HomeMy WebLinkAboutP-1.pdfPLUMBING NOTES
1. CONTRACTOR SHALL VERIFY THE CONDITION AND ROUTING OF PIPING SYSTEM
SO THAT NEW WORK CAN BE INSTALLED WITHOUT INTERFERENCE WITH OTHER TRADES.
MAKE ALL ROUTING, RTTING, AND EXTENSIONS AS NOTED AND AS REQUIRED FOR
A COMPLETE SYSTEM.
2 ALL WORK SHALL MEET ALL APPLICABLE CODES IN THE VILLAGE OF ZIONSVILLE.
3. CONTRACTOR SHALL PROVIDE ALL NECESSARY PATCHING, CUTTING, EXCAVATION,
AND BACKRLL FOR THE INSTALLATION OF THE WORK.
4_ SANITARY PIPING SHALL BE SERVICE WEIGHT CAST IRON PIPE WITH CAULKED JOINTS.
PIPE SIZE 2 1�2" AND SMALLER COULD BE iYPE "C' COPPER WITH SOLDERED JOINTS.
5. DOMESTIC HOT AND COLD WATER PIPING SHALL BE TYPE "C' COPPER AND INSULATED
WITH 1�2" THICK, 3 LB DENSITY OF RBERGL4SS INSUL4TION OF UNNERSAL JACKEL TAPE
ALL JOINTS WITH SAME FACING MATERIAL PER ILLINOIS PLUMBING CODE.
6. PROVIDE COMPLETE SANITARY, VENT, WASTE PIPMG SYSTEM FOR THE PROJECT,
INCWDING ALL NECESSARY PIPING, VENT PIPING, FITTING, FLOOR DRAINS, PLUMBING
FIXTURES, TRAPS, TAIL PIECES, AND RNAL CONNECTION TO ALL RXTURES.
7. PROVIDE COMPLETE NEW DOMESTIC WATER DISTRIBUTION PIPING SYSTEM FOR ALL
PLUMBING FIXTURES AND EQUIPMENT, INCLUDING ALL RNAL CONNECTIONS AND WITH HOT
WATER HEATER.
8- PROVIDE SHUT-OFF VALVE AT EACH OF THE WATER CONNECTIONS TO EACH PLUMBING
FIXTURE AND EACH PIECE OF EQUIPMENT.
9. SHUT-0FF VALVE AT EACH BRANCH PIPE SHALL BE MINIMUM 125 PSI BRONZE BALL
VALVE.
10. PROVIDE ALL NECESSARY PIPING TESTS AS REQUIRED.
11. A STACK TEST IS REQUIRED ON ALL UNDERGROUND AND ROUGH PLUMBING.
12 100 PSI AIR TEST OR WATER PRESSURE REQUIRED ON WATER PIPING AT TIME OF
ROUGH INSPECTIONS.
13. PLUMBING SYSTEM SHALL BE IN COMPLIANCE WITH THE 2012 INDIANA PLUMBING CODE
AND THE TOWN OF ZIONSVILLE MUNICIPAL CODE.
14. PLUMBING SYSTEM SHALL BE W COMPLIANCE WITH THE INTERNATIONAL ENERGY CONSERVATION CODE
15. ALL PLUMBING CONTRACTORS AND PWMBING SUB-CONTRACTORS SHALL COMPLY WITH THE TOWN
OF ZIONSVILLE CONTRACTOR APPLICATION PROCESS.
16. ALL PWMBING PERMIT FEES SHALL BE RECEIVED AND PERMITS ISSUED BEFORE START OF
ANY PWM8ING WORK.
1Z ALL PWMBING DEMOLITION AND RENOVATION SHALL BE PERFORMED BY THE PLUMBING
CONTRACTOR OF RECORD.
18. ALL BACKFLOW DEVICES SHALL REQUIRE PERMIT FEE AND BE INSTALLED BY A REGISTERED
PLUMBING CONTRACTOR, WCWDING THE BACKFLOW DEVICE FOR THE FlRE SUPPRESSION SYSTEM.
19. ALL DISCONNECTED OR DISCONTINUED PIPING SHALL BE DONE IN A MANNER SO AS NOT
TO CREATE A DEAD END SITUATION.
20. THE WATER HEATER RELIEF VALVE DISCHARGE SHALL DRAIN TO A PROPER RECEPTOR.
21. INSULATION AT ALL SERVICE HOT WATER PIPING SHALL 8E W COMPLIANCE WITH THE 2009
INTERNATIONAL ENERGY CONSERVATION CODE.
22 SANITARY FACILITIES SHALL BE PROVIDED DURING DEMOLITION, CONSTRUCTION AND REMODELING
IN ACCOR�ANCE WITH THE INTERNATIONAL PWMBING CODE.
