HomeMy WebLinkAbout05100108-Sq. Ft.will
true
Comm
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / 0etention areas, etc.,.)
o. Sump pump -- Show sump pump p t(s) anti discharge line locations
p .Geotherm.al heat pump discharge locations
NOTE: If land ~s not within a platted subdivision, a legal description is required
CARMEL ZONING ORDINANCE Z-289, SECT[ON 29,04.02 (3): "The Director .?ali ap,prove or.deny the Improvement
Location Permit within five (5) working days of the receipt of the written application rorm ano accompanying
materials. The Improvement Location Permt sba b,,e ssued when the proposed structure, mprovement or use and
its location conform in alt respects to this ordinance.
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILE BE PROV[DED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OFZONING APPEALS, AND/OR DEFT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
ADDITIONAL iNFORMATiON MAY BE REQUESTED BY, AND WiLL BE PROWDED TO THE BUILDING INSPECTOR, IF
THE SUBMITI'ED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW,
THE OFFICE OF BUILDING &CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCT[ONPLANSASA"BONUSROOM"TOBEU~' C_ ABL ~1 [SHE. SPACE. IFANAREASO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCT[ON PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED~"BONUS ROOM" AREA IS TO BECOME A FINISHED AREA
:U ~N :E_OF THE P RM_ -, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
AND SHOULD NOT BEGTN PRZOR TO THE
WORK SHOULD NOT BE POURED,
ISSUANCE
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining
a bud ng permit and/or prying with construction beyond_the sta,,ge, of a r,e?_u_ire?_ i_n_specti.o~n~w]t~h~o~ut approval
constitutes Late Fee ponalties, per Z-289 of the Carmel/Clay Loning urainance,
'~G & COPE ENFORCEMENT; CITY OF CARMEL. One Civic Scl.; Ca~mel, IN 445052. Ph. (517) 571-2444.
and accurately on the
submitted with the
ity Services. ! further
~re to comply
,y (Indiana
is
S:PermttslFOP34S/RESZDENTZIM. PROCEDURES 2 of 2