HomeMy WebLinkAboutCorrespondence
OS()d. DOC? 8 ;bp/~
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Pedcor Phase III - Building 4 & 5
Plan Submittal Date: 04/04/05 Hydrologic Unit Code:
Project Location Description: City Center Drive and 3rd Ave.
Latitude and Longitude: Lat 39 58.23 Long 86 7.90
Civil Quarter: NE
County: Hamilton
5120201090030
=
=
.,..
~ Project Owner Name: Pedcor
e
J.. Contact:
Q
~ Address: 335 Ridgepoint Drive
~
't City: Carmel
.~ Phone: 317 705-7979
o
~
~
Section:
36
18N
FAX:
State: IN
317 705-7980
Zip: 46032
E-Mail:
Plan Preparer Name: Kevin Sellers
Affiliation: CSO
Address: 280 East 96th Street, Suite 200
City: Indianapolis
Phone: 848-7800299-7500
FAX:
State: IN
317 574-0957
Zip: 46240
E-Mail: www.csoinc.net
Review Date: 04/18/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
OJ
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317 -773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
../ PLAN IS AJ)EQITAl'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the
o PI.JA.N IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Pedcor Phase III - Building 4 & 5
Plan Submittal Date: 03/09/05 Hydrologic Unit Code:
Project Location Description: City Center Drive and 3rd Ave.
Latitude and Longitude: Lat 39 58.23 Long 86 7.90
Civil Quarter: NE
County: Hamilton
5120201090030
=
=
.,..
~ Project Owner Name: Pedcor
e Contact:
~
= Address: 335 Ridgepoint Drive
~
't City: Carmel
OJ
.~ Phone:
~
~
Section:
36
18N
3E
317 705-7979
FAX:
State: IN
317 705-7980
Zip: 46032
E-Mail:
Plan Preparer Name: Kevin Sellers
Affiliation: CSO
Address: 280 East 96th Street, Suite 200
City: Indianapolis
Phone: 848-7800299-7500
FAX:
State: IN
317 574-0957
Zip: 46240
E-Mail: www.csoinc.net
Review Date: 03/28/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
OJ
.S: Agency: Hamilton County Soil and Water Conservation District
OJ
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101.
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQITAl'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A of the NOI must also be sent to the
o PI.JAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1