGELINE ROAD
12/16/2004
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
TOTAL VEHIC.~ES (PASSENGER CARS + TRUCKS)
AM PEAK HOUR VOLUMES OFF PEAK HOUR VOLUMES PM PEAK HOUR VOLUMES
BEGINS 7:00 AM BEGINS BEGINS 4:45 PM
L T R TOTAL L T R TOTAL L T R TOTAL
13 154 95 262 13 568 99 680
51 493 25 569 39 320 6 365
5 239 32 276 48 272 21 341
83 147 17 247 66 132 43 241
AM PEAK HOUR FACTOR
PEAK HOUR FACTOR
OFF PEAK HOUR FACTOR
.
PM PEAK HOUR FACTOR
NORTHBOUND
SOUTHBOUND
EASTBOUND
WESTBOUND
APP'ROACH
0.87
0.80
0.58
0.74
INTERSECTION APPROACH
0.91
INTERSECTION APPROACH
0.96
0.87
0.82
0.79
INTERSECTION
0.92
TRUCK PERCENTAGE
AM PEAK HOUR PERCENTAGE OFF PEAK HOUR PERCENTAGE PM PEAK HOUR PERCENTAGE
L T R TOTAL L T R TOTAL L T R TOTAL
NORTHBOUND 0.0% 7.8% 0.0% 4.6% 15.4% 1.2% 0.0% 1.30/0
SOUTHBOUND 3.9% 2.2% 4.0% 2.5% 2.6% 1.3% 0.0% 1.4%
EASTBOUND 0.0% 0.4% 3.1% 0.70/0 0.0% 0.4% 0.0% 0.3%
WESTBOUND 0.0% 4.1% 11.8% 3.2% 0.0% 0.0% 0.00/0 0.0%
HOURL Y SUMMARY
HOUR NB SB NB+SB EB we EB+WB TOTAL
6:00 AM TO 7:00 AM 98 245 343 85 108 193 536
7:00 AM TO 8:00 AM 262 569 831 276 247 523 1354
8:00 AM TO 9:00 AM 208 357 565 74 207 281 846
3:00 PM TO 4:00 PM 497 404 901 153 350 503 1404
4:00 PM TO 5:00 PM 575 413 988 260 179 439 1427
5:00 PM TO 6:00 PM 676 353 1029 337 231 568 1597
TOTAL VOLUME 2316 2341 4657 1185 1322 2507 7164
PERCENTAGE 32.3% 32.7% 65.0% 16.5% 18.5% 35.0o,{, 100.0%
6
Release 11-18-04
. :."',', ':
. A & F ENGINEERING CO., LLC
TRAFFIC VOLUME SUMMARY
CLIENT : ~ CENTEX HOMES
~
.. INTERSECTION : 136TH & RANGELINE ROAD
DATE: 12/16/2004
DIRECTION OF TRAVEL: NORTHBOUND
HOUR lEFT THROUGH RIGHT TOTAL
AM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
6:00 AM - 7:00 AM 5 0 5 60 5 65 28 0 28 93 5 98
7:00 AM - 8:00 AM 13 0 13 142 . - 12 154 95 0 95 250 12 262
8:00 AM - 9:00 AM 10 0 10 173 7 -180 15 3 18 198 10 208
PM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
3:00 PM - 4:00 PM 23 3 26 403 8 411 57 3 60 483 14 497
4:00 PM - 5:00 PM 20 1 21 474 13 487 64 3 67 558 17 575
5:00 PM - 6:00 PM 11 1 12 554 7 -561 103 0 103 668 8 676
PASSENGER 82 1806 362 2250
94.3% 97.2% 97.60/0 97.2%
TRUCK 5 52 9 66
5.7% 2.80/0 2.4% 2.80/0
BOTH 87 1858 371 2316
3.8% 80.2% 16.0% 100.0%
DIRECTION OF TRAVEL: SOUTHBOUND
HOUR lEFT THROUGH RIGHT TOTAL
AM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
6:00 AM- - 7:00 AM 24 0 24 213 2 215 6 0 6 243 2 245
7:00 AM- 8:00 AM 49 2 51 482 11 493 24 1 25 555 14 569
8:00 AM - 9:00 AM 19 0 19 314 14 328 10 0 10 343 14 357
PM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
3:00 PM - 4:00 PM 36 1 37 336 18 354 13 0 13 385 19 404
4:00 PM - 5:00 PM 47 1 48 349 6 355 10 0 10 406 7 413
5:00 PM - 6:00 PM 33 0 33 311 3 314 6 0 6 350 3 353
