Loading...
HomeMy WebLinkAboutCorrespondence OS()d. DOC? 8 ;bp/~ Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Pedcor Phase III - Building 4 & 5 Plan Submittal Date: 04/04/05 Hydrologic Unit Code: Project Location Description: City Center Drive and 3rd Ave. Latitude and Longitude: Lat 39 58.23 Long 86 7.90 Civil Quarter: NE County: Hamilton 5120201090030 = = .,.. ~ Project Owner Name: Pedcor e J.. Contact: Q ~ Address: 335 Ridgepoint Drive ~ 't City: Carmel .~ Phone: 317 705-7979 o ~ ~ Section: 36 18N FAX: State: IN 317 705-7980 Zip: 46032 E-Mail: Plan Preparer Name: Kevin Sellers Affiliation: CSO Address: 280 East 96th Street, Suite 200 City: Indianapolis Phone: 848-7800299-7500 FAX: State: IN 317 574-0957 Zip: 46240 E-Mail: www.csoinc.net Review Date: 04/18/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC .~ Agency: Hamilton County Soil and Water Conservation District OJ ~ Address: 1108 South 9th Street ; City: Noblesville ~ Phone: 317 -773-2181 Assisted By: FAX: State: IN 317-776-1101 Zip: 46060 E-Mail: john-south@iaswcd.org ../ PLAN IS AJ)EQITAl'E: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the SWCD, o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the o PI.JA.N IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1 Construction/Stormwater Pollution Prevention Plan Technical Review and Comment (Form 1) Project Name: Pedcor Phase III - Building 4 & 5 Plan Submittal Date: 03/09/05 Hydrologic Unit Code: Project Location Description: City Center Drive and 3rd Ave. Latitude and Longitude: Lat 39 58.23 Long 86 7.90 Civil Quarter: NE County: Hamilton 5120201090030 = = .,.. ~ Project Owner Name: Pedcor e Contact: ~ = Address: 335 Ridgepoint Drive ~ 't City: Carmel OJ .~ Phone: ~ ~ Section: 36 18N 3E 317 705-7979 FAX: State: IN 317 705-7980 Zip: 46032 E-Mail: Plan Preparer Name: Kevin Sellers Affiliation: CSO Address: 280 East 96th Street, Suite 200 City: Indianapolis Phone: 848-7800299-7500 FAX: State: IN 317 574-0957 Zip: 46240 E-Mail: www.csoinc.net Review Date: 03/28/05 ~ Principal Plan Reviewer: John B. South P.E. CPESC OJ .S: Agency: Hamilton County Soil and Water Conservation District OJ ~ Address: 1108 South 9th Street ; City: Noblesville ~ Phone: 317-773-2181 Assisted By: FAX: State: IN 317-776-1101. Zip: 46060 E-Mail: john-south@iaswcd.org PLAN IS ADEQITAl'E: A comprehensive plan review has been completed and it has been determined that the plan satisfies the minimum requirements and intent of 327 lAC 15-5. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A NOI must also be sent to the SWCD, o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and revisions to the plan may be required at that time to address deficiencies. o Please refer to additional information included on the following page(s). o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana Department of Environmental Management. Construction activities may begin 48 hours following the submittal of the NO/. A of the NOI must also be sent to the o PI.JAN IS DEFICIENT: Significant deficiencies were identified during the plan review. o Please refer to additional information included on the following page(s). o DO NOT file a Notice of Intent for this project. o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re- submitted, and notification has been received that the minimum requirements have been satisfied. Plan Revisions Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified in the Plan Review Section above. DNR, Division of Soil Conservation Page 1 of 1 Revised 12/09/03, Form 1