HomeMy WebLinkAbout05090108-Sq. Ft. ~. All sidewalks and driveways
Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge locations.
*NOTE: If land is not within a platted subdiv,sion, a legal description is required.
CARMEL ZONING ORDINANCE Z-289, SECTION 29 04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
IN ADDITION TO THE ABOVE-LISTED SUBMII-rAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDEANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOTOF SUFFICIENT CLARITY OR DETAIL, TO iNDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
:~ THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE ' N ' B~ _ SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA ~
ISSUANCE OF THE PER~_~.~, THE PLANS AND PERMIT RECORDS ~UST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
-:CT TO FZELD ;[NSPECTZON, AND SHOULD NOT BEGZN PR[OR TO THE
ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
Beginning prior to obtaining
approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06,07, and 29.06.08.
BUILDING & CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sq,; Carmel IN 46032. Ph, ('317) 571-244~.
I, the u
pletely and accurately on the
will result in a
Cod~
true
provideo
Community Services regardi
(Finished and
Unfinished)
Porch or
sunroom
unity Services, I further
fluxes. Failure to comply
ndiana
in the table below is
· of
TOTAL
/oo f
S:Perrnits/FORIqS/RESZD ENT~AL PROCEDURES 2 of 2