PASSENGER 208 2005 69 2282
98.1 % 97.4% 98.60/0 97.5%
TRUCK 4 54 1 59
1.90/0 2.6% 1.4% 2.5%
BOTH 212 2059 70 2341
9.1% 88.0% 3.0% 100.0%
DIRECTION OF TRAVEL: EASTBOUND
HOUR LEFT THROUGH RIGHT TOTAL
AM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
6:00 AM - 7:00 AM 2 1 3 77 0 n 5 0 5 84 1 85
7:00 AM - 8:00 AM 5 0 5 238 1 239 31 1 32 274 2 276
8:00 AM - 9:00 AM 9 2 11 48 1 49 13 1 14 70 4 74
PM TIME PERIOD PASS TRUCK- - BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
3:00 PM - 4:00 PM 29 1 30 95 5 100 22 1 23 146 7 153
4:00 PM - 5:00 PM 36 0 36 206 1 207 16 1 17 258 2 260
5:00 PM - 6:00 PM 41 0 41 273 1 274 22 0 22 336 1 337
PASSENGER 122 937 109 1168
96.8% 99.0% 96.5% 98.6%
TRUCK 4 9 4 17
3.2% 1.0% 3.5% 1.4%
BOTH 126 946 113 1185
10.6% 79.8% 9.50/0 100.0%
DIRECTION OF TRAVEL: WESTBOUND
HOUR LEFT THROUGH RIGHT TOTAl
AM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
6:00 AM - 7:00 AM 21 0 21 69 2 71 16 0 16 106 2 108
7:00 AM - 8:00 AM 83 0 083 141 6 147 15 2 17 239 8 247
8:00 AM - 9:00 AM 61 0 61 121 2 123 20 3 23 202 5 207
PM TIME PERIOD PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH PASS TRUCK BOTH
3:00 PM - 4:00 PM 98 1 99 174 2 176 74 1 75 346 4 350
4:00 PM - 5:00 PM 58 0 58 81 1 82 37 2 39 176 3 179
5:00 PM - 6:00 PM 58 0 58 133 0 133 40 0 40 231 0 231
PASSENGER 379 719 202 1300
99.70/0 98.2% 96.20/0 98.3%
TRUCK 1 13 8 22
0.3% 1.80/0 3.80/0 1.7%
BOTH 380 732 210 1322
28.70/0 55.4% 15.9% 100.0%
Release 11-18-04
7
.
INPUT
Intersection Information:
In tersecti on:
Jurisdiction:
Date:
North/South Street:
EastlWest Street: -
Project 10:
Scenario:
Peak Period:
136th Street & Range-line ~oad
Carmel, IN
12-20-04
RanfeIine Road
136t Street
Centex Homes
Scenario 1 - Existing Traffic Volumes
AM Peak
Roundabout Geometries:
Northbound Westbound Southbound Eastbound
Ent Width, E 4.88 m 4.88 m 4.88 m 4.88 m
Flare Len th, L' 25.0 m 25.0 m 25.0 m 25.0 m
Half Width, V 3.35 m 3.35 m 3.35 m 3.35 m
Ent Radius, R 15.0 m ]5.0 m ]5.0 m 15.0 m
Ent An Ie, PHI 20.0 de 20.0 de 20.0 de 20.0 de
Inscribed Circle 36.59 m 36.59 m 36.59 m 36.59 m
Diameter, D
Flows:
Approach PCU Flows FLOF CL
1 sl Exit 2nd Exit 3rd Exit U-Turn
Northbound ].05 95 ]54 13 0 ].00 50%
Westbound 1.05 17 147 83 0 1.00 50%
Southbound 1.05 25 493 51 0 1.00 50%
Eastbound 1.05 32 239 5 0 1.00 50%
A roach Flow Ratio Flow Time
Northbound 0.75 1.125 0.75 0 30 60
Westbound 0.75 1.125 0.75 0 30 60
Southbound 0.75 1.125 0.75 0 30 60
Eastbound 0.75 1.125 0.75 0 30 60
OUTPUT - A vera e Dela
A roach Avera e Dela
Northbound 3.6 see
Westbound 3.0 see
Southbound 5.4 see
Eastbound 4.8 see
Intersection 4.3 see
& LOS
Level of Service
A
A
A
A
A
.