23. PROVIDE FULL PORT SHUT OFF VALVES(NO BUTTERFLY VALVES).
24. BACKFLOW PREVENTOR, RPZ(REDUCED PRESSURE ZONE) SHALL CONFORM TO THE 2012
INDIANA PLUMBING CODE WITH AMENDMENTS.
25. ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM JOB COMPLETION.
FROM EXISTING 2 GAL. BLADER
ROOF �CW SERVICE � EXPANSION TANK
BACKFLOW
PREVENTOR
EXISTING
C.W. MEfER
FLOOR
__ __ __ 3�4„- __
V.B.NEW NEW NEW
�LT-1 W-1 EWD
ASTM T&P 7�
REIJEF VALVE �/2' I'�� i � 1�2�
PIPE TO O� i
ELECTRIC �UNDRY TUB ��- �i� _ —
Hwn
�—�---
EXISTWG UNDERGROUND
SERVICE WITH CURB STOP
1 DOMESTIC
SCALE: N.T.S.
�
NEW NEW
S-1 L-1
� ��
PROVIDE MIXING VALVE TO OBTAIN
THE HOT WATER TEMPERATURE NOT
TO EXCEED 110' F.(TYP.)
3/4"
NEW i NEW NEW
WC-1 L-1 WC-1
1�2'� � � � 1�2'�
_��_�_�
WATER PIPING DIAGRAM
COLD WATER PIPE
HOT WATER PIPE
ROOF 4 X 5 VTR
�2„ �4
r--„-----„-------- -----------� ,
2 2 2° 2
�c� �f—� �� �T—� ���'—�
I rEWi I �WALL BOX�WD � gEW LEW � I i i rLEW i I
I NEW I I I NEW
GROUND FLOOR rn �I � �I aEW� � � � �aEW�I WC-1I ��� � I a=EW� I WC-1
4" � 4"
4° CONNECT TO
EXISTING SANITARY
4
2 SANITARY PIPING DIAGRAM
SCALE N.T.S.
4
4° CONNECT TO
EXISTING SANITARY
�
PLUMBING FIXTURE SCHEDULE
TAG FIXTURE MANUFACTURER MODEL # QUANTITY FINISH�COLOR REMARKS
WC-1 TOILET AMERICAN STANDARD 2586.000 2 WHITE A.D.A. STANDARD
L-1 LAVATORY AMERICAN STANDARD 0355.012 2 WHITE A.DA. STANDARD, NOTE #2
S-1 SINK 1 STAWLESS STEEL 19' X 17' X 6 1�2" DEEP
LT-1 LAUNDRY TUB MUSTEE, EL. & SONS 14C 1 WHITE 25" X 23"
F.D. FLOOR DRAIN J.R. SMITH 2O10B 3 NOTE �3
EWD WATER DISPENSER MACKE XSTREAMSTYLE 1 STAINLESS STEEL
PLUMBING RXTURE NOTES:
1_ CONTRACTOR SHALL SUBMIT CUT SHEETS OF ALL PLUMBING FIxTURES FOR OWNER'S APPROVAL-
2 PROVIDE INSULATED ENCLOSURE FOR HOT, COLD, AND WASTE PIPING AT SINK AND FAUCET 3885F.
3. NICKEL BRONZE STRAINER WITH SEDIMENT BUCKET
4. ELECTRIC WATER HEATER: AA. SMITH DSE-20, 20 GALLON, 1800W, MOUNT ABOVE CEILWG, FURNISH WITH DRIP PAN, DRAIN,
EXPANSION TANK AND VACUUM RELIEF.
EXISTWG METAL DECK �
� - - ��
�.�
VACUUM RELIEF
VALVE(PER CODE)
SHUT-OFF VALVE
ELECTRIC HWH
WATER HEATER PLATFORM-
CEILING MOUNT, HOLDRITE
MODEL #30-SWHP-M
2 GAL. BLADER
EXPANSION TANK
ASTM T&P
RELIEF VALVE
PIPE TO
LAUNDRY TUB
3 WATER HEATER PLATFORM DETAIL
SCALE: N.T.S.
EXPIRATION DATE
12/01/2013
Nabil Zahrah
AR 11300009
a
�
c�
L
�
�
H
�o N
IT� 6 I�
�v o r
V � �
�
.�
� �o
` . �
n � �
� �
� � z
z �
� � �
Q� � �
0
}' � N
�
L
�
�
U
U
Q
0
a
� E
�
�
� a
m
a
0
�
�
�
Q
�
CJ
Q
0
�
W
�
�
�
Z
m �
� w
T � �
^� J 0
yy � z
2013-1047