Loading...
HomeMy WebLinkAbout05090108-Sq. Ft. ~. All sidewalks and driveways Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge locations. *NOTE: If land is not within a platted subdiv,sion, a legal description is required. CARMEL ZONING ORDINANCE Z-289, SECTION 29 04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMII-rAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDEANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOTOF SUFFICIENT CLARITY OR DETAIL, TO iNDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. :~ THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE ' N ' B~ _ SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA ~ ISSUANCE OF THE PER~_~.~, THE PLANS AND PERMIT RECORDS ~UST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. -:CT TO FZELD ;[NSPECTZON, AND SHOULD NOT BEGZN PR[OR TO THE ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, Beginning prior to obtaining approval constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06,07, and 29.06.08. BUILDING & CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sq,; Carmel IN 46032. Ph, ('317) 571-244~. I, the u pletely and accurately on the will result in a Cod~ true provideo Community Services regardi (Finished and Unfinished) Porch or sunroom unity Services, I further fluxes. Failure to comply ndiana in the table below is · of TOTAL /oo f S:Perrnits/FORIqS/RESZD ENT~AL PROCEDURES 2 of 2