INPUT
Intersection Information:
In tersecti on:
Jurisdiction:
Date:
North/South Street:
East/W est Street:
Project ill:
Scenario:
Peak Period:
136th Street & Rangeline .Road
Carmel, IN
12-20-04
Ranieline Road
136 Street
Centex Homes
Scenario 1 - Existing Traffic Volumes
PM Peak
Roundabout Geometries:
Northbound Westbound Southbound Eastbound
Ent Width, E 4.88 m 4.88 m 4.88 m 4.88 m
Flare Len th, L' 25.0 m 25.0 m 25.0 m 25.0 ill
Half Width, V 3.35 m 3.35 m 3.35 m 3.35 ill
Ent Radius, R ]5.0 m 15.0 m 15.0 m 15.0 m
Ent Angle, PHI 20.0 de 20.0 de 20.0 de 20.0 de
Inscribed Circle 36.59 m 36.59 m 36.59 m 36.59 m
Diameter, D
Flows:
Approach peu Flows FLOF CL
1 st Exit 2nd Exit 3rd Exit U- Turn
Northbound 1.05 99 568 13 0 ].00 50%
Westbound 1.05 "43 132 66 0 ].00 50%
Southbound 1.05 6 320 39 0 ].00 50%
Eastbound 1.05 2] 272 48 0 1.00 50%
A roach Flow Ratio Flow Time
Northbound 0.75 1.125 0.75 0 30 60
Westbound 0.75 1.125 0.75 0 30 60
Southbound 0.75 1.125 0.75 0 30 60
Eastbound 0.75 1.125 0.75 0 30 60
OUTPUT - A vera e DeJa
A roach Avera e Dela
Northbound" 7.2 see
Westbound 4.2 see
Southbound 3.6 see
Eastbound 4.2 see
Intersection 5.4 see
& LOS
Level of Service
A
A
A
A
A
9
.
INPUT
Intersection Information:
Intersection:
Jurisdiction:
Date:
North/South Street:
EastlWest Street:
Project ill:
Scenario:
Peak Period:
] 36th Street & Rangeline Road
Carmel, IN
]2-20-04
Ranleline Road
] 36 Street
Centex Homes
Scenario 2 - Existing + Proposed
AM Peak
Roundabout Geometries:
Northbound
4.88 m
25.0 m
3.35 m
15.0 m
20.0 deg
36.59 m
Ent Width, E
Flare Len th, L'
Half Width, V
Ent Radius, R
Entry An Ie, PHI
Inscribed Circle
Diameter, D
Westbound
4.88 m
25.0 m
3.35 m
15.0 m
20.0 de
36.59 m
Southbound
4.88 m
25.0 m
3.35 m
15.0 m
20.0 de
36.59 m
Eastbound
4.88 m
25.0 m
3.35 m
15.0 m
20.0 de
36.59 m
Flows:
Approach PCU Hows FLOF CL
1 st Exit 2nd Exit 3rd Exit U- Turn
Northbound 1.05 95 155 14 0 1.00 50%
Westbound 1.05 19 149 83 0 1.00 50%
Southbound 1.05 27 498 61 0 1.00 50%
Eastbound 1.05 36 248 8 0 1.00 50%
A roach Flow Ratio . Flow Time
Northbound 0.75 1.125 0.75 0 30 60
Westbound 0.75 1.125 0.75 0 30 - 60
Southbound 0.75 ] .125 0.75 0 30 60
Eastbound 0.75 1.125 0.75 0 30 60
OUTPUT - A vera e Dela
A roach Avera e Dela
Northbound 3.6 sec
Westbound 3.0 see
Southbound 5.4 see
Eastbound 4.8 sec
Intersection 4.5 see
& LOS
Level of Service
A
A
A
A
A
,.
