HomeMy WebLinkAbout05090105-Sq. Ft. k. All sidewalks anddriveways
L Sewer and water I nes, septic system, (tanks & filed system) and/or well locations
m, Drainage flow arrows
n, All drainage swales and subsurface facilities (]retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and ~ischarge line locations
p, Geolihermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision~ a legal description is required.
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Locatior~ Permit shall be issued when the proposed structure, improvement, or use and
its location conform in ail respects to this ordinance."
IN ADDITION TO THE ABOVE-LISTED SUBMII-FAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMI-rTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WiTH ALL APPLICABLE CODES AND ORDINANCES.
SUBMI1TAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBM1TrAL, WILL
EXTEND THE TIME 1T TAKES COMPLETETHE PERMIT REVIEW,
THE OFFICE OF BUILDING & ,C, ODE ENFORC,E,,M?NT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A 'BONUS ROOM TOBEUNOCC P_-BL F I HEDSPACE. IFANAREASO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME AFINISHED AREA ~
· F THE PERMIT THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING 8(
CODE ENFORCEMENT.
ALL CONSI'RUCTZON IS SUB3ECT TO FIELD INSPECTZON, AND SHOULD NOT BEGIN PRIOR TO THE
ISSUANCE OF THE BUILDING PERMZT, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE iNSPECT~ON. Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BL/ILDING ~ CODE ENFOKCEMENT~ CITY OF CARMEL, One Civic Sq.; C~rmel, IN 46052. Ph. C517) 571-24~.
and accurately on the
;. I further
· ,~ mislead the Dept. of
Sq.
Garages
below is
APPLICANT'S SIGNATURE
S:Pe rmits / FORHS./RESIDENT/~L PROCEDURES 2 of 2