,
INPUT
Intersection Information:
Intersection:
Jurisdiction:
Date:
North/South Street:
East/W est Street:
Project ill:
Scenario:
Peak Period:
136th Street & Rangeline ~Road
Cannel, IN
] 2-20-04
Ranleline Road
] 36 Street
Centex Homes
Scenario 2 - Existing + Proposed
PM Peak
Roundabout Geometries:
Northbound Westbound Southbound Eastbound
Ent Width, E 4.88 m 4.88 m 4.88 m 4.88 m
Flare Len th, L' 25.0 m 25.0 m 25.0 m 25.0 m
Half Width, V 3.35 m 3.35 m 3.35 m 3.35 m
Ent Radius, R ]5.0 m ]5.0 m 15.0 m 15.0 m
Ent An Ie, PHI 20.0 deg 20.0 de 20.0 de 20.0 de
Inscribed Circle 36.59 m 36.59 m 36.59 m 36.59 m
Diameter, D
Flows:
Approach PCU Flows FLOF CL
151 Exit 2nd Exit 3rd Exit U-Turn
Northbound ].05 99 572 17 0 1.00 50%
Westbound 1.05 53 140 66 0 1.00 50%
Southbound ].05 9 322 44 0 1.00 50%
Eastbound ].05 23 276 51 0 1.00 50%
A roach Flow Ratio Flow Time
Northbound 0.75 1.125 0.75 0 30 60
Westbound 0.75 1 .125 0.75 0 30 60
Southbound 0.75 1.125 0.75 0 30 60
Eastbound 0.75 1.125 0.75 0 30 60
A roach
Northbound
Westbound
Southbound
Eastbound
Intersection
& LOS
Level of Service
A
A
A
A
A
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
~nalyst RMB Intersection
~gency/Co. A&F Engineering Uurisdiction Carmel
Date Performed 12/22/2004 . -, ~nalysis Year Existing+Proposed
t\nalysis Time Period ~M Peak
)roject Description Centex Homes
East/West Street: 136th Street Ir'JorthlSouth Street: Access/1 sf A venue
Intersection Orientation: East-West IStlldy Period (hrs): 0.25
~ehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
l T A l T A
Volume (vehlh) 3 276 -4 4 186 3
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate (veMl) 3 306 4 4 206 3
Proportion of heavy 3 3
vehicles, P HV -- - - -
Median type Undivided
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
Configu ration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement 7 8 9 10 11 12
l T R L T R
Volume (vehlh) 12 1 12 16 1 14
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate (veMl) 13 1 13 17 1 15
Proportion of heavy 3 3 3 3 3 3
vehicles, P HV
Percent grade (Ok) 0 0
Flared approach N N
Storage 0 0
RT Channelized? 0 0
Lanes 0 1 0 0 1 0
K:;onfigu ration LTR LTR
Control Delay, Queue Length, Level of Service
Approach EB we Northbound Southbound
Movement 1 4 7 8 9 10 11 12
....ane Configuration LTR LTR LTR LTR
!Volume, v (vph) 3 4 27 33
Capacity, cm (vph) 1356 1245 545 562
v/c ratio 0.00 . 0.00 0.05 0.06
Queue length (950/0) 0.01 0.01 0.16 0.19
Control Delay (slveh) 7.7 7.9 11.9 11.8
_OS A A B B
Approach delay (s1veh) - - ,; 11.9 11.8
Approach LOS -- - 8 B
Tw'o-Way Stop Control
w.
. . :
.
- ,
t
HCS2000™
Page 1 of~
Copyright Q 2003 University of Rorida. All Rights Reserved
Version 4.1
.
~
'Two-Way Stop Control
Page I of
. . . !
TWO-WAY ~TOP CONTROL SUMMARY
General Information ;ite Information
Analyst RMB ~ntersection
Agency/Co. A&F Engineering Jurisdiction Carmel
Date Performed 12/22/2004 t\nalysis Year Existing+Proposed
Analysis Time Period PM Peak
Project Description Centex Homes
EastlWest Street: 136th Street !North/South Street: Access/1st A venue
Intersection Orientation: East-West IStudy Period hrs): 0.25
lVehicle Volumes and Adjustments
Major Street Eastbound Westbound
Movement 1 2 3 4 5 6
L T R L T R
~olume (vehlh) 13 342 13 14 1St 15
Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate (vehlh) 14 380 14 15 167 16
Proportion of heavy 3 3
vehicles, PHV -- -- -- --
Median type Undivided
AT Channelized? 0 0
:"anes 0 1 0 0 1 0
Configuration LTR LTR
Upstream Signal 0 0
Minor Street Northbound Southbound
Movement -7 8 9 10 11 12
L T R. L T A
~olume (vehlh) 8 1 8 8 1 6
Peak-hour factor, PHF 0.90 0.90 0,,'90 0.90 0.90 0,,90
Hourly Flow Rate (veh/h) 8 1 8 8 1 6
Proportion of heavy 3 3 3 3 3 3
vehicles, P HV
Percent grade (0/0) 0 0
Flared approach N N
Storage 0 0
~T Channelized? 0 0
Lanes 0 1 0 0 1 0
Configu ration LTR LTR
Control Delay, Queue Length, level of Service
Approach EB WB Northbound Southbound
Movement 1 4 7 8 9 10 11 12
lane Configuration LTR LTR LTR LTR
Volume, v (vph) 14 15 17 15
Capacity, cm (vph) 1386 1159 479 493
vIe ratio 0.01 0.01 0.04 0.03
Queue length (95%) 0.03 0.04 0.11 0.09
Control Delay (s/veh) 7.6 8.1 12.8 12.5
...OS A A 8 B
Approach delay (s/veh) - - 12.8 12.5
Approach LOS -- -- 8 8
~
. i
HCS2000™
Copyright 0 2003 University of Rorida. All Rights Reserved
Version 4.
14
~ T,,!o+Way Stop Control
i
TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
~nalyst RMB Intersection Rangline Road & Access
~gency/Co. A&F Engineering Ju risdiction Carmel
Date Performed 12/22/2004 Analysis Year Existing+Proposed
Analysis Time Period AM Peak . -
Project Description Centex Homes
EastlWest Street: Access Drive !North/South Street: Rangeline Road
I ntersection Orientation: North-South !Study period (hrs): 0.25
~ehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R l T R
Volume 3 179 0 0 570 2
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 3 198 0 0 633 2
Percent Heavy Vehicles 3 -- -- 0 -- -
Median Type Undivided
RT Channelized 0 0
Lanes 0 1 0 0 1 1
Configu ration LT T R
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
l T R L T R
~olume 0 0 0 10 0 16
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Row Rate, HFR 0 0 0 11 0 17
Percent Heavy Vehicles 0 0 0 3 0 3
Percent Grade (0/0) 0 0
Flared Approach N N
Storage 0 0
AT Channelized 0 0
lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach NB S8 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
lane Configuration LT LR
v (vph) 3 28
C (m) (vph) 943 409
vIe 0.00 0.07
95% queue length 0.01 0.22
Control Delay 8.8 14.4
LOS A B
Approach Delay -- -- I 14.4
Approach LOS -- -- B
r
Rights Reserved
Copyright <0 2003 University of Rorida, An Rights Re$erved
Version 4.1d
16
Tv.~o.{W'lY Stop Control
4. .
Page 1 of2
..
~
TWO-W A Y STOP CONTROL SUMMARY
General Information Site Information
Analyst RMB Intersection Rangline Road & Access
Agency/Co. A&F Engineering Uu risdiction Carmel
Date Performed 12/22/2004 ~nalysis Year Existing+Proposed
Analysis Time Period PM Peak - -
Project Description Centex Homes
Eastf\Nest Street: Access Drive 1N0rth/South Street: Rangeline Road
Intersection Orientation: North-South IStudy period hrs): 0.25
~ehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume 15 661 0 0 368 10
Peak-Hour Factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 16 734 0 0 408 11
Percent Heavy Vehicles 3 - -- 0 - -
Median Type Undivided
RT Channelized 0 0
L.anes 0 1 0 0 1 1
Configuration LT T R
Upstream Signal 0 0
Minor Street Westbound Eastbound
Movement 7 8 9 10 11 12
L T R L T R
Wolume 0 0 0 5 0 7
Peak-Hour Factor, PHF 0.90 0,,90 0.90 0.90 0.90 0.90
Hourly Flow Rate, HFR 0 0 0 5 0 7
Percent Heavy Vehicles 0 0 0 3 0 3
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue LenQth, and Level of Service
Approach NB 58 Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v (vph) 16 12
C (m) (vph) 1135 343
~/c 0.01 0.03
~5% queue length 0.04 0.11
Control Delay 8.2 15.9
,...OS A C
Approach Delay -- -- 15.9
~pproach LOS - -- C t
Rights Reserved
Copyright <0 2003 University of Aorida, All Rights Reserved
Version 4